stamped and sealed construction drawings.pdf
PDF 46 MB Posted
- Solicitation number
- 36C25922R0088
About this file
This document contains details of a federal solicitation and related construction drawings file. Solicitation number 36C25922R0088 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 is seeking bids for the Z2DA--T2 635-20-130 Renovate 5 East project at VA-22-00061294. The opportunity type is listed as a solicitation and the description provided is "End of Solicitation." A stamped and sealed construction drawings file with an unspecified content is also included and appears to contain technical specifications and design plans relevant to the renovation project.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
PRELIM
IN
ARY
NO
T F
O R
C O
NSTR
UC
TIO
N
/1 /2
:3
:3
P M
CONSTRUCTION DOCUMENTS
11/10/2021
COVER SHEET
GI-000
DESIGN RENOVATION OF 5
EAST
JEJL
921 NE 13TH ST.
OKLAHOMA CITY, OK 73104CODY COOPER
VA259-16-D-0217
36C25921N0083
DESIGN RENOVATION OF 5 EAST
PROJECT NO.
OKLAHOMA CITY VA HEALTH CARE SYSTEM
921 NE 13TH ST.
OKLAHOMA CITY, OK 73104
VA
U.S DEPARTMENT OF VETERAN'S AFFAIRS
VETERAN'S HEALTH ADMINISTRATION
VA259-16-D-0217
36C25921N0083
11.10.21
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
PRELIM
IN
ARY
NO
T F
O R
C O
NSTR
UC
TIO
N
/1 /2
:2
:4
P M
CONSTRUCTION DOCUMENTS
11/10/2021
PROJECT DIRECTORY, DRAWING
INDEX AND GENERAL NOTES
GI-001
DESIGN RENOVATION OF 5
EAST
JEJL
921 NE 13TH ST.
OKLAHOMA CITY, OK 73104CODY COOPER
VA259-16-D-0217
36C25921N0083
ARCHITECT
JAMES LUSHBOUGH, AIA, NCARB
MECHANICAL ENGINEER
PAT MORGAN
ELECTRICAL ENGINEER
WILL WANGEN
FourFront Design Inc.
517 7th Street Rapid City, South Dakota 57701 Phone (605) 342-9470
Albertson Engineering Inc.
3202 West Main Street, Suite C Rapid City, South Dakota 57702 Phone (605) 343-9606
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
PROJECT DIRECTORY:
STRUCTURAL ENGINEER
LUCAS FRIED
FIRE PROTECTION ENGINEER
MARK SORINSON
SHEET INDEX:
GENERAL
GI-000 COVER SHEET
GI-001 PROJECT DIRECTORY, DRAWING INDEX AND GENERAL NOTES
GI-002 LOCATION MAP / CONTRACTOR STAGING AREA AND ACCESS
GI-003 ABBREVIATIONS, SYMBOLS, LEGENDS AND ARCHITECTURE GENERAL NOTES
GI-010 NEW AREA PLAN
GI-200 CODE REVIEW PLAN
GI-201 LIFE SAFETY PLAN
GI-300 INFECTION CONTROL PLAN
ARCHITECTURE
AD-100 DEMOLITION PLAN
AD-101 DEMOLITION REFLECTED CEILING PLANS
AS-000 WALL TYPES
AS-001 PARTITION FRAMING DETAILS
AS-010 HEAD OF WALL DETAILS
AS-020 PLAN DETAILS
AS-021 PLAN DETAILS
AS-022 PLAN DETAILS
AS-100 ARCHITECTURAL FLOOR PLAN
AS-101 DIMENSION FLOOR PLAN
AS-102 REFLECTED CEILING PLAN
AS-103 CEILING DETAILS
AS-400 ENLARGED PLANS I
AS-401 ENLARGED PLANS II
AS-402 ENLARGED PLANS III
AS-403 ENLARGED PLANS IV
AS-404 ENLARGED PLANS V
AS-405 ENLARGED PLANS VI
AS-406 INTERIOR ELEVATIONS
AS-407 INTERIOR ELEVATIONS
AS-408 INTERIOR ELEVATIONS
AS-409 MILLWORK SECTIONS AND PLAN DETAILS
AS-500 ROOM FINISH SCHEDULE
AS-501 FLOOR FINISH PLAN
AS-502 WALL PROTECTION PLAN
AS-600 DOOR SCHEDULE, ELEVATIONS, AND DETAILS
AS-601 DOOR DETAILS
EQUIPMENT
QH-100 MEDICAL EQUIPMENT PLAN
INTERIOR FURNISHINGS
IF-100 FURNISHINGS REFERENCE PLAN
MECHANICAL
M-000 SYMBOLS, LEGENDS AND ABBREVIATIONS
M-101 MECHANICAL FIRE BARRIER PLAN
MHD-101 MECHANICAL HVAC DEMO PLAN 5TH FLOOR PLAN
MPD-101 MECHANICAL PIPING DEMO PLAN 5TH FLOOR PLAN
MH-101 MECHANICAL HVAC PLAN 5TH FLOOR PLAN
MP-101 MECHANICAL PIPING PLAN 5TH FLOOR PLAN
M-501 MECHANICAL SCHEDULES AND DETAILS
PLUMBING
P-000 SYMBOLS, LEGENDS AND ABBREVIATIONS
P-001 LEVEL 5 - NEW FIRE BARRIER PLAN
PD-101 LEVEL 4 - PLUMBING DEMOLITION PLAN
PD-102 LEVEL 5 - PLUMBING DEMOLITION
P-103 LEVEL 4 - NEW SANITARY WASTE AND VENT PLAN
P-104 LEVEL 5 - NEW DOMESTIC WATER PLAN
P-105 LEVEL 5 - NEW SANITARY WASTE AND VENT PLAN
P-106 LEVEL 5 - NEW MED GAS PLAN
P-201 WATER ISOMETRIC VIEW
P-202 SANITARY ISOMETRIC VIEW
P-203 MED GAS ISOMETRIC VIEW
P-501 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
ELECTRICAL
E-000 ELECTRICAL LEGEND AND ABBREVIATIONS
E-001 ELECTRICAL SCHEDULE
E-002 ELECTRICAL DETAILS
ED-100 POWER DEMOLITION PLAN
ED-200 LIGHT DEMOLITION PLAN
ED-300 SPECIAL SYSTEM DEMOLITION PLAN
E-100 POWER PLAN
E-200 LIGHT PLAN
E-300 SPECIAL SYSTEM PLAN
FIRE PROTECTION
FA-100 FIRE ALARM COVER SHEET
FA-101 FIRE ALARM - LEVEL 5 - DEMO
FA-102 FIRE ALARM - LEVEL 5 - NEW
FP-100 FIRE PROTECTION COVER SHEET
FP-101 FIRE PROTECTION - LEVEL 5 - DEMO
FP-102 FIRE PROTECTION - LEVEL 5 - NEW
1. ALL WORK SHALL COMPLY WITH APPLICABLE CODES, REGULATIONS,
AND ORDINANCES.
2. THE CONTRACTOR SHALL PERFORM ALL TESTING AND INSPECTIONS
AS SPECIFIED, OR AS NECESSARY TO DEMONSTRATE A COMPLETE
AND SATISFACTORY INSTALLATION.
3. THE CONTRACTOR SHALL PROTECT EXISTING BUILDING AND SITE
MATERIALS SCHEDULED TO REMAIN, AND SHALL BE RESPONSIBLE FOR
DAMAGE TO THE SAME RESULTING FROM WORK UNDER THIS
CONTRACT. THE CONTRACTOR SHALL RESTORE DAMAGED EXISTING
BUILDING AND SITE MATERIALS TO THEIR ORIGINAL CONDITION.
4. CONTRACTOR SHALL INSPECT SITE AND FIELD VERIFY ALL
DIMENSIONS AND CONDITIONS PRIOR TO COMMENCING
CONSTRUCTION. CONTRACTOR SHALL NOTIFY
ARCHITECT/CONTRACTING OFFICER REPRESENTATIVE IMMEDIATELY
OF ANY DISCREPANCIES.
5. CONTRACTOR SHALL COORDINATE ALL WORK AND SHOP DRAWINGS
WITH OTHER TRADES.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL
WORK. CONTRACTOR SHALL ANTICIPATE AREAS WHERE THE
INSTALLATION OF MECHANICAL AND ELECTRICAL WORK WILL BE
RESTRICTED, CONGESTED, OR DIFFICULT TO INSTALL, AND SHALL
COORDINATE INSTALLATION BETWEEN ALL TRADES.
7. SUB-CONTRACTOR SHALL COORDINATE LOCATIONS FOR ALL
MECHANICAL AND ELECTRICAL ITEMS WITH THE GENERAL
CONTRACTOR. CONTRACTOR SHALL NOTIFY
ARCHITECT/CONTRACTING OFFICER REPRESENTATIVE OF ANY
DISCREPANCIES PRIOR TO INSTALLATION AND/OR FABRICATION.
8. ALL BUILDING DIMENSIONS ARE TO FACE OF STUD, FACE OF
MASONRY, AND EXTERIOR WINDOW OR DOOR ROUGH OPENING.
9. ALL ANGLES ON PLANS ARE 45- OR 90-DEGREES, UNLESS NOTED
OTHERWISE. CURVED ELEMENTS ARE LOCATED AS DIMENSIONED.
10. ALL ITEMS ARE NEW UNLESS SPECIFICALLY IDENTIFIED AS EXISTING.
11. SEE LIFE SAFETY AND FIRE PROTECTION PLANS FOR LOCATIONS OF
FIRE- AND SMOKE-RATED PARTITIONS.
12. INSTALL BLOCKING WITHIN PARTITIONS AS REQUIRED FOR
INSTALLATION OF WALL-MOUNTED CABINETS, TOILET ACCESSORIES,
WALL STOPS, AND MISCELLANEOUS ITEMS.
13. LOCATE INTERIOR CONTROL JOINTS WHERE INDICATED, BUT AT A
MINIMUM TO DIVIDE ALL GYPSUM BOARD INTO SECTIONS NOT
EXCEEDING 30-FEET IN LENGTH.
14. ALL CEILING GRID SHALL BE CENTERED WITHIN THE ROOM OR
CORRIDOR IN WHICH IT OCCURS, UNLESS SHOWN OTHERWISE.
15. ALL CEILING HEIGHTS LISTED IN THE RCP PLAN ARE FROM THE FINISH
FLOOR OF THE LISTED ROOM, UNLESS NOTED OTHERWISE.
16. ALL CHANGES IN FLOOR MATERIALS OCCUR AT THE FOLLOWING
LOCATIONS, UNLESS NOTED OTHERWISE: 1) AT THE CENTER LINE OF
DOORS IN THE CLOSED POSITION, OR; 2) AT THE CENTER LINE OF
OPENINGS SEPARATING ROOMS.
17. WHERE METAL STUDS EXTEND TO THE STRUCTURE ABOVE, PROVIDE
DOUBLE-HEAD TRACK TO ALLOW FOR 3/4” MINIMUM DEFLECTION OF
THE STRUCTURE.
18. IN SOME INSTANCES, THERMAL AND SOUND INSULATION HAS BEEN
OMITTED FROM DETAILS FOR CLARITY. SEE SPECIFICATIONS,
PARTITION TYPES, AND WALL SECTIONS FOR LOCATIONS REQUIRING
INSULATION.
GENERAL NOTES:
O X Y G E N
T A N K
C H A
IN
L
IN
K
RAMP DOWN
RAMP UP
R A
M P
U P
H C
H
CHC
HC
P A R K
IN
G
N O
V E H
P O L
IC
E
T R U C K
L A U N D R Y
P L A N T E R
P L A N T E R
P L A N T E R
P L A N T E R
P L A N T E R
HC
N
M c M
E C
H A
N S
T R
E E
T
N
K E
L L Y
S T
R E
E T
NE 13th STREET
NE 13th STREET
OKLAHOMA CITY VA HEALTH
CARE SYSTEM
CONTRACTOR POINT OF ACCESS FOR INTERIOR REMODEL
WORK. COORDINATE WITH PHASING PLANS IN THIS
DRAWING SET.
1. SHEET SIZE FOR PROPER SCALE IS 30X42. CONTRACTOR SHALL NOT
SCALE DRAWINGS BUT SHALL REQUEST THE DESIRED DIMENSIONS
FROM THE ARCHITECT.
2. SEE SHEET GI-001 FOR GENERAL NOTES.
N
AREA OF WORK
F
C B
G
19D185
AREA OF WORK
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
PRELIM
IN
ARY
NO
T F
O R
C O
NSTR
UC
TIO
N
AREA OF WORK
/1 /2
:3
:3
P M
CONSTRUCTION DOCUMENTS
11/10/2021
LOCATION MAP / CONTRACTOR
STAGING AREA AND ACCESS
GI-002
DESIGN RENOVATION OF 5
EAST
JEJL
921 NE 13TH ST.
OKLAHOMA CITY, OK 73104CODY COOPER
VA259-16-D-0217
36C25921N0083
SITE MAP
SHEET SPECIFIC NOTES:
STAGING LEGEND
1. CONTRACTOR OVERFLOW PARKING SHALL BE PROVIDED IN
COORDINATION WITH THE COR. THE LOCATION OF THIS
PARKING IS 3 BLOCKS EAST OF THE HOSPITAL ALONG LOTTIE
AVENUE. CONTRACTOR SHALL CORDINATE WITH THE COR
FOR SHUTTLE SERVICES TO THE HOSPITAL OR PROVIDE THEIR
OWN SHUTTLE SERVICES.
N
GENERAL NOTES:
# POUND OR NUMBER
& AND
@ AT
AB ANCHOR BOLT
ACI AMERICAN CONCRETE INSTITUTE
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
AFF ABOVE FINISH FLOOR
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AISI AMERICAN IRON AND STEEL INSTITUTE
ALUM ALUMINUM
ANOD ANODIZED
ASD ALTERNATE STRESS DESIGN
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AWS AMERICAN WELDING SOCIETY
BD BOARD
BLK BLOCK
BM BEAM
B.O. BOTTOM OF
BOT BOTTOM
BRG BEARING
BRKT BRACKET
BSMT BASEMENT
BLDG BUILDING
BYND BEYOND
CAB CABINET
CER CERAMIC
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CLG CEILING
CLR CLEAR
COL COLUMN
COMPR COMPRESSIBLE
CONC CONCRETE
CONST JT CONSTRUCTION JOINT
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
DBL DOUBLE
DEMO DEMOLISH OR DEMOLITION
DET DETAIL
DIA DIAMETER
DIM DIMENSION
DIR DIRECTION
DN DOWN
DR DOOR
DWG DRAWING
EA EACH
EE EACH END
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR OR ELEVATION
EQ EQUAL
ES EACH SIDE
EXIST EXISTING
EXP BOLT EXPANSION BOLT
EXP JT EXPANSION JOINT
EXT EXTERIOR
FD FLOOR DRAIN OR FIRE DEPARTMENT
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FIXT FIXTURE
FLR FLOOR
FM FILLED METAL
F.O. FACE OF
FT FOOT OR FEET
F.V. FIELD VERIFY
GA GAUGE
GALV GALVANIZED
GP GUSSET PLATE
GWB GYPSUM WALL BOARD
GYP GYPSUM
HC HOLLOW CORE
HDR HEADER
HEF HORIZONTAL EACH FACE
HI HIGH
HIF HORIZONTAL INSIDE FACE
HM HOLLOW METAL
HOF HORIZONTAL OUTSIDE FACE
HOR HORIZONTAL
HP HIGH POINT
HR HOUR
HS HIGH STRENGTH
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR
CONDITIONING
ICBO INTERNATIONAL CONFERENCE OF BUILDING
OFFICIALS
ID INSIDE DIAMETER
ILO IN LIEU OF
IN INCH
INCL INCLUDE
INSUL INSULATED OR INSULATION
INT INTERIOR
IRGWB IMPACT RESISTANT GYPSUM WALL BOARD
JT JOINT
K KIP (1000 POUNDS)
LLV LONG LEG VERTICAL
LP LOW POINT
LVL LEVEL
LW LIGHT WEIGHT
MAX MAXIMUM
MCB METAL CORNER BEAD
MECH MECHANICAL
MEMBR MEMBRANE
MFR MANUFACTURED
MIN MINIMUM
MRGWB MOISTURE-RESISTANT GYPSUM WALL BOARD
MTL METAL
NF NEAR FACE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OPPOSITE HAND
OPNG OPENING
OZ OUNCE
PDF POWER DRIVEN FASTENER
PL PLATE
P.LAM PLASTIC LAMINATE
PLUMB PLUMBING
PLY PLYWOOD
PORC PORCELAIN
PNL PANEL
PNT PAINT OR PAINTED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PT POINT
PR PAIR
PROP PROPERTY
PVC POLYVINYL CHLORIDE
ABBREVIATIONS
R RADIUS
RBR RUBBER
RCP REFLECTED CEILING PLAN
RE RIGHT END
REINF REINFORCED
REF REFERENCE
REQD REQUIRED
RET RETURN
RETG RETAINING
RM ROOM
R.O. ROUGH OPENING
SAB SOUND ATTENUATION BATTS
SC SOLID CORE
SDI STEEL DECK INSTITUTE
SECT SECTION
SHT SHEET
SIM SIMILAR
SL SPLICE LENGTH
SLV SHORT LEG VERTICAL
SMS SHEET METAL SCREWS
SPEC SPECIFIED OR SPECIFICATION
SPK SPRINKLER OR SPEAKER
SQ SQUARE
SSTL STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STIFF STIFFENER
STL STEEL
STR STAIR
STRUCT STRUCTURE OR STRUCTURAL
SUP SUPPORT
SYM SYMMETRICAL
T&B TOP AND BOTTOM
TBD TO BE DETERMINED
T/D TELEPHONE/DATA
TEL TELEPHONE
TEMP TEMPERATURE
THK THICK OR THICKNESS
THRD THREADED
TLT TOILET
T.O. TOP OF
T.O.C TOP OF CONCRETE
T.O.F TOP OF FRAMING
T.O.S TOP OF STEEL/STUD
T.O.W TOP OF WALL
TPD TOILET PAPER DISPENSER
TYP TYPICAL
U/S UNDERSIDE
UNO UNLESS NOTED OTHERWISE
US UNDERSIDE
VCT VINYL COMPOSITE TILE
VEF VERTICAL EACH FACE
VERT VERTICAL
VIF VERIFY IN FIELD
VOF VERTICAL OUTSIDE FACE
VWC VINYL WALL COVERING
W/ WITH
WD WOOD
WDW WINDOW
WP WORKING POINT
STEEL/METAL
WOOD (ROUGH) BLOCKING OR SHIM
CONCRETE MASONRY
PLAN AND SECTION
WOOD (ROUGH)
ACOUSTIC CEILING TILE
GYPSUM BOARD
CEILING
CONCRETE
ELEVATION
CENTER LINE
LINE SYMBOLS
GRID LINE
PROPERTY LINE
CUT LINE
BATT INSULATION
WOOD SUBSTRATE
RIGID INSULATION
MATERIAL LEGEND
FLOORING
BID ALTERNATE
EPOXY COATED CONCRETE
PT1 - PORCELAIN TILE
RF - RUBBER FLOORING
LVT1 - LUXURY VINYL TILE
RES-6 - RESINOUS FLOORING
PT3 - PORCELAIN TILE
CPT-1 - CARPET TILE
WSF-1 - WELDED SEAM FLOORING
N
Room name
1t
VIEW NAME
1/8" = 1'-0"1 DRAWING TITLE
SCALE
BUILDING SECTION
DIRECTION OF SIGHT
DRAWING NUMBER
SHEET NUMBER
WALL SECTION
DETAIL CUT
A101
DETAIL CALLOUT
A101
A101
A101
A101
DIRECTION OF SIGHT
DRAWING NUMBER
SHEET NUMBER
DRAWING NUMBER
SHEET NUMBER
DRAWING NUMBER
SHEET NUMBER
INTERIOR ELEVATION
DRAWING NUMBER
DIRECTION OF SIGHT
SHEET NUMBER
ROOM TAG
ROOM NAME
ROOM NUMBER
KEYNOTE TAG
5-04 KEYNOTE DESIGNATION
DOOR TAG
DOOR NUMBER
PARTITION TAG
WALL DESIGNATION
WINDOW TAG
WINDOW DESIGNATION
ELEVATION MARKER
HEIGHT
NORTH ARROW
TRUE NORTH
PLAN NORTH
ARCHITECTURAL SYMBOLS
M3A
V.A. SYMBOLS
FIRE RESISTIVE RATED LINE, 1 HOUR
FIRE RESISTIVE RATED LINE, 2 HOUR
FIRE RESISTIVE RATED LINE, 3 HOUR
FIRE RESISTIVE RATED LINE, 4 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 1 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 2 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 3 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 4 HOUR
V V ITEM - VA SUPPLIED AND INSTALLED
VC ITEM - VA SUPPLIED AND CONTRACTOR INSTALLED
CC ITEM - CONTRACTOR SUPPLIED AND INSTALLED
A
COLUMN GRID
DIMENSION LINE
NORTH ARROW
CL CENTER LINE
N
1. THESE LEGENDS ARE COMPOSED OF STANDRD SYMBOLS AND
ARE PERTINENT TO THE CONDITIONS ON THIS SET OF
DRAWINGS TO THE EXTENT APPLICABLE.
2. ADDITIONAL LEGENDS AND/OR OTHER LEGENDS MAY APPEAR
IN THIS SET OF DRAWINGS TO INDICATE SPECIFIC CONDITIONS
IN LIEU OF SYMBOLS SHOWN ON THIS SHEET.
LEGEND NOTES:
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
PRELIM
IN
ARY
NO
T F
O R
C O
NSTR
UC
TIO
N
/1 /2
:3
:3
P M
CONSTRUCTION DOCUMENTS
11/10/2021
ABBREVIATIONS, SYMBOLS, LEGENDS
AND ARCHITECTURE GENERAL NOTES
GI-003
DESIGN RENOVATION OF 5
EAST
JEJL
921 NE 13TH ST.
OKLAHOMA CITY, OK 73104CODY COOPER
VA259-16-D-0217
36C25921N0083
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
A
A
B
B
C
C
D
D
E
E
F
F
G
G
I
I
J
J
K
K
L
L
26 SF
ELECTRICAL
CLOSET
5A101
61 SF
CORRIDOR
C5A 4
353 SF
CORRIDOR
C5E 5
62 SF
STORAGE
5E114
261 SF
PATIENT ROOM
5A104
48 SF
PATIENT TOILET
5A105
48 SF
PATIENT TOILET
5A107
250 SF
PATIENT ROOM
(BARIATRIC)
5A108
63 SF
PATIENT TOILET
5A111
70 SF
ANTE ROOM
5A110
294 SF
PATIENT ROOM
(ISO)
5A112
122 SF
STORAGE
5A113
55 SF
PATIENT TOILET
5A116
228 SF
PATIENT ROOM
5A117
231 SF
PATIENT ROOM
5A118
55 SF
PATIENT TOILET
5A119
295 SF
PATIENT ROOM
(BARIATRIC)
5A121
67 SF
PATIENT TOILET
5A123
58 SF
PATIENT TOILET
5A122
263 SF
PATIENT ROOM
5A124
ELECTRICAL
5A126
103 SF
SOILED UTILITY
5A125
79 SF
HAC
5A127
93 SF
CLEAN LINEN
5A128
264 SF
PATIENT ROOM
5A129
49 SF
PATIENT TOILET
5A130
49 SF
PATIENT TOILET
5A131
259 SF
PATIENT ROOM
5A132
132 SF
OIT
5E103
251 SF
PATIENT ROOM
5A133
49 SF
PATIENT TOILET
5A134
49 SF
PATIENT TOILET
5A135
256 SF
PATIENT ROOM
5A136
97 SF
CLEAN UTILITY
5A137
107 SF
NURSE TEAM
STATION
5A139
160 SF
NURSE MANAGER
5A143
65 SF
PATIENT TOILET
5A141
263 SF
PATIENT ROOM
5A140
437 SF
CORRIDOR
C5A 5
152 SF
MED ROOM/IV
STORAGE
5A106
25 SF
OXYGEN
STORAGE
5A114
57 SF
CLEAN SUPPLY
5A109
635 SF
CORRIDOR
C5A 6
28 SF
NURSE ALCOVE
5A115
42 SF
NURSE ALCOVE
5A120
27 SF
CRASH CART
ALCOVE
5A138
626 SF
CORRIDOR
C5A 7
271 SF
NURSE
LOUNGE/WORK
ROOM
5E101
2 SF54 SF
STORAGE
5A142
295 SF
FAMILY
NOURISHMENT
CENTER
5A144
75 SF
STAFF TOILET
5E100
9 9
H
H
1. SHEET SIZE FOR PROPER SCALE IS 30X42. CONTRACTOR SHALL NOT
SCALE DRAWINGS BUT SHALL REQUEST THE DESIRED DIMENSIONS
FROM THE ARCHITECT.
2. SEE SHEET GI-001 FOR GENERAL NOTES.
1 HOUR FIRE BARRIER
1 HOUR FIRE / SMOKE
EXISTING 2 HOUR FIRE/SMOKE
FIRE BARRIER LEGEND:
SMOKE PARTITION
N
AREA OF WORK
F
C B
G
19D185
AREA OF WORK
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
PRELIM
IN
ARY
NO
T F
O R
C O
NSTR
UC
TIO
N
AREA OF WORK
/1 /2
:3
:5
P M
CONSTRUCTION DOCUMENTS
11/10/2021
NEW AREA PLAN
GI-010
DESIGN RENOVATION OF 5
EAST
JEJL
921 NE 13TH ST.
OKLAHOMA CITY, OK 73104CODY COOPER
VA259-16-D-0217
36C25921N0083
NET ROOM AREA SCHEDULE
No. NAME AREA
5A101 ELECTRICAL CLOSET 26 SF
5A104 PATIENT ROOM 261 SF
5A105 PATIENT TOILET 48 SF
5A106 MED ROOM/IV STORAGE 152 SF
5A107 PATIENT TOILET 48 SF
5A108 PATIENT ROOM (BARIATRIC) 250 SF
5A109 CLEAN SUPPLY 57 SF
5A110 ANTE ROOM 70 SF
5A111 PATIENT TOILET 63 SF
5A112 PATIENT ROOM (ISO) 294 SF
5A113 STORAGE 122 SF
5A114 OXYGEN STORAGE 25 SF
5A115 NURSE ALCOVE 28 SF
5A116 PATIENT TOILET 55 SF
5A117 PATIENT ROOM 228 SF
5A118 PATIENT ROOM 231 SF
5A119 PATIENT TOILET 55 SF
5A120 NURSE ALCOVE 42 SF
5A121 PATIENT ROOM (BARIATRIC) 295 SF
5A122 PATIENT TOILET 58 SF
5A123 PATIENT TOILET 67 SF
5A124 PATIENT ROOM 263 SF
5A125 SOILED UTILITY 103 SF
5A126 ELECTRICAL 3 SF
5A127 HAC 79 SF
5A128 CLEAN LINEN 93 SF
5A129 PATIENT ROOM 264 SF
5A130 PATIENT TOILET 49 SF
5A131 PATIENT TOILET 49 SF
5A132 PATIENT ROOM 259 SF
5A133 PATIENT ROOM 251 SF
5A134 PATIENT TOILET 49 SF
5A135 PATIENT TOILET 49 SF
5A136 PATIENT ROOM 256 SF
5A137 CLEAN UTILITY 97 SF
5A138 CRASH CART ALCOVE 27 SF
5A139 NURSE TEAM STATION 107 SF
5A140 PATIENT ROOM 263 SF
5A141 PATIENT TOILET 65 SF
5A142 STORAGE 54 SF
5A143 NURSE MANAGER 160 SF
5A144 FAMILY NOURISHMENT CENTER 295 SF
5E100 STAFF TOILET 75 SF
5E101 NURSE LOUNGE/WORK ROOM 271 SF
5E103 OIT 132 SF
5E114 STORAGE 62 SF
C5A 4 CORRIDOR 61 SF
C5A 5 CORRIDOR 437 SF
C5A 6 CORRIDOR 635 SF
C5A 7 CORRIDOR 626 SF
1/8" = 1'-0"
LEVEL 5 EAST - NET AREA PLAN
N
NET ROOM TOTAL 7717 SF
2 SF
GENERAL NOTES:
1. SHEET SIZE FOR PROPER SCALE IS 30X42. CONTRACTOR SHALL NOT
SCALE DRAWINGS BUT SHALL REQUEST THE DESIRED DIMENSIONS
FROM THE ARCHITECT.
2. SEE SHEET GI-001 FOR GENERAL NOTES.
BUILDING CODE SUMMARY
2021INTERNATIONAL BUILDING CODE
2021 N.F.P.A. 101 LIFE SAFETY CODE
PROJECT NAME: DESIGN RENOVATION OF 5 EAST
OKLAHOMA CITY VA HEALTH CARE SYSTEM
A/E PROJECT NO.: 2226.A26
PREPARED BY: JAMES LUSHBOUGH
DATE: 7-15-21
1. APPLICABLE CODES/STANDARDS:
A. VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATOIN GUIDE, AND OTHER GUIDENCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
a.ARCHITECTURAL (AUG. 2, 2014); ASBESTOS ABATEMENT (JULY 2011); ELECTRICAL (DEC 2015); FIRE PROTECTION (DEC 2016) HVAC (MAR 2011); INTERIOR DESIGN (MAY 2008); LIGHTING DESIGN (DEC 2015); PHYSICAL SECURITY (JAN 2015); PLUMBING (NOV 20140;
SIGNAGE (OCT 2013)
b.PG-18-14 ROOM FINISH, DOOR HARDWARE SCHEDULE
c. PG-18-9 SPACE PLANNING CRITERIA –
B. INTERNATIONAL BUILDING CODE IBC (2021)
C. NFPA 1 – FIRE CODE (2021)
D. NFPA 101 - LIFE SAFETY CODE (LSC) – (2021)
E. NFPA 220 – STANDARDS ON TYPES OF BUILDING CONSTRUCTION – (2021)
F.NFPA 10 – STANDARD FOR PORTABLE FIRE EXTINGUISHERS – (2021)
G. NFPA 241 – STANDARD FOR SAFEGUARDING CONSTRUCTION (2021)
H. REFER TO FIRE PROTECTION/LIFE SAFETY/ACCESSIBILITY CODE REVIEW FOR ADDITIONAL CODES & STANDARDS.
2.OCCUPANCY CLASSIFICATION: NEW HEALTHCARE OCCUPANCY (L.C.S. CHAPTER.18)
3.TYPE OF CONSTRUCTION:
A. NFPA 220(TABLE 4.1.1) – TYPE II - 111
4.OCCUPANCY SEPARATIONS:
A. IBC (SECTIONS 508 & 508.4) – FIRE BARRIERS - N.R. NON-SEPARATED USES AS PER SECTION 508.3 INCIDENTAL USE AREAS AS PER TABLE
509. WHEN INCIDENTAL USE AREAS ARE SPRINKLED, THE AREA IS TO BE SEPARATED BY WALLS TO RESIST THE PASSAGE OF SMOKE (509.4.2)
B. IBC (SECTION 508.2.5) – FIRE SEPARATION NOT REQUIRED WHERE MECHANICAL ROOMS ARE EQUIPED WITH AUTOMATIC SPRINKLER
SYSTEM.
5.TYPE OF CONSTRUCTION - FIRE-RESISTIVE REQUIREMENTS (NFPA 220 TABLE 4.1.1)
A. EXTERIOR WALLS - BEARING = 1 HOURS
B. INTERIOR WALLS - BEARING = 1 HOURS
C. EXTERIOR WALLS - NON-BEARING = 0 HOURS
D. INTERIOR WALLS – NON-BEARING = 0 HOURS
E. STRUCTURAL FRAME = 1 HOURS
F. FLOORS/FLOOR-CEILINGS = 1 HOURS
G. ROOFS/ROOF-CEILING = 1 HOURS
6.FIRE-RESISTANT MATERIALS AND CONSTRUCTION (CHAPTER 7) (L.S.C. 8.2.3)
A. FIRE RESISTIVE ASSEMBLIES AS PER CHAPTER 7 – SMOKE PARTITIONS, IBC SECTION 710 (L.S.C. SECTION 8.4)
B. NFPA 101 - CHAPTER 18 HAZARDOUS ROOMS AND INCIDENTAL USE ROOM SEPARATION.
7.FIRE PROTECTION REQUIREMENTS:
A. BUILDING IS CURRENTLY FULLY SPRINKLERED WITH AN AUTOMATIC STANDPIPE SYSTEM AND WILL REMAIN SO UPON COMPLETION OF THE
PROJECT.
B. FIRE EXTINGUISHERS WILL BE PROVIDED AS INDICATED ON LIFE SAFETY PLANS.
C. NFPA 101 (8.5.5.2, 8.7.12.1)
D. NFPA 101 (CHAPTER 8 AND 9)
1. 1-HR FIRE BARRIER REQUIRED FOR GENERAL STROAGE, BOILER, OR FIURNACE ROOMS AND SHOPS THAT INCLUDE WOODWORKING OR PAINTING AREA, UNLESS AUTOMATIC SPRINKLER PROTECTION IS PROVIDED. WHERE AUTOMTIC SPRINKLER PROTECTION IS
PROVIDED SMOKE PARTITIONS SHALL BE PROVIDED. 8.7.1.1, 8.7.1.2.
E. NFPA 10 (TABLE 6.2.1.1) – MECHANICAL ROOMS AND LARGE STORAGE ROOMS SHALL BE PROTECTED UTILIZING ORDINARY EXTINGUISHER PLACEMENT FOR CLASS A HAZARD. A MAXIMUM TRAVEL DISTANCE TO FIRE EXTINGUISHER OF 75 FEET.
8.MEANS OF EGRESS/EXITING:
A. NUMBER OF MEANS OF EGRESS: THE EXISTING EGRESS CONDITIONS SHALL NOT BE CHANGED AS A RESULT OF THIS PROJECT.
B. ARRANGEMENT OF MEANS OF EGRESS: THE EXISTING EGRESS CONDITIONS SHALL NOT BE CHANGED AS A RESULT OF THIS PROJECT
C. COMMON PATH OF TRAVEL:
1.NFPA 101 (18.2.5.2) – MAX ALLOWED 100FT.
2.PROVIDED: COMMON PATH IS ˜70FT
D. TRAVEL DISTANCE TO EXITS:
1. NFPA 101 (18.2.6.2.2) – MAX ALLOWED 200FT.
2. PROVIDED: 110FT
G. MEANS OF EGRESS ILLUMINATION:
1.NFPA 101 (7.8) – REQUIRE BY CHAPTER 38, PROVIDE IN ACCORDANCE WITH 7.8
2.EMERGENCY LIGHTING – NFPA 101 (7.9) – REQUIRED BY CHAPTER 38, PROVIDE IN ACCORDANCE WITH 7.9.
9. OCCUPANT LOAD:
A. NFPA 101 (TABLE 7.3.1.2)
1.BUSINESS USE: 150 SQ. FT. /PERSON
2.ASSEMBLY (UNCONCENTRATED) – 15 SQ.FT./PERSON
3. INPATIENT TREATMENT AREAS – 240 SQ.FT./PERSON
B. OCCUPANT LOAD CALCULATIONS SEE CODE REVIEW PLAN FOR SCHEDULE.
ELECTRICAL
CLOSET
5A101
CORRIDOR
C5A 4
CORRIDOR
C5E 5
STORAGE
5E114
PATIENT ROOM
5A104
PATIENT TOILET
5A105
PATIENT TOILET
5A107
PATIENT ROOM
(BARIATRIC)
5A108
PATIENT TOILET
5A111
ANTE ROOM
5A110
PATIENT ROOM
(ISO)
5A112
STORAGE
5A113
PATIENT TOILET
5A116
PATIENT ROOM
5A117
PATIENT ROOM
5A118
PATIENT TOILET
5A119
PATIENT ROOM
(BARIATRIC)
5A121
PATIENT TOILET
5A123
PATIENT TOILET
5A122
PATIENT ROOM
5A124
ELECTRICAL
5A126
SOILED UTILITY
5A125
HAC
5A127
CLEAN LINEN
5A128
PATIENT ROOM
5A129
PATIENT TOILET
5A130
PATIENT TOILET
5A131
PATIENT ROOM
5A132
OIT
5E103
PATIENT ROOM
5A133
PATIENT TOILET
5A134
PATIENT TOILET
5A135
PATIENT ROOM
5A136
CLEAN UTILITY
5A137
NURSE TEAM
STATION
5A139
NURSE MANAGER
5A143
PATIENT TOILET
5A141
PATIENT ROOM
5A140
CORRIDOR
C5A 5
MED ROOM/IV
STORAGE
5A106
OXYGEN
STORAGE
5A114
CLEAN SUPPLY
5A109
CORRIDOR
C5A 6
NURSE ALCOVE
5A115
NURSE ALCOVE
5A120
CRASH CART
ALCOVE
5A138
CORRIDOR
C5A 7
NURSE
LOUNGE/WORK
ROOM
5E101
FAMILY
NOURISHMENT
CENTER
5A144
STORAGE
5A142
STAFF TOILET
5E100
A
A
A
A
A
A
A
A
A
5A105 5A107
A
5A111
5A116
5A117
5A1185A121
5A119
5A122 5A124
5A123
C5A 4
5A141
5A140
5A125
5A127
5A137
5A128
C A
5E101
E
C5E 5
E
A
A
2 5
A
A
A
A
A
A
5A104 5A108
5E100
ASSEMBLY
INPATIENT TREATMENT AREA
UNOCCUPIED
OCCUPANCY LEGEND
BUISNESS
1 HOUR FIRE BARRIER
1 HOUR FIRE / SMOKE
EXISTING 2 HOUR FIRE/SMOKE
FIRE BARRIER LEGEND:
SMOKE PARTITION
N
AREA OF WORK
F
C B
G
19D185
AREA OF WORK
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
PRELIM
IN
ARY
NO
T F
O R
C O
NSTR
UC
TIO
N
AREA OF WORK
/1 /2
:3
:0
P M
CONSTRUCTION DOCUMENTS
11/10/2021
CODE REVIEW PLAN
GI-200
DESIGN RENOVATION OF 5
EAST
JEJL
921 NE 13TH ST.
OKLAHOMA CITY, OK 73104CODY COOPER
VA259-16-D-0217
36C25921N0083
GENERAL NOTES:
1/8" = 1'-0"
LEVEL 5 EAST - OCCUPANCY PLAN
OCCUPANCY LOAD TABLE
Department OCCUPANT LOAD FACTOR AGGREGATE AREA OCCUPANT LOAD
ASSEMBLY - OCCUPANCY 15 673 SF 45
BUISNESS - OCCUPANCY 150 312 SF 2
INPATIENT OCCUPANCY 240 3185 SF 13
TOTAL 4170 SF 60
2 2
3 3
4 4
5 5
6 6
7 7
8 8
A
A
B
B
C
C
D
D
E
E
F
F
G
G
I
I
J
J
K
K
L
L
26 SF
ELECTRICAL
CLOSET
5A101
61 SF
CORRIDOR
C5A 4
353 SF
CORRIDOR
C5E 5
62 SF
STORAGE
5E114
261 SF
PATIENT ROOM
5A104
48 SF
PATIENT TOILET
5A105
48 SF
PATIENT TOILET
5A107
250 SF
PATIENT ROOM
(BARIATRIC)
5A108
63 SF
PATIENT TOILET
5A111
70 SF
ANTE ROOM
5A110
294 SF
PATIENT ROOM
(ISO)
5A112
122 SF
STORAGE
5A113
55 SF
PATIENT TOILET
5A116
228 SF
PATIENT ROOM
5A117
231 SF
PATIENT ROOM
5A118
55 SF
PATIENT TOILET
5A119
295 SF
PATIENT ROOM
(BARIATRIC)
5A121
67 SF
PATIENT TOILET
5A123
58 SF
PATIENT TOILET
5A122
263 SF
PATIENT ROOM
5A124
ELECTRICAL
5A126
103 SF
SOILED UTILITY
5A125
79 SF
HAC
5A127
93 SF
CLEAN LINEN
5A128
264 SF
PATIENT ROOM
5A129
49 SF
PATIENT TOILET
5A130
49 SF
PATIENT TOILET
5A131
259 SF
PATIENT ROOM
5A132
132 SF
OIT
5E103
251 SF
PATIENT ROOM
5A133
49 SF
PATIENT TOILET
5A134
49 SF
PATIENT TOILET
5A135
256 SF
PATIENT ROOM
5A136
97 SF
CLEAN UTILITY
5A137
107 SF
NURSE TEAM
STATION
5A139
160 SF
NURSE MANAGER
5A143
65 SF
PATIENT TOILET
5A141
263 SF
PATIENT ROOM
5A140
437 SF
CORRIDOR
C5A 5
152 SF
MED ROOM/IV
STORAGE
5A106
25 SF
OXYGEN
STORAGE
5A114
57 SF
CLEAN SUPPLY
5A109
635 SF
CORRIDOR
C5A 6
28 SF
NURSE ALCOVE
5A115
42 SF
NURSE ALCOVE
5A120
27 SF
CRASH CART
ALCOVE
5A138
626 SF
CORRIDOR
C5A 7
271 SF
NURSE
LOUNGE/WORK
ROOM
5E101
75 SF
STAFF TOILET
5E100
54 SF
STORAGE
5A142
20 2
1 1
TRAVEL DISTANCE = 82'
T R
A V
E L D
IS
T
A N
C E
FEC
F E
C
9 9
H
H
SMOKE ZONE 5
SMOKE ZONE 9
S M
O K
E Z
O N
E
S M
O K
E Z
O N
E
1. SHEET SIZE FOR PROPER SCALE IS 30X42. CONTRACTOR SHALL NOT
SCALE DRAWINGS BUT SHALL REQUEST THE DESIRED DIMENSIONS
FROM THE ARCHITECT.
2. SEE SHEET GI-001 FOR GENERAL NOTES.
OCCUPANT LOAD
SPACE NOT OCCUPIED
EXIT DOOR TAG
LINE TYPES FOR MEANS OF EGRESS:
TD #
TRAVEL DISTANCE
COMMON PATH
CP #
EXIT DISCHARGE
FIRE BARRIER LEGEND:
1 HOUR FIRE
1 HOUR FIRE / SMOKE
FE FIRE EXTINGUISHER IN CABINET
LIFE SAFETY SYMBOLS:
EXISTING 2 HOUR FIRE/SMOKE
SMOKE PARTITION
N
AREA OF WORK
F
C B
G
19D185
AREA OF WORK
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
PRELIM
IN
ARY
NO
T F
O R
C O
NSTR
UC
TIO
N
AREA OF WORK
/1 /2
:3
:2
P M
CONSTRUCTION DOCUMENTS
11/10/2021
LIFE SAFETY PLAN
GI-201
DESIGN RENOVATION OF 5
EAST
JEJL
921 NE 13TH ST.
OKLAHOMA CITY, OK 73104CODY COOPER
VA259-16-D-0217
36C25921N0083
1/8" = 1'-0"
LEVEL 5 EAST - LIFE SAFETY PLAN
GENERAL NOTES:
INFECTION CONTROL RISK ASSESSMENT
STEP ONE:
USING THE FOLLOWING TABLE, IDENTIFY THE TYPE OF CONSTRUCTION PROJECT ACTIVITY (TYPE A-D)
TYPE D
TYPE A
INSPECTION AND NON-INVASIVE ACTIVITIES.
INCLUDES, BUT IS NOT LIMITED TO:
• REMOVAL OF CEILING TILES FOR VISUAL INSPECTION ONLY, E.G., LIMITED TO 1 TILE PER 50
SQUARE FEET.
• PAINTING (BUT NOT SANDING).
• WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH DO
NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER
THAN FOR VISUAL INSPECTION.
TYPE B
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST
INCLUDES, BUT IS NOT LIMITED TO:
• INSTALLATION OF TELEPHONE AND COMPUTER CABLING.
• ACCESS TO CHASE SPACE.
• CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.
TYPE C
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION
OR REMOVAL OF OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES.
INCLUDES, BUT IS NOT LIMITED TO:
• SANDING OF WALLS FOR PAINTING OR WALL COVERING.
• REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK.
• NEW WALL CONSTRUCTION.
• MINOR DUCT WORK OR E1ECU?CA? WORK ABOVE CEILINGS.
• MAJOR CABLING ACTIVITIES.
• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT.
TYPE D
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES, BUT IS NOT LIMITED TO:
• ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS
• REQUIRES HEAVY DEMOLITION ON REMOVAL OF A COMPLETE CABLING SYSTEM
• NEW CONSTRUCTION
STEP TWO: HIGHEST RISK
USING THE FOLLOWING TABLE, IDENTIFY THE PATIENT RISK GROUPS THAT WILL BE AFFECTED. IF
MORE THAN ONE RISK GROUP WILL BE AFFECTED, SELECT THE HIGHER RISK GROUP
LOW RISK MEDIUM RISK HIGH RISK HIGHEST RISK
• OFFICE AREA • CARDIOLOGY
• ECHOCARDIOGRAPHY
• ENDOSCOPY
• NUCLEAR MEDICINE
• PHYSICAL THERAPY
• RADIOLOGY / MRI
• RESPIRATORY THERAPY
• CCU
• EMERGENCY ROOM
• LABOR AND DELIVERY
• LABORATORIES (SPECIMEN)
• MEDICAL UNITS
• NEWBORN NURSERY
• OUTPATIENT SURGERY
• PEDIATRICS
• PHARMACY
• POST ANESTHESIA CARE
UNIT
• SURGICAL UNITS
• ANY AREA CARING FOR
IMMUNOCOMPROMISED
PATIENTS
• BURN UNITS
• CARDIAC CATH LAB
• CENTRAL STERILE SUPPLY
• INTENSIVE CARE UNIT
• NEGATIVE PRESSURE
ISOLATION ROOMS
• ONCOLOGY
• OPERATING ROOMS
INCLUDING C SECTION
ROOMS
STEP THREE:
MATCH THE PATIENT RISK GROUP (LOW, MEDIUM, HIGH, HIGHEST) WITH THE PLANNED ...
CONSTRUCTION PROJECT TYPE (A, B, C, D) ON THE FOLLOWING MATRIX, TO FIND THE ...
CLASS OF PRECAUTIONS ( I, II, III OR IV) OR LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED.
CLASS I - IV OR COLOR-CODED PRECAUTIONS ARE DELINEATED ON THE FOLLOWING PAGE.
IC MATRIX - CLASS OF PRECAUTIONS: CONSTRUCTION PROJECT BY PATIENT RISK
CONSTRUCTION PROJECT TYPE
PATIENT RISK GROUP TYPE A TYPE B TYPE C TYPE D
LOW RISK GROUP I II II III / IV
MEDIUM RISK GGROUP I II III IV
HIGH RISK GROUP I II III / IV IV
HIGHEST RISK GROUP II III / IV III / IV IV
NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND
RISK LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.
STEP THREE: CLASS IV
DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS
UPON COMPLETION OF PROJECTDURING CONSTRUCTION PROJECT
CLASS I
1. EXECUTE WORK BY METHODS TO MINIMIZE
RAISING DUST FROM CONSTRUCTION
OPERATIONS
2. IMMEDIATELY REPLACE A CEILING TILE
DISPLACED FOR VISUAL INSPECTION
1. CLEAN WORK AREA UPON COMPLETION OF
TASK.
CLASS II
1. PROVIDE ACTIVE MEANS TO PREVENT
AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE
2. WATER MIST WORK SURFACE TO CONTROL
DUST WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT
OF WORK AREA.
6. REMOVE OR ISOLATE HVAC SYSTEM IN
AREAS WHERE WORK IS BEING PERFORMED.
1. WIPE WORK SURFACES WITH CLEANER /
DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. WET MOP AND / OR VACUUM WITH HEPA
VACUUM BEFORE LEAVING WORK AREA.
4. UPON COMPLETION, RESTORE HVAC
SYSTEM WHERE WORK WAS PERFORMED
CLASS III
1. REMOVE OR ISOLATE HVAC SYSTEM IN
AREA WHERE WORK I.E. BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E.
SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED
CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT)
BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN
WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS.
4. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR
CARTS. TAPE COVERING UNLESS SOLID LID.
1. DO NOT REMOVE BARRIERS FROM WORK
AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE OWNER'S SAFETY
DEPARTMENT AND INFECTION PREVENTION
AND CONTROL DEPARTMENT AND
THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPARTMENT.
2. REMOVE BARRIER MATERIALS CAREFULLY
TO MINIMIZE SPREADING OF DIRT AND
DEBRIS ASSOCIATED WITH CONSTRUCTION.
3. VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS.
4. WET MOP AREA WITH CLEANER /
DISINFECTANT.
5. UPON COMPLETION, RESTORE HVAC
SYSTEM WHERE WORK WAS PERFORMED
CLASS IV
1. ISOLATE HVAC SYSTEM IN AREA WHERE
WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E.
SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED
CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT)
BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN
WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS.
4. SEAL HOLES, PIPES, CONDUITS, AND
PUNCTURES.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL
PERSONNEL TO PASS THROUGH THIS ROOM
SO THEY CAN BE VACUUMED USING A HEPA
VACUUM CLEANER BEFORE LEAVING WORK
SITE OR THEY CAN WEAR CLOTH OR PAPER
COVERALLS THAT ARE REMOVED EACH TIME
THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING THE WORK
SITE ARE REQUIRED TO WEAR SHOE
COVERS. SHOE COVERS MUST BE CHANGED
EACH TIME THE WORKER EXITS THE WORK
AREA.
1. DO NOT REMOVE BARRIERS FROM WORK
AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE OWNER'S SAFETY
DEPARTMENT AND INFECTION PREVENTION
AND CONTROL DEPARTMENT AND
THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPT.
2. REMOVE BARRIER MATERIAL CAREFULLY
TO MINIMIZE SPREADING OF DIRT AND
DEBRIS ASSOCIATED WITH CONSTRUCTION.
3. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN COVERED CONTAINERS.
4. COVER TRANSPORT RECEPTACLES OR
CARTS. TAPE COVERING UNLESS SOLID LID.
5. VACUUM WORK AREA WITH I-IEPA
FILTERED VACUUMS.
6. WET MOP AREA WITH CLEANER /
DISINFECTANT.
7. UPON COMPLETION, RESTORE HVAC
SYSTEM WHERE WORK WAS PERFORMED
1 HOUR SMOKE RATED
TEMPORARY CONSTRUCTION
PARTITION
TEMPORARY CONSTRUCTION BARRIER
PROJECT SCOPE
SUPPLY DUCTS EITHER
KEEP RUNNING OR
COVER WHEN
RUNNING TO KEEP
DUST OUT
COVER ALL RETURNS AT
THE GRATE/DIFFUSERS
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
SUSPENDED PLASTIC
ZIPPER WALL CURTAIN
BARRIER
FIRE PULL
STATION WITH
AUDIO / VISUAL
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
F L E
X D
U C
T
2' - 11 1/2"
GI-300
A P
P R
O X
A .F
.F
POST ICRA,
ILSM, FIRE
INSPECTION
SHEETS VISIBLE
TO PUBLIC
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
V .I .F
E X
IS
T
IN
G
W A
L L
V .I .F
E X
IS
T
IN
G
W A
L L
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
5A101
C5E 5
5E114
5E102
5A104
5A105 5A107
5A108
5A111 5A110
5A112 5A113
5A116
5A117
5A118
5A119
5A121
5A1235A122
5A124
5A126
5A125
5A127
5A128
5A129
5A130
5A131
5A132
5E103
5A133
5A134
5A135
5A136
5A137
5A139
5A143 5A141
C5A 5
5A106
5A114 5A109 C5A 6
5A115
5A120
5A138
C5A 7
5E101
5A144 5A140
5A142
5E100
A A
A
A
1. SHEET SIZE FOR PROPER SCALE IS 30X42. CONTRACTOR SHALL NOT
SCALE DRAWINGS BUT SHALL REQUEST THE DESIRED DIMENSIONS
FROM THE ARCHITECT.
2. SEE SHEET GI-001 FOR GENERAL NOTES.
1 HOUR FIRE BARRIER
1 HOUR FIRE / SMOKE
EXISTING 2 HOUR FIRE/SMOKE
FIRE BARRIER LEGEND:
SMOKE PARTITION
N
AREA OF WORK
F
C B
G
19D185
AREA OF WORK
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
PRELIM
IN
ARY
NO
T F
O R
C O
NSTR
UC
TIO
N
AREA OF WORK
/1 /2
:3
:3
P M
CONSTRUCTION DOCUMENTS
11/10/2021
INFECTION CONTROL PLAN
GI-300
DESIGN RENOVATION OF 5
EAST
JEJL
921 NE 13TH ST.
OKLAHOMA CITY, OK 73104CODY COOPER
VA259-16-D-0217
36C25921N0083
A. THE ONE-HOUR FIRE-RATED CONSTRUCTION BARRIERS SHALL BE CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.
B. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR OCCUPIED AREAS OF THE FLOOR.
C. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREA; REVIEW WITH COR AND VA SAFETY GROUP.
D. CONTRACTOR SHALL PROVIDE FIRE WATCH FOR ALL HOT WORK ACTIVITIES AND WHEN FIRE ALARM OR SPRINKLER SYSTEMS
ARE OFFLINE MORE THAN 4HOURS IN A 24 HOUR PERIOD.
E. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT ALL TIMES (24/7), WHETHER OCCUPIED OR NOT, THROUGHOUT
DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION UNITS.
F.MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.
G. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR
EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE CONSTRUCTION AREA.
H. REDIRECT ALL MEDICAL CENTER PERSONNEL, PATIENTS, AND VISITORS SO THEY DO NOT EXIT THROUGH THE CONSTRUCTION AREA. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION AREA THAT RED: "CONSTRUCTION AREA - DO NOT ENTER".
I. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND KEEP A CURRENT HOT WORK PERMIT ON SITE.
J. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE SURE
THEY REMAIN EFFECTIVE.
K. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA TO PREVENT CONTAMINATION OF EXISTING DUCT SYSTEMS.
L. OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING WORK.
M. ISOLATE HVAC SYSTEM WITHIN CONSTRUCTION AREA TO PREVENT CONTAMINATION OF EXISTING DUCT SYSTEM.
N. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT0 BEFORE
CONSTRUCTION BEGINS.
O. AFTER COMPLETION OF WORK AND BETWEEN PHASES; VACUUM CONSTRUCTION AREA WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT, REMOVE CONSTRUCTION BARRIERS (UPON APPROVAL), PATCH OR REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER REMOVAL, AND REMOVE ISOLATION OF HVAC SYSTEM. UPON COMPLETION, RESTORE HVAC SYSTEM
WHERE WORK WAS PERFORMED.
P. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES AND/OR CONDUITS APPROPRIATELY AND IMMEDIATELY TO
MAINTAIN DUCT PROTECTION AND NEGATIVE AIR PRESSURE.
Q. CONSTRUCT ANTEROOM ART ENTRANCES TO CONSTRUCTION AREAS AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS THROUGH THIS ROOM TO BEVACUUMED WITH A HEPA VACUUM CLEANER PRIOR TO LEAVING THE SITE OR THEY CAN WEAR CLOTH
OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE WORK SITE.
Q.A. CONSTRUCTION WORKERS WILL NOT BE ENTERING ANY OCCUPIED VA SPACES.
Q.B. DIRECT ACCESS TO OUT THROUGH ANTEROOM(EXIT/ENTRANCE)
R. ALL PERSONNEL ENTERING WORK SITE (ONLY IF ENTERING VA SPACE) ARE REQUIRED TO WEAR SHOE COVERING.
S. CONSTRUCTION BARRIERS SHALL NOT BE REMOVED UNTIL PROJECT IS COMPLETED AND INSPECTION BY VA SAFETY
PERSONNEL, INFECTION CONTROL GROUP, AND COR.
T. REMOVE BARRIERS MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. COVER TRANSPORT RECEPTACLES
OR CARTS. TAPE COVERING UNLESS SOLID LID.
INFECTION CONTROL NOTES - CLASS IV
CONSTRUCITON:
1/4" = 1'-0"
ICRA SCHEDULE
1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
1/2" = 1'-0"
ROOM ELEVATION (TYPICAL)
1/2" = 1'-0"
CROSS SECTION 'A'
12" = 1'-0"
ILSM TEMPORARY BARRIER TAG
1/16" = 1'-0"
LEVEL 5 EAST - INFECTION CONTROL PLAN
GENERAL NOTES:
NOTE:
EGRESS STAIR TO REMAIN OPEN AND SAFE FOR USE THROUGHOUT
DURATION OF PROJECT, CONTRACTOR TO PROVIDE TEMPORARY
BARRIERS AS NECESSARY TO ENSURE SAFE EGRESS OUT OF STAIR IN
CASE OF AN EVENT WITHIN EXISTING HOSPITAL.
02-03 02-03
02-16 02-03
02-02
02-03
02-15
02-03
02-15
02-03 02-02
02-0302-0302-03
02-02
02-15
02-0302-0302-0302-03
02-15
02-0302-03
02-02
02-0302-0302-03
02-15
02-03
02-02
02-0302-03
02-15
02-02
02-15
02-0302-0302-03
02-03
02-02
02-02
02-1502-15
02-0302-0302-03
02-02
02-02
02-1502-15
02-03
02-0202-02
02-03
02-03
02-15
02-02
02-0302-0302-03
02-02
02-0302-03
02-0302-03
02-03
02-02
02-15
02-0302-03
02-02
02-02 02-02
02-03
02-15
02-0302-03
02-0202-02 02-0202-02
02-0202-0202-0202-02
02-15 02-15
02-15 02-0302-0302-03
02-03
02-03
02-03
02-0302-0302-0302-03
02-03
02-03
02-02
02-02
02-03
02-16 02-16
02-03
02-0302-03 02-03
02-03
02-03
02-0302-03
02-03
02-0302-0302-03
02-15
02-0302-0302-0302-03
02-15
02-0302-0302-03
02-03
02-15
02-0302-0302-03
02-15
02-15
02-0202-02
02-0302-0302-0302-0302-03 02-03
02-15
02-0202-02
02-15
02-0302-03
02-03
02-02
02-02 02-0302-03
02-0302-0302-03
02-0202-02
02-0302-03
02-0302-03
02-0302-0302-03 02-0202-1502-15 02-02
02-0302-03
02-0302-03
02-15
02-16
02-0202-02
02-0202-02
02-0202-02
02-0202-02
02-0202-02
02-0202-02
02-02
02-02
02-02
02-02
02-02
02-03
02-0302-0302-0302-03
02-0302-03
02-03
02-0302-03
02-03
02-15
02-16 02-03
02-03
02-15
02-16
02-03
02-15
02-16
02-0302-03
02-03
02-15
02-16
02-03
02-0302-0302-03
02-16
02-16
02-15
02-03
02-03
02-16
02-16
02-15
02-0302-03
02-03
02-16
02-15
02-0302-03
02-16
02-15
02-0302-0302-03
02-0302-03
02-16
02-15
02-03
02-0302-03
02-16
02-16
02-03
02-03
02-03
02-03
02-03
02-03
02-0302-03
02-0302-03
02-0302-03
02-0302-03
02-0302-03
02-0302-03
02-09
02-03
02-03
02-04
02-03
02-03
02-19 02-19
02-19
02-19
02-19
02-1902-19
02-04
02-03
02-19
02-19
02-04
02-19
02-03
02-03
02-1902-19
02-19
02-04 02-04
02-04
02-0402-0402-04
02-19
02-19 02-19
02-19 02-19
02-19
02-19
02-1902-19
02-19
02-19
02-1902-19
02-1902-19
02-1902-19
02-19 02-1902-1902-1902-19
02-19
02-1902-1902-19
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
A
A
B
B
C
C
D
D
E
E
F
F
G
G
I
I
J
J
K
K
L
L
9 9
H
H
02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-08 02-08
02-08 02-08 02-08 02-08
02-0802-08
02-08 02-0802-08
02-0802-08
02-08
02-08
02-08
02-08
02-08 02-08
02-08 02-08
02-08
02-08
02-0802-08
02-08 02-0802-08
02-08 02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-08
02-04
02-04
02-03
02-0902-09
02-03
EXISTING ELECTRICAL
PANEL TO REMAIN
02-04
02-0402-04 02-04
02-04
02-03
02-03
02-03
02-04
02-03
02-2102-21
02-20
02-20
02-21
02-21
02-21
02-21
02-21
02-21
02-21
02-21
DEMOLITION LEGEND:
LIMITS OF PROJECT/CONSTRUCTION
UNDER THIS CONTRACT.
AREA OF WORK NOT IN THE SCOPE.
EXISTING TO REMAIN.
ITEMS TO BE DEMOLISHED. SEE
KEYNOTES.
APPROXIMATE AREA OF EXISTING
CONCRETE SLAB TO BE REMOVED
FOR NEW TRENCH DRAIN.
EXISTING TERRAZZO FLOOR BASE
TO BE REMOVED.
1. SHEET SIZE FOR PROPER SCALE IS 30X42. CONTRACTOR SHALL NOT
SCALE DRAWINGS BUT SHALL REQUEST THE DESIRED DIMENSIONS
FROM THE ARCHITECT.
2. SEE SHEET GI-001 FOR GENERAL NOTES.
1 HOUR FIRE BARRIER
1 HOUR FIRE / SMOKE
EXISTING 2 HOUR FIRE/SMOKE
FIRE BARRIER LEGEND:
SMOKE PARTITION
N
AREA OF WORK
F
C B
G
19D185
AREA OF WORK
SUMMIT FIRE CONSULTING
575 MINNEHAHA AVE WEST
ST. PAUL, MINNESOTA 55103
(612) 387-7050
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOUR FRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
PRELIM
IN
ARY
NO
T F
O R
C O
NSTR
UC
TIO
N
AREA OF WORK
/1 /2
:3
:5
P M
CONSTRUCTION DOCUMENTS
11/10/2021
DEMOLITION PLAN
AD-100
DESIGN RENOVATION OF 5
EAST
JEJL
921 NE 13TH ST.
OKLAHOMA CITY, OK 73104CODY COOPER
VA259-16-D-0217
36C25921N0083
1/8" = 1'-0"
LEVEL 5 EAST - DEMOLITION PLAN
KEYNOTES:
02-02 REMOVE EXISTING DOOR, DOOR HARDWARE, AND
FRAME COMPLETELY. COORDINATE WITH ANY
ASSOCIATED ELECTRICAL/ACCESS CONTROL
DEMOLITION.
02-03 REMOVE EXISTING WALL FROM FINISH FLOOR TO
STRUCTURE ABOVE AND ANY ASSOCIATED
MECHANICAL/PLUMBING/ELECTRICAL/FIRE
PROTECTION. SEE MECHANICAL, PLUMBING,
ELECTRICAL, FIRE PROTECTION FOR ADDITIONAL
INFORMATION.
02-04 REMOVE EXISTING FINISH AND GYPSUM BOARD
FROM FLOOR TO STRUCTURE TO EXISTING
PARTITION FRAMING. COORDINATE WITH ALL
MECHANICAL, PLUMBING, ELECTRICAL FOR
ADDITIONAL DEMOLITION WORK.
02-08 REMOVE EXISTING FLOORING, BASE AND TRIM,
PREPARE FOR NEW FLOORING. SEE SLOOR FINISH
PLAN.
02-09 REMOVE PORTION OF EXISTING WALL FOR
SCHEDULED OPENING. SEE OPENING SCHEDULE FOR
ADDITIONAL INFORMATION. SEE STRUCTURAL
DRAWINGS.
02-15 REMOVE EXISTING PLUMBING FIXTURES AND PIPING.
SEE PLUMBING DRAWINGS FOR ADDITIONAL
INFORMATION.
02-16 REMOVE EXISTING CASEWORK AND COUNTERTOPS.
02-19 REMOVE EXISTING TERAZZO FLOOR BASE.
02-20 REMOVE EXISTING DOOR AND FRAME, TYPICAL.
02-21 REMOVE PORTION OF EXISTING CONCRETE SLAB
FOR DRAIN PIPE, SEE PLUMBING DRAWINGS.
SHEET SPECIFIC NOTES:
1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VISIT
THE PROJECT AND VERIFY EXISTING CONDITIONS/DIMENSIONS
AND PROPOSED CONDITIONS.
2. THE DEMOLITION PLAN INDICATES GENERAL INFORMATION
AND INTENT. THE CONTRACTOR SHALL COORDINATE
DEMOLITION WITH NEW CONSTRUCTION TO ENSURE QUALITY
OF FINAL PRODUCT.
3. DASHED BOLD LINES INDICATE EXTENT OF DEMOLITION
INCLUDING THE FOLLOWING: INTERIOR PARTITIONS (REMOVE
TO STRUCTURE); CEILINGS, INCLUDING CEILING SUSPENSION
SYSTEM, MISC. STEEL SUPPORTS FOR SUSPENDED
EQUIPMENT, SUSPENDED EQUIPMENT, LIGHT FIXTURES,
DIFFUSERS AND GRILLES ETC.; FLOOR FINISHES (TO
CONCRETE) INCLUDING CARPET, RESILIENT TILE, SHEET VINYL,
CERAMIC TILE ETC; DOORS AND FRAMES UNLESS NOTED
OTHERWISE; CMU BLOCK/BRICK AND BACKUP WALL SYSTEM;
CABINET WORK, SHELVING, BASES; TOILET PARTITIONS AND
ACCESSORIES; EQUIPMENT ITEMS; PLUMBING FIXTURES.
4. GENERAL CONTRACTOR SHALL COORDINATE DEMOLITION
BETWEEN ALL TRADES. NOTIFY A/E IMMEDIATELY OF ANY
CONFLICTS OR DISCREPANCIES.
5. REFER TO PHASING SHEET FOR PROJECT PHASING AND
SEQUENCE OF WORK. ALL DEMOLITION AND REMODEL WORK
MUST BE CLOSELY COORDINATED WITH THE COR.
6. THE GENERAL CONTRACTOR SHALL INSPECT AND FIELD
VERIFY EXISTING CONDITIONS PRIOR TO COMMENCING WORK,
INCLUDING ELEMENTS SUBJECT TO DAMAGE OR MOVEMENT
DURING DEMOLITION, CUTTING OR PATCHING.
7. MATERIAL PRODUCT FROM DEMOLITION SHALL BECOME THE
PROPERTY AND RESPONSIBILITY OF THE CONTRACTOR WITH
THE EXCEPTION OF SPECIFIED ITEMS DESIGNATED EITHER IN
THE PLANS OR VERBALLY REQUESTED BY THE (COR) TO BE
RETAINED BY THE VA.
8. OFFSITE DISPOSAL OF THE DEMOLISHED ITEMS IS THE
RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE
DISPOSED OF LAWFULLY.
9. DEMOLITION MATERIALS SHALL BE REMOVED FROM SITE ON A
DAILY BASIS. COORDINATE WITH THE COR THE IDENTIFICATION
AND TRANSFER OF ANY ITEMS THAT NEED TO BE SALVAGED.
10. VERIFY LOCATION OF EXISTING UTILITY LINES PRIOR TO
STARTING DEMOLITION. MAY NOT BE LIMITED TO UTILITIES
SHOWN ON ARCHITECTURAL, MECHANICAL, PLUMBING, AND
ELECTRICAL PLANS. REFER TO THE THESE DRAWINGS FOR
ADDITIONAL INFORMATION.
11. UPON…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .