Questions.docx
DOCX document 52 KB Posted
- Solicitation number
- 36C25923Q0387
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ICRA 660-CSI-115 DEXA Site Prep.pdf | ||
| 36C25923Q0387 0002.docx | DOCX document | |
| CSRA 660-CSI-115 DEXA Site Prep.pdf | ||
| ILSM 660-CSI-115 Dexa Site Prep.pdf | ||
| S04-660-CSI-115 Site Walk Sign in Sheet.pdf | ||
| 36C25923Q0387 0001.docx | DOCX document | |
| S04 - Site Visit Meeting Doc.docx | DOCX document | |
| 100_ CD(NFC) - DEXA Drawings.pdf | ||
| CD NFC DEXA Specifications.pdf | ||
| 36C25923Q0387.docx | DOCX document | |
| 852.219-75 LOS Certificaiton.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1-Is there a cost estimate , budget or ballpark figure for the project listed? Is there an actual start date for the project : COST RANGE:
Between $100,000 and $250,000 look for more information in the Instructions to offerors in the Solicitation.
2- What is the estimated construction/project cost?
See answer in question 1.
3- Does the door frame need hospital stops?
Yes.
4-In the Notes it refers to Drawings T-100 and MEP drawings. These drawings weren’t a part of the package. Can you provide these drawings?
There were no Technology based documents as part of the project.
As the design and construction document stages progressed the existing technology locations were remaining in place and thus Technology sheets were not incorporated into the project.
5-Can we get a list of Certified lift contractors?
Arjo needs to be directly contacted and check if they have a list of contractors.
The contact person is Jean.Marinangeli@arjo.com 6-Is additional fire protection required during construction?
Yes, If contractor is impairing the Fire suppression system Contractor should either turn the heads up or provide a temporary alarm.
7-Is the contractor required to provide a TAB Report after the completion of the project? If so, do you have a baseline of what the rooms are now?
Yes, a Test and Balance report is required although the room pressurization is neutral. Base line for the room is shown below for the control room and scanning room. We are treating the area like a CT.