Questions.docx

DOCX document 52 KB Posted

Attached to
Z2DA--660-CSI-115 (Engineering)(CON) DEXA Site Prep (VA-23-00026338)
Solicitation number
36C25923Q0387
Issued by

View the file

Other files

File Type Posted
ICRA 660-CSI-115 DEXA Site Prep.pdf PDF
36C25923Q0387 0002.docx DOCX document
CSRA 660-CSI-115 DEXA Site Prep.pdf PDF
ILSM 660-CSI-115 Dexa Site Prep.pdf PDF
S04-660-CSI-115 Site Walk Sign in Sheet.pdf PDF
36C25923Q0387 0001.docx DOCX document
S04 - Site Visit Meeting Doc.docx DOCX document
100_ CD(NFC) - DEXA Drawings.pdf PDF
CD NFC DEXA Specifications.pdf PDF
36C25923Q0387.docx DOCX document
852.219-75 LOS Certificaiton.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1-Is there a cost estimate , budget or ballpark figure for the project listed? Is there an actual start date for the project : COST RANGE:

Between $100,000 and $250,000 look for more information in the Instructions to offerors in the Solicitation.

2- What is the estimated construction/project cost?

See answer in question 1.

3- Does the door frame need hospital stops?

Yes.

4-In the Notes it refers to Drawings T-100 and MEP drawings. These drawings weren’t a part of the package. Can you provide these drawings?

There were no Technology based documents as part of the project.

As the design and construction document stages progressed the existing technology locations were remaining in place and thus Technology sheets were not incorporated into the project.

5-Can we get a list of Certified lift contractors?

Arjo needs to be directly contacted and check if they have a list of contractors.

The contact person is Jean.Marinangeli@arjo.com 6-Is additional fire protection required during construction?

Yes, If contractor is impairing the Fire suppression system Contractor should either turn the heads up or provide a temporary alarm.

7-Is the contractor required to provide a TAB Report after the completion of the project? If so, do you have a baseline of what the rooms are now?

Yes, a Test and Balance report is required although the room pressurization is neutral. Base line for the room is shown below for the control room and scanning room. We are treating the area like a CT.