100_ CD(NFC) - DEXA Drawings.pdf

PDF 9 MB Posted

Attached to
Z2DA--660-CSI-115 (Engineering)(CON) DEXA Site Prep (VA-23-00026338)
Solicitation number
36C25923Q0387
Issued by

View the file

Other files

File Type Posted
ICRA 660-CSI-115 DEXA Site Prep.pdf PDF
36C25923Q0387 0002.docx DOCX document
CSRA 660-CSI-115 DEXA Site Prep.pdf PDF
ILSM 660-CSI-115 Dexa Site Prep.pdf PDF
S04-660-CSI-115 Site Walk Sign in Sheet.pdf PDF
Questions.docx DOCX document
36C25923Q0387 0001.docx DOCX document
S04 - Site Visit Meeting Doc.docx DOCX document
CD NFC DEXA Specifications.pdf PDF
36C25923Q0387.docx DOCX document
852.219-75 LOS Certificaiton.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(THIS DRAWING SET NOT INTENDED FOR CONSTRUCTION)

PROJECT MANAGEMENT,

ARCHITECTURE, & ELECTRICAL

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com

GEORGE E. WAHLEN VA MEDICAL CENTER

500 FOOTHILL DRIVE

SALT LAKE CITY, UT 84148

DEXA SITE PREP PROJECT

PROJECT # 660-CSI-115

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

660-CSI-115

8/19/2022

100% CONSTRUCTION

DOCUMENT DEXA SITE PREP PROJECT

500 FOOTHILL DRIVE

SALT LAKE CITY, UT 84148

NOT FOR

CONSTRUCTION

GI-000

COVER SHEET

RAC

JY

MECHANICAL & PLUMING

7100 E BELLEVIEW AVE, STE 107

GREENWOOD VILLAGE, CO 80111

Phone: (720) 200-5955 www.specialzedeng.com

DISCIPLINE REFERENCES

DRAWING FOR THE FOLLOWING DISCIPLINES ARE

CONTAINED IN THE DOCUMENT. THE DISCIPLINES ARE

IDENTIFIED BY THE REFERENCE WHICH IS INCORPORATED

INTO THE SHEET TITLE.

G GENERAL INFORMATION

H HAZARDOUS

V SURVEY/MAPPING

B GEOTECHNICAL

W CIVIL WORKS

C CIVIL

L LANDSCAPE

S STRUCTURAL

A ARCHITECTURAL

I INTERIORS

Q EQUIPMENT

F FIRE PROTECTION

P PLUMBING

D PROCESS

M MECHANICAL

E ELECTRICAL

T TELECOMM

R RESOURCE

SHEET NUMBER

AD-100-1.B

DISCIPLINE

SHEET NUMBER

BUILDING

FLOOR

BUILDING

NUMBER

DRAWING NUMBERING

1 BUILDING SECTION

SCALE: 1/8" = 1'-0"

EACH DRAWING IS NUMBERED ACCORDING TO IT'S

LOCATION ON THE SHEET. THE DRAWING TITLE APPEARS

ABOVE THE DEMARCATION LINE AND THE APPROPRIATE

SCALE IS LOCATED BELOW THE DEMARCATION LINE.

DRAWING REFERENCE

1/AS-101

SHEET NUMBERDRAWING NUMBER

ON SHEET BY

LOCATION

ARCHITECTURAL SYMBOLS

℄ CENTER LINE

ELEVATION INDICATORXXX.XX'

CENTER LINE INDICATOR

DEMOLITION LINE

EXISTING TO REMAIN LINE

FEATURES ABOVE LINE INDICATOR

CONSTRUCTION LIMITS

BREAK, ROUND (USER DEFINES SIZE)

BREAK, STRAIGHT (SEE SECTION

INDICATORS, BUILDING BREAK

STANDARDS)

DIMENSION LINE

X'-X"

1/AS-101 INTERIOR ELEVATION

P-1

WALL OR PARTITION TYPE

ROOM NAME

ROOM NAME

ROOM NAME AND NUMBER

A

COLUMN GRID

22 KEYED NOTE

N

NORTH ARROW

REVISIONS

EXTENT OF

CURRENT

REVISION

REVISION

NUMBER

REFER TO REVISION HISTORY ON TITLE BLOCK OF EACH

SHEET.

1/AS-101

DETAIL INDICATOR

1/AS-101 BUILDING SECTION INDICATOR

101 DOOR NUMBER

A WINDOW INDICATOR

GENERAL NOTES

1. UNLESS NOTED AS EXISTING, ALL MATERIALS, EQUIPMENT,

MANUFACTURED ITEMS AND ASSEMBLIES INCORPORATED

INTO THE WORK SHALL BE NEW.

2. UNLESS NOTED TO BE REMOVED AND/OR, DISPOSED OF,

EXISTING ITEMS ARE TO REMAIN. THEY SHALL BE

PROTECTED FROM DAMAGE DUE TO CONSTRUCTION

ACTIVITIES. ANY EXISTING ITEMS TO REMAIN THAT

BECOME DAMAGED DUE TO CONSTRUCTION ACTIVITIES

SHALL BE REPAIRED OR REPLACED TO MATCH EXISTING

AT NO ADDITIONAL COST TO THE OWNER.

3. NOTATIONS FOR ITEMS OF WORK APPLY TO EACH

GRAPHICAL INDICATION SHOWN ON THE DRAWINGS.

4. ALL ITEMS NOTED TO HAVE PAINT FINISH SHALL BE

CLEANED AND PROPERLY PREPARED IN ACCORDANCE

WITH THE SPECIFICATIONS PRIOR TO THE APPLICATION OF

PRIMER AND PAINT.

5. THE CONTRACTOR SHALL THOROUGHLY FAMILIARIZE

THEM SELF WITH THE ARCHITECTURAL, STRUCTURAL,

MECHANICAL, ELECTRICAL, PLUMBING, TECHNOLOGY, ETC.

WORK SCOPE. THE CONTRACTING OFFICE

REPRESENTATIVE SHALL BE NOTIFIED OF CONFLICTS OR

DISCREPANCIES PRIOR TO COMMENCEMENT OF

CONSTRUCTION.

6. THE CONTRACTOR SHALL VISIT THE SITE, VERIFY FIELD

CONDITIONS, COMPARE FIELD CONDITIONS AND OTHER

INFORMATION KNOWN TO THE CONTRACTOR WITH

CONTRACT DOCUMENTS.

7. THE CONTRACTOR SHALL REPORT ANY UNFORESEEN

FIELD CONDITIONS, ERRORS, INCONSISTENCIES, OR

OMISSIONS DISCOVERED AT ANY TIME DURING THE WORK,

UPON SUCH DISCOVERY, THE CONTRACTOR SHALL

CONTACT THE CONTRACTING OFFICER REPRESENTATIVE

FOR CLARIFICATION BEFORE PROCEEDING OR

CONTINUING WITH THAT PORTION OF THE WORK.

8. WORK SHALL CONFORM TO MOST CURRENT VERSION OF

ALL APPLICABLE CODE AND STANDARDS INCLUDING THE

INTERNATIONAL BUILDING CODE, VA MASTER

SPECIFICATIONS, AND LATEST ADOPTED NFPA.

9. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING

OFFICER REPRESENTATIVE OF ANY DISCREPANCIES

BETWEEN THE DRAWINGS, NOTES, AND FIELD CONDITIONS

BEFORE BIDDING AND COMMENCING ANY WORK, AND

REQUEST CLARIFICATION IN WRITING.

10. WHEN UNANTICIPATED ARCHITECTURAL, STRUCTURAL,

MECHANICAL, ELECTRICAL, PLUMBING, TECHNOLOGY, ETC.

ELEMENTS THAT CONFLICT WITH INTENDED FUNCTION OR

DESIGN ARE ENCOUNTERED, INVESTIGATE AND MEASURE

THE NATURE AND EXTENT OF THE CONFLICT. PROMPTLY

SUBMIT A WRITTEN REPORT TO THE CONTRACTING

OFFICER REPRESENTATIVE.

11. WHERE MOUNTING HEIGHTS ARE NOT INDICATED, INSTALL

USING MANUFACTURER'S OR INDUSTRY STANDARDS.

WHERE STANDARDS DO NOT EXIST, NOTIFY THE

CONTRACTING OFFICER REPRESENTATIVE FOR

CLARIFICATION.

12. CONTRACTOR SHALL NOT BARRICADE EMERGENCY

EGRESS TO OR FROM THIS AREA.

13. PROVIDE ACCESS TO THE WORK AS DIRECTED BY THE

CONTRACTING OFFICER REPRESENTATIVE. SECURE

ACCESS POINT AS SPECIFIED AND DIRECTED BY THE

CONTRACTING OFFICER REPRESENTATIVE. PROVIDE

WALK-OFF MATS TO MEET FACILITY INFECTION CONTROL

GUIDELINES AT EACH ACCESS POINT WHERE REQUIRED.

14. ALL EXISTING WALL MOUNTED ITEMS AND DEVICES ARE

TO BE REMOVED PRIOR TO DEMOLITION WORK, FULLY

REFURBISHED, AND REINSTALLED IN THE NEW WALL

ASSEMBLY. LOCATION TO BE VERIFIED BY CONTRACTING

OFFICER REPRESENTATIVE. ITEMS MAY INCLUDE: DOOR

STOPS, HAND SANITIZER DISPENSERS, FIRE STROBES,

SWITCHES, ELECTRIC COVER PLATES, ELECTRIC OUTLETS,

BULLETIN BOARDS, MILLWORK, CLOCK, DATA OUTLET,

PUSH BUTTON, FIRE CONTROL BOX, PHONE, AND ROOM

SIGNAGE, ETC.

15. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR

LEGAL DISPOSAL OF ALL DEBRIS.

16. OWNER SHALL HAVE THE RIGHT OF FIRST REFUSAL ON

ITEMS INDICATED TO BE SALVAGED.

17. THE BUILDING WILL BE OCCUPIED AT ALL TIMES THROUGH

THE DURATION OF CONSTRUCTION.

DIMENSIONING CONVENTIONS

1. EXCEPT WHERE DIRECTED TO PLACE ITEMS OF THE WORK

AT THE "APPROXIMATE LOCATION SHOWN." DO NOT SCALE

DRAWINGS FOR DIMENSIONAL INFORMATION.

2. ALL ELEMENTS OF THE DOCUMENTS MAY NOT BE DRAWN

TO EXACT SCALE. ALL DIMENSIONS REQUESTED ARE

SHOWN (OR MAY BE DERIVED FROM THOSE SHOWN OR

NOTED) ON THE FLOOR PLANS, DETAIL PLANS,

ELEVATIONS, SCHEDULES, CONFIGURATION DETAILS, AND

SPECIFICATIONS. SEE THE NOTES BELOW AND SYMBOLS

FOR DIMENSIONING CONVENTIONS USED ON THIS

PROJECT.

3. EXCEPT WHERE SPECIFICALLY NOTED TO THE CONTRARY,

ALL DIMENSIONS SHOWN ON THE ARCHITECTURAL

DRAWINGS CONFORM TO THE FOLLOWING CONVENTIONS.

A. ALL DIMENSIONS ARE MEASURED FROM FACE OF

PARTITION ASSEMBLY:

• FACE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY

APPLIED FINISHES HAVING THICKNESS WHICH MAY BE

ADDED TO SUCH WALL). UNLESS NOTED AS A "FACE

OF FINISH" OR DIMENSION, DIMENSIONS ARE NOT

MEASURED TO THE FACE OF APPLIED FINISH BUT

RATHER TO THE FACE OF CORE STRUCTURE (STUD,

ETC...). REFER TO THE THICKNESS OF EACH

PARTITION TYPE.

B. DIMENSIONS UTILIZING THE "CENTERLINE" SYMBOL ARE

MEASURED TO:

• CENTERLINE OF PARTITION ASSEMBLY (EXCLUSIVE OF

ANY APPLIED FINISHES HAVING THICKNESS WHICH

MAY BE ADDED TO SUCH WALLS) AT PARTITIONS

FRAMED WITH METAL STUDS. REFER TO "PARTITION

SCHEDULE" TO DETERMINE THICKNESS OF EACH

PARTITION TYPE.

C. WHERE "EQUAL" DIMENSIONS ARE USED ON REFLECTED

ON REFLECTED CEILING PLANS TO LOCATE CEILING

GRID WORK POINTS, MEASURE DIMENSIONS TO:

• EDGE OF INDICATED CEILING AT FACE OF ADJACENT

APPLIED FINISH MEASURED AT THE CEILING PLANE.

4. WHERE OPENINGS IN WALLS (SUCH AS INTERIOR

WINDOWS OR DOORS) ARE NOT DIMENSIONED BUT

SHOWN AS BEING IN THE CENTER OF A GIVEN WALL

SURFACE. LOCATE OPENINGS AS GRAPHICALLY

REPRESENTED.

SHEET INDEX

PROJECT INFORMATION

ARCHITECTURAL

GI-000 COVER SHEET

GI-010 GENERAL INFORMATION

GI-020 ARCHITECTURAL ABBREVIATIONS

AS-100 OVERALL FLOOR PLAN

AS-101 EXISTING AND PROPOSED FLOOR PLAN

AS-200 EXISTING AND PROPOSED REFLECTED CEILING PLAN

AS-400 EXISTING STRESS ROOM ELEVATIONS

AS-401 EXISTING CT SCAN ROOM ELEVATIONS

AS-402 PROPOSED DEXA ROOM ELEVATIONS

AS-403 PROPOSED STRESS AND OFFICE ELEVATIONS

AS-500 ROOM FINISH AND DOOR SCHEDULES

MECHANICAL

M000 MECHANICAL SYMBOLS AND ABBREVIATIONS

MH200 MECHANICAL FLOOR PLAN

M500 MECHANICAL DETAILS

M600 MECHANICAL SCHEDULES

ELECTRICAL

E-000 ELECTRICAL SYMBOLS, ABBREVIATIONS AND NOTES

E-100 EXISTING AND PROPOSED LIGHTING PLAN

E-101 PHOTOMETRIC PLAN AND LUMINAIRE SCHEDULE

E-200 EXISTING AND PROPOSED POWER PLAN

E-500 ELECTRICAL DETAILS

DESIGN MANUALS:

- PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS

- PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES

- PG-18-8 SEISMIC DESIGN HANDBOOK

- PG-10-10 DESIGN MANUALS

- VA ARCHITECTURAL DESIGN MANUAL

- VA MECHANICAL DESIGN MANUAL

- VA ELECTRICAL DESIGN MANUAL

- VA PLUMBING DESIGN MANUAL

- VA FIRE PROTECTION DESIGN MANUAL

APPLICABLE CODES AND REGULATIONS:

ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH ALL CURRENT APPLICABLE

CODES AND STANDARDS.

IN ADDITION TO ALL DEPARTMENT OF VETERANS AFFAIRS, ALL WORK SHALL COMPLY

WITH ACCESSIBILITY REQUIREMENTS OF UTAH AND THE DEPARTMENT OF VETERANS

AFFAIRS GUIDELINES, ABA (ARCHITECTURAL BARRIERS ACT) ACCESSIBILITY

STANDARD FOR FEDERAL FACILITIES.

APPLICABLE CODES AND STANDARDS (LATEST EDITIONS) INCLUDE:

- ADA ACCESSIBILITY STANDARDS

- NFPA 101, "LIFE SAFETY CODE"

- NFPA 13, "INSTALLATION OF SPRINKLER SYSTEMS"

- NFPA 70, "NATIONAL ELECTRICAL CODE (NEC)"

- NFPA 72, "NATIONAL FIRE ALARM CODE"

- NFPA 90A, "INSTALLATION OF AIR CONDITIONING AND VENTILATION

SYSTEMS"

- NFPA 99, "INSTALLATION FOR HEALTH CARE FACILITIES"

- NFPA 241, "STANDARD FOR SAFEGUARDING CONSTRUCTION,

ALTERATION, AND DEMOLITION OPERATIONS"

- INTERNATIONAL BUILDING CODE (IBC)

- INTERNATIONAL MECHANICAL CODE (IMC)

- INTERNATIONAL PLUMBING CODE (IPC)

GI-010

GENERAL INFORMATION

VV, RAC

JY

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

660-CSI-115

8/19/2022

100% CONSTRUCTION

DOCUMENT DEXA SITE PREP PROJECT

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAMA AMERICAN ARCHITECTURAL

MANUFACTURERS ASSOCIATION

AB ANCHOR BOLT

ABC AGGREGATE BASE COURSE

AC ASBESTOS CEMENT OR

ASPHALTIC CONCRETE

ACI AMERICAN CONCRETE INSTITUTE

ACM ASBESTOS CONTAINING

MATERIAL

ACP ACRYLIC GLAZING

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES

ACT

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDN ADDITION

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, OR

ADJUSTABLE

ADMIN ADMINISTRATION

ADB AUTOMATIC DOOR BOTTOM

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGA AMERICAN GAS ASSOCIATION

AGC ASSOCIATED GENERAL

CONTRACTORS

AGGR AGGREGATE

AHJ AUTHORITY HAVING

JURISDICTION

AHR ANCHOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF

ARCHITECTS

AISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTION

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINUM

AMP AMPERE

AMT AMOUNT

ANOD ANODIZED

ANSI AMERICAN NATIONAL

STANDARDS INSTITUTE

ANT ANTENNA

APA AMERICAN PLYWOOD

ASSOCIATION

APPD APPROVED

APPROX APPROXIMATE

APT APARTMENT

AR AS REQUIRED

ARCH ARCHITECT

ASB ASBESTOS

ASI ARCHITECT'S SUPPLEMENTAL

INSTRUCTION

ASKLR AUTOMATIC SPRINKLER

ASPH ASPHALT

ASSN ASSOCIATION

ASTM AMERICAN SOCIETY FOR TESTING

AND MATERIALS

ATCH ATTACHMENT

ATM AUTOMATIC TELLER MACHINE

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AVE AVENUE

AVG AVERAGE

AW ACID WASTE

AWI ARCHITECTURAL WOODWORKING

INSTITUTE

AWPA AMERICAN WOOD PRESERVERS'

ASSOCIATION

AWS AMERICAN WELDING SOCIETY

AWT ACOUSTICAL WALL TREATMENT

B LABEL CLASS B DOOR

B PL BASE PLATE

BALC BALCONY

BAT BATTEN

BB BULLETIN BOARD

BD BOARD

BD FT BOARD FEET (FOOT)

BEV BEVEL

BHMA BUILDER'S HARDWARE

MANUFACTURER'S ASSOCIATION

BI FLD DR BIFOLDING DOORS

BITUM BITUMINOUS

BKG BACKING

BLD BUILD

BLDG BUILDING

BLKT BLANKET

BLVD BOULEVARD

BM BEAM OR BENCHMARK

BOT BOTTOM

BR BEDROOM

BRCG BRACING

BRDG BRIDGING

BRDG JST BRIDGING JOIST

BRG BEARING

BRG PL BEARING PLATE

BRKT BRACKET

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BU BUSHEL

BUR BUILT-UP ROOFING

ARCHITECTURAL ABBREVIATIONS

C CELSIUS CHANNEL

C CHANNEL CELSIUS

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

C TO C CENTER TO CENTER

CAB CABINET

CAC CEILING ATTENUATION CLASS

CB CATCH BASIN OR CORNER BEAD

CBB CEMENTITIOUS (BACKER) BOARD

CC CUBIC CENTIMETER

CCTV CLOSED CIRCUIT TELEVISION

CCW COUNTERCLOCKWISE

CD CONSTRUCTION DOCUMENTS OR

CONTRACT DOCUMENTS

CEM CEMENT

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR

FURNISHED/CONTRACTOR

INSTALLED

CF/OI CONTRACTOR

FURNISHED/OWNER INSTALLED

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CENTER OF GRAVITY OR CORNER

GUARD

CGSFU CERAMIC GLAZED STRUCTURAL

FACING UNITS

CH BD CHALKBOARD

CHEM CHEMICAL

CHFR CHAMFER

CHK CHECK

CI CAST IRON

CIP CAST-IN-PLACE

CIR CIRCLE

CIRC CIRCULAR

CJ CONSTRUCTION JOINT OR

CONTROL JOINT

CL CENTER LINE

CLDG CLADDING

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

cm² SQUARE CENTIMETER cm³ CUBIC CENTIMETER

CM CONSTRUCTION MANAGEMENT

CMU CONCRETE MASONRY UNIT

CNR CORNER

CNTR COUNTER

CO CARBON MONOXIDE,

CERTIFICATE OF OCCUPANCY,

CLEANOUT, OR COMPANY

CO2 CARBON DIOXIDE

COL COLUMN

COM COMMON

COMB COMBINATION, COMBINED

COMM COMMUNICATION

COMP COMPONENT

CONC CONCRETE

CONC FLR CONCRETE FLOOR

COND CONDENSER OR CONDITION

CONF CONFERENCE

CONN CONNECT

CONSTR CONSTRUCTION

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CORR CORRIDOR

CPM CRITICAL PATH METHOD

CPRS COMPRESSIBLE

CPT CARPET

CRS COLD ROLLED STEEL

CRSI CONCRETE REINFORCING STEEL

INSTITUTE

CSB CONCRETE SPLASH BLOCK

CSG CASING

CSI CONSTRUCTION SPECIFICATIONS

INSTITUTE

CSK COUNTER SUNK

CSMT CASEMENT

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTG COATING

CTR CENTER CONTOUR

CTRL CONTROL

CTV CABLE TELEVISION

CU COPPER C

CU FT CUBIC FEET

CU IN CUBIC INCH

CU YD CUBIC YARD

CURT CURTAIN

CYL CYLINDER

CYL L CYLINDER LOCK

D DEPTH OR PENNY (NAIL)

D LABEL CLASS D DOOR

DAT DATUM

DB DECIBEL

DBL DOUBLE

DBL GLZ DOUBLE GLAZE

DC DIRECT CURRENT

DEG DEGREE

DEL DELETE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL DIAGRAM

DIAG DIAGRAM DIAGONAL

DIFF DIFFERENCE OR DIFFUSER

DIM DIMENSION

DIR DIRECTION

DISP DISPENSER

DIST DISTANCE

DIV DIVIDE OR DIVISION

DL DEAD LOAD

DOC DOCUMENT

DOUG FIR DOUGLAS FIR

DOZ DOZEN

DR DOOR, DRAIN, DRESSING

ROOM, OR DRIVE

DR CL DOOR CLOSER

DR FR DOOR FRAME

DR OPNG DOOR OPENING

DS DOWNSPOUT

DSGN DESIGN

DW DISHWASHER

DWG DRAWING

DWTR DUMBWAITER

E EAST

E LABEL CLASS E DOOR

EA EACH

EFF EFFICIENCY

EFS EXTERIOR FINISH SYSTEM

EIFS EXTERIOR INSULATION AND

FINISH SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRIC

ELEC DR OP ELECTRIC DOOR OPENER

ELEV ELEVATOR

EMER EMERGENCY

EMER SHR EMERGENCY SHOWER

ENCL ENCLOSURE

ENGR ENGINEER

ENVIR ENVIRONMENT

EPA ENVIRONMENTAL PROTECTION

AGENCY

EPDM ETHYLENE PROPYLENE DIENE

MOMOMER

EPO EMERGENCY POWER OFF

EPS EXPANDED POLYSTYRENE

BOARD (INSULATION)

EQ EQUAL

EQL SP EQUALLY SPACED

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ERD EXISTING ROOF DRAIN

ESC ESCAPE OR ESCUTCHEON

ESCAL ESCALATOR

ESMT EASEMENT

ESP ESPECIALLY

EST ESTIMATE

ETC AND SO FORTH OR ET CETERA

EW EACH WAY

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION OR EXPOSED

EXP BT EXPANSION BOLT

EXST GR EXISTING GRADE

EXT EXTERIOR, EXTERNAL, OR

EXTINGUISHER

EXT GR EXTERIOR GRADE

F FAHRENHEIT OR FEMALE

FA FIRE ALARM

FAB FABRIC

FAC FACTOR

FACIL FACILITY

FAS FASCIA

FAS BD FASCIA BOARD

FCO FLOOR CLEANOUT

FCTY FACTORY

FD FLOOR DRAIN

FDC FIRE DEPARTMENT

CONNECTION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF&E FURNITURE, FIXTURE, AND

EQUIPMENT

FH FLAT HEAD OR FLAT HEAD

SCREWS

FHC FIRE HOSE CABINET

FHMS FLAT HEAD MACHINE SCREW

FHP FULL HEIGHT PARTITION

FHWS FLAT HEAD WOOD SCREW

FIG FIGURE

FIL FILLET

FIN FINISH

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIN WD FINISH WOOD

FIXT FIXTURE

FL FLOORLINE

FLASH FLASHING

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLR FLOOR

FLR FIN FLOOR FINISH

FLR SK FLOOR SINK

FLUOR FLUORESCENT

FLUOR FIX FLUORESCENT FIXTURE

FM FACTORY MUTUAL

FM-G FACTORY MUTUAL GLOBAL

FO FINISHED OPENING

FOC FACE OF CONCRETE OR FACE

OF CURB

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF SLAB OR FACE OF STUD

FOUNT FOUNTAIN

FOW FACE OF WALL

FP FIRE PROTECTION OR FIREPROOF

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FIRE RATING, FIRE RESISTANT,

OR FRAME

FR SNK FLUSHING RIM SINK

FREQ FREQUENCY

FRMG FRAMING

FRP FIBER REINFORCED POLYESTER

OR

FIBERGLASS REINFORCED

PLASTIC

FRZ FREEZER

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET OR FOOT

FTG FOOTING

FURG FURRING

FURN FURNISH OR FURNITURE

FUT FUTURE

FWC FABRIC WALLCOVERING

GA GAGE OR GYPSUM ASSOCIATION

GAL GALLON

GALV GALVANIC OR GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GDR GUARD RAIL

GEN GENERAL OR GENERATOR

GFRC GLASS-FIBER-REINFORCED

CONCRETE

GFRG GLASS-FIBER-REINFORCED

GYPSUM

GFRP GLASS-FIBER-REINFORCED

PLASTIC

GI GALVANIZED IRON

GL GLASS

GL BLK GLASS BLOCK

GLU LAM GLUED LAMINATED WOOD

GR FL GROUND FLOOR

GRAN GRANITE

GRTG GRATING

GSB GYPSUM SHEATHING BOARD

GSM GALVANIZED SHEET METAL

GSU GLAZED STRUCTURAL UNIT

GT GROUT

GUAR GUARANTEE

GUT GUTTER

GYP GYPSUM

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H HIGH

H PLAM HIGH PRESSURE PLASTIC

LAMINATE

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIB

HC HOLLOW CORE

HCWD HOLLOW CORE WOOD DOOR

HDBD HARDBOARD

HDNR HARDENER

HDO HIGH DENSITY OVERLAY

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE

AIR (FILTER)

HEX HEXAGON

HF HIGH FREQUENCY

HGR HANGER

HM HECTOMETER

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMDF HOLLOW METAL DOOR AND

FRAME

HMF HOLLOW METAL FRAME

HNDRL HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HOSP HOSPITAL

HP HIGH PRESSURE OR

HORSEPOWER

HQ HEADQUARTERS

HS HEAT-STRENGTHENED (GLASS)

OR HIGH STRENGTH

HSE HOUSE

HSKPG HOUSEKEEPING

HST HOIST

HT HEIGHT

HVAC HEATING, VENTILATING, AND AIR

CONDITIONING

HVY HEAVY

HW HOT WATER

HYD HYDRANT

HYDR HYDRAULIC

I INTERSTATE (HIGHWAY) OR

MOMENT OF INERTIA

IAQ INDOOR AIR QUALITY

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE

DIAMETER, OR INTERIOR DESIGN

ID NO IDENTIFICATION NUMBER

ILLUM ILLUMINATION

INCL INCLUDED

IND INDEPENDENT OR INDUSTRIAL

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INTERCOM INTERCOMMUNICATION

INTL INTERNATIONAL

IRMA INVERTED ROOF MEMBRAME

ASSEMBLY

IWH INSTANTANEOUS WATER

HEATER

JAN JANITOR

J-BOX JUNCTION BOX

KD KILN DRIED OR KNOCKED

DOWN

KIT KITCHEN

KO KNOCKOUT

KPL KICKPLATE

L ANGLE

LAB LABORATORY

LAD LADDER

LAM LAMINATE

LAM GL LAMINATED GLASS

LAU LAUNDRY

LAV LAVATORY

LBR LUMBER

LBS POUND

LD BRG LOAD-BEARING

LDR LEADER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LH LEFT HAND

LHR LEFT HAND REVERSE

LHR LEFT HAND REVERSE LATENT

HEAT RATION

LIB LIBRARY

LIN LINEAR

LINO LINOLEUM

LIQ LIQUID

LKR LOCKER

LKR RM LOCKER ROOM

LKWASH LOCKERWASHER

LL LEAD LINED

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMST LIMESTONE

LNDSCP LANDSCAPE

LR LIVING ROOM

LRG LARGE

LRV LOUVERED ROOF VENT

LS LUMP SUM

LT LIGHT

LT GA LIGHT GAGE

LT WT LIGHTWEIGHT

LTG LIGHTING

LTNG LIGHTNING

LVD LOUVERED

LVR LOUVER

LWC LIGHTWEIGHT CONCRETE

LWIC LIGHTWEIGHT INSULATION

CONCRETE

LYR LAYER

MACH MACHINE

MACH RM MACHINE ROOM

MAINT MAINTENANCE

MAN MANUAL

MATL MATERIAL

MATV MASTER ANTENNA TELEVISION

SYSTEM

MAX MAXIMUM

MB MACHINE BOLT

MCB METAL CORNER BEAD

MD DECK

ME MECHANICAL ENGINEER

MEAS MEASURE

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MED MEDICAL MEDIUM

MED MEDIUM MEDICAL

MEK METHYL ETHYL KETONE

MEL MELAMINE

MEMB MEMBRANE

MEMO MEMORANDUM

MEZZ MEZZANINE

MF MILL FINISH

MFD MANUFACTURED

MFG MANUFACTURING

MFR MANUFACTURER

MFR REC MANUFACTURER'S

RECOMMENDATION

MGT MANAGEMENT

MH MANHOLE

MIC MICROPHONE

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM MINUTE

MIN MINUTE MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MIT MITER

MKR MARKER

ML METAL LATH

MLDG MOLDING (MOULDING)

MLWK MILLWORK

mm MILLIMETER

MO MASONRY OPENING OR MOTOR

OPERATED

MOD MODEL, MODIFY OR MODULE

MOD BIT MODIFIED BITUMEN

MON MONITOR

MOPR MOP RACK

MR MOISTURE RESISTANT

MS MACHINE SCREW OR MOP SINK

MTD MOUNTED

MTG MOUNTING

MTL METAL

MULL MULLION

MW MICROWAVE

MWP MEMBRANE WATERPROOFING

N NORTH

NA NOT APPLICABLE

NAAMM NATIONAL ASSOCIATION OF

ARCHITECTURAL METAL

MANUFACTURERS

NAT NATURAL

NATL NATIONAL

NC NOISE CRITERIA

NCOMBL NONCOMBUSTIBLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATION

NEUT NEUTRAL

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NR NOISE REDUCTION

NRC NOISE REDCTION COEFFICIENT

NRCA NATIONAL ROOFING

CONTRACTORS ASSOCIATION

NRP NONREMOVABLE

NS NARROW STILE

NUM NUMERAL

O/O OUT TO OUT

O OXYGEN

OA OUTSIDE AIR OR OVERALL

OC ON CENTER

OCC OCCUPY

OCT OCTAGON

OD OUTSIDE DIAMETER OUTSIDE

DIMENSION

OD OUTSIDE DIMENSION OUTSIDE

DIAMETER

OF/CI OWNER

FURNISHED/CONTRACTOR

INSTALLED

OFD OVERFLOW DRAIN

OFF OFFICE

OF/OI OWNER FURNISHED/OWNER

INSTALLED

OH OVERHANG

OH DR OVERHEAD (COILING) DOOR

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

OPT OPTIONAL

OR OPERATING ROOM OR OUTSIDE

RADIUS

ORD ORDNANCE OR OVERFLOW ROOF

DRAIN

ORG ORGANIC

ORIG ORIGINAL

ORN ORNAMENTAL

OSHA OCCUPATIONAL SAFETY AND

HEALTH ADMINISTRATION

OUT OUTLET

OZ OUNCE

PAR PARALLEL OR PARAPET

PARA PARAGRAPH

PART PARTIAL

PAT PATTERN

PB PUSH BUTTON

PBD PARTICLE BOARD

PC PIECE, POLYCARBONATE OR

PORTLAND CEMENT

PCA PORTLAND CEMENT

ASSOCIATION

PCC PRECAST CONCRETE

PCCP CONCRETE PAVEMENT

PCD PAPER CUP DISPENSER

PCF POUNDS PER CUBIC FOOT

PCP PORTLAND CEMENT PLASTER

PED PEDESTAL

PEN PENETRATE

PEND PENDANT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PGBD PEGBOARD

PHAR PHARMACY

PHOTO PHOTOGRAPH

PHS PHILLIPS HEAD SCREW

PKG PACKAGE

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER OR PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PMTL PAINTED METAL

PNEU PNEUMATIC

PNL PANEL

PO POST OFFICE PURCHASE ORDER

PO PURCHASE ORDER POST OFFICE

POLY POLYETHYLENE (PLASTIC)

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATE

PREFIN PREFINISH

PRELIM PRELIMINARY

PREP PREPARATION

PRESS PRESSURE

PREV PREVIOUS

PRKG PARKING

PRMLD PREMOLDED

PROJ PROJECT

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT, PNEUMATIC TUBE, OR

PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PVC POLYVINYL CHLORIDE (PLASTIC)

PVG PAVING

PWR POWER

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QRY QUARRY

QT QUARRY TILE

QTB QUARRY TILE BASE

QTF QUARRY TILE FLOOR

QTR QUARTER

QTY QUANTITY

QUAD QUADRANT

QUAL QUALITY

R RADIUS OR RISER

RA RETURN AIR

RAD RADIATOR

RB RESILIENT BASE OR RUBBER

BASE

RB HK ROBE HOOK

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REMOTE CONTROL

RCP REFLECTED CEILING PLAN

RCVR RECEIVER

RD ROAD OR ROOF DRAIN

REC RECESSED

RECD RECEIVED

RECPT RECEPTACLE

RECT RECTANGLE

REF REFERENCE OR REFRIGERATOR

REFR REFRACTORY REFRIGERATION

REFR REFRIGERATION REFRACTORY

REG REGISTER

REINF REINFORCE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

RET RETURN

REV REVISION

RF RADIO FREQUENCY

RFG ROOFING

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RHMS ROUND HEAD MACHINE SCREW

RHR RIGHT HAND REVERSE

RHWS ROUND HEAD WOOD SCREW

RL ROOF LEADER

RLG RAILING

RM ROOM

RND ROUND

RO ROUGH OPENING

ROW RIGHT OF WAY

RPM REVOLUTIONS PER MINUTE

RS ROUGH SAWN

RT RIGHT

RV ROOF VENT

RVS REVERSE

RWD REDWOOD

RWL RAIN WATER LEADER

SA SUPPLY AIR

SALV SALVAGE

SAMP SAMPLE

SAN SANITARY

SAT SUSPENDED ACOUSTICAL TILE

SATC SUSPENDED ACOUSTICAL TILE

CEILING

SB SPLASH BLOCK

SBS STYRENE BUTADIEN STYRENE

SBSTR SUBSTRATE

SC SHADING COEFFICIENT OR SOLID

CORE

SCH SCHOOL

SCHED SCHEDULE

SCHEM SCHEMATIC

SCP SCUPPER

SCRN SCREEN

SCT STRUCTURAL CLAY TILE

SCWD SOLID CORE WOOD DOOR

SD SHOP DRAWINGS, SMOKE

DETECTOR, OR SOAP DISPENSER

SDG SIDING

SECT SECTION

SEG SEGMENT

SEL SELECT

SEP SEPARATE

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGD SLIDING GLASS DOOR

SGL SINGLE

SHR SHOWER

SHR HD SHOWER HEAD

SHRD SHOWER DRAIN

SHT SHEET

SHT MTL FLASH SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SJI STEEL JOIST INSTITUTE

SK SKETCH

SKLT SKYLIGHT

SLD WDW HORIZONTAL SLIDING

WINDOW

SLDG SLIDING

SLNT SEALANT

SM SHEET METAL

SMK SMOKE

SND SANITARY NAPKIN

DISPENSER

SND INS SOUND INSULATION

SNDU SANITARY NAPKIN

DISPOSAL UNIT

SPEC SPECIFICATION

SPKLR SPRINKLER

SPKR SPEAKER

SPLY SUPPY

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SANITARY SEWER OR

SERVICE SINK

SST STAINLESS STEEL

ST STAIRS OR STREET

STC SOUND TRANSMISSION

CLASS

STD STANDARD

STIF STIFFENER

STL JST STEEL JOIST

STL LNTL STEEL LINTEL

STL PL STEEL PLATE

STL RF DK STEEL ROOF DECK

STL TB STEEL TUBE

STL TR STEEL TRUSS

STNLS STAINLESS

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

STRUCT STL STRUCTURAL STEEL

SUB SUBSTITUTE

SURF SURFACE

SUSP SUSPEND

SUSP CLG SUSPENDED CEILING

SV SHEET VINYL

SW SWITCH

SWDR SWING DOOR

SYM SYMBOL

SYNTH SYNTHETIC

SYS SYSTEM

T TREAD

T&G TONGUE AND GROOVE

T&M TIME AND MATERIALS

TB THROUGH BOLT OR TOWEL

BAR

TCA TILE COUNCIL OF AMERICA

TCP TELEPHONE CONTROL

PANEL TEMPERATURE OR

TRAFFIC CONTROL PLAN

TD TOWEL DISPENSOR

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE OR

TEMPORARY

TER TERRAZZO

THD THREAD

THERM THERMAL

THK THICKNESS

THRES THRESHOLD

THRU THROUGH

THRUOUT THROUGHOUT

TK BD TACKBOARD

TMPD TEMPERED

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TO TOP OF ___

TO FDN TOP OF FOUNDATION

TOB TOP OF BEAM

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPH TOILET PAPER HOLDER

TR TOWEL RACK

TRANS TRANSOM

TRANS WD FIN TRANSPARENT WOOD

FINISH

TRTD TREATED

TS TENSILE STRENGTH OR

TUBE STEEL

TSTAT THERMOSTAT

TV TELEVISION

TYP TYPICAL

U HEAT TRANSFER

COEFFICIENT

UC UNDERCUT

UCD UNDERCUT DOOR

UGND UNDERGROUND

UL UNDERWRITERS

LABORATORIES

ULT ULTIMATE

UNFIN UNFINISH

UNO UNLESS NOTED OTHERWISE

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER

SUPPLY

UR URINAL

UTIL UTILITY

UV ULTRAVIOLET

V VOLT

VAC VACUUM

VAR VARIES

VCT VINYL COMPOSITION TILE

VITRIFIED CLAY TILE

VEH VEHICLE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VFAT VINYL FACED ACOUSTICAL

TILE

VIC VICINTY

VID VIDEO

VIF VERIFY IN FIELD

VNR VENEER

VOC VOLATILE ORGANIC

COMPOUND

VOL VOLUME

VOLT VOLTAGE

VP VENEER PLASTER

VR VAPOR RETARDER

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

VWF VINYL WALL FABRIC

W WIDE OR WEST

W/ WITH

W/O WITHOUT

WARR WARRANTY

WBL WOOD BLOCKING

WC WALL COVERING OR WATER

CLOSET

WC WL HNG WATER CLOSET, WALL HUNG

WCHR WATER CHILLER

WCL WL MTD WATER COOLER, WALL HUNG

WD WOOD

WDW WINDOW

WF WIDE FLANGE

WFAB WALL FABRIC

WFR WOOD FRAME

WFS WOOD FURRING STRIPS

WH WATER HEATER

WHSE WAREHOUSE

WLD WELDED

WM WIRE MESH

WP WATERPROOFING

WPD WATER PRESSURE DROP

WPM WATERPROOF MEMBRANE

WPR WALL PROTECTION/RAILING

WR WEATHER RESISTANT

WS WEATHERSTRIP

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

X BRACE CROSS BRACE

XPS EXTRUDED POLYSTYRENE

BOARD (INSULATION)

YD YARD

YR YEAR

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

660-CSI-115

8/19/2022

100% CONSTRUCTION

DOCUMENT DEXA SITE PREP PROJECT

GI-020

ARCHITECTURAL

ABBREVIATIONS

PACSPACS

PACS

PACS

STORAGE

5 5 5

COPIER

SMALL

REF

1F02-1

D0WN

D0WN

UP

1C21-1

STAIR LEVEL

1C00A-1

CSC OFFICE

CSC OFFICE1D18-1

1D34A-1

1H19-1

1H03-1

1H

F-

M R

I C O

N

TR

O L

AR

EA

1H00E-1CORRIDOR (TO MRI & BREAKRM.)

1A15A-1CLEAN UTILITY

1C16A-1STORAGE

1C16-1THERAPY

1F17-1PT OFFICE

1F19-1WORKROOM

1F09-1PHYS EXAM RM. # 02

1F13-1PHYS EXAM RM. # 04

1F21-1STORAGE

1F23-1PHYS EXAM RM. # 03

1F33K-1EXAM RM. # 07

1F33L-1TRACTION

1F31-1EXAM RM. # 06

1F01A-1SECURE STORAGE

1F01-1SECURE STORAGE

1F00D-1CORRIDOR

1F05-1PM & R TEAM ROOM

1F07-1EXAM RM. # 01

1F11-1EXAM RM. # 03

1F15-1EXAM RM. # 051F29-1PHYS EXAM # 07

1F00C-1CORRIDOR

1F25-1TOILET (UNISEX)1F29-1HAC

1F20-1OCC. TRAINING

1F20A-1BATH ROOM

1F20B-1CLOSET

1F20C-1QUIET ROOM

1F33A-1HAND THERAPY

1F33-1PHYSICAL THERAPY GYM

1F33B-1EXAM RM. # 05

1F33C-1EXAM RM. # 04

1F33D-1EXAM RM. # 03

1F33H-1EXAM RM. # 02

1F33I-1EXAM RM. # 01

1F33J-1CARDIAC REHAB

1F33F-1ELECTRICAL

1F33E-1EMERGENCY1F33G-1TEL/DATA

1F00E-1CORRIDOR

1F22-1MECHANICAL

1E23-1LAB (HOT)

1E22-1TREATMENT (PETSCAN)

1E20-1(PATIENT)

1E18-1TREATMENT # 01 (INJECTION)

1E21-1TREATMENT # 03 (INJECTION)

1E19-1TREATMENT # 02 (INJECTION)

1E

-1 C

O N

TR

O

L R

M

PE

TS

C

AN

1E91-1ENTRANCE (TO UTILITY TUNNEL)

1E17-1RESTROOM

1EAD-1AUX. SYSTEMS

1EAC-1TEL/DATA

1EAB-1ENTRY (UTILITIES)

1EAA-1ELECTRICAL

1EA-1STAIR LEVEL1E00A-1CORRIDOR

1E15-1ULTA-SOUND RM. # 03

1E13A-1MEDICINE

1E

B-

O

FF

IC

E

(A

SS

T.

C

H

IE

F)

1E01A-1OFFICE (SECRETARY)

1E01-1RECEPTION

1E03-1STORAGE

1E07-1MULTI-VIEWING RM.

1E05-1IMAGING RM. # 01

1E07A-1CONTROL ROOM

1E00.01-1PREP. AREA

1E09-1IMAGING RM. # 02

1E11A-1TOILET (STAFF)

1E11B-1BATH/SHOWER

1E11-1STAFF LOCKER

1E16-1VASCULAR ROOM

1E13-1VASCULAR LAB

1E14-1ULTA-SOUND RM. # 04

1E08-1

STRESS TEST RM.

1E10-1

IMAGING RM. # 03

1E

-1

EX

TR

AS

TI

TI

AL

S

PA

C

E 1E

-1

EX

TR

AS

TI

TI

AL

S

PA

C E

1E

-1

EX

TR

AS

TI

TI

AL

S

PA

C

E

1E12-1LOUNGE (NUCMED)

1E06A-1STORAGE (NUCMED)

1E

R

AD

IO

P

H

AR

M

AC

EU

TI

TI

C

AL

S

LA

B

1E04TOILET

1E02WAITING AREA

1F12A-1CONFERENCE RM

1F00F-1FIRE HOSE/EXT

1F16-1TOILET (UNISEX)

1F18-1LOCKERS (STAFF)

1F04-1WHEELCHAIR CLINIC

1F08-1OFFICE

1F14-1VISION REHAB

1F12-1PANS ROOM

1F10-1OFFICE

1C00B-1CORRIDOR

1C00C-1LOBBY

1C33A-1STORAGE (BOTTLED GLASS)

1C33-1UTILITY (CLEAN)

1C31-1UTILITY (SOILED)

1C31A-1MECHANICAL (ACCESS)

1C31B-1LINEN (SOILED)

1C31C-1STORAGE (TRASH)

1C31CC-1STORAGE (INFECTIOUS)

1C

B-

TE

L/

D

AT

A 1C29-1THERAPY (HANDS)1C29A-1OFFICE

1C27-1STORAGE

1C25-1HAC

1C23-1TEL/DATA

1C14-1ELECTRICAL

1C12-1TEL/DATA

1C10-1FIRE EQUIP

1C21A-1TOILET (UNISEX)

OFFICE (IRMS)

1A

A-

1C17BA-1STORAGE

1CA-1

1A04-1

1C08-1OFFICE (CHIEF)

1F00-1

1A04D-1

CORRIDOR

EXAM #10

CORRIDOR

1E00-1

STORAGE

CORRIDOR

1C00-1CORRIDOR

1C17A-1OFFICE

1C17B-1OFFICES (2-WRKSTNS)

1C

C-

PI

PE

C H

AS

E

1C17-1OFFICES (3-WRKSTNS)1C15-1OFFICES (5-WRKSTNS)

1C13A-1(PRIVATE)

1C13-1OFFICE

1C06-1OFFICE

1C09-1OFFICE (CHAPLIN)

1C11-1OFFICE (CHAPLIN)

1C04-1OFFICE

1C07-1OFFICE (CHAPLIN)

1C05-1STORAGE (CHAPLIN)

1C02-1OFFICE

1C

-1

PI

PE

C

H

AS

E

1B17H-1CLOAKRM

1C03-1TOILET (MEN)1B19-1TOILET (WOMEN)

1B21-1FIRE EQUIP

1B00D-1LOBBY

1BE2-1"B" ELEVATOR LEVEL

1BE1-1"A" ELEVATOR LEVEL

1BA-1STAIR LEVEL

1B06A-1RECEPTION

1D02-1HALL

1D02A-1ELECTRICAL

1B06D-1WAITING AREA

1B06C-1TOILET (WOMEN)

1B06B-1TOILET (MEN)

1B23-1HAC

1B25A-1ELECTRICAL

1B25-1ELECTRICAL

1B27-1SHOP

1B29-1TELE/DATA

1B12-1OFFICE

1B14-1OFFICE

1B10-1OFFICE

1B31-1OFFICE

1B33-1OFFICE

1B

CA

-1

ST

O

R

AG

E 1B35C-1CONFERENCE RM

1B35B-1MECH (NAT. GAS)

1B35A-1OFFICE

1BB-1STAIR LEVEL

1B47-1WORKRM (1-WRKSTN)

1B45-1OFFICE

1B43-1OFFICE

1B41-1STORAGE

1B39-1FIRE EQUIP

1B37-1OFFICE

1B35-1OFFICE

1B16-1OFFICE

1B18-1OFFICE

1B20-1OFFICE

1B00E-1CORRIDOR

1B00F-1CORRIDOR

1D

-1 C

O R

R

ID

O R

(T O

M R

I/C T)

1B22-1OFFICE

1B24A-1CSC OFFICE

1B24-1CSC WAITING AREA

1B24D-1

1B17BA-1

1B24C-1CSC OFFICE

1B24B-1

1B00C-1

1D06A-1STORAGE

1D06-1CHEST

1D

-1 D

R

ES

SI

N

G A

R

EA

1D10-1DRESSING AREA

1D08-1BONE SCAN

1D12-1ENTRY

1D12A-1TOILET

1D14-1OFFICES (ACI/MANDATE)

1D14A-1OFFICE (ACI/MANDATE)

1D14B-1OFFICE (ACI/MANDATE)

1D16-1MECHANICAL

1DA-1STAIR LEVEL

"F " E

LE

VA

TO

R

L

EV

EL

PHONE

1B E3

-1

"E " E

LE

VA

TO

R

L

EV

EL

FIRESAFETY EQP

1HD00C-1CORRIDOR (TO MRI)

1D00A-1CORRIDOR (MRI/CT & EXIT)

1H37.01-1LOCK BOX (GUN)

1H

-1

SU

B W

AI

TI

N G

A R

EA

1B03-1

OFFICE

1D34B-1OFFICE

1D34-1OFFICE 1D22-1UTILITY1D24-1UTILITY1D26-1HAC

1D28-1OFFICE

1D30-1OFFICE

1D01-1CT SCANNER-02

1D03-1CONTROL ROOM(CT 02)

1D00B-1CORRIDOR (TO NEW MRI&CT)

CONFERENCE ROOM

1H01A-1STORAGE (CT EQUIP)

RESIDENT DIRECTOR

CT CONTROL

1H01-1CT SCANNER

1H00A-1CORRIDOR (TO CT)

1H05-1RM-ADA

1H07-1TOILET (MEN)

1H00-1CORRIDOR (TO MRI & EXIT)

1H09-1TOILET (WOMEN)

1H11-1DRESSING RM

1H13-1STORAGE (FUTURE X-RAY)

1H15-1X-RAY

1H00B-1VESTIBULE

1H27AA-1MECHANICAL

1H25A-1STORAGE

1H27A-1MECHANICAL

1H21A-1STORAGE 1H21B-1STORAGE

1H23-1MRI (ZONE 4)

1H25-1DATA

1H27-1MECHANICAL

1H21-1MRI (ZONE 4)

1H00E.01-1STORAGE

1H00G-1CORRIDOR (TO BREAK RM)

1H

A-

N U

R

SI

N G

S

TA

TI

O

N

1H17-1DATA

1H31A-1LOCKERS (STAFF)

1H29-1TOILET (UNISEX)

1H35I-1DRESSING RM

1H31-1BREAK RM (STAFF)

1H35A-1OFFICE (INTERVIEW)

1H33-1PREP AREA

1H35B-1TOILET

1H35-1SUB WAITING

1H33B-1STORAGE (EQP)1H33C-1TOILET (UNISEX)

1H35C-1TOILET

1H35D-1DRESSING RM

1H35E-1DRESSING RM

1H35F-1DRESSING RM

1H39C-1EXAM/TREATMENT RM

1H35G-1DRESSING RM

1H35H-1LINEN (CLEAN)

1H39-1CT SCAN

1H39B-1DRESSING RM

1D36-1ELECTRICAL

1D38-1TOILET (HC)

1D32BB-1OFFICE (ACI MANDATE)

1D32A-1STORAGE

1D32-1VIEWING/READING

1D66-1AUTO

1D19-1HAC

1D64-1G/P #02

1D62-1TOILET1D60-1TOILET

1D58-1G/P #01

1D56A-1LOUNGE

1D56B-1STORAGE

1D56C-1LOCKER RM. (STUDENTS)

1D66A-1STORAGE

1D56-1VIEWING

1D

D-

BA

R

IU

M

P R

EP

1D48A-1STORAGE (EQP)

1D54-1R/F #02

1D52-1TOILET

1D50-1TOILET

1D48-1R/F #01

1D46-1TOILET

1D00D-1CORRIDOR (WC)

1D44B-1CONTROL

1D42A-1CONTROL

1D00G-1REAR ENTRY (WC)

1H39A-1TOILET (UNISEX)

1D32B-1MULTI-VIEWING

1D40-1BIOMED

1D00C-1MAIN ENTRANCE (WC)

1D42B-1EQUIPMENT

1D45-1BREAK ROOM

1D42-1ANGIOGRAPHY

1D69-1DEXA SCANNER (BONE DENSIYT)

1D44-1SPECIAL PROCEDURES

1D44A-1STROAGE

1D53-1LAB

1D61-1HAC

1D71-1STORAGE

1D75A-1STORAGE

1D00I-1CORRIDOR (WC INTERIOR)

1D59-1MED ROOM

1D67-1OFFICE #02

1D65-1CONF/BREAKRM

1D63-1OFFICE

1D73-1UTILITY (CLEAN)

1D77-1EXAM ROOM 7

1D75-1EXAM # 06

1D55-1EXAM # 03 1D57-1EXAM # 04

1D49-1EXAM RM # 011D51-1EXAM # 02

1D79-1TOILET (UNISEX)

1D81-1EXAM # 05

1D00GA-1RECEPTION

1D47-1OFFICE #01

1D00F-1FRONT ENTRY

1D45A-1WAITIG/EDUCATE

1D00G-1CORRIDOR (WC INTERIOR)

1D45-1WAITIG AREA

1A23-1OFFICE

1A25-1OFFICE

1A27F-1OFFICE

1A27E-1OFFICE

1A27D-1COPIER/FILES

1AB-1STAIR LEVEL

1A

C-

C O

N

FE

R

EN

C E

R M

1A27B-1OFFICE 1A27A-1OFFICE

1A27-1OFFICES (MCCR)

1A20-1CONF/TRAIN/BREAKRM (110D)

1A16E-1HAC

1A16.05-1EXAM #06

1A16.06-1EXAM #04

1A16.04-1EXAM #07

1A16.03-1EXAM #05

1A16DB-1STORAGE 1A

DA

-1

U

TI

LI

TY1A16D-1PACS

1A14A-1STORAGE

1A16FA-1MECHANICAL

1A16F-1WORKRM (STAFF)

1A16C-1STORAGE 1A16B-1EXAM #02

1A16A1TOILET (UNISEX)

1A16-1PODIATRY CLINIC

1A16.02-1EXAM #03

1A16.01-1EXAM #01

1A18-1WAITIG AREA

1A21-1RECEPTION (110D) 1A

B-

SH

O

P/

EL

EC

TR

IC

AL

1A19A-1AUX. SYSTEMS

1A19C-1TEL/DATA1A19-1ENTRY (UTILITIES)

1A17-1FIRE EQUIP.

1A14-1(4-WRKSTNS)

1AA-1STAIR LEVEL

1A

-1 O

FF

IC

E (2

-W R

KS

TN

S)

1A

-1

PO

D

IA

TR

Y

R

ES

ID

EN

T O

FF

IC

E

1A08-1PODIATRY (CONF. RM.)

1A06-1EXAM #08

1A

-1

LA

B (R

EH

AB

/P O

D

IA

TR

Y)

1A13-1CONF/BREAKRM

1A11-1OFFICE

1A04E-1EXAM #09

D

EN

TA

L

H

YG

IE

N

E

OFFICE (CALL CTR.)

1A04C-1

1A07-1SHOP (BIOMED)1A09-1UTILITY (SOILED)

1A02A-1OFFICE (110, WC)

1A02-1OFFICES (WC)

1A

-1 U

TI

LI

TY

(C

LE

AN

1A03-1STORAGE (FILES) 1A01-1LOCKERS

1A00-1CORRIDOR 1B00-1CORRIDOR

1A02B-1OFFICE (110, WC)

1B06E-1MECHANICAL RM.

1B06-1RADIOLOGY

1B06F-1TELEPHONE

1B06G-1TELEPHONE 1B08-1ELECTRICAL

1B04-1DENTAL HYGIENE (110D)

1B17-1CHAPEL

1B00A-1CORRIDOR

1B15-1STORAGE (ESCORT)

CORRIDOR

1BE3-1SERVICE ELEVATOR

1B13-1OFFICE (00Q)

MOTHER'S RM (110D)

1B

-1

TE

L/ D

AT

A

1B

B-

ST

O

R

AG

E

1B17E-1STORAGE

1B17C-1STORAGE

1B17D-1STORAGE 1B17F-1STORAGE

1B17G-1STORAGE

STORAGE

CORRIDOR

1B00F-14CORRIDOR

1B

A-

ST

O

R

AG

E

1BB-14STAIR LEVEL

1B E1

-1

"C " E

LE

VA

TO

R

L

EV

EL

1B E2

-1

"D " E

LE

VA

TO

R

L

EV

EL

1B E4

-1

1B09-1MECHANICAL

1B

-1

TE

L/ D

AT

A

ELECTRICAL1B

-1 U

TI

LI

TI

ES

1B01FB-1TOILET (UNISEX)

1BC-1STAIR LEVEL1B01F-1ENTRY 1B01FA-1

1B01E-1

1B01.01-1RECEPTION DECK

1B01-1PHARMACY OFFICES

1B01C-1

OFFICE

1B01A-1PROCUREMENT

1B01B-1OP SUPPORT

1F12A

DIRECTOR of PHARMACY

1B01D-1ASSIST. DIRECTOR

CONFERENCE RM

RECEPTION DESK1F03A-1

1F03-1

CORRIDOR

1B00B-1

1F00A-1 CORRIDOR

CORRID

OR

1F00B-1

1G

DRESSING

1B02-1

DRESSING RM

TOILET

RECEPTION/ADMIN

VESTIBULE

1G 0A

OFFIC

E(00

1G 01A

STORAGE

1G 01B

OFFIC

E(11

1G 02B

OFFIC

E(11

1G

OFFIC

E(11

A)

1G 02B

OFFIC

E

1G

OFFIC

E

1G

OFFIC

E

1G

OFFIC

E

1G 08A

FIR

E EQUIPMENT

1G

OFFIC

E

1G

CONF R

OOM

1G

1G18TEL/ DATA

1G14HAC

STORAGE

1G 12B

STORAGE

1G 12A

1G16TOILET(FEMALE)

1G20ELECTRICAL

1G22TOILET(MALE)

1G00BCORRIDOR

1G00CCORRIDOR1G17HBOOK-DROP

1G17GLOBBY PATIENT

1G17LOBBY

1G17EOFFICE (2 STAFF)

1G17FOFFICE (1 STAFF)

1G17COFFICE (LIBRARY CHEF)

1G17BBTEL/DATA

1G17BHAC

1G17AFIRE EQUIPMENT

1G15AWORKROOM

1B01.02-1

1G15CONFERENCE 1G13OFFICE

1G17.06CIRCULATION DESK

1H00BLIBRARY

TOILE

T

1G 01C

OFFIC

E

1G

OFFIC

E

1G

03COPIER

1G03B

OFFIC

E

OFFIC

E

1G

OFFIC

E

1G

COPIER

1G

COPIER

1G 07A

WAITING AREA

1D14C

STORAGE

STORAGE

1AA-1STAIR

COPIER

COPIERC

O

P

IE

R

OXYGENTANKSCONTAINER

COPIER

1C19

SOILED

1CE4

TOILET(M)1C16-1 TOILET(W)1C18-1

VESTIBULE

LEVEL

ELEVATOREQUIPMENT1C35-1 STAIR LEVEL 'A'1CB-1

1C00CA-1

ELEV LOBBY1CE5ELEV LOBBY

PROSTHETICSSTORAGE1F24-1

LEVEL1CE4-1 1CE5-1

ENTRY

STAIR B

1EB

SHELL SPACE

1E25

ELECTRICAL

TRANSFORMER

1E26

ELEVATOR ELEVATOR

TV

1D01A-1DATA

AS-101

N

1 OVERALL FLOOR PLAN - FIRST FLOOR

SCALE: 1" = 20'-0"

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

660-CSI-115

8/19/2022

100% CONSTRUCTION

DOCUMENT DEXA SITE PREP PROJECT

AS-100

OVERALL FLOOR PLAN

VV

JY

MULT

BAT

1E08-1

STRESS TEST RM.

1E10-1

IMAGING RM. # 03

1E

-1

EX

TR

AS

TI

TI

AL

S

PA

1E

-1

EX

TR

AS

TI

TI

AL

S

PA

C

E 1E12-1

LOUNGE (NUCMED)

1E00-1

CORRIDOR

1 EXISTING IMAGING & STRESS ROOMS

SCALE: 1/4" = 1'-0"

N

3E 8E

2E

7E

4E

1E

2E

11E

7E

2E

2E

6E 5E

12E

12E

9E

9E

MULT

BAT

1E

-1

EX

TR

AS

TI

TI

AL

S

PA

1E

-1

EX

TR

AS

TI

TI

AL

S

PA

C

E

1E12-1

LOUNGE (NUCMED)

1E00-1

CORRIDOR

OFFICE

1E10B

STRESS

TEST

1E10A

DEXA

1E08

2 PROPOSED FLOOR PLAN

SCALE: 1/4" = 1'-0"

N

8P

1P

4P

7P

3P

6P

6P

6P

9P

3P 9P

3P 9P

13P

2P

2P

2P

14P

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

660-CSI-115

8/19/2022

100% CONSTRUCTION

DOCUMENT DEXA SITE PREP PROJECT

AS-101

EXISTING AND PROPOSED

FLOOR PLAN

VV

JY

GENERAL NOTES - EXISTING

A. REFERENCE GENERAL NOTES ON SHEET

GI-020.

B. UNLESS NOTED OTHERWISE, EXISTING WALLS

ARE 5/8" GYPSUM BOARD EACH SIDE ON 3 5/8"

METAL STUDS FRAMED TO UNDERSIDE OF

PRIMARY FRAMING STRUCTURE (CONCRETE).

C. UNLESS NOTED OTHERWISE, EXISTING DOOR

ASSEMBLIES ARE SOLID CORE WOOD/HOLLOW

METAL FRAME TYPICAL (4' X 7'-0").

D. UNLESS NOTED OTHERWISE, EXISTING LAY-IN

CEILING ASSEMBLIES ARE 2' X 2' STANDARD

GRID WITH FISSURED TILES, SQUARE EDGE AT

9'-4" A.F.F. TYPICAL.

E. UNLESS NOTED OTHERWISE, EXISTING

FLOORING (TILES OR ROLLS) IS GLUED DOWN.

F. PARTIAL OR ENTIRE DEMOLITION OF EXISTING

CEILING ASSEMBLIES WILL BE NECESSARY

AND WILL REQUIRE RECONSTRUCTION TO

MATCH EXISTING OR BETTER CONDITIONS.

REFERENCE ALL DISCIPLINE DEMOLITION AND

NEW CONSTRUCTION DRAWINGS.

G. CONTRACTOR SHALL REMOVE THE EXISTING

LIFT BY REQUESTING COR SUBCONTRACTOR

CERTIFIED FIRMS TO PERFORM THIS TASK.

REFER SPECIFICATION SECTION 117300

CEILING MOUNTED PATIENT LIFT SYSTEM.

KEYED NOTES - EXISTING

1E. PORTION OF EXISTING WALL TO BE REMOVED

TO ACCOMMODATE NEW DOOR/FRAME

ASSEMBLY.

2E. REMOVE EXISTING MISCELLANEOUS

EQUIPMENT. COORDINATE NEW LOCATION

WITH COR.

3E. EXISTING SCANNER AND BASE RAIL TO BE

REMOVED BY OWNER.

4E. EXISTING DESKTOP AND UPS TO BE

RELOCATED. COORDINATE NEW LOCATION

WITH COR.

5E. EXISTING TV MONITOR TO BE REMOVED FOR

REINSTALLATION IF INDICATED.

6E. EXISTING WINDOW ASSEMBLY TO REMAIN.

7E. EXISTING SINK TO REMAIN.

8E. EXISTING STORAGE TO BE RELOCATED BY

OWNER.

9E. EXISTING WALL SCONCE (REFER 4/AS-401 AND

4/AS-402) TO BE REMOVED BY CONTRACTOR.

10E. NOT USED

11E. EXISTING COUNTER/BASE CABINET AND

UPPER WALL CABINETS TO BE REMOVED.

12E. REFERENCE TECHNOLOGY AND MEP

DRAWINGS FOR WORK SCOPE AT EXISTING

ROOM.

EXISTING WALL TO REMAIN

EXISTING WALL TO BE REMOVED

EXISTING DOOR/FRAME ASSEMBLY

TO REMAIN

EXISTING WINDOW ASSEMBLY TO REMAIN

LEGEND - EXISTING

GENERAL NOTES - PROPOSED

A. REFERENCE GENERAL NOTES ON SHEET

GI-020.

B. UNLESS NOTED OTHERWISE, EXISTING WALLS

ARE 5/8" GYPSUM BOARD/ 3 5/8" METAL STUD

FRAMED TO UNDERSIDE OF PRIMARY BUILDING

FRAMING STRUCTURE.

C. UNLESS NOTED OTHERWISE, EXISTING DOORS

ARE SOLID CORE WOOD WITH HOLLOW METAL

FRAME (4'-0" X 7'-0").

D. UNLESS NOTED OTHERWISE LAY-IN CEILING

ARE 2'X2' FISSURED TILES SQUARE EDGE AT

8'-0" AFF.

E. PARTIAL CORRIDOR RECONSTRUCTION OF

SOME EXISTING CEILING ASSEMBLIES

THROUGH OUT, SPECIALLY IN CORRIDORS,

WILL BE NECESSARY. REFERENCE ALL

DISCIPLINE DEMOLITION DRAWINGS.

RECONSTRUCTION IS TO MATCH EXISTING OR

BETTER CONDITIONS.

F. ALL NEW WALLS SHALL BE PARTITION TYPE '1'

UNLESS OTHERWISE NOTED.

G. FIELD VERIFY ALL EXISTING DIMENSIONS.

NOTIFY COR, BEFORE EXECUTION OF WORK, IF

ANY DISCREPANCIES.

H. REFERENCE AS-200 FOR REFLECTED CEILING

PLANS.

KEYED NOTES - PROPOSED

1P. PROVIDE NEW WALL (FLOOR TO UNDERSIDE

OF STRUCTURE) TO MATCH EXISTING.

REFERENCE ROOM FINISH SCHEDULE.

2P. VERIFY EXISTING INTERIOR PERIMETER

ROOM WALLS TO BE SEALED TOP AND

BOTTOM.

3P. PROVIDE NEW FLOORING AS SCHEDULED.

4P. PROVIDE AND INSTALL NEW DOOR, FRAME

AND HARDWARE SUCH AS INDICATED ON

DOOR SCHEDULE.

5P. NOT USED.

6P. PROVIDE NEW ROOM SIGNAGE. COORDINATE

NUMBER AND NAME WITH COR.

7P. NEW DEXA AND ACCESSORIES TO BE

INSTALLED PER MANUFACTURE

SPECIFICATION. COORDINATE FINAL

LOCATION WITH COR.

8P. PROVIDE NEW BASE CABINET, UPPER WALL

AND NEW SOLID SURFACE.

9P. REFERENCE MEP DRAWINGS FOR ROOM

WORK SCOPE.

10P. NOT USED.

11P. NOT USED.

12P. NOT USED.

13P. REPAIR FLOOR AS NEEDED WHERE CT SCAN

FLOOR MOUNTING OCCURED.

14P. OFCI APPLIQUE ON BOTH SIDES OF WINDOW.

ART SUBJECT TO BE PROVIDED BY VA.

EXISTING WALL TO REMAIN

NEW WALL CONSTRUCTION

EXISTING DOOR/FRAME ASSEMBLY TO

REMAIN

EXISTING WINDOW ASSEMBLY TO

REMAIN

NEW DOOR/FRAME ASSEMBLY

1 HR. FIRE-RATED WALL

LEGEND - PROPOSED

TEMPORARY WALL

MULT

BAT

1E

-1

EX

TR

AS

TI

TI

AL

S

PA

1E

-1

EX

TR

AS

TI

TI

AL

S

PA

C

E 1E12-1

LOUNGE (NUCMED)

1E00-1

CORRIDOR

1 EXISTING REFLECTING CEILING PLAN - DEMOLITION

SCALE: 1/4" = 1'-0"

N

1E

7E

1E

4E

3E

3E

6E

3E

5E

5E

4E

2E

7E6E

9E

TYP

8E

8E

8E

MULT

BAT

1E

-1

EX

TR

AS

TI

TI

AL

S

PA

1E

-1

EX

TR

AS

TI

TI

AL

S

PA

C

E

1E12-1

LOUNGE (NUCMED)

1E00-1

CORRIDOR

2 PROPOSED REFLECTED CEILING PLAN

SCALE: 1/4" = 1'-0"

N

1P

7P

1P

3P

3P

3P

6P

3P

5P

1P

4P

5P

8P

8P

8P

7P6P

7P6P

EQ

EQ

EQ

EQ

EQ

EQ

2P TYP

11P

TYP

10P

OFFICE

1E10B

STRESS

TEST

1E10A

DEXA

1E08

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

660-CSI-115

8/19/2022

100% CONSTRUCTION

DOCUMENT DEXA SITE PREP PROJECT

AS-200

EXISTING AND PROPOSED

REFLECTED CEILING PLAN

VV

JY

GENERAL NOTES - EXISTING

A. REFERENCE GENERAL NOTES ON SHEET

GI-020.

B. UNLESS NOTED OTHERWISE, ALL EXISTING

WALLS ARE 5/8" GYPSUM BOARD EACH SIDE

ON 3 5/8" METAL STUDS FRAMED TO

UNDERSIDE OF PRIMARY FRAMING

STRUCTURE (CONCRETE).

C. UNLESS NOTED OTHERWISE, EXISTING LAY-IN

CEILING ASSEMBLIES ARE 2' X 2' STANDARD

GRID WITH FISSURED TILES, SQUARE EDGE

AT 9'-4" A.F.F. TYPICAL.

D. NOT ALL EXISTING CEILING DEVICES ARE

SHOWN ON THESE DRAWINGS.

E. PARTIAL OR ENTIRE DEMOLITION OF SOME

EXISTING CEILING ASSEMBLIES, ESPECIALLY

IN CORRIDORS, WILL BE NECESSARY AND

WILL REQUIRE RECONSTRUCTION TO MATCH

EXISTING CONDITIONS. REFERENCE ALL

DISCIPLINE DEMOLITION AND NEW

CONSTRUCTION DRAWINGS.

KEYED NOTES - EXISTING

1E. REMOVE EXISTING 2'X2' CEILING ASSEMBLY

TO ACCOMMODATE NEW CEILING AT 8 FT AFF.

2E. EXISTING 2' x 4' LAY-IN CEILING FIXTURES TO

BE REMOVED. REFER TO DRAWING E-100.

3E. REMOVE AND SALVAGE ALL CEILING DEVICES

FOR RE-INSTALLATION.

4E. REMOVE EXISTING LIFT WITH RAILS AND

ACCESSORIES TO BE REINSTALLED PER THE

PROPOSED REFLECTED CEILING PLAN.

5E. REMOVE CURTAIN AND RAIL.

6E. REMOVE FIRE SPRINKLER HEADS, ACCESS

PANEL AND HVAC SUPPLY DIFFUSSER PER

MECHANICAL DRAWING MH200.

7E. REFER TO MECHANICAL DRAWING MH200 AND

TECHNOLOGY DRAWING T-100 TO

COORDINATE OVERHEAD WORK SCOPE.

8E. REMOVE EXISTING 2'X2' CEILING GYPSUM

PANEL TO BE REINSTALLED PER RENOVATION

DRAWINGS AND PHASING PLAN.

9E. EXISTING CABLE TRAY TO REMAIN.

LAY-IN CEILING ASSEMBLY

2X4 LIGHT FIXTURE

WINDOW ASSEMBLY TO REMAIN

LEGEND - EXISTING

SURVEILLANCE CAMERA

RTLS DEVICE - CENTRAK

LAY-IN CEILING ASSEMBLY TO BE

REMOVE TEMPORARILY

SPRINKLER HEAD

GENERAL NOTES - PROPOSED

A. REFERENCE GENERAL NOTES ON SHEET

GI-020.

B. UNLESS NOTED OTHERWISE, ALL EXISTING

WALLS ARE 5/8" GYPSUM BOARD/ 3 5/8" METAL

STUD FRAMED TO UNDERSIDE OF BUILDING

FRAMING STRUCTURE.

C. UNLESS NOTED OTHERWISE ALL EXISTING

LAY-IN CEILING ARE 2'X2' FISSURED TILES

SQUARE EDGE.

D. PARTIAL OR ENTIRE RECONSTRUCTION OF

SOME EXISTING CEILING ASSEMBLIES

THROUGH OUT, SPECIALLY IN CORRIDORS,

WILL BE NECESSARY. REFERENCE ALL

DISCIPLINE DEMOLITION DRAWINGS.

RECONSTRUCTION IS TO MATCH EXISTING OR

BETTER CONDITIONS.

E. FIELD VERIFY ALL EXISTING DIMENSIONS.

NOTIFY COR, BEFORE EXECUTION OF WORK, IF

ANY DISCREPANCIES.

F. CONTRACTOR SHALL REINSTALL LIFT IN THE

NEW DEXA ROOM BY REQUESTING CERTIFIED

COR SUBCONTRACTOR FIRMS.

G. REFERENCE AS-101 FOR FLOOR PLANS.

KEYED NOTES - PROPOSED

LEGEND - PROPOSED

1P. INSTALL NEW 2'X2' CEILING ASSEMBLY AT 8'-0"

AFF.

2P. PROVIDE NEW 2'X4' LAY-IN CEILING FIXTURES.

REFER TO ELECTRICAL DRAWING E-100.

3P. REINSTALL MISCELLANEOUS CEILING

DEVICES.

4P. CONTRACTOR SHALL REINSTALL EXISTING

LIFT AND RAIL BY A CERTIFIED

SUBCONTRACTOR (REQUEST CANDIDATE LIST

FORM FROM COR).

5P. INSTALL NEW CURTAIN AND RAIL.

6P. PROVIDE FIRE SPRINKLER HEADS, HVAC

SUPPLY AND RETURN DIFFUSER PER

MECHANICAL DRAWINGS AND MH200.

7P. REFER TO DRAWING MH200 AND T-100 FOR

COORDINATING MECHANICAL AND

TECHNOLOGY OVERHEAD SYSTEM.

8P. REINSTALL EXISTING IN-LAY CEILING PANELS.

9P. NOT USED.

10P. EXISTING CABLE TRAY TO REMAIN.

CONTRACTOR SHOULD COORDINATE

OVERHEAD SYSTEM WITH MEP DISCIPLINES.

11P. PROVIDE NEW 2'X2' LAY-IN CEILING FIXTURES.

REFER TO E-100.

NEW LAY-IN CEILING ASSEMBLY

NEW 2X4 LIGHT FIXTURE

EXISTING WINDOW ASSEMBLY TO REMAIN

SURVEILLANCE CAMERA

RTLS DEVICE - CENTRAK

TEMPORARY WALL

LAY-IN CEILING ASSEMBLY TO BE

REINSTALLED

EXISTING SPRINKLER HEAD

NEW 2X2 LIGHT FIXTURE

IMAGING RM. #3

1E10-1

STRESS TEST RM.

1E08-1

14'-8"

9' -4

14'-8"

9' -4

14'-0"

9' -4

14'-0"

9' -4

3 4

COMPUTER WORKSTATION

TREADMILL

STRETCHER

151312

8 9

1 2 3

*dwgmodels.com

17 17 17

17 1718

A

A

22 22

MULT

EX

TR

AS

1E00-1

CORRIDOR

DEXA

1E08

1 EXISTING STRESS ROOM LAYOUT

SCALE: 1/4" = 1'-0"

N

2 SOUTH ELEVATION

SCALE: 3/4" = 1'-0"

3 NORTH ELEVATION

SCALE: 3/4" = 1'-0"

4 WEST ELEVATION

SCALE: 3/4" = 1'-0"

5 EAST ELEVATION

SCALE: 3/4" = 1'-0"

AS-400

EXISTING STRESS ROOM

ELEVATIONS

VV

JY

GENERAL NOTES - EXISTING

A. EXISTING LAY-IN CEILING (TYP UNO)

B. REFERENCE AS-402 FOR PROPOSED DEXA

ROOM ELEVATIONS.

KEYED NOTES - EXISTING

1. WALL SCONCE

2. McQUAY UNIT

3. WALL MOUNTED SLEEVE

4. VAC

5. MED AIR

6. OXYGEN (O2)

7. BULLETIN BOARD

8. RETURN DIFFUSER

9. SUPPLY DIFFUSER

10. THERMOSTAT

11. COVER DISPENSER

12. PAPER TOWEL DISPENSER

13. SHOE COVER DISPENSER

14. SOAP COVER DISPENSER

15. SCRIPPS NEEDLE DISPENSER

16. WALL MOUNTED PHONE

17. POWER RECEPTACLE.

18. DATA OUTLET

19. LIGHT SWITCH

20. 12"X4" EXISTING CABLE TRAY (FIELD VERIFY

LOCATIONS)

21. ARJO MAXI-LIFT

22. CEILING MOUNTED CURTAIN TRACK AND

CURTAIN.

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

660-CSI-115

8/19/2022

100% CONSTRUCTION

DOCUMENT DEXA SITE PREP PROJECT

23'-5"

9' -4

23'-5"

9' -4

14'-8"

9' -4

14'-8"

9' -4

1 2 3

*dwgmodels.com

COMPUTER WORKSTATION

6 3

20 19

27 27 27 27 27

29 29

A

BAT

1E10-1

IMAGING RM. # 03

EX

TR

A

1E

-1

EX

TR

AS

TI

TI

AL

S

PA

C

E

1 EXISTING IMAGING ROOM LAYOUT

SCALE: 1/4" = 1'-0"

N

2 SOUTH ELEVATION

SCALE: 3/4" = 1'-0"

3 NORTH ELEVATION

SCALE: 3/4" = 1'-0"

4 WEST ELEVATION

SCALE: 3/4" = 1'-0"

5 EAST ELEVATION

SCALE: 3/4" = 1'-0"

AS-401

EXISTING CT SCAN ROOM

ELEVATIONS

VV

JY

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

660-CSI-115

8/19/2022

100% CONSTRUCTION

DOCUMENT DEXA SITE PREP PROJECT

GENERAL NOTES - EXISTING

A. EXISTING LAY-IN CEILING (TYP UNO)

B. REFERENCE AS-403 FOR PROPOSED STRESS

TEST AND OFFICE ELEVATONS.

KEYED NOTES - EXISTING

1. WALL SCONCE

2. 12"X4" EXISTING CABLE TRAY (FIELD VERIFY

LOCATIONS)

3. WALL MOUNTED SLEEVE

4. VAC

5. MED AIR

6. OXYGEN (O2)

7. NOT USED

8. RETURN DIFFUSER

9. SUPPLY DIFFUSER

10. THERMOSTAT

11. COVER DISPENSER

12. PAPER TOWEL DISPENSER

13. SHOE COVER DISPENSER

14. SOAP COVER DISPENSER

15. NOT USED

16. VISUAL ROOM PRESSURE MONITOR

17. EXTEC HYGRO-THERMOMETER CLOCK

18. EMERSON WIRELLES DATA LOGGER

19. NORTEC HUMIDIFIER

20. WALL MOUNTED STORAGE

21. ELECTRIC PANEL

22. EMERGENCY LIGHT

23. WALL MOUNTED SCREEN

24. EMERGENCY POWER SHUT-OFF

25. WALL MOUNTED PHONE

26. CHARGE STATION (PORTABLE LIFTS)

27. POWER RECEPTACLE

28. DATA OUTLET

29. LIGHT SWITCH

30. CEILING MOUNTED CURTAIN TRACK AND

CURTAIN.

14'-8"

14'-8" 14'-0"

14'-0"

COMPUTER

WORKSTATION

BY VA

DEXA BY VA

4 4

1 2 3

*dwgmodels.com

1 1

DEXA BY VA

4 4 4

4 4

4 55

8' -0

8'

-0

8' -0

8'

-0

4'-4" 4'-4"

2 2

9'-5"

4'-9"

4" 6"

1/

2" 4"

2'-1"

1"

1/4" PLYWOOD BACK COVER OVER

1X4 BLOCKING, FINISH AS SCHEDULED

KV-255 STEEL STANDARDS

& KV-256 CLIPS

3/4" ADJUSTABLE SHELF WITH

PLASTIC LAMINATE FACES & PVC EDGES

3/4" DRAWER & DOOR WITH PLASTIC

LAMINATE FACES & PVC EDGES

3/4" PLYWOOD TOP & BACKSPLASH

WITH PLASTIC LAMINATE FACES

AND PVC EDGES

KV-255 STEEL STANDARDS

& KV-256 CLIPS

3/4" DOOR WITH PLASTIC LAMINATE

FACES & PVC EDGES

3/4" ADJUSTABLE SHELVES WITH

PLASTIC LAMINATE FACES & PVC EDGES

1'-0"1/4" PLYWOOD BACK COVER OVER

1X4 BLOCKING, FINISH AS SCHEDULED

BASE AS SCHEDULED

1/2" PLYWOOD BOX WITH 1/4"

BOTTOM. FINISH AS SPECIFIED

2' -1

0" 1'

-1 1"

7' -3

2'

-6

7 CABINET DETAIL

SCALE: 3/4" = 1'-0"

7/

AS

-4

MULT

EX

TR

AS

1E00-1

CORRIDOR

DEXA

1E08

1 PROPOSED DEXA ROOM LAYOUT

SCALE: 1/4" = 1'-0"

N

2 SOUTH ELEVATION

SCALE: 3/4" = 1'-0"

3 NORTH ELEVATION

SCALE: 3/4" = 1'-0"

4 WEST ELEVATION

SCALE: 3/4" = 1'-0"

5 EAST ELEVATION

SCALE: 3/4" = 1'-0"

AS-402

PROPOSED DEXA ROOM

ELEVATIONS

VV

JY

Project Number

Building Number

Drawing Number

DrawnCheckedIssue Date

Location

Project Title

21 3 4 5 6 7 8 9 10

21 3 4 5 6 7 8 9 10

B

A

C

D

E

F

B

A

C

D

E

F

PhaseDrawing Title

Approved: Project Director

ARCHITECT OF RECORDCONSULTANTRevisions: Date:

U.S. Department of Veterans Affairs

Construction and Facilities Management

8718 Botts Lane Phone: (210) 816-4784 San Antonio, Texas 78217 Fax: (210) 881-6808 www.hfscompany.com jbianco@hfscompany.com

FULLY SPRINKLERED

660-CSI-115

8/19/2022

100% CONSTRUCTION

DOCUMENT DEXA SITE PREP PROJECT

GENERAL NOTES

KEYED NOTES - PROPOSED

1. PROVIDE NEW CEILING ASSEMBLY AT 8'-0".

2. PROVIDE NEW BASE CABINET.

3. PROVIDE NEW COUNTER TOP.

4. REFER TO MEP DRAWINGS FOR SCOPE.

5. REFER TO TECHNOLOGY DRAWINGS FOR

SCOPE.

6. REINSTALL EXISTING LIFT AND RAIL PER

MANUFACTURE INSTRUCTION. COORDINATE

LOCATION WITH THE PROPOSED REFLECTED

CEILING PLAN.

7. CONTRACTOR TO INSTALL A VA PROVIDED

APPIQUE ON BOTH SIDES OF GLASS.

8. CEILING MOUNTED CURTAIN TRACK AND

CURTAIN (NEW) REUSE CURTAIN TRACK.

A. SHADED EXISTING ELEMENTS TO REMAIN.

B. REFERENCE AS-400 FOR EXISTING STRESS

TEST ROOM ELEVATIONS.

23'-5"

8' -0

" T

YP

IC

AL

23'-5"

8'…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .