This document is an amendment to a solicitation for the Miles City CLC Boiler Plant Repairs project, Solicitation Number 36C25924R0060.
The amendment provides responses to several questions regarding the boiler plant requirements. Key details include:
- The boiler's maximum allowable working pressure is 15 PSI, with safety valves set at lower pressures, resulting in an operating pressure of 10 PSI or less.
- The contractor will be required to supply and install a propane backup system that meets the VHA & OHE guidance, including VA publication SD235239-03 for Natural Gas & LP Gas, Burner & Ignitor Fuel - Standard Piping. The OHE will likely need to review and approve the design of the propane backup system installation.
The overall project scope involves boiler plant repairs at the Miles City CLC, project number 436-24-123. No other major changes to the solicitation terms and conditions are noted in this amendment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25924R0060 0004.docx | DOCX document | |
| P09 - SOW Boiler Plant Repairs Miles City 436-24-123.pdf | ||
| S04 - Site Visit Meeting Doc Boiler Plant Repairs.pdf | ||
| 36C25924R0060 0002.docx | DOCX document | |
| S04 - Site Visite Attendance Roster.pdf | ||
| 36C25924R0060 0001.docx | DOCX document | |
| Miles City Boilers Specifications.pdf | ||
| S22- 852.219-75 LOS Certification.docx | DOCX document | |
| 36C25924R0060_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 05-23-2024 436-24-123 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders
36C25924R0060 05-22-2024
X x x x The purpose of this amendment is to provide RFI responses. All other terms and conditions remain unchanged.
Miles City Boiler Repair
36C25924R0060, Boiler Plant Repairs Miles City CLC, MT, Project Number: 436-24-125
QUESTION 1: With the MAWP of the boiler at 15 psi. SVB2 is required to be set @ 14 psi, SVB1 Is required to be set @ 13 psi, the HHBSPLS is required to trip @ 12 psi and the HBSPLS is required to trip @ 11 psi, therefore the operating pressure of the boiler will now be @ 10 psi or less. Please acknowledge that the plant can operate at a maximum of 10 psi.
ANSWER 1: As per the VHA & HEFP, new redesigns must comply with all publications, Directive 1810, and the VHA Boiler and Associated Plant Safety Device Testing Manual 8th Edition (Feb 2024). Please submit with that in consideration (i.e. plan on 10 PSIG operating Pressure).
QUESTION 2: It is assumed that even though the MAWP of the boilers are 15 psi, the operational pressure will only be at 10 psi. Please acknowledge that the scope of work does not intend to change for the steam header valves to be replaced since the operational pressure is below that required of DA151 .
ANSWER 2: Acknowledged - We plan on meeting the requirements as published by per VHA & HEFP guidance.
QUESTION 3: The plant does not have a propane backup system for firing on #2 Fuel Oil as required by both the Design Manual and the 8th Edition Testing Manual. Will the contractor be required to supply and install a propane backup system?
ANSWER 3: Yes - We plan on meeting the requirements as published by per VHA & OHE guidance.
QUESTION 4: If the contractor is required to supply and install a propane backup system, will it be required to meet with SD235239-03, Natural Gas & LP Gas, Burner & Ignitor Fuel - Standard Piping?
ANSWER 4: Yes – VA publication attached for Team’s reference
QUESTION 5: If a propane backup system is required to meet with SD235239-03, Natural Gas & LP Gas, Burner & Ignitor Fuel - Standard Piping, will OHE be required to review and approve design of the installation? (note: a propane backup system is usually housed in a separate outside building and installing backup tanks with all associated alarms and safety devices)
ANSWER 5: We will seek guidance from VHA – OHE but submittals should account for the possibility of the above separate building being required.