S04_Site Visit Meeting Doc 635 - Condensate Return Pump Replacement.pdf

PDF 213 KB Posted

Attached to
635 Condensate Return Pump Replacement Federal contract opportunity
Solicitation number
36C25925Q0399
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

This document is a Pre-Bid Meeting summary for the 635 - Condensate Return Pump Replacement project at the Oklahoma City VA Medical Center. The solicitation involves a construction contract between $150,000 and $200,000 for replacing a condensate return pump, with work to be completed within 45 days of the Notice to Proceed. Key requirements include compliance with OSHA, EPA, and environmental regulations, proper handling of waste and debris, and adherence to the Buy American Act for materials and equipment.

The solicitation specifies that offers are due on June 12th, 2025, by 2:00 P.M. Central Time, to be submitted via email to Blake.Rowland@va.gov. Post-award compliance expectations include weekly certified payroll submissions and verification that all materials are manufactured within the United States. The pre-bid meeting and site walk are not mandatory, but prospective offerors must submit any questions in writing to the Contracting Officer for official response through an amendment.

View the file

Other files for this federal contract opportunity

Other files attached to 635 Condensate Return Pump Replacement, newest first.
File Type Posted
S02_RFP 36C25925Q0399 0003.docx DOCX document
S02_Questions for Solicitation 36C25925Q0399 Part 1.pdf PDF
S02_36C25925Q0399 0002.docx DOCX document
S04_Site Visit Meeting Attendance 635 - Condensate Return Pump Replacement.pdf PDF
S02_36C25925Q0399 0001.docx DOCX document
P07_WAGE DETERMINATIONS OKC Service.docx DOCX document
S02_RFP 36C25925Q0399.docx DOCX document
S02_Past Performance Questionnaire_Blank.docx DOCX document
S02_852.219-75 LOS Certification.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Bid Meeting For

635 - Condensate Return Pump Replacement

The contractor will provide labor, materials, equipment, and other services as necessary to supply all utilities and site preparation required Condensate Return Pump Replacement. Outlined in the Statement of Work and associated documents, located at 921 N.E. 13th Street, Oklahoma City, OK, 73104.

All work must be done in compliance with applicable OSHA, EPA and federal/state environmental regulations and policies. Contractor is responsible for proper handling and disposal of debris, waste and excess fuel generated during completion of this work.

Location: Oklahoma City VA Medical Center

Introductions: Blake Rowland, CS, Robyn Young, CO, and Nicholas Binion, COR

Site Visit:

• The pre-bid meeting/site walk is not mandatory.

• Questions during site visit must be written down and submitted to the Contracting Officer to provide answers in an amendment to all interested parties.

Pertinent Dates:

• Please ask questions during the site visit or please submit your questions to Blake.Rowland@va.gov

• Offers are due on June 12th, 2025, no later than 2:00 P.M. Central Time. Submit via email to

Blake.Rowland@va.gov.

Site Visit Guidelines:

• Prospective offerors are prohibited from attempting to gain information by inquiring with VA employees about project other than through written questions submitted to Contracting Officer.

• Prospective offerors are prohibited from visiting site other than through formal invitation by Contracting Officer.

• Attendees of walk-through are to stay as a group while walking to various locations and are to leave the future project site once the walk-through is concluded.

Solicitation Information:

• Confirmation of construction range: between $150,000.00 – $200,000.00.

• Offer Guarantee & Payment/Performance Bonds: as outlined in the solicitation.

• VAAR clause 852.219-75 Limitation on Subcontracting: please ensure you provide a signed copy of this clause with your offer package.

• Contractor shall begin performance within 10 days after Notice to Proceed (NTP) and complete within 45 days.

Post Award Compliance:

• Compliance with Construction Rate Wages and Application wage determination shall be expected of the contractor. The contractor shall submit their weekly certified payrolls with their monthly invoice.

• Compliance with Buy American Act: Related to the construction of this project, it is understood that all items and/or materials required for this contract will be manufactured within the United States IAW the Buy American Act: 41 U.S.C. Chapter 83. If an item is identified as not manufactured within the United States it needs to be brought up to the COR and CO as early in the process as possible.