This document contains details of a federal solicitation and related construction drawings file. Solicitation number 36C25922R0088 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 is seeking bids for the Z2DA--T2 635-20-130 Renovate 5 East project at VA-22-00061294. The opportunity type is listed as a solicitation and the description provided is "End of Solicitation." A stamped and sealed construction drawings file with an unspecified content is also included and appears to contain technical specifications and design plans relevant to the renovation project.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

PRELIM

IN

ARY

NO

T F

O R

C O

NSTR

UC

TIO

N

/1 /2

:3

:3

P M

CONSTRUCTION DOCUMENTS

11/10/2021

COVER SHEET

GI-000

DESIGN RENOVATION OF 5

EAST

JEJL

921 NE 13TH ST.

OKLAHOMA CITY, OK 73104CODY COOPER

VA259-16-D-0217

36C25921N0083

DESIGN RENOVATION OF 5 EAST

PROJECT NO.

OKLAHOMA CITY VA HEALTH CARE SYSTEM

921 NE 13TH ST.

OKLAHOMA CITY, OK 73104

VA

U.S DEPARTMENT OF VETERAN'S AFFAIRS

VETERAN'S HEALTH ADMINISTRATION

VA259-16-D-0217

36C25921N0083

11.10.21

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of

Veterans Affairsof

PRELIM

IN

ARY

NO

T F

O R

C O

NSTR

UC

TIO

N

/1 /2

:2

:4

P M

CONSTRUCTION DOCUMENTS

11/10/2021

PROJECT DIRECTORY, DRAWING

INDEX AND GENERAL NOTES

GI-001

DESIGN RENOVATION OF 5

EAST

JEJL

921 NE 13TH ST.

OKLAHOMA CITY, OK 73104CODY COOPER

VA259-16-D-0217

36C25921N0083

ARCHITECT

JAMES LUSHBOUGH, AIA, NCARB

MECHANICAL ENGINEER

PAT MORGAN

ELECTRICAL ENGINEER

WILL WANGEN

FourFront Design Inc.

517 7th Street Rapid City, South Dakota 57701 Phone (605) 342-9470

Albertson Engineering Inc.

3202 West Main Street, Suite C Rapid City, South Dakota 57702 Phone (605) 343-9606

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

PROJECT DIRECTORY:

STRUCTURAL ENGINEER

LUCAS FRIED

FIRE PROTECTION ENGINEER

MARK SORINSON

SHEET INDEX:

GENERAL

GI-000 COVER SHEET

GI-001 PROJECT DIRECTORY, DRAWING INDEX AND GENERAL NOTES

GI-002 LOCATION MAP / CONTRACTOR STAGING AREA AND ACCESS

GI-003 ABBREVIATIONS, SYMBOLS, LEGENDS AND ARCHITECTURE GENERAL NOTES

GI-010 NEW AREA PLAN

GI-200 CODE REVIEW PLAN

GI-201 LIFE SAFETY PLAN

GI-300 INFECTION CONTROL PLAN

ARCHITECTURE

AD-100 DEMOLITION PLAN

AD-101 DEMOLITION REFLECTED CEILING PLANS

AS-000 WALL TYPES

AS-001 PARTITION FRAMING DETAILS

AS-010 HEAD OF WALL DETAILS

AS-020 PLAN DETAILS

AS-021 PLAN DETAILS

AS-022 PLAN DETAILS

AS-100 ARCHITECTURAL FLOOR PLAN

AS-101 DIMENSION FLOOR PLAN

AS-102 REFLECTED CEILING PLAN

AS-103 CEILING DETAILS

AS-400 ENLARGED PLANS I

AS-401 ENLARGED PLANS II

AS-402 ENLARGED PLANS III

AS-403 ENLARGED PLANS IV

AS-404 ENLARGED PLANS V

AS-405 ENLARGED PLANS VI

AS-406 INTERIOR ELEVATIONS

AS-407 INTERIOR ELEVATIONS

AS-408 INTERIOR ELEVATIONS

AS-409 MILLWORK SECTIONS AND PLAN DETAILS

AS-500 ROOM FINISH SCHEDULE

AS-501 FLOOR FINISH PLAN

AS-502 WALL PROTECTION PLAN

AS-600 DOOR SCHEDULE, ELEVATIONS, AND DETAILS

AS-601 DOOR DETAILS

EQUIPMENT

QH-100 MEDICAL EQUIPMENT PLAN

INTERIOR FURNISHINGS

IF-100 FURNISHINGS REFERENCE PLAN

MECHANICAL

M-000 SYMBOLS, LEGENDS AND ABBREVIATIONS

M-101 MECHANICAL FIRE BARRIER PLAN

MHD-101 MECHANICAL HVAC DEMO PLAN 5TH FLOOR PLAN

MPD-101 MECHANICAL PIPING DEMO PLAN 5TH FLOOR PLAN

MH-101 MECHANICAL HVAC PLAN 5TH FLOOR PLAN

MP-101 MECHANICAL PIPING PLAN 5TH FLOOR PLAN

M-501 MECHANICAL SCHEDULES AND DETAILS

PLUMBING

P-000 SYMBOLS, LEGENDS AND ABBREVIATIONS

P-001 LEVEL 5 - NEW FIRE BARRIER PLAN

PD-101 LEVEL 4 - PLUMBING DEMOLITION PLAN

PD-102 LEVEL 5 - PLUMBING DEMOLITION

P-103 LEVEL 4 - NEW SANITARY WASTE AND VENT PLAN

P-104 LEVEL 5 - NEW DOMESTIC WATER PLAN

P-105 LEVEL 5 - NEW SANITARY WASTE AND VENT PLAN

P-106 LEVEL 5 - NEW MED GAS PLAN

P-201 WATER ISOMETRIC VIEW

P-202 SANITARY ISOMETRIC VIEW

P-203 MED GAS ISOMETRIC VIEW

P-501 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

ELECTRICAL

E-000 ELECTRICAL LEGEND AND ABBREVIATIONS

E-001 ELECTRICAL SCHEDULE

E-002 ELECTRICAL DETAILS

ED-100 POWER DEMOLITION PLAN

ED-200 LIGHT DEMOLITION PLAN

ED-300 SPECIAL SYSTEM DEMOLITION PLAN

E-100 POWER PLAN

E-200 LIGHT PLAN

E-300 SPECIAL SYSTEM PLAN

FIRE PROTECTION

FA-100 FIRE ALARM COVER SHEET

FA-101 FIRE ALARM - LEVEL 5 - DEMO

FA-102 FIRE ALARM - LEVEL 5 - NEW

FP-100 FIRE PROTECTION COVER SHEET

FP-101 FIRE PROTECTION - LEVEL 5 - DEMO

FP-102 FIRE PROTECTION - LEVEL 5 - NEW

1. ALL WORK SHALL COMPLY WITH APPLICABLE CODES, REGULATIONS,

AND ORDINANCES.

2. THE CONTRACTOR SHALL PERFORM ALL TESTING AND INSPECTIONS

AS SPECIFIED, OR AS NECESSARY TO DEMONSTRATE A COMPLETE

AND SATISFACTORY INSTALLATION.

3. THE CONTRACTOR SHALL PROTECT EXISTING BUILDING AND SITE

MATERIALS SCHEDULED TO REMAIN, AND SHALL BE RESPONSIBLE FOR

DAMAGE TO THE SAME RESULTING FROM WORK UNDER THIS

CONTRACT. THE CONTRACTOR SHALL RESTORE DAMAGED EXISTING

BUILDING AND SITE MATERIALS TO THEIR ORIGINAL CONDITION.

4. CONTRACTOR SHALL INSPECT SITE AND FIELD VERIFY ALL

DIMENSIONS AND CONDITIONS PRIOR TO COMMENCING

CONSTRUCTION. CONTRACTOR SHALL NOTIFY

ARCHITECT/CONTRACTING OFFICER REPRESENTATIVE IMMEDIATELY

OF ANY DISCREPANCIES.

5. CONTRACTOR SHALL COORDINATE ALL WORK AND SHOP DRAWINGS

WITH OTHER TRADES.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL

WORK. CONTRACTOR SHALL ANTICIPATE AREAS WHERE THE

INSTALLATION OF MECHANICAL AND ELECTRICAL WORK WILL BE

RESTRICTED, CONGESTED, OR DIFFICULT TO INSTALL, AND SHALL

COORDINATE INSTALLATION BETWEEN ALL TRADES.

7. SUB-CONTRACTOR SHALL COORDINATE LOCATIONS FOR ALL

MECHANICAL AND ELECTRICAL ITEMS WITH THE GENERAL

CONTRACTOR. CONTRACTOR SHALL NOTIFY

ARCHITECT/CONTRACTING OFFICER REPRESENTATIVE OF ANY

DISCREPANCIES PRIOR TO INSTALLATION AND/OR FABRICATION.

8. ALL BUILDING DIMENSIONS ARE TO FACE OF STUD, FACE OF

MASONRY, AND EXTERIOR WINDOW OR DOOR ROUGH OPENING.

9. ALL ANGLES ON PLANS ARE 45- OR 90-DEGREES, UNLESS NOTED

OTHERWISE. CURVED ELEMENTS ARE LOCATED AS DIMENSIONED.

10. ALL ITEMS ARE NEW UNLESS SPECIFICALLY IDENTIFIED AS EXISTING.

11. SEE LIFE SAFETY AND FIRE PROTECTION PLANS FOR LOCATIONS OF

FIRE- AND SMOKE-RATED PARTITIONS.

12. INSTALL BLOCKING WITHIN PARTITIONS AS REQUIRED FOR

INSTALLATION OF WALL-MOUNTED CABINETS, TOILET ACCESSORIES,

WALL STOPS, AND MISCELLANEOUS ITEMS.

13. LOCATE INTERIOR CONTROL JOINTS WHERE INDICATED, BUT AT A

MINIMUM TO DIVIDE ALL GYPSUM BOARD INTO SECTIONS NOT

EXCEEDING 30-FEET IN LENGTH.

14. ALL CEILING GRID SHALL BE CENTERED WITHIN THE ROOM OR

CORRIDOR IN WHICH IT OCCURS, UNLESS SHOWN OTHERWISE.

15. ALL CEILING HEIGHTS LISTED IN THE RCP PLAN ARE FROM THE FINISH

FLOOR OF THE LISTED ROOM, UNLESS NOTED OTHERWISE.

16. ALL CHANGES IN FLOOR MATERIALS OCCUR AT THE FOLLOWING

LOCATIONS, UNLESS NOTED OTHERWISE: 1) AT THE CENTER LINE OF

DOORS IN THE CLOSED POSITION, OR; 2) AT THE CENTER LINE OF

OPENINGS SEPARATING ROOMS.

17. WHERE METAL STUDS EXTEND TO THE STRUCTURE ABOVE, PROVIDE

DOUBLE-HEAD TRACK TO ALLOW FOR 3/4” MINIMUM DEFLECTION OF

THE STRUCTURE.

18. IN SOME INSTANCES, THERMAL AND SOUND INSULATION HAS BEEN

OMITTED FROM DETAILS FOR CLARITY. SEE SPECIFICATIONS,

PARTITION TYPES, AND WALL SECTIONS FOR LOCATIONS REQUIRING

INSULATION.

GENERAL NOTES:

O X Y G E N

T A N K

C H A

IN

L

IN

K

RAMP DOWN

RAMP UP

R A

M P

U P

H C

H

CHC

HC

P A R K

IN

G

N O

V E H

P O L

IC

E

T R U C K

L A U N D R Y

P L A N T E R

P L A N T E R

P L A N T E R

P L A N T E R

P L A N T E R

HC

N

M c M

E C

H A

N S

T R

E E

T

N

K E

L L Y

S T

R E

E T

NE 13th STREET

NE 13th STREET

OKLAHOMA CITY VA HEALTH

CARE SYSTEM

CONTRACTOR POINT OF ACCESS FOR INTERIOR REMODEL

WORK. COORDINATE WITH PHASING PLANS IN THIS

DRAWING SET.

1. SHEET SIZE FOR PROPER SCALE IS 30X42. CONTRACTOR SHALL NOT

SCALE DRAWINGS BUT SHALL REQUEST THE DESIRED DIMENSIONS

FROM THE ARCHITECT.

2. SEE SHEET GI-001 FOR GENERAL NOTES.

N

AREA OF WORK

F

C B

G

19D185

AREA OF WORK

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

PRELIM

IN

ARY

NO

T F

O R

C O

NSTR

UC

TIO

N

AREA OF WORK

/1 /2

:3

:3

P M

CONSTRUCTION DOCUMENTS

11/10/2021

LOCATION MAP / CONTRACTOR

STAGING AREA AND ACCESS

GI-002

DESIGN RENOVATION OF 5

EAST

JEJL

921 NE 13TH ST.

OKLAHOMA CITY, OK 73104CODY COOPER

VA259-16-D-0217

36C25921N0083

SITE MAP

SHEET SPECIFIC NOTES:

STAGING LEGEND

1. CONTRACTOR OVERFLOW PARKING SHALL BE PROVIDED IN

COORDINATION WITH THE COR. THE LOCATION OF THIS

PARKING IS 3 BLOCKS EAST OF THE HOSPITAL ALONG LOTTIE

AVENUE. CONTRACTOR SHALL CORDINATE WITH THE COR

FOR SHUTTLE SERVICES TO THE HOSPITAL OR PROVIDE THEIR

OWN SHUTTLE SERVICES.

N

GENERAL NOTES:

# POUND OR NUMBER

& AND

@ AT

AB ANCHOR BOLT

ACI AMERICAN CONCRETE INSTITUTE

ACT ACOUSTIC CEILING TILE

AD AREA DRAIN

AFF ABOVE FINISH FLOOR

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

AISI AMERICAN IRON AND STEEL INSTITUTE

ALUM ALUMINUM

ANOD ANODIZED

ASD ALTERNATE STRESS DESIGN

ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS

AWS AMERICAN WELDING SOCIETY

BD BOARD

BLK BLOCK

BM BEAM

B.O. BOTTOM OF

BOT BOTTOM

BRG BEARING

BRKT BRACKET

BSMT BASEMENT

BLDG BUILDING

BYND BEYOND

CAB CABINET

CER CERAMIC

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CLG CEILING

CLR CLEAR

COL COLUMN

COMPR COMPRESSIBLE

CONC CONCRETE

CONST JT CONSTRUCTION JOINT

CONT CONTINUOUS

CPT CARPET

CT CERAMIC TILE

DBL DOUBLE

DEMO DEMOLISH OR DEMOLITION

DET DETAIL

DIA DIAMETER

DIM DIMENSION

DIR DIRECTION

DN DOWN

DR DOOR

DWG DRAWING

EA EACH

EE EACH END

EF EACH FACE

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR OR ELEVATION

EQ EQUAL

ES EACH SIDE

EXIST EXISTING

EXP BOLT EXPANSION BOLT

EXP JT EXPANSION JOINT

EXT EXTERIOR

FD FLOOR DRAIN OR FIRE DEPARTMENT

FEC FIRE EXTINGUISHER CABINET

FIN FINISH

FIXT FIXTURE

FLR FLOOR

FM FILLED METAL

F.O. FACE OF

FT FOOT OR FEET

F.V. FIELD VERIFY

GA GAUGE

GALV GALVANIZED

GP GUSSET PLATE

GWB GYPSUM WALL BOARD

GYP GYPSUM

HC HOLLOW CORE

HDR HEADER

HEF HORIZONTAL EACH FACE

HI HIGH

HIF HORIZONTAL INSIDE FACE

HM HOLLOW METAL

HOF HORIZONTAL OUTSIDE FACE

HOR HORIZONTAL

HP HIGH POINT

HR HOUR

HS HIGH STRENGTH

HT HEIGHT

HVAC HEATING, VENTILATING, AND AIR

CONDITIONING

ICBO INTERNATIONAL CONFERENCE OF BUILDING

OFFICIALS

ID INSIDE DIAMETER

ILO IN LIEU OF

IN INCH

INCL INCLUDE

INSUL INSULATED OR INSULATION

INT INTERIOR

IRGWB IMPACT RESISTANT GYPSUM WALL BOARD

JT JOINT

K KIP (1000 POUNDS)

LLV LONG LEG VERTICAL

LP LOW POINT

LVL LEVEL

LW LIGHT WEIGHT

MAX MAXIMUM

MCB METAL CORNER BEAD

MECH MECHANICAL

MEMBR MEMBRANE

MFR MANUFACTURED

MIN MINIMUM

MRGWB MOISTURE-RESISTANT GYPSUM WALL BOARD

MTL METAL

NF NEAR FACE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OH OPPOSITE HAND

OPNG OPENING

OZ OUNCE

PDF POWER DRIVEN FASTENER

PL PLATE

P.LAM PLASTIC LAMINATE

PLUMB PLUMBING

PLY PLYWOOD

PORC PORCELAIN

PNL PANEL

PNT PAINT OR PAINTED

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED

PT POINT

PR PAIR

PROP PROPERTY

PVC POLYVINYL CHLORIDE

ABBREVIATIONS

R RADIUS

RBR RUBBER

RCP REFLECTED CEILING PLAN

RE RIGHT END

REINF REINFORCED

REF REFERENCE

REQD REQUIRED

RET RETURN

RETG RETAINING

RM ROOM

R.O. ROUGH OPENING

SAB SOUND ATTENUATION BATTS

SC SOLID CORE

SDI STEEL DECK INSTITUTE

SECT SECTION

SHT SHEET

SIM SIMILAR

SL SPLICE LENGTH

SLV SHORT LEG VERTICAL

SMS SHEET METAL SCREWS

SPEC SPECIFIED OR SPECIFICATION

SPK SPRINKLER OR SPEAKER

SQ SQUARE

SSTL STAINLESS STEEL

STC SOUND TRANSMISSION CLASS

STD STANDARD

STIFF STIFFENER

STL STEEL

STR STAIR

STRUCT STRUCTURE OR STRUCTURAL

SUP SUPPORT

SYM SYMMETRICAL

T&B TOP AND BOTTOM

TBD TO BE DETERMINED

T/D TELEPHONE/DATA

TEL TELEPHONE

TEMP TEMPERATURE

THK THICK OR THICKNESS

THRD THREADED

TLT TOILET

T.O. TOP OF

T.O.C TOP OF CONCRETE

T.O.F TOP OF FRAMING

T.O.S TOP OF STEEL/STUD

T.O.W TOP OF WALL

TPD TOILET PAPER DISPENSER

TYP TYPICAL

U/S UNDERSIDE

UNO UNLESS NOTED OTHERWISE

US UNDERSIDE

VCT VINYL COMPOSITE TILE

VEF VERTICAL EACH FACE

VERT VERTICAL

VIF VERIFY IN FIELD

VOF VERTICAL OUTSIDE FACE

VWC VINYL WALL COVERING

W/ WITH

WD WOOD

WDW WINDOW

WP WORKING POINT

STEEL/METAL

WOOD (ROUGH) BLOCKING OR SHIM

CONCRETE MASONRY

PLAN AND SECTION

WOOD (ROUGH)

ACOUSTIC CEILING TILE

GYPSUM BOARD

CEILING

CONCRETE

ELEVATION

CENTER LINE

LINE SYMBOLS

GRID LINE

PROPERTY LINE

CUT LINE

BATT INSULATION

WOOD SUBSTRATE

RIGID INSULATION

MATERIAL LEGEND

FLOORING

BID ALTERNATE

EPOXY COATED CONCRETE

PT1 - PORCELAIN TILE

RF - RUBBER FLOORING

LVT1 - LUXURY VINYL TILE

RES-6 - RESINOUS FLOORING

PT3 - PORCELAIN TILE

CPT-1 - CARPET TILE

WSF-1 - WELDED SEAM FLOORING

N

Room name

1t

VIEW NAME

1/8" = 1'-0"1 DRAWING TITLE

SCALE

BUILDING SECTION

DIRECTION OF SIGHT

DRAWING NUMBER

SHEET NUMBER

WALL SECTION

DETAIL CUT

A101

DETAIL CALLOUT

A101

A101

A101

A101

DIRECTION OF SIGHT

DRAWING NUMBER

SHEET NUMBER

DRAWING NUMBER

SHEET NUMBER

DRAWING NUMBER

SHEET NUMBER

INTERIOR ELEVATION

DRAWING NUMBER

DIRECTION OF SIGHT

SHEET NUMBER

ROOM TAG

ROOM NAME

ROOM NUMBER

KEYNOTE TAG

5-04 KEYNOTE DESIGNATION

DOOR TAG

DOOR NUMBER

PARTITION TAG

WALL DESIGNATION

WINDOW TAG

WINDOW DESIGNATION

ELEVATION MARKER

HEIGHT

NORTH ARROW

TRUE NORTH

PLAN NORTH

ARCHITECTURAL SYMBOLS

M3A

V.A. SYMBOLS

FIRE RESISTIVE RATED LINE, 1 HOUR

FIRE RESISTIVE RATED LINE, 2 HOUR

FIRE RESISTIVE RATED LINE, 3 HOUR

FIRE RESISTIVE RATED LINE, 4 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 1 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 2 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 3 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 4 HOUR

V V ITEM - VA SUPPLIED AND INSTALLED

VC ITEM - VA SUPPLIED AND CONTRACTOR INSTALLED

CC ITEM - CONTRACTOR SUPPLIED AND INSTALLED

A

COLUMN GRID

DIMENSION LINE

NORTH ARROW

CL CENTER LINE

N

1. THESE LEGENDS ARE COMPOSED OF STANDRD SYMBOLS AND

ARE PERTINENT TO THE CONDITIONS ON THIS SET OF

DRAWINGS TO THE EXTENT APPLICABLE.

2. ADDITIONAL LEGENDS AND/OR OTHER LEGENDS MAY APPEAR

IN THIS SET OF DRAWINGS TO INDICATE SPECIFIC CONDITIONS

IN LIEU OF SYMBOLS SHOWN ON THIS SHEET.

LEGEND NOTES:

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

PRELIM

IN

ARY

NO

T F

O R

C O

NSTR

UC

TIO

N

/1 /2

:3

:3

P M

CONSTRUCTION DOCUMENTS

11/10/2021

ABBREVIATIONS, SYMBOLS, LEGENDS

AND ARCHITECTURE GENERAL NOTES

GI-003

DESIGN RENOVATION OF 5

EAST

JEJL

921 NE 13TH ST.

OKLAHOMA CITY, OK 73104CODY COOPER

VA259-16-D-0217

36C25921N0083

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

A

A

B

B

C

C

D

D

E

E

F

F

G

G

I

I

J

J

K

K

L

L

26 SF

ELECTRICAL

CLOSET

5A101

61 SF

CORRIDOR

C5A 4

353 SF

CORRIDOR

C5E 5

62 SF

STORAGE

5E114

261 SF

PATIENT ROOM

5A104

48 SF

PATIENT TOILET

5A105

48 SF

PATIENT TOILET

5A107

250 SF

PATIENT ROOM

(BARIATRIC)

5A108

63 SF

PATIENT TOILET

5A111

70 SF

ANTE ROOM

5A110

294 SF

PATIENT ROOM

(ISO)

5A112

122 SF

STORAGE

5A113

55 SF

PATIENT TOILET

5A116

228 SF

PATIENT ROOM

5A117

231 SF

PATIENT ROOM

5A118

55 SF

PATIENT TOILET

5A119

295 SF

PATIENT ROOM

(BARIATRIC)

5A121

67 SF

PATIENT TOILET

5A123

58 SF

PATIENT TOILET

5A122

263 SF

PATIENT ROOM

5A124

ELECTRICAL

5A126

103 SF

SOILED UTILITY

5A125

79 SF

HAC

5A127

93 SF

CLEAN LINEN

5A128

264 SF

PATIENT ROOM

5A129

49 SF

PATIENT TOILET

5A130

49 SF

PATIENT TOILET

5A131

259 SF

PATIENT ROOM

5A132

132 SF

OIT

5E103

251 SF

PATIENT ROOM

5A133

49 SF

PATIENT TOILET

5A134

49 SF

PATIENT TOILET

5A135

256 SF

PATIENT ROOM

5A136

97 SF

CLEAN UTILITY

5A137

107 SF

NURSE TEAM

STATION

5A139

160 SF

NURSE MANAGER

5A143

65 SF

PATIENT TOILET

5A141

263 SF

PATIENT ROOM

5A140

437 SF

CORRIDOR

C5A 5

152 SF

MED ROOM/IV

STORAGE

5A106

25 SF

OXYGEN

STORAGE

5A114

57 SF

CLEAN SUPPLY

5A109

635 SF

CORRIDOR

C5A 6

28 SF

NURSE ALCOVE

5A115

42 SF

NURSE ALCOVE

5A120

27 SF

CRASH CART

ALCOVE

5A138

626 SF

CORRIDOR

C5A 7

271 SF

NURSE

LOUNGE/WORK

ROOM

5E101

2 SF54 SF

STORAGE

5A142

295 SF

FAMILY

NOURISHMENT

CENTER

5A144

75 SF

STAFF TOILET

5E100

9 9

H

H

1. SHEET SIZE FOR PROPER SCALE IS 30X42. CONTRACTOR SHALL NOT

SCALE DRAWINGS BUT SHALL REQUEST THE DESIRED DIMENSIONS

FROM THE ARCHITECT.

2. SEE SHEET GI-001 FOR GENERAL NOTES.

1 HOUR FIRE BARRIER

1 HOUR FIRE / SMOKE

EXISTING 2 HOUR FIRE/SMOKE

FIRE BARRIER LEGEND:

SMOKE PARTITION

N

AREA OF WORK

F

C B

G

19D185

AREA OF WORK

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

PRELIM

IN

ARY

NO

T F

O R

C O

NSTR

UC

TIO

N

AREA OF WORK

/1 /2

:3

:5

P M

CONSTRUCTION DOCUMENTS

11/10/2021

NEW AREA PLAN

GI-010

DESIGN RENOVATION OF 5

EAST

JEJL

921 NE 13TH ST.

OKLAHOMA CITY, OK 73104CODY COOPER

VA259-16-D-0217

36C25921N0083

NET ROOM AREA SCHEDULE

No. NAME AREA

5A101 ELECTRICAL CLOSET 26 SF

5A104 PATIENT ROOM 261 SF

5A105 PATIENT TOILET 48 SF

5A106 MED ROOM/IV STORAGE 152 SF

5A107 PATIENT TOILET 48 SF

5A108 PATIENT ROOM (BARIATRIC) 250 SF

5A109 CLEAN SUPPLY 57 SF

5A110 ANTE ROOM 70 SF

5A111 PATIENT TOILET 63 SF

5A112 PATIENT ROOM (ISO) 294 SF

5A113 STORAGE 122 SF

5A114 OXYGEN STORAGE 25 SF

5A115 NURSE ALCOVE 28 SF

5A116 PATIENT TOILET 55 SF

5A117 PATIENT ROOM 228 SF

5A118 PATIENT ROOM 231 SF

5A119 PATIENT TOILET 55 SF

5A120 NURSE ALCOVE 42 SF

5A121 PATIENT ROOM (BARIATRIC) 295 SF

5A122 PATIENT TOILET 58 SF

5A123 PATIENT TOILET 67 SF

5A124 PATIENT ROOM 263 SF

5A125 SOILED UTILITY 103 SF

5A126 ELECTRICAL 3 SF

5A127 HAC 79 SF

5A128 CLEAN LINEN 93 SF

5A129 PATIENT ROOM 264 SF

5A130 PATIENT TOILET 49 SF

5A131 PATIENT TOILET 49 SF

5A132 PATIENT ROOM 259 SF

5A133 PATIENT ROOM 251 SF

5A134 PATIENT TOILET 49 SF

5A135 PATIENT TOILET 49 SF

5A136 PATIENT ROOM 256 SF

5A137 CLEAN UTILITY 97 SF

5A138 CRASH CART ALCOVE 27 SF

5A139 NURSE TEAM STATION 107 SF

5A140 PATIENT ROOM 263 SF

5A141 PATIENT TOILET 65 SF

5A142 STORAGE 54 SF

5A143 NURSE MANAGER 160 SF

5A144 FAMILY NOURISHMENT CENTER 295 SF

5E100 STAFF TOILET 75 SF

5E101 NURSE LOUNGE/WORK ROOM 271 SF

5E103 OIT 132 SF

5E114 STORAGE 62 SF

C5A 4 CORRIDOR 61 SF

C5A 5 CORRIDOR 437 SF

C5A 6 CORRIDOR 635 SF

C5A 7 CORRIDOR 626 SF

1/8" = 1'-0"

LEVEL 5 EAST - NET AREA PLAN

N

NET ROOM TOTAL 7717 SF

2 SF

GENERAL NOTES:

1. SHEET SIZE FOR PROPER SCALE IS 30X42. CONTRACTOR SHALL NOT

SCALE DRAWINGS BUT SHALL REQUEST THE DESIRED DIMENSIONS

FROM THE ARCHITECT.

2. SEE SHEET GI-001 FOR GENERAL NOTES.

BUILDING CODE SUMMARY

2021INTERNATIONAL BUILDING CODE

2021 N.F.P.A. 101 LIFE SAFETY CODE

PROJECT NAME: DESIGN RENOVATION OF 5 EAST

OKLAHOMA CITY VA HEALTH CARE SYSTEM

A/E PROJECT NO.: 2226.A26

PREPARED BY: JAMES LUSHBOUGH

DATE: 7-15-21

1. APPLICABLE CODES/STANDARDS:

A. VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATOIN GUIDE, AND OTHER GUIDENCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

a.ARCHITECTURAL (AUG. 2, 2014); ASBESTOS ABATEMENT (JULY 2011); ELECTRICAL (DEC 2015); FIRE PROTECTION (DEC 2016) HVAC (MAR 2011); INTERIOR DESIGN (MAY 2008); LIGHTING DESIGN (DEC 2015); PHYSICAL SECURITY (JAN 2015); PLUMBING (NOV 20140;

SIGNAGE (OCT 2013)

b.PG-18-14 ROOM FINISH, DOOR HARDWARE SCHEDULE

c. PG-18-9 SPACE PLANNING CRITERIA –

B. INTERNATIONAL BUILDING CODE IBC (2021)

C. NFPA 1 – FIRE CODE (2021)

D. NFPA 101 - LIFE SAFETY CODE (LSC) – (2021)

E. NFPA 220 – STANDARDS ON TYPES OF BUILDING CONSTRUCTION – (2021)

F.NFPA 10 – STANDARD FOR PORTABLE FIRE EXTINGUISHERS – (2021)

G. NFPA 241 – STANDARD FOR SAFEGUARDING CONSTRUCTION (2021)

H. REFER TO FIRE PROTECTION/LIFE SAFETY/ACCESSIBILITY CODE REVIEW FOR ADDITIONAL CODES & STANDARDS.

2.OCCUPANCY CLASSIFICATION: NEW HEALTHCARE OCCUPANCY (L.C.S. CHAPTER.18)

3.TYPE OF CONSTRUCTION:

A. NFPA 220(TABLE 4.1.1) – TYPE II - 111

4.OCCUPANCY SEPARATIONS:

A. IBC (SECTIONS 508 & 508.4) – FIRE BARRIERS - N.R. NON-SEPARATED USES AS PER SECTION 508.3 INCIDENTAL USE AREAS AS PER TABLE

509. WHEN INCIDENTAL USE AREAS ARE SPRINKLED, THE AREA IS TO BE SEPARATED BY WALLS TO RESIST THE PASSAGE OF SMOKE (509.4.2)

B. IBC (SECTION 508.2.5) – FIRE SEPARATION NOT REQUIRED WHERE MECHANICAL ROOMS ARE EQUIPED WITH AUTOMATIC SPRINKLER

SYSTEM.

5.TYPE OF CONSTRUCTION - FIRE-RESISTIVE REQUIREMENTS (NFPA 220 TABLE 4.1.1)

A. EXTERIOR WALLS - BEARING = 1 HOURS

B. INTERIOR WALLS - BEARING = 1 HOURS

C. EXTERIOR WALLS - NON-BEARING = 0 HOURS

D. INTERIOR WALLS – NON-BEARING = 0 HOURS

E. STRUCTURAL FRAME = 1 HOURS

F. FLOORS/FLOOR-CEILINGS = 1 HOURS

G. ROOFS/ROOF-CEILING = 1 HOURS

6.FIRE-RESISTANT MATERIALS AND CONSTRUCTION (CHAPTER 7) (L.S.C. 8.2.3)

A. FIRE RESISTIVE ASSEMBLIES AS PER CHAPTER 7 – SMOKE PARTITIONS, IBC SECTION 710 (L.S.C. SECTION 8.4)

B. NFPA 101 - CHAPTER 18 HAZARDOUS ROOMS AND INCIDENTAL USE ROOM SEPARATION.

7.FIRE PROTECTION REQUIREMENTS:

A. BUILDING IS CURRENTLY FULLY SPRINKLERED WITH AN AUTOMATIC STANDPIPE SYSTEM AND WILL REMAIN SO UPON COMPLETION OF THE

PROJECT.

B. FIRE EXTINGUISHERS WILL BE PROVIDED AS INDICATED ON LIFE SAFETY PLANS.

C. NFPA 101 (8.5.5.2, 8.7.12.1)

D. NFPA 101 (CHAPTER 8 AND 9)

1. 1-HR FIRE BARRIER REQUIRED FOR GENERAL STROAGE, BOILER, OR FIURNACE ROOMS AND SHOPS THAT INCLUDE WOODWORKING OR PAINTING AREA, UNLESS AUTOMATIC SPRINKLER PROTECTION IS PROVIDED. WHERE AUTOMTIC SPRINKLER PROTECTION IS

PROVIDED SMOKE PARTITIONS SHALL BE PROVIDED. 8.7.1.1, 8.7.1.2.

E. NFPA 10 (TABLE 6.2.1.1) – MECHANICAL ROOMS AND LARGE STORAGE ROOMS SHALL BE PROTECTED UTILIZING ORDINARY EXTINGUISHER PLACEMENT FOR CLASS A HAZARD. A MAXIMUM TRAVEL DISTANCE TO FIRE EXTINGUISHER OF 75 FEET.

8.MEANS OF EGRESS/EXITING:

A. NUMBER OF MEANS OF EGRESS: THE EXISTING EGRESS CONDITIONS SHALL NOT BE CHANGED AS A RESULT OF THIS PROJECT.

B. ARRANGEMENT OF MEANS OF EGRESS: THE EXISTING EGRESS CONDITIONS SHALL NOT BE CHANGED AS A RESULT OF THIS PROJECT

C. COMMON PATH OF TRAVEL:

1.NFPA 101 (18.2.5.2) – MAX ALLOWED 100FT.

2.PROVIDED: COMMON PATH IS ˜70FT

D. TRAVEL DISTANCE TO EXITS:

1. NFPA 101 (18.2.6.2.2) – MAX ALLOWED 200FT.

2. PROVIDED: 110FT

G. MEANS OF EGRESS ILLUMINATION:

1.NFPA 101 (7.8) – REQUIRE BY CHAPTER 38, PROVIDE IN ACCORDANCE WITH 7.8

2.EMERGENCY LIGHTING – NFPA 101 (7.9) – REQUIRED BY CHAPTER 38, PROVIDE IN ACCORDANCE WITH 7.9.

9. OCCUPANT LOAD:

A. NFPA 101 (TABLE 7.3.1.2)

1.BUSINESS USE: 150 SQ. FT. /PERSON

2.ASSEMBLY (UNCONCENTRATED) – 15 SQ.FT./PERSON

3. INPATIENT TREATMENT AREAS – 240 SQ.FT./PERSON

B. OCCUPANT LOAD CALCULATIONS SEE CODE REVIEW PLAN FOR SCHEDULE.

ELECTRICAL

CLOSET

5A101

CORRIDOR

C5A 4

CORRIDOR

C5E 5

STORAGE

5E114

PATIENT ROOM

5A104

PATIENT TOILET

5A105

PATIENT TOILET

5A107

PATIENT ROOM

(BARIATRIC)

5A108

PATIENT TOILET

5A111

ANTE ROOM

5A110

PATIENT ROOM

(ISO)

5A112

STORAGE

5A113

PATIENT TOILET

5A116

PATIENT ROOM

5A117

PATIENT ROOM

5A118

PATIENT TOILET

5A119

PATIENT ROOM

(BARIATRIC)

5A121

PATIENT TOILET

5A123

PATIENT TOILET

5A122

PATIENT ROOM

5A124

ELECTRICAL

5A126

SOILED UTILITY

5A125

HAC

5A127

CLEAN LINEN

5A128

PATIENT ROOM

5A129

PATIENT TOILET

5A130

PATIENT TOILET

5A131

PATIENT ROOM

5A132

OIT

5E103

PATIENT ROOM

5A133

PATIENT TOILET

5A134

PATIENT TOILET

5A135

PATIENT ROOM

5A136

CLEAN UTILITY

5A137

NURSE TEAM

STATION

5A139

NURSE MANAGER

5A143

PATIENT TOILET

5A141

PATIENT ROOM

5A140

CORRIDOR

C5A 5

MED ROOM/IV

STORAGE

5A106

OXYGEN

STORAGE

5A114

CLEAN SUPPLY

5A109

CORRIDOR

C5A 6

NURSE ALCOVE

5A115

NURSE ALCOVE

5A120

CRASH CART

ALCOVE

5A138

CORRIDOR

C5A 7

NURSE

LOUNGE/WORK

ROOM

5E101

FAMILY

NOURISHMENT

CENTER

5A144

STORAGE

5A142

STAFF TOILET

5E100

A

A

A

A

A

A

A

A

A

5A105 5A107

A

5A111

5A116

5A117

5A1185A121

5A119

5A122 5A124

5A123

C5A 4

5A141

5A140

5A125

5A127

5A137

5A128

C A

5E101

E

C5E 5

E

A

A

2 5

A

A

A

A

A

A

5A104 5A108

5E100

ASSEMBLY

INPATIENT TREATMENT AREA

UNOCCUPIED

OCCUPANCY LEGEND

BUISNESS

1 HOUR FIRE BARRIER

1 HOUR FIRE / SMOKE

EXISTING 2 HOUR FIRE/SMOKE

FIRE BARRIER LEGEND:

SMOKE PARTITION

N

AREA OF WORK

F

C B

G

19D185

AREA OF WORK

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

PRELIM

IN

ARY

NO

T F

O R

C O

NSTR

UC

TIO

N

AREA OF WORK

/1 /2

:3

:0

P M

CONSTRUCTION DOCUMENTS

11/10/2021

CODE REVIEW PLAN

GI-200

DESIGN RENOVATION OF 5

EAST

JEJL

921 NE 13TH ST.

OKLAHOMA CITY, OK 73104CODY COOPER

VA259-16-D-0217

36C25921N0083

GENERAL NOTES:

1/8" = 1'-0"

LEVEL 5 EAST - OCCUPANCY PLAN

OCCUPANCY LOAD TABLE

Department OCCUPANT LOAD FACTOR AGGREGATE AREA OCCUPANT LOAD

ASSEMBLY - OCCUPANCY 15 673 SF 45

BUISNESS - OCCUPANCY 150 312 SF 2

INPATIENT OCCUPANCY 240 3185 SF 13

TOTAL 4170 SF 60

2 2

3 3

4 4

5 5

6 6

7 7

8 8

A

A

B

B

C

C

D

D

E

E

F

F

G

G

I

I

J

J

K

K

L

L

26 SF

ELECTRICAL

CLOSET

5A101

61 SF

CORRIDOR

C5A 4

353 SF

CORRIDOR

C5E 5

62 SF

STORAGE

5E114

261 SF

PATIENT ROOM

5A104

48 SF

PATIENT TOILET

5A105

48 SF

PATIENT TOILET

5A107

250 SF

PATIENT ROOM

(BARIATRIC)

5A108

63 SF

PATIENT TOILET

5A111

70 SF

ANTE ROOM

5A110

294 SF

PATIENT ROOM

(ISO)

5A112

122 SF

STORAGE

5A113

55 SF

PATIENT TOILET

5A116

228 SF

PATIENT ROOM

5A117

231 SF

PATIENT ROOM

5A118

55 SF

PATIENT TOILET

5A119

295 SF

PATIENT ROOM

(BARIATRIC)

5A121

67 SF

PATIENT TOILET

5A123

58 SF

PATIENT TOILET

5A122

263 SF

PATIENT ROOM

5A124

ELECTRICAL

5A126

103 SF

SOILED UTILITY

5A125

79 SF

HAC

5A127

93 SF

CLEAN LINEN

5A128

264 SF

PATIENT ROOM

5A129

49 SF

PATIENT TOILET

5A130

49 SF

PATIENT TOILET

5A131

259 SF

PATIENT ROOM

5A132

132 SF

OIT

5E103

251 SF

PATIENT ROOM

5A133

49 SF

PATIENT TOILET

5A134

49 SF

PATIENT TOILET

5A135

256 SF

PATIENT ROOM

5A136

97 SF

CLEAN UTILITY

5A137

107 SF

NURSE TEAM

STATION

5A139

160 SF

NURSE MANAGER

5A143

65 SF

PATIENT TOILET

5A141

263 SF

PATIENT ROOM

5A140

437 SF

CORRIDOR

C5A 5

152 SF

MED ROOM/IV

STORAGE

5A106

25 SF

OXYGEN

STORAGE

5A114

57 SF

CLEAN SUPPLY

5A109

635 SF

CORRIDOR

C5A 6

28 SF

NURSE ALCOVE

5A115

42 SF

NURSE ALCOVE

5A120

27 SF

CRASH CART

ALCOVE

5A138

626 SF

CORRIDOR

C5A 7

271 SF

NURSE

LOUNGE/WORK

ROOM

5E101

75 SF

STAFF TOILET

5E100

54 SF

STORAGE

5A142

20 2

1 1

TRAVEL DISTANCE = 82'

T R

A V

E L D

IS

T

A N

C E

FEC

F E

C

9 9

H

H

SMOKE ZONE 5

SMOKE ZONE 9

S M

O K

E Z

O N

E

S M

O K

E Z

O N

E

1. SHEET SIZE FOR PROPER SCALE IS 30X42. CONTRACTOR SHALL NOT

SCALE DRAWINGS BUT SHALL REQUEST THE DESIRED DIMENSIONS

FROM THE ARCHITECT.

2. SEE SHEET GI-001 FOR GENERAL NOTES.

OCCUPANT LOAD

SPACE NOT OCCUPIED

EXIT DOOR TAG

LINE TYPES FOR MEANS OF EGRESS:

TD #

TRAVEL DISTANCE

COMMON PATH

CP #

EXIT DISCHARGE

FIRE BARRIER LEGEND:

1 HOUR FIRE

1 HOUR FIRE / SMOKE

FE FIRE EXTINGUISHER IN CABINET

LIFE SAFETY SYMBOLS:

EXISTING 2 HOUR FIRE/SMOKE

SMOKE PARTITION

N

AREA OF WORK

F

C B

G

19D185

AREA OF WORK

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

PRELIM

IN

ARY

NO

T F

O R

C O

NSTR

UC

TIO

N

AREA OF WORK

/1 /2

:3

:2

P M

CONSTRUCTION DOCUMENTS

11/10/2021

LIFE SAFETY PLAN

GI-201

DESIGN RENOVATION OF 5

EAST

JEJL

921 NE 13TH ST.

OKLAHOMA CITY, OK 73104CODY COOPER

VA259-16-D-0217

36C25921N0083

1/8" = 1'-0"

LEVEL 5 EAST - LIFE SAFETY PLAN

GENERAL NOTES:

INFECTION CONTROL RISK ASSESSMENT

STEP ONE:

USING THE FOLLOWING TABLE, IDENTIFY THE TYPE OF CONSTRUCTION PROJECT ACTIVITY (TYPE A-D)

TYPE D

TYPE A

INSPECTION AND NON-INVASIVE ACTIVITIES.

INCLUDES, BUT IS NOT LIMITED TO:

• REMOVAL OF CEILING TILES FOR VISUAL INSPECTION ONLY, E.G., LIMITED TO 1 TILE PER 50

SQUARE FEET.

• PAINTING (BUT NOT SANDING).

• WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH DO

NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER

THAN FOR VISUAL INSPECTION.

TYPE B

SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST

INCLUDES, BUT IS NOT LIMITED TO:

• INSTALLATION OF TELEPHONE AND COMPUTER CABLING.

• ACCESS TO CHASE SPACE.

• CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.

TYPE C

WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION

OR REMOVAL OF OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES.

INCLUDES, BUT IS NOT LIMITED TO:

• SANDING OF WALLS FOR PAINTING OR WALL COVERING.

• REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK.

• NEW WALL CONSTRUCTION.

• MINOR DUCT WORK OR E1ECU?CA? WORK ABOVE CEILINGS.

• MAJOR CABLING ACTIVITIES.

• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT.

TYPE D

MAJOR DEMOLITION AND CONSTRUCTION PROJECTS

INCLUDES, BUT IS NOT LIMITED TO:

• ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS

• REQUIRES HEAVY DEMOLITION ON REMOVAL OF A COMPLETE CABLING SYSTEM

• NEW CONSTRUCTION

STEP TWO: HIGHEST RISK

USING THE FOLLOWING TABLE, IDENTIFY THE PATIENT RISK GROUPS THAT WILL BE AFFECTED. IF

MORE THAN ONE RISK GROUP WILL BE AFFECTED, SELECT THE HIGHER RISK GROUP

LOW RISK MEDIUM RISK HIGH RISK HIGHEST RISK

• OFFICE AREA • CARDIOLOGY

• ECHOCARDIOGRAPHY

• ENDOSCOPY

• NUCLEAR MEDICINE

• PHYSICAL THERAPY

• RADIOLOGY / MRI

• RESPIRATORY THERAPY

• CCU

• EMERGENCY ROOM

• LABOR AND DELIVERY

• LABORATORIES (SPECIMEN)

• MEDICAL UNITS

• NEWBORN NURSERY

• OUTPATIENT SURGERY

• PEDIATRICS

• PHARMACY

• POST ANESTHESIA CARE

UNIT

• SURGICAL UNITS

• ANY AREA CARING FOR

IMMUNOCOMPROMISED

PATIENTS

• BURN UNITS

• CARDIAC CATH LAB

• CENTRAL STERILE SUPPLY

• INTENSIVE CARE UNIT

• NEGATIVE PRESSURE

ISOLATION ROOMS

• ONCOLOGY

• OPERATING ROOMS

INCLUDING C SECTION

ROOMS

STEP THREE:

MATCH THE PATIENT RISK GROUP (LOW, MEDIUM, HIGH, HIGHEST) WITH THE PLANNED ...

CONSTRUCTION PROJECT TYPE (A, B, C, D) ON THE FOLLOWING MATRIX, TO FIND THE ...

CLASS OF PRECAUTIONS ( I, II, III OR IV) OR LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED.

CLASS I - IV OR COLOR-CODED PRECAUTIONS ARE DELINEATED ON THE FOLLOWING PAGE.

IC MATRIX - CLASS OF PRECAUTIONS: CONSTRUCTION PROJECT BY PATIENT RISK

CONSTRUCTION PROJECT TYPE

PATIENT RISK GROUP TYPE A TYPE B TYPE C TYPE D

LOW RISK GROUP I II II III / IV

MEDIUM RISK GGROUP I II III IV

HIGH RISK GROUP I II III / IV IV

HIGHEST RISK GROUP II III / IV III / IV IV

NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND

RISK LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.

STEP THREE: CLASS IV

DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS

UPON COMPLETION OF PROJECTDURING CONSTRUCTION PROJECT

CLASS I

1. EXECUTE WORK BY METHODS TO MINIMIZE

RAISING DUST FROM CONSTRUCTION

OPERATIONS

2. IMMEDIATELY REPLACE A CEILING TILE

DISPLACED FOR VISUAL INSPECTION

1. CLEAN WORK AREA UPON COMPLETION OF

TASK.

CLASS II

1. PROVIDE ACTIVE MEANS TO PREVENT

AIRBORNE DUST FROM DISPERSING INTO

ATMOSPHERE

2. WATER MIST WORK SURFACE TO CONTROL

DUST WHILE CUTTING.

3. SEAL UNUSED DOORS WITH DUCT TAPE.

4. BLOCK OFF AND SEAL AIR VENTS.

5. PLACE DUST MAT AT ENTRANCE AND EXIT

OF WORK AREA.

6. REMOVE OR ISOLATE HVAC SYSTEM IN

AREAS WHERE WORK IS BEING PERFORMED.

1. WIPE WORK SURFACES WITH CLEANER /

DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

3. WET MOP AND / OR VACUUM WITH HEPA

VACUUM BEFORE LEAVING WORK AREA.

4. UPON COMPLETION, RESTORE HVAC

SYSTEM WHERE WORK WAS PERFORMED

CLASS III

1. REMOVE OR ISOLATE HVAC SYSTEM IN

AREA WHERE WORK I.E. BEING DONE TO

PREVENT CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS I.E.

SHEETROCK, PLYWOOD, PLASTIC, TO SEAL

AREA FROM NON WORK AREA OR IMPLEMENT

CONTROL CUBE METHOD (CART WITH

PLASTIC COVERING AND SEALED

CONNECTION TO WORK SITE WITH HEPA

VACUUM FOR VACUUMING PRIOR TO EXIT)

BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN

WORK SITE UTILIZING HEPA EQUIPPED AIR

FILTRATION UNITS.

4. CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

5. COVER TRANSPORT RECEPTACLES OR

CARTS. TAPE COVERING UNLESS SOLID LID.

1. DO NOT REMOVE BARRIERS FROM WORK

AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY THE OWNER'S SAFETY

DEPARTMENT AND INFECTION PREVENTION

AND CONTROL DEPARTMENT AND

THOROUGHLY CLEANED BY THE OWNER'S

ENVIRONMENTAL SERVICES DEPARTMENT.

2. REMOVE BARRIER MATERIALS CAREFULLY

TO MINIMIZE SPREADING OF DIRT AND

DEBRIS ASSOCIATED WITH CONSTRUCTION.

3. VACUUM WORK AREA WITH HEPA FILTERED

VACUUMS.

4. WET MOP AREA WITH CLEANER /

DISINFECTANT.

5. UPON COMPLETION, RESTORE HVAC

SYSTEM WHERE WORK WAS PERFORMED

CLASS IV

1. ISOLATE HVAC SYSTEM IN AREA WHERE

WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS I.E.

SHEETROCK, PLYWOOD, PLASTIC, TO SEAL

AREA FROM NON WORK AREA OR IMPLEMENT

CONTROL CUBE METHOD (CART WITH

PLASTIC COVERING AND SEALED

CONNECTION TO WORK SITE WITH HEPA

VACUUM FOR VACUUMING PRIOR TO EXIT)

BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN

WORK SITE UTILIZING HEPA EQUIPPED AIR

FILTRATION UNITS.

4. SEAL HOLES, PIPES, CONDUITS, AND

PUNCTURES.

5. CONSTRUCT ANTEROOM AND REQUIRE ALL

PERSONNEL TO PASS THROUGH THIS ROOM

SO THEY CAN BE VACUUMED USING A HEPA

VACUUM CLEANER BEFORE LEAVING WORK

SITE OR THEY CAN WEAR CLOTH OR PAPER

COVERALLS THAT ARE REMOVED EACH TIME

THEY LEAVE THE WORK SITE.

6. ALL PERSONNEL ENTERING THE WORK

SITE ARE REQUIRED TO WEAR SHOE

COVERS. SHOE COVERS MUST BE CHANGED

EACH TIME THE WORKER EXITS THE WORK

AREA.

1. DO NOT REMOVE BARRIERS FROM WORK

AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY THE OWNER'S SAFETY

DEPARTMENT AND INFECTION PREVENTION

AND CONTROL DEPARTMENT AND

THOROUGHLY CLEANED BY THE OWNER'S

ENVIRONMENTAL SERVICES DEPT.

2. REMOVE BARRIER MATERIAL CAREFULLY

TO MINIMIZE SPREADING OF DIRT AND

DEBRIS ASSOCIATED WITH CONSTRUCTION.

3. CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN COVERED CONTAINERS.

4. COVER TRANSPORT RECEPTACLES OR

CARTS. TAPE COVERING UNLESS SOLID LID.

5. VACUUM WORK AREA WITH I-IEPA

FILTERED VACUUMS.

6. WET MOP AREA WITH CLEANER /

DISINFECTANT.

7. UPON COMPLETION, RESTORE HVAC

SYSTEM WHERE WORK WAS PERFORMED

1 HOUR SMOKE RATED

TEMPORARY CONSTRUCTION

PARTITION

TEMPORARY CONSTRUCTION BARRIER

PROJECT SCOPE

SUPPLY DUCTS EITHER

KEEP RUNNING OR

COVER WHEN

RUNNING TO KEEP

DUST OUT

COVER ALL RETURNS AT

THE GRATE/DIFFUSERS

FIRE EXTINGUISHER ON

PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

SUSPENDED PLASTIC

ZIPPER WALL CURTAIN

BARRIER

FIRE PULL

STATION WITH

AUDIO / VISUAL

PROVIDE STICKY

MATS (CHANGED END

OF SHIFT OR MORE IF

NECESSARY TO

MAINTAIN

CLEANLINESS).

POST ICRA, ILSM, FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

F L E

X D

U C

T

2' - 11 1/2"

GI-300

A P

P R

O X

A .F

.F

POST ICRA,

ILSM, FIRE

INSPECTION

SHEETS VISIBLE

TO PUBLIC

SUSPENDED

PLASTIC ZIPPER

WALL CURTAIN

BARRIER

V .I .F

E X

IS

T

IN

G

W A

L L

V .I .F

E X

IS

T

IN

G

W A

L L

HEPA

NEGATIVE AIR

UNIT

FINISHED FLOORING TO BE KEPT

CLEAN. FLOORS NOT BEING REPLACED

MUST BE PROTECTED. COVER WITH

ROSIN PAPER / FIRE RATED PLYWOOD

ISLM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

5A101

C5E 5

5E114

5E102

5A104

5A105 5A107

5A108

5A111 5A110

5A112 5A113

5A116

5A117

5A118

5A119

5A121

5A1235A122

5A124

5A126

5A125

5A127

5A128

5A129

5A130

5A131

5A132

5E103

5A133

5A134

5A135

5A136

5A137

5A139

5A143 5A141

C5A 5

5A106

5A114 5A109 C5A 6

5A115

5A120

5A138

C5A 7

5E101

5A144 5A140

5A142

5E100

A A

A

A

1. SHEET SIZE FOR PROPER SCALE IS 30X42. CONTRACTOR SHALL NOT

SCALE DRAWINGS BUT SHALL REQUEST THE DESIRED DIMENSIONS

FROM THE ARCHITECT.

2. SEE SHEET GI-001 FOR GENERAL NOTES.

1 HOUR FIRE BARRIER

1 HOUR FIRE / SMOKE

EXISTING 2 HOUR FIRE/SMOKE

FIRE BARRIER LEGEND:

SMOKE PARTITION

N

AREA OF WORK

F

C B

G

19D185

AREA OF WORK

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

PRELIM

IN

ARY

NO

T F

O R

C O

NSTR

UC

TIO

N

AREA OF WORK

/1 /2

:3

:3

P M

CONSTRUCTION DOCUMENTS

11/10/2021

INFECTION CONTROL PLAN

GI-300

DESIGN RENOVATION OF 5

EAST

JEJL

921 NE 13TH ST.

OKLAHOMA CITY, OK 73104CODY COOPER

VA259-16-D-0217

36C25921N0083

A. THE ONE-HOUR FIRE-RATED CONSTRUCTION BARRIERS SHALL BE CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.

B. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR OCCUPIED AREAS OF THE FLOOR.

C. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREA; REVIEW WITH COR AND VA SAFETY GROUP.

D. CONTRACTOR SHALL PROVIDE FIRE WATCH FOR ALL HOT WORK ACTIVITIES AND WHEN FIRE ALARM OR SPRINKLER SYSTEMS

ARE OFFLINE MORE THAN 4HOURS IN A 24 HOUR PERIOD.

E. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT ALL TIMES (24/7), WHETHER OCCUPIED OR NOT, THROUGHOUT

DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION UNITS.

F.MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.

G. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR

EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE CONSTRUCTION AREA.

H. REDIRECT ALL MEDICAL CENTER PERSONNEL, PATIENTS, AND VISITORS SO THEY DO NOT EXIT THROUGH THE CONSTRUCTION AREA. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION AREA THAT RED: "CONSTRUCTION AREA - DO NOT ENTER".

I. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND KEEP A CURRENT HOT WORK PERMIT ON SITE.

J. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE SURE

THEY REMAIN EFFECTIVE.

K. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA TO PREVENT CONTAMINATION OF EXISTING DUCT SYSTEMS.

L. OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING WORK.

M. ISOLATE HVAC SYSTEM WITHIN CONSTRUCTION AREA TO PREVENT CONTAMINATION OF EXISTING DUCT SYSTEM.

N. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON WORK AREA OR IMPLEMENT

CONTROL CUBE METHOD (CART WITH

PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT0 BEFORE

CONSTRUCTION BEGINS.

O. AFTER COMPLETION OF WORK AND BETWEEN PHASES; VACUUM CONSTRUCTION AREA WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT, REMOVE CONSTRUCTION BARRIERS (UPON APPROVAL), PATCH OR REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER REMOVAL, AND REMOVE ISOLATION OF HVAC SYSTEM. UPON COMPLETION, RESTORE HVAC SYSTEM

WHERE WORK WAS PERFORMED.

P. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES AND/OR CONDUITS APPROPRIATELY AND IMMEDIATELY TO

MAINTAIN DUCT PROTECTION AND NEGATIVE AIR PRESSURE.

Q. CONSTRUCT ANTEROOM ART ENTRANCES TO CONSTRUCTION AREAS AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS THROUGH THIS ROOM TO BEVACUUMED WITH A HEPA VACUUM CLEANER PRIOR TO LEAVING THE SITE OR THEY CAN WEAR CLOTH

OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE WORK SITE.

Q.A. CONSTRUCTION WORKERS WILL NOT BE ENTERING ANY OCCUPIED VA SPACES.

Q.B. DIRECT ACCESS TO OUT THROUGH ANTEROOM(EXIT/ENTRANCE)

R. ALL PERSONNEL ENTERING WORK SITE (ONLY IF ENTERING VA SPACE) ARE REQUIRED TO WEAR SHOE COVERING.

S. CONSTRUCTION BARRIERS SHALL NOT BE REMOVED UNTIL PROJECT IS COMPLETED AND INSPECTION BY VA SAFETY

PERSONNEL, INFECTION CONTROL GROUP, AND COR.

T. REMOVE BARRIERS MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.

CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. COVER TRANSPORT RECEPTACLES

OR CARTS. TAPE COVERING UNLESS SOLID LID.

INFECTION CONTROL NOTES - CLASS IV

CONSTRUCITON:

1/4" = 1'-0"

ICRA SCHEDULE

1/2" = 1'-0"

TYPICAL CONSTRUCTION PLAN LAYOUT

1/2" = 1'-0"

ROOM ELEVATION (TYPICAL)

1/2" = 1'-0"

CROSS SECTION 'A'

12" = 1'-0"

ILSM TEMPORARY BARRIER TAG

1/16" = 1'-0"

LEVEL 5 EAST - INFECTION CONTROL PLAN

GENERAL NOTES:

NOTE:

EGRESS STAIR TO REMAIN OPEN AND SAFE FOR USE THROUGHOUT

DURATION OF PROJECT, CONTRACTOR TO PROVIDE TEMPORARY

BARRIERS AS NECESSARY TO ENSURE SAFE EGRESS OUT OF STAIR IN

CASE OF AN EVENT WITHIN EXISTING HOSPITAL.

02-03 02-03

02-16 02-03

02-02

02-03

02-15

02-03

02-15

02-03 02-02

02-0302-0302-03

02-02

02-15

02-0302-0302-0302-03

02-15

02-0302-03

02-02

02-0302-0302-03

02-15

02-03

02-02

02-0302-03

02-15

02-02

02-15

02-0302-0302-03

02-03

02-02

02-02

02-1502-15

02-0302-0302-03

02-02

02-02

02-1502-15

02-03

02-0202-02

02-03

02-03

02-15

02-02

02-0302-0302-03

02-02

02-0302-03

02-0302-03

02-03

02-02

02-15

02-0302-03

02-02

02-02 02-02

02-03

02-15

02-0302-03

02-0202-02 02-0202-02

02-0202-0202-0202-02

02-15 02-15

02-15 02-0302-0302-03

02-03

02-03

02-03

02-0302-0302-0302-03

02-03

02-03

02-02

02-02

02-03

02-16 02-16

02-03

02-0302-03 02-03

02-03

02-03

02-0302-03

02-03

02-0302-0302-03

02-15

02-0302-0302-0302-03

02-15

02-0302-0302-03

02-03

02-15

02-0302-0302-03

02-15

02-15

02-0202-02

02-0302-0302-0302-0302-03 02-03

02-15

02-0202-02

02-15

02-0302-03

02-03

02-02

02-02 02-0302-03

02-0302-0302-03

02-0202-02

02-0302-03

02-0302-03

02-0302-0302-03 02-0202-1502-15 02-02

02-0302-03

02-0302-03

02-15

02-16

02-0202-02

02-0202-02

02-0202-02

02-0202-02

02-0202-02

02-0202-02

02-02

02-02

02-02

02-02

02-02

02-03

02-0302-0302-0302-03

02-0302-03

02-03

02-0302-03

02-03

02-15

02-16 02-03

02-03

02-15

02-16

02-03

02-15

02-16

02-0302-03

02-03

02-15

02-16

02-03

02-0302-0302-03

02-16

02-16

02-15

02-03

02-03

02-16

02-16

02-15

02-0302-03

02-03

02-16

02-15

02-0302-03

02-16

02-15

02-0302-0302-03

02-0302-03

02-16

02-15

02-03

02-0302-03

02-16

02-16

02-03

02-03

02-03

02-03

02-03

02-03

02-0302-03

02-0302-03

02-0302-03

02-0302-03

02-0302-03

02-0302-03

02-09

02-03

02-03

02-04

02-03

02-03

02-19 02-19

02-19

02-19

02-19

02-1902-19

02-04

02-03

02-19

02-19

02-04

02-19

02-03

02-03

02-1902-19

02-19

02-04 02-04

02-04

02-0402-0402-04

02-19

02-19 02-19

02-19 02-19

02-19

02-19

02-1902-19

02-19

02-19

02-1902-19

02-1902-19

02-1902-19

02-19 02-1902-1902-1902-19

02-19

02-1902-1902-19

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

A

A

B

B

C

C

D

D

E

E

F

F

G

G

I

I

J

J

K

K

L

L

9 9

H

H

02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-08 02-08

02-08 02-08 02-08 02-08

02-0802-08

02-08 02-0802-08

02-0802-08

02-08

02-08

02-08

02-08

02-08 02-08

02-08 02-08

02-08

02-08

02-0802-08

02-08 02-0802-08

02-08 02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-08

02-04

02-04

02-03

02-0902-09

02-03

EXISTING ELECTRICAL

PANEL TO REMAIN

02-04

02-0402-04 02-04

02-04

02-03

02-03

02-03

02-04

02-03

02-2102-21

02-20

02-20

02-21

02-21

02-21

02-21

02-21

02-21

02-21

02-21

DEMOLITION LEGEND:

LIMITS OF PROJECT/CONSTRUCTION

UNDER THIS CONTRACT.

AREA OF WORK NOT IN THE SCOPE.

EXISTING TO REMAIN.

ITEMS TO BE DEMOLISHED. SEE

KEYNOTES.

APPROXIMATE AREA OF EXISTING

CONCRETE SLAB TO BE REMOVED

FOR NEW TRENCH DRAIN.

EXISTING TERRAZZO FLOOR BASE

TO BE REMOVED.

1. SHEET SIZE FOR PROPER SCALE IS 30X42. CONTRACTOR SHALL NOT

SCALE DRAWINGS BUT SHALL REQUEST THE DESIRED DIMENSIONS

FROM THE ARCHITECT.

2. SEE SHEET GI-001 FOR GENERAL NOTES.

1 HOUR FIRE BARRIER

1 HOUR FIRE / SMOKE

EXISTING 2 HOUR FIRE/SMOKE

FIRE BARRIER LEGEND:

SMOKE PARTITION

N

AREA OF WORK

F

C B

G

19D185

AREA OF WORK

SUMMIT FIRE CONSULTING

575 MINNEHAHA AVE WEST

ST. PAUL, MINNESOTA 55103

(612) 387-7050

ALBERTSON ENGINEERING, INC.

315 NORTH MAIN AVENUE, SUITE 200

SIOUX FALLS, SOUTH DAKOTA 57104

PH: (605) 274-0880

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

Department of Veterans Affairsof

PRELIM

IN

ARY

NO

T F

O R

C O

NSTR

UC

TIO

N

AREA OF WORK

/1 /2

:3

:5

P M

CONSTRUCTION DOCUMENTS

11/10/2021

DEMOLITION PLAN

AD-100

DESIGN RENOVATION OF 5

EAST

JEJL

921 NE 13TH ST.

OKLAHOMA CITY, OK 73104CODY COOPER

VA259-16-D-0217

36C25921N0083

1/8" = 1'-0"

LEVEL 5 EAST - DEMOLITION PLAN

KEYNOTES:

02-02 REMOVE EXISTING DOOR, DOOR HARDWARE, AND

FRAME COMPLETELY. COORDINATE WITH ANY

ASSOCIATED ELECTRICAL/ACCESS CONTROL

DEMOLITION.

02-03 REMOVE EXISTING WALL FROM FINISH FLOOR TO

STRUCTURE ABOVE AND ANY ASSOCIATED

MECHANICAL/PLUMBING/ELECTRICAL/FIRE

PROTECTION. SEE MECHANICAL, PLUMBING,

ELECTRICAL, FIRE PROTECTION FOR ADDITIONAL

INFORMATION.

02-04 REMOVE EXISTING FINISH AND GYPSUM BOARD

FROM FLOOR TO STRUCTURE TO EXISTING

PARTITION FRAMING. COORDINATE WITH ALL

MECHANICAL, PLUMBING, ELECTRICAL FOR

ADDITIONAL DEMOLITION WORK.

02-08 REMOVE EXISTING FLOORING, BASE AND TRIM,

PREPARE FOR NEW FLOORING. SEE SLOOR FINISH

PLAN.

02-09 REMOVE PORTION OF EXISTING WALL FOR

SCHEDULED OPENING. SEE OPENING SCHEDULE FOR

ADDITIONAL INFORMATION. SEE STRUCTURAL

DRAWINGS.

02-15 REMOVE EXISTING PLUMBING FIXTURES AND PIPING.

SEE PLUMBING DRAWINGS FOR ADDITIONAL

INFORMATION.

02-16 REMOVE EXISTING CASEWORK AND COUNTERTOPS.

02-19 REMOVE EXISTING TERAZZO FLOOR BASE.

02-20 REMOVE EXISTING DOOR AND FRAME, TYPICAL.

02-21 REMOVE PORTION OF EXISTING CONCRETE SLAB

FOR DRAIN PIPE, SEE PLUMBING DRAWINGS.

SHEET SPECIFIC NOTES:

1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VISIT

THE PROJECT AND VERIFY EXISTING CONDITIONS/DIMENSIONS

AND PROPOSED CONDITIONS.

2. THE DEMOLITION PLAN INDICATES GENERAL INFORMATION

AND INTENT. THE CONTRACTOR SHALL COORDINATE

DEMOLITION WITH NEW CONSTRUCTION TO ENSURE QUALITY

OF FINAL PRODUCT.

3. DASHED BOLD LINES INDICATE EXTENT OF DEMOLITION

INCLUDING THE FOLLOWING: INTERIOR PARTITIONS (REMOVE

TO STRUCTURE); CEILINGS, INCLUDING CEILING SUSPENSION

SYSTEM, MISC. STEEL SUPPORTS FOR SUSPENDED

EQUIPMENT, SUSPENDED EQUIPMENT, LIGHT FIXTURES,

DIFFUSERS AND GRILLES ETC.; FLOOR FINISHES (TO

CONCRETE) INCLUDING CARPET, RESILIENT TILE, SHEET VINYL,

CERAMIC TILE ETC; DOORS AND FRAMES UNLESS NOTED

OTHERWISE; CMU BLOCK/BRICK AND BACKUP WALL SYSTEM;

CABINET WORK, SHELVING, BASES; TOILET PARTITIONS AND

ACCESSORIES; EQUIPMENT ITEMS; PLUMBING FIXTURES.

4. GENERAL CONTRACTOR SHALL COORDINATE DEMOLITION

BETWEEN ALL TRADES. NOTIFY A/E IMMEDIATELY OF ANY

CONFLICTS OR DISCREPANCIES.

5. REFER TO PHASING SHEET FOR PROJECT PHASING AND

SEQUENCE OF WORK. ALL DEMOLITION AND REMODEL WORK

MUST BE CLOSELY COORDINATED WITH THE COR.

6. THE GENERAL CONTRACTOR SHALL INSPECT AND FIELD

VERIFY EXISTING CONDITIONS PRIOR TO COMMENCING WORK,

INCLUDING ELEMENTS SUBJECT TO DAMAGE OR MOVEMENT

DURING DEMOLITION, CUTTING OR PATCHING.

7. MATERIAL PRODUCT FROM DEMOLITION SHALL BECOME THE

PROPERTY AND RESPONSIBILITY OF THE CONTRACTOR WITH

THE EXCEPTION OF SPECIFIED ITEMS DESIGNATED EITHER IN

THE PLANS OR VERBALLY REQUESTED BY THE (COR) TO BE

RETAINED BY THE VA.

8. OFFSITE DISPOSAL OF THE DEMOLISHED ITEMS IS THE

RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE

DISPOSED OF LAWFULLY.

9. DEMOLITION MATERIALS SHALL BE REMOVED FROM SITE ON A

DAILY BASIS. COORDINATE WITH THE COR THE IDENTIFICATION

AND TRANSFER OF ANY ITEMS THAT NEED TO BE SALVAGED.

10. VERIFY LOCATION OF EXISTING UTILITY LINES PRIOR TO

STARTING DEMOLITION. MAY NOT BE LIMITED TO UTILITIES

SHOWN ON ARCHITECTURAL, MECHANICAL, PLUMBING, AND

ELECTRICAL PLANS. REFER TO THE THESE DRAWINGS FOR

ADDITIONAL INFORMATION.

11. UPON…