This document contains pre-bid questions and answers and supporting documents for a federal construction project to replace HVAC equipment at Building 35 of the Sheridan VA Medical Center.

The project involves installing a new 600-amp electrical panel, replacing RTU-1 with a new unit including electrical and ductwork, adding energy recovery ventilators on the first two floors, and miscellaneous associated work. Subcontractors must be able to access all levels of the building during construction. An asbestos report and photos of the existing transformer are provided. The proposal due date is extended to January 26, 2024. The Department of Veterans Affairs Veterans Health Administration VISN 19 will administer the fixed-price contract to be awarded for project number 666-24-126 at the Sheridan, Wyoming VAMC.

View the file

Other files

File Type Posted
36C25924Q0064_Revised Bid Schedule_ Page 5.docx DOCX document
36C25924Q0064 0002.docx DOCX document
Asbestos Report B35.pdf PDF
TF-35 Low Side.jpg JPG image
TF-35 Low Side Open.jpg JPG image
S02-3-10-2021 Past Performance Questionnaire_Blank_Fillable PDF.pdf PDF
36C25924Q0064_2.docx DOCX document
6 Specifications 24-126 B35 HVAC.pdf PDF
6 Drawings B35 HVAC.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 666-24-126 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders

36C25924Q0064 12-20-2023

X X X 1:00 PM MT on 1/26/2024 The purpose of this amendment is to provide site visit questions and answers, a copy of Building 35 Asbestos Report, two photos, and to extend the proposal due date to 1/26/2024.

See continuation pages for details.

Project 666-24-126 Building 35 HVAC Project Pre-bid RFI Questions and Answers

Q1. Please provide a panel specification for electrical note #1. Rating of panel, breakers required, mlo or main breaker, etc.

A1. Provide one new 42 space, 600-amp panel approved equal to Square D model NQ442L6C with Square D model QOB bolt on circuit breakers. Panel shall have the means to sub-feed a second panel. Copper bus material, NEMA 1 rated, locking door, removable inner dead front cover. Provide manufacturer’s standard option for pre-punched knockouts on top and bottom end walls. Panels shall meet NFPA and manufacturers requirements.

Q2. The location of the 600A main panel is in the existing location of the data equipment. Is the data equipment to be moved?

A2. Locate panels on East wall adjacent to the data equipment. Maintain minimum 3’-0” clearances.

Q3. Electrical note #3. Is the intent to install 2 parallel 3" conduits? It's not possible to get NEC rated 600A ampacity wire in a single 3" conduit.

A3. Provide Two parallel 3” or a single conduit to house the conductors as needed for the most cost-effective solution.

Q4. Will the prime contractor be required to have a separate SSHO for this project or can the SSHO work on multiple projects?

A4. A superintendent may work on multiple projects at the Sheridan VA and provide notification to the COR of a designated alternate with a 30-hour OSHA card while not on station.

Q5. Is the SSHO required to be onsite full time with no other duties?

A5. No. Superintendent may leave site to procure materials, etc.

Q6. Does the CQCM have to be on site full time?

A6. The CQCM can be the supervisor as mentioned above.

Q7. Can the CQCM be the superintendent?

A7. Yes.

Q8. Can the Superintendent be the SSHO and CQCM?

A8. Yes.

Q9. Concerning electrical Note #1 on M100

a. Please provide a panel schedule for the new panel being called for.

b. Please Clarify what is meant by “100 breaker distribution panel.”

A9.

a. Provide one new 42 space, 600-amp panel approved equal to Square D model NQ442L6C with Square D model QOB bolt on circuit breakers. Panel shall have the means to sub-feed a second panel. Copper bus material, NEMA 1 rated, locking door, removable inner dead front cover. Provide manufacturer’s standard option for pre-punched knockouts on top and bottom end walls. Panels shall meet NFPA and manufacturers requirements.

b. See above.

Q10. Concerning electrical note #1 on M100

a. This note calls for a 600A feed from Transformer TF-35. Will a load study be required to verify the existing load and confirm viability of a new 600A feed?

b. A typical 600A feed consists of 2 parallel runs of 4 - 350 MCM Copper and a #1 Ground in 3” conduits. For bidding purposes, can we assume this is what will be required?

A10.

a. The Sheridan VA will conduct a study of the power requirements.

b. As stated, will work if installed per the NEC.

Q11. Concerning Electrical Note #5 on M100

a. New conduit is being called out for RTU-1. With no mention of wire or terminations. Will new wire and final termination be required as well?

b. Will any Fire Alarm (Duct detectors or HVAC Shutdown) be required for the new unit?

A11.

a. On the RTU-1 schedule note 6 states to “Provide wire, conduit, and required breaker at nearest panel with space available. Install electrical work per NEC.” For this project provide means to furnish and install for a complete working system.

b. All VA air handlers shall have supply and return duct smoke detectors and shall be connected to the fire alarm system.

Q12. After the site walk and looking through the drawings can the VA provide a list of existing utilities in the basement that will need to be removed/demoed? Along with what floors 1 and 2.

A12. No utilities are removed. Electrical panels are refed from the new panel.

Q13. Can the VA provide a detail on the for plan note 5?

A13. Do not cut floor joists. Alternatively wrap floor joist with 24 gauge sheet metal, and provide a duct connection of equal size (per SMACNA) as indicated on plan.

Q14. Will there be any roof work? If so what type of roofing is existing on Building 35?

A14. No roof work required on this project.

Q15. After trench work to transformer what type of landscaping will be required?

A15. Follow note three, and finish disturbed soil to match existing.

Q16. Will we have access to all levels during construction?

A16. Access to the building will be coordinated with Acquisition and Logistics.

Q17. Does the RTU require an equipment pad? If so, can the VA provide details on what they would like for the pad?

A17. RTU-1 shall have a 12” galvanized steel curb, and shall set on a 4” thick concrete pad raised above the area pavement.

Q18. Will any of the duct supports outside coming off the RTU require concrete pads?

A18. No. Foam/ galvanized Unistrut stands on the existing pavement will work.

Q19. Is this project a design build?

A19. No, but contractor can provide RFI’s for alternate methods.

Q20. For EF-2 it says to provide one for each floor, do these get installed in the same general area on each floor?

A20. Yes.

Q21. Who is responsible for moving items in the way of the construction work?

A21. Contractor shall coordinate with the COR with 48 hours’ notice. The VA shall move items.

Q22. Is there any lead or asbestos abatement that needs to be done for this project? Does the VA have a hazardous material report?

A22. The window paint contains lead that will be in the way of performing the work indicated on the plan. An asbestos report is included with these answers and is available at the Sheridan VA safety office. Lead painted material may not be cut. Remove prior to work. Abate asbestos containing materials prior to performing work. Replace window trim as required for work.

See attached document: Asbestos Report B35.

See attached document: TF-35 Low Side Open.

See attached document: TF-35 Low Side.

Project 666-24-126 Building 35 HVAC Project, Sheridan, WY VAMC