S02_Questions for Solicitation 36C25925Q0399 Part 1.pdf

PDF 53 KB Posted

Attached to
635 Condensate Return Pump Replacement
Solicitation number
36C25925Q0399
Issued by

About this file

This document is a questions and answers file for Solicitation 36C25925Q0399, providing detailed clarifications for a condensate return pump replacement project at a Department of Veterans Affairs facility. The Q&A addresses seven specific technical details about the equipment replacement, including confirmation that the heat recovery heat exchanger will not be demolished, the condensate tank can be offline for 3 days, condensate will be gravity-drained per plant supervisor instructions, no isolation valves need replacement, the drain line will be rerouted, no after-hours work is required, and the unit serial number is 165708. The project involves removing and replacing a condensate return skid located in building 1's sub-basement, with the contractor responsible for verifying all project site conditions and existing structure details.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions for Solicitation 36C25925Q0399 Part 1

1. Is the heat recovery heat exchanger at the inlet side of the receiver tank being replaced or demolished as part of the project?

Answer: No

2. Is there an allocated amount of time when the condensate tank being replaced can be offline?

Answer: 3 days

3. What is the specific location where the condensate return from the building return will be drained when the condensate tank is being replaced? Will the condensate need to be collected and pumped, or can it be gravity-drained?

Answer: Per the plant supervisor gravity to drain

4. Are any isolation valves on the return or supply headers required to be replaced?

5. Is the drain line on the leaving side of the condensate receiver tank required to be modified or replaced?

Answer: Return line layout unknown at this time. Plan to reroute drain line.

6. Does any of the work need to be conducted during after-hours?

7. Please confirm the serial number for the unit being replaced is 165708.

Answer: Yes