PLUMBING_ELEC PLANS.pdf
PDF 1 MB Posted
- Attached to
- Z2DA--442-22-025 Repair Boiler Plant equipment
- Solicitation number
- 36C25923R0096
About this file
This document package includes mechanical, plumbing, and electrical drawings for boiler plant upgrades at the Cheyenne VA Medical Center, along with the associated federal contract solicitation. The drawings show as-built conditions and call out specific repairs and replacements needed for valves, condensate equipment, emergency power off buttons, and other mechanical, plumbing and electrical systems supporting the boiler plant. The federal solicitation is seeking bids to complete the repairs and upgrades depicted in the drawings, including replacing gates valves, angle valves, condensate vessels, boilers descaling, and installing additional emergency power off buttons. The solicitation is open for vendors to bid on the work through the Department of Veterans Affairs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EXISTING PICTURES.pdf | ||
| 36C25923R0096 0002.docx | DOCX document | |
| RFI (1).docx | DOCX document | |
| 442-22-025_Specifications_20230913.pdf | ||
| 36C25923R0096 0001.docx | DOCX document | |
| S04 -Site Visit Meeting Doc.docx | DOCX document | |
| 442-22-025_PreBidSignIn_20230802.pdf | ||
| Past Performance Questionnaire.docx | DOCX document | |
| S22- 852.219-75 LOS Certificaiton.docx | DOCX document | |
| 2023_OUTBUILDINGS_13_COMBINDED_AS_BUILT_1-31-23.pdf | ||
| REPAIR_BOILER_PLANT_EQUIPMENT_1-31-23.pdf | ||
| 36C25923R0096.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CHEYENNE VAMC BOILER ANALYSIS
CHEYENNE, WYOMING
05/19/23 KMK JMM
Revisions: Date:
1501 W. Fountainhead Parkway, Suite 330
Tempe, AZ 85282 800-678-7077 480-621-3444 www.spectrum-engineers.com Project No. 234007
MECHANICAL ENGINEER
CONTACT:
E-MAIL:
PHONE:
kevin.kosor@speceng.com
1501 West Fountainhead Parkway, Suite 330 Tempe, Arizona 85282
480.621.3447 Kevin Kosor, PE
Spectrum Engineers
MECHANICAL BASEMENT FLOOR MECHANICAL
PIPING PLAN AS-BUILT - BUILDING 13
MP101
1 BASEMENT FLOOR MECHANICAL PIPING PLAN
SCALE: 1/4"=1'-0"
PRELIM
INARY
NOT FOR
CONSTRUCTION
AutoCAD SHX Text
ESTCODE
AutoCAD SHX Text
EWS
AutoCAD SHX Text
DEAREATOR
AutoCAD SHX Text
SURGE TANK
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
DIESEL PUMP STATION
AutoCAD SHX Text
AutoCAD SHX Text
LINE 1 EAST
AutoCAD SHX Text
LINE 2 WEST
AutoCAD SHX Text
FOR
AutoCAD SHX Text
FOS
AutoCAD SHX Text
FOS
AutoCAD SHX Text
FOR
AutoCAD SHX Text
FOS
AutoCAD SHX Text
FOR
AutoCAD SHX Text
FOS
AutoCAD SHX Text
FOR
AutoCAD SHX Text
FOR
AutoCAD SHX Text
FOS
AutoCAD SHX Text
FOR
AutoCAD SHX Text
FOS
AutoCAD SHX Text
FOR
AutoCAD SHX Text
FOS
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text 13.L-101
AutoCAD SHX Text
BOILER
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
FOUNDATION
AutoCAD SHX Text 13.L-106
AutoCAD SHX Text
OTHER
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
S13FL
AutoCAD SHX Text
STAIRS
AutoCAD SHX Text 13.L-107
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 13.L-104
AutoCAD SHX Text
OTHER
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text 13.L-105
AutoCAD SHX Text
OTHER
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text 13.L-105A
AutoCAD SHX Text 13.L-102
AutoCAD SHX Text
STAFF
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 13.L-103
AutoCAD SHX Text
TOILET
AutoCAD SHX Text 13.L-100
AutoCAD SHX Text
OTHER
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text
S13.1-FL
AutoCAD SHX Text
STAIRS
AutoCAD SHX Text
BOILER #1
AutoCAD SHX Text
BOILER #2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PRV
AutoCAD SHX Text
PRV
AutoCAD SHX Text
HPS
AutoCAD SHX Text
HPS
AutoCAD SHX Text
HPS
AutoCAD SHX Text
HPS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MPS
AutoCAD SHX Text
MPS
AutoCAD SHX Text
MPS
AutoCAD SHX Text
FW
AutoCAD SHX Text
FW
AutoCAD SHX Text
FM
AutoCAD SHX Text
FM
AutoCAD SHX Text
CB-2
AutoCAD SHX Text
CB-1
AutoCAD SHX Text
CP-13A-1
AutoCAD SHX Text
HX-BA-2
AutoCAD SHX Text
HX-BA-1
AutoCAD SHX Text
SECONDARY HW PUMP
AutoCAD SHX Text
SECONDARY HW PUMP
AutoCAD SHX Text
SECONDARY HW PUMP
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
PLAN
VHACHYKellyB Callout VALVE #7: REPLACE EXISTING GATE VALVE WITH NEW GATE VALVE. CONTRACTOR SHALL MATCH EXISTING AS BASIS OF DESIGN. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
VHACHYKellyB Callout VALVE #8: REPLACE EXISTING GATE VALVE WITH NEW GATE VALVE. CONTRACTOR SHALL MATCH EXISTING AS BASIS OF DESIGN. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMNETS.
VHACHYKellyB Snapshot
VHACHYKellyB Snapshot
VHACHYKellyB Snapshot
VHACHYKellyB Snapshot
VHACHYKellyB Snapshot
VHACHYKellyB Callout VALVE #4: REPLACE EXISTING GATE VALVE WITH NEW GATE VALVE. CONTRACTOR SHALL MATCH EXISTING AS BASIS OF DESIGN. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
VHACHYKellyB Snapshot
VHACHYKellyB Snapshot
VHACHYKellyB Callout VALVE #1: REPLACE EXISTING ANGLE/CHECK VALVE WITH NEW ANGLE/CHECK VALVE. CONTRACTOR SHALL MATCH EXISTING AS BASIS OF DESIGN. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
VHACHYKellyB Callout VALVE #3: REPLACE EXISTING ANGLE/CHECK VALVE WITH NEW ANGLE/CHECK VALVE. CONTRACTOR SHALL MATCH EXISTING AS BASIS OF DESIGN. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIRMENTS.
VHACHYKellyB Callout CLEAN DA TANK. COORDINATE CLEANING WITH BOILER PLANT SUPERVISOR FOR VA INSPECTION. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION
VHACHYKellyB Callout CLEAN CONDENSATE INLET TANK. COORDINATE CLEANING WITH PLANT SUPERVISOR FOR VA INSPECTION. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION
VHACHYKellyB Ellipse
VHACHYKellyB Callout REPLACE CONDENSATE VESSEL. CONTRACTOR SHALL MATCH EXISTING AS BASIS OF DESIGN. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
VHACHYKellyB Ellipse
VHACHYKellyB Ellipse
VHACHYKellyB Callout REPLACE CONDENSATE MOVERS. CONTRACTOR SHALL MATCH EXISTING AS BASIS OF DESIGN. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
VHACHYKellyB Rectangle
VHACHYKellyB Callout
DE-SCALE BOILERS, REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION
VHACHYKellyB Snapshot
VHACHYKellyB Snapshot
VHACHYKellyB Rectangle
VHACHYKellyB Text Box
BASEMENT FLOOR PLUMBING PLAN
VHACHYKellyB Snapshot
VHACHYKellyB Snapshot
VHACHYKellyB Callout VALVE #5: REPLACE EXISTING GATE VALVE WITH NEW GATE VALVE. CONTRACTOR SHALL MATCH EXISTING AS BASIS OF DESIGN. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
VHACHYKellyB Callout VALVE #6: REPLACE EXISTING GATE VALVE WITH NEW GATE VALVE. CONTRACTOR SHALL MATCH EXISTING AS BASIS OF DESIGN. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
VHACHYKellyB Callout VALVE #11: PROVIDE ADDITIONAL STEAM SHED VALVE TO MATCH EXISTING SHED VALVE. CONTRACTOR SHALL COORDINATE LOCATION WITH BOILER PLANT SUPERVISOR PRIOR TO INSTALL. REFER TO VALVE #11 PICTURE FOR EXISTING CONDITIONS.
VHACHYKellyB Callout VALVE #9: REPLACE EXISTING GATE VALVE WITH NEW GATE VALVE. CONTRACTOR SHALL MATCH EXISTING AS BASIS OF DESIGN. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
VHACHYKellyB Callout VALVE #2: REPLACE EXISTING GATE VALVE WITH NEW GATE VALVE. CONTRACTOR SHALL MATCH EXISTING AS BASIS OF DESIGN. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
VHACHYKellyB Callout VALVE #10: REPLACE EXISTING GATE VALVE WITH NEW GATE VALVE. CONTRACTOR SHALL MATCH EXISTING AS BASIS OF DESIGN. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CHEYENNE VAMC BOILER ANALYSIS
CHEYENNE, WYOMING
05/19/23 KMK JMM
Revisions: Date:
1501 W. Fountainhead Parkway, Suite 330
Tempe, AZ 85282 800-678-7077 480-621-3444 www.spectrum-engineers.com Project No. 234007
MECHANICAL ENGINEER
CONTACT:
E-MAIL:
PHONE:
kevin.kosor@speceng.com
1501 West Fountainhead Parkway, Suite 330 Tempe, Arizona 85282
480.621.3447 Kevin Kosor, PE
Spectrum Engineers
MECHANICAL FIRST FLOOR MECHANICAL
PIPING PLAN AS-BUILT - BUILDING 13
MP102
1 FIRST FLOOR MECHANICAL PIPING PLAN
SCALE: 1/4"=1'-0"
PRELIM
INARY
NOT FOR
CONSTRUCTION
AutoCAD SHX Text
4" VTR
AutoCAD SHX Text
METER SHED
AutoCAD SHX Text
LPG BOTTLE (FOR PILOT GAS)
AutoCAD SHX Text
GAS TO BOILERS
AutoCAD SHX Text
GAS METER
AutoCAD SHX Text
TO GAS SUPPLY
AutoCAD SHX Text G
AutoCAD SHX Text
NG
AutoCAD SHX Text
NG
AutoCAD SHX Text
LPG
AutoCAD SHX Text
LPG
AutoCAD SHX Text
NG
AutoCAD SHX Text 13.1-103
AutoCAD SHX Text
GENERATORS
AutoCAD SHX Text 13.1-102
AutoCAD SHX Text O&M
AutoCAD SHX Text
SUPERVISOR
AutoCAD SHX Text 13.L-101
AutoCAD SHX Text
BOILER
AutoCAD SHX Text 13.1-100A
AutoCAD SHX Text
EOC
AutoCAD SHX Text
STAFF OFFICE
AutoCAD SHX Text 13.1-100
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text 13.1-101
AutoCAD SHX Text
GAS HOUSE
AutoCAD SHX Text S13.1-F1
AutoCAD SHX Text
STAIRS
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
PLAN
VHACHYKellyB Rectangle
VHACHYKellyB Ellipse
VHACHYKellyB Ellipse
VHACHYKellyB Line
VHACHYKellyB Callout PROVIDE 3/4" WATER LINE WITH BACKFLOW PREVENTER FROM SOFT WATER SYSTEM TO MAKE-UP WATER TANK. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIRMENTS.
VHACHYKellyB Rectangle
VHACHYKellyB Text Box
FIRST FLOOR PLUMBING PLAN
VHACHYKellyB Callout
SOFT WATER SYSTEM
VHACHYKellyB Callout
MAKE-UP WATER TANK LOCATED ON BASEMENT FLOOR
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CHEYENNE VAMC BOILER ANALYSIS
CHEYENNE, WYOMING
05/19/23 KMK JMM
Revisions: Date:
1501 W. Fountainhead Parkway, Suite 330
Tempe, AZ 85282 800-678-7077 480-621-3444 www.spectrum-engineers.com Project No. 234007
MECHANICAL ENGINEER
CONTACT:
E-MAIL:
PHONE:
kevin.kosor@speceng.com
1501 West Fountainhead Parkway, Suite 330 Tempe, Arizona 85282
480.621.3447 Kevin Kosor, PE
Spectrum Engineers
MECHANICAL FIRST FLOOR MECHANICAL
PIPING PLAN AS-BUILT - BUILDING 13
MP102
1 FIRST FLOOR MECHANICAL PIPING PLAN
SCALE: 1/4"=1'-0"
PRELIM
INARY
NOT FOR
CONSTRUCTION
PROVIDE 3/4"
WATER LINE WITH
BACKFLOW
PREVENTER (# OR
EQUAL) FROM SOFT
WATER SYSTEM TO
MAKE-UP WATER
TANK.
FIRST FLOOR PLUMBING PLAN
SOFT WATER SYSTEM
MAKE-UP WATER
TANK LOCATED ON
BASEMENT FLOOR
VHACHYKellyB Snapshot
VHACHYKellyB Callout EPO#2: EXISTING EPO SHALL BE REPLACED. PROVIDE UL LISTED MUSHROOM HEAD BUTTON WITH "PULL TO RESET" FUNCTION, IN NEMA 4X ENCLOSURE. PILLA #BSD120, OR EQUAL. PROVIDE WITH COVER, PILLA #CLHCOV1, OR EQUAL. EPO CURRENTLY FED FROM EPO#1 WITH #12 CONDUCTORS. EXISTING FEED SHALL REMAIN AND BE UTILIZED FOR ADDITIONAL EPOs. PROVIDE 3/4" CONDUIT WITH 2#12 & #12G TO NEXT EPO.
VHACHYKellyB Polygon
VHACHYKellyB Polygon
VHACHYKellyB Polygon
VHACHYKellyB Rectangle
VHACHYKellyB Rectangle
VHACHYKellyB Polygon
VHACHYKellyB Snapshot
VHACHYKellyB Rectangle
VHACHYKellyB Text Box
BASEMENT FLOOR ELECTRICAL PLAN
VHACHYKellyB Callout EPO #4: PROVIDE UL LISTED MUSHROOM HEAD BUTTON WITH "PULL TO RESET" FUNCTION, IN NEMA 4X ENCLOSURE. PILLA #BSD120, OR EQUAL. PROVIDE WITH COVER, PILLA #CLHCOV1, OR EQUAL. PROVIDE 3/4" CONDUIT WITH 2#12 & #12G TO NEXT EPO.
VHACHYKellyB
PUSH BUTTON
VHACHYKellyB
PUSH BUTTON
VHACHYKellyB
PUSH BUTTON
VHACHYKellyB
PUSH BUTTON
VHACHYKellyB Callout EPO #5: PROVIDE UL LISTED MUSHROOM HEAD BUTTON WITH "PULL TO RESET" FUNCTION, IN NEMA 4X ENCLOSURE. PILLA #BSD120, OR EQUAL. PROVIDE WITH COVER, PILLA #CLHCOV1, OR EQUAL. PROVIDE 3/4" CONDUIT WITH 2#12 & #12G TO NEXT EPO.
VHACHYKellyB Snapshot
VHACHYKellyB Rectangle
VHACHYKellyB
PUSH BUTTON
VHACHYKellyB Callout EPO#1: EXISTING EPO SHALL BE REPLACED. PROVIDE UL LISTED MUSHROOM HEAD BUTTON WITH "PULL TO RESET" FUNCTION, IN NEMA 4X ENCLOSURE. PILLA #BSD120, OR EQUAL. PROVIDE WITH COVER, PILLA #CLHCOV1, OR EQUAL. EPO CURRENTLY FED FROM JCI PANEL LOCATED IN OTHER MECHANICAL 13.L-100 VIA #12 CONDUCTORS. EXISTING FEED SHALL REMAIN AND BE UTILIZED FOR ADDITIONAL EPOs.
VHACHYKellyB Callout EPO#3: PROVIDE UL LISTED MUSHROOM HEAD BUTTON WITH "PULL TO RESET" FUNCTION, IN NEMA 4X ENCLOSURE. PILLA #BSD120, OR EQUAL. PROVIDE WITH COVER, PILLA #CLHCOV1, OR EQUAL. INSTALL ON EXISTING COLUMN IN ACCESSIBLE LOCATION. PROVIDE 3/4" CONDUIT WITH 2#12 & #12G TO NEXT EPO.
VHACHYKellyB Rectangle
VHACHYKellyB Text Box
JCI PANEL
VHACHYKellyB Snapshot
VHACHYKellyB Snapshot
VHACHYKellyB Rectangle
VHACHYKellyB Rectangle
VHACHYKellyB Polygon
VHACHYKellyB Rectangle
VHACHYKellyB Rectangle
VHACHYKellyB Rectangle
VHACHYKellyB Rectangle
VHACHYKellyB Rectangle
VHACHYKellyB Callout EPO #6: PROVIDE UL LISTED MUSHROOM HEAD BUTTON WITH "PULL TO RESET" FUNCTION, IN NEMA 4X ENCLOSURE. PILLA #BSD120, OR EQUAL. PROVIDE WITH COVER, PILLA #CLHCOV1, OR EQUAL. PROVIDE 3/4" CONDUIT WITH 2#12 & #12G TO NEXT EPO.
VHACHYKellyB Callout EPO #7: PROVIDE UL LISTED MUSHROOM HEAD BUTTON WITH "PULL TO RESET" FUNCTION, IN NEMA 4X ENCLOSURE. PILLA #BSD120, OR EQUAL. PROVIDE WITH COVER, PILLA #CLHCOV1, OR EQUAL.
VHACHYKellyB Callout EPO #2: PROVIDE UL LISTED MUSHROOM HEAD BUTTON WITH "PULL TO RESET" FUNCTION, IN NEMA 4X ENCLOSURE. PILLA #BSD120, OR EQUAL. PROVIDE WITH COVER, PILLA #CLHCOV1, OR EQUAL. PROVIDE 3/4" CONDUIT WITH 2#12 & #12G TO NEXT EPO.
VHACHYKellyB Callout EPO #1: PROVIDE UL LISTED MUSHROOM HEAD BUTTON WITH "PULL TO RESET" FUNCTION, IN NEMA 4X ENCLOSURE. PILLA #BSD120, OR EQUAL. PROVIDE WITH COVER, PILLA #CLHCOV1, OR EQUAL. PROVIDE 3/4" CONDUIT WITH 2#12 & #12G TO NEXT EPO.
VHACHYKellyB
PUSH BUTTON
VHACHYKellyB
PUSH BUTTON
VHACHYKellyB
PUSH BUTTON
VHACHYKellyB
PUSH BUTTON
VHACHYKellyB Text Box
FIRST FLOOR ELECTRICAL PLAN
| ME001 - MECHANICAL COVER SHEET |
| MP100 - MECHANICAL SITE LAYOUT |
| MP101 - BASEMENT FLOOR MECHANICAL PIPING PLAN |
| MP102 - FIRST FLOOR MECHANICAL PIPING PLAN |
| MP501 - MECHANICAL DETAILS |
| MP502 - MECHANICAL DETAILS |
File details come from the government source that posted it. Updated .