This document is an Amendment to a Request for Quotation (RFQ) for fire extinguisher and kitchen hood inspection services at the Oklahoma City VA Medical Center. The key details are:
The amendment provides questions submitted and answers provided regarding the requirements. The scope includes annual inspection of various fire extinguishers, 6-year and 12-year maintenance for fire extinguishers, and 6-month inspections of kitchen hood fire suppression systems. The contract will have a base period and 4 option years. Pricing is required for each contract period. The North American Industry Classification System (NAICS) code is 922160 - Fire Protection, and the Product/Service Code is H112 - Quality Control - Fire Control Equipment. No previous inspection reports will be provided, and the kitchen area inspections will be coordinated to minimize disruption to ongoing operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25925Q0032 0002.docx | DOCX document | |
| 36C25925Q0032 0001.docx | DOCX document | |
| 36C25925Q0032.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25925Q0032 / P0003
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders
36C25925Q0032
X X X See CONTINUATION Page
RFQ
36C25925Q0032 Fire Extinguishers-Kitchen Hoods Inspections
The purpose of this amendment is to present questions submitted in the allowed time frame and answers to those questions.
The following line-item schedule replaces all previous line-item schedules.
Jeffery Eller Contracting Officer
VA-VHA-RPWO-2024-0110
CONTINUATION PAGE
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
| ANNUAL INSPECTION FOR FIRE EXTINGUISHERS | |
| • | (3), 20 lbs ABC |
| • | (325), 10 lbs ABC |
| • | (19), 5 lbs ABC |
| • | (68), 2.5 lbs ABC |
| • | (7), Ansul K Guard kitchen fire extinguishers (low pH, wet-chemical) |
| • | (5), Ansul “clean agent” MRI approved (Hexafluoropropane filled) |
| • | (10), 10 lbs CO2 |
| • | (7), 5 lbs CO2 |
Contract Period: Base POP Begin: 12-01-2024 POP End: 11-30-2025 PRINCIPAL NAICS CODE: 922160 - Fire Protection PRODUCT/SERVICE CODE: H112 - Quality Control - Fire Control Equipment
| 39.00 |
| EA |
| __________________ |
| __________________ |
6 YEAR MAINTENANCE FOR FIRE EXTINGUISHERS
Contract Period: Base POP Begin: 12-01-2024 POP End: 11-30-2025
| 2.00 |
| EA |
| __________________ |
| __________________ |
| 6 MONTH INSPECTION FOR KITCHEN HOOD FIRE SUPPRESSION SYSTEMS | |
| • | Ground Floor: (3), Ansul R-102 wet chemical fire suppression systems |
| • | 2nd Floor: (2), Ansul R-102 wet chemical fire suppression systems and (3), Wells-VCS 2000 small stoves in Healthy Cooking Kitchen |
| • | 4th Floor: (1), Denlar (model D1000) small cook stove |
Contract Period: Base POP Begin: 12-01-2024 POP End: 11-30-2025
| 20.00 |
| EA |
| __________________ |
| __________________ |
12 YEAR MAINTENANCE FOR FIRE EXTINGUISHERS
Contract Period: Base POP Begin: 12-01-2024 POP End: 11-30-2025
| 1.00 |
| JB |
| __________________ |
| __________________ |
| ANNUAL INSPECTION FOR FIRE EXTINGUISHERS | |
| • | (3), 20 lbs ABC |
| • | (325), 10 lbs ABC |
| • | (19), 5 lbs ABC |
| • | (68), 2.5 lbs ABC |
| • | (7), Ansul K Guard kitchen fire extinguishers (low pH, wet-chemical) |
| • | (5), Ansul “clean agent” MRI approved (Hexafluoropropane filled) |
| • | (10), 10 lbs CO2 |
| • | (7), 5 lbs CO2 |
Contract Period: Option 1 POP Begin: 12-01-2025 POP End: 11-30-2026
| 20.00 |
| EA |
| __________________ |
| __________________ |
6 YEAR MAINTENANCE FOR FIRE EXTINGUISHERS
Contract Period: Option 1 POP Begin: 12-01-2025 POP End: 11-30-2026
| 2.00 |
| EA |
| __________________ |
| __________________ |
| 6 MONTH INSPECTION FOR KITCHEN HOOD FIRE SUPPRESSION SYSTEMS | |
| • | Ground Floor: (3), Ansul R-102 wet chemical fire suppression systems |
| • | 2nd Floor: (2), Ansul R-102 wet chemical fire suppression systems and (3), Wells-VCS 2000 small stoves in Healthy Cooking Kitchen |
| • | 4th Floor: (1), Denlar (model D1000) small cook stove |
Contract Period: Option 1 POP Begin: 12-01-2025 POP End: 11-30-2026
| 10.00 |
| EA |
| __________________ |
| __________________ |
12 YEAR MAINTENANCE FOR FIRE EXTINGUISHERS
Contract Period: Option 1 POP Begin: 11-01-2025 POP End: 11-30-2026
| 1.00 |
| JB |
| __________________ |
| __________________ |
| ANNUAL INSPECTION FOR FIRE EXTINGUISHERS | |
| • | (3), 20 lbs ABC |
| • | (325), 10 lbs ABC |
| • | (19), 5 lbs ABC |
| • | (68), 2.5 lbs ABC |
| • | (7), Ansul K Guard kitchen fire extinguishers (low pH, wet-chemical) |
| • | (5), Ansul “clean agent” MRI approved (Hexafluoropropane filled) |
| • | (10), 10 lbs CO2 |
| • | (7), 5 lbs CO2 |
Contract Period: Option 2 POP Begin: 12-01-2026 POP End: 11-30-2027
| 20.00 |
| EA |
| __________________ |
| __________________ |
6 YEAR MAINTENANCE FOR FIRE EXTINGUISHERS
Contract Period: Option 2 POP Begin: 12-01-2026 POP End: 11-30-2027
| 2.00 |
| EA |
| __________________ |
| __________________ |
| 6 MONTH INSPECTION FOR KITCHEN HOOD FIRE SUPPRESSION SYSTEMS | |
| • | Ground Floor: (3), Ansul R-102 wet chemical fire suppression systems |
| • | 2nd Floor: (2), Ansul R-102 wet chemical fire suppression systems and (3), Wells-VCS 2000 small stoves in Healthy Cooking Kitchen |
| • | 4th Floor: (1), Denlar (model D1000) small cook stove |
Contract Period: Option 2 POP Begin: 12-01-2026 POP End: 11-30-2027
| 10.00 |
| EA |
| __________________ |
| __________________ |
12 YEAR MAINTENANCE FOR FIRE EXTINGUISHERS
Contract Period: Option 2 POP Begin: 12-01-2026 POP End: 11-30-2027
| 1.00 |
| JB |
| __________________ |
| __________________ |
| ANNUAL INSPECTION FOR FIRE EXTINGUISHERS | |
| • | (3), 20 lbs ABC |
| • | (325), 10 lbs ABC |
| • | (19), 5 lbs ABC |
| • | (68), 2.5 lbs ABC |
| • | (7), Ansul K Guard kitchen fire extinguishers (low pH, wet-chemical) |
| • | (5), Ansul “clean agent” MRI approved (Hexafluoropropane filled) |
| • | (10), 10 lbs CO2 |
| • | (7), 5 lbs CO2 |
Contract Period: Option 3 POP Begin: 12-01-2027 POP End: 11-30-2028
| 20.00 |
| EA |
| __________________ |
| __________________ |
6 YEAR MAINTENANCE FOR FIRE EXTINGUISHERS
Contract Period: Option 3 POP Begin: 12-01-2027 POP End: 11-30-2028
| 2.00 |
| EA |
| __________________ |
| __________________ |
| 6 MONTH INSPECTION FOR KITCHEN HOOD FIRE SUPPRESSION SYSTEMS | |
| • | Ground Floor: (3), Ansul R-102 wet chemical fire suppression systems |
| • | 2nd Floor: (2), Ansul R-102 wet chemical fire suppression systems and (3), Wells-VCS 2000 small stoves in Healthy Cooking Kitchen |
| • | 4th Floor: (1), Denlar (model D1000) small cook stove |
Contract Period: Option 3 POP Begin: 12-01-2027 POP End: 11-30-2028
| 10.00 |
| EA |
| __________________ |
| __________________ |
12 YEAR MAINTENANCE FOR FIRE EXTINGUISHERS
Contract Period: Option 3 POP Begin: 12-01-2027 POP End: 11-30-2028
| 1.00 |
| JB |
| __________________ |
| __________________ |
| ANNUAL INSPECTION FOR FIRE EXTINGUISHERS | |
| • | (3), 20 lbs ABC |
| • | (325), 10 lbs ABC |
| • | (19), 5 lbs ABC |
| • | (68), 2.5 lbs ABC |
| • | (7), Ansul K Guard kitchen fire extinguishers (low pH, wet-chemical) |
| • | (5), Ansul “clean agent” MRI approved (Hexafluoropropane filled) |
| • | (10), 10 lbs CO2 |
| • | (7), 5 lbs CO2 |
Contract Period: Option 4 POP Begin: 12-01-2028 POP End: 11-30-2029
| 20.00 |
| EA |
| __________________ |
| __________________ |
6 YEAR MAINTENANCE FOR FIRE EXTINGUISHERS
Contract Period: Option 4 POP Begin: 12-01-2028 POP End: 11-30-2029
| 2.00 |
| EA |
| __________________ |
| __________________ |
| 6 MONTH INSPECTION FOR KITCHEN HOOD FIRE SUPPRESSION SYSTEMS | |
| • | Ground Floor: (3), Ansul R-102 wet chemical fire suppression systems |
| • | 2nd Floor: (2), Ansul R-102 wet chemical fire suppression systems and (3), Wells-VCS 2000 small stoves in Healthy Cooking Kitchen |
| • | 4th Floor: (1), Denlar (model D1000) small cook stove |
Contract Period: Option 4 POP Begin: 12-01-2028 POP End: 11-30-2029
| 10.00 |
| EA |
| __________________ |
| __________________ |
12 YEAR MAINTENANCE FOR FIRE EXTINGUISHERS
Contract Period: Option 4 POP Begin: 12-01-2028 POP End: 11-30-2029
| GRAND TOTAL |
| __________________ |
A.2 QUESTIONS AND ANSWERS
Questions and Answers for RFQ 36C25925Q0032 Fire Extinguishers-Kitchen Hoods Inspections
1. Will previous inspection reports for the fire extinguishers at the site be provided?
· No, inspection reports will not be provided.
2. What is the working arrangement for Kitchen Hood Inspection, will it be after hours?
· No, the kitchen will continue to be in use and stop during the inspection, then resume. Coordination will be made between the COR the Contractor and the staff on inspection time.
3. What is the model of the Kitchen Hoods, suppression system requiring inspection?
· Ground Floor: (3), Ansul R-102 wet chemical fire suppression systems
· 2nd Floor: (2), Ansul R-102 wet chemical fire suppression systems and (3), Wells-VCS 2000 small stoves in Healthy Cooking Kitchen
· 4th Floor: (1), Denlar (model D1000) small cook stove
4. What is the type, class, size and manufacturer/model of the requirement?
· (3), 20 lbs ABC
· (325), 10 lbs ABC
· (19), 5 lbs ABC
· (68), 2.5 lbs ABC
· (7), Ansul K Guard kitchen fire extinguishers (low pH, wet-chemical)
· (5), Ansul “clean agent” MRI approved (Hexafluoropropane filled)
· (10), 10 lbs CO2
· (7), 5 lbs CO2
5. For line item 0002, we have the 6- and 12-year maintenance for fire extinguishers listed with a quantity of 1.00 and unit JB. If there are separate prices for the 6-year and 12-year maintenance, how would you like us to price it? Should we combine them into a single lump sum, or list them separately?
· A new line item will be created to separate the two requirements.