36C25922Q0662 0002.docx

DOCX document 22 KB Posted

Attached to
Z2DA--(660) Underground Fuel Storage Tank Removal & Remediation (VA-22-00055703)
Solicitation number
36C25922Q0662
Issued by

View the file

Other files

File Type Posted
S02 Asphalt Paving Specifications.docx DOCX document
36C25922Q0662 0001.docx DOCX document
Attachment 3_SOW Attachments.pdf PDF
Attachment 2_UST Removal Certified Contractors.pdf PDF
36C25922Q0662_1.docx DOCX document
Attachment 1_P07 WD UT20220085_1Jul22.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 660-22-116 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village

CO

80111 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village

CO

80111 To all Offerors/Bidders

36C25922Q0662 08-29-2022

X X X

X The purpose of this amendment is to provide questions and answers under RFI #1 and to add Asphalt Paving Specifications (see attached).

RFI #1

660-22-116 Underground Fuel Storage Tank Removal, Disposal of and Remediation

Q1. It is stated that all the work must be completed within 30 days. That is not possible given the requested work to be performed. Is that a typo?

R1. Based on the deliverable schedule provided below the project has a 9-month period of performance.

1. Corrective Action Plan

1. Draft Corrective Action Plan – Complete within 60 days of award of contract

1. Final Corrective Action Plan – Complete within 10 days of receipt of draft comments from VA

1. UST Permanent Closure Plan – Complete within 60 days of award of contract

1. Pre-Removal Meeting – Complete within 30 days of CAP approval by Utah DERR

1. Remove and Replace Site Structures

3. Removal – Complete within 30 days of Pre-Removal Meeting

3. Replacement – Complete within 30 days of completion of Site Restoration

1. UST Excavation, Demolition, and Removal – Begin within 60 days of CAP approval by DERR

1. Excavation of Contaminated Soils - Begin within 60 days of CAP approval by DERR

1. Site Closure Sampling - Begin within 60 days of CAP approval by DERR

1. Site Restoration – Complete within 30 days of completion of Site Closure Sampling

1. Permanent Tank Closure Notice – Complete within 60 days of completion of Site Closure Sampling

1. Corrective Action Report

9. Draft Corrective Action Report – Complete within 60 days of completion of Site Closure Sampling

9. Final Corrective Action Report - Complete within 15 days of receipt of draft comments from VA

1. Tank Materials and Soil Final Disposition Documentation - Complete within 60 days of completion of Site Closure Sampling

Q2. It states that a Corrective Act Plan (CAP) be completed, typically a CAP is not submitted until the impacts have been fully defined per the Utah LUST program requirements. The impacts at this site have not been defined vertically, the Utah LUST group may request more investigation?

R2. The VA received a “Corrective Action Plan Requirements” Letter from the Utah DERR, dated August 30, 2021. This letter states that a Correction Action Plan (CAP) must be provided to the DERR for approval. The CAP must follow the guidance and format provided in DERR’s GAP Guide, and any abatement or cleanup activities at the site must be performed by a Utah-certified UST Consultant.

Based on this correspondence with the State, VA does not believe that additional investigation will be required from Utah DEQ.

Q3. How heavy is the closed-in-place UST?

R3. The current weight of the tank is unknown. A.3 SOW Section 3 Tank Descriptions and Status describes the closed in-place tank as a 3,000-gal fiberglass tank filled with a cement slurry.

Q4. It is not clear in the SOW if the dispenser islands needs to be removed, do the dispenser islands and fuel lines need to be removed?

R4. A.3 SOW Section 4e UST Excavation, Demolition and Removal includes the following statement: “Contractor will complete all work and documentation necessary to remove Tank 12(38D) and Tank 13(38G) from the site and dispose of (or recycle) material off-site. Removal of tanks will include fuel piping and dispenser island excavation and removal. “

Q5. The UST basin is currently concrete surrounded by asphalt. After the UST removal would this area need to be replaced with concrete, or would we want to restore with asphalt to match the surrounding ground surface?

R5. A.3 SOW Section 4h UST Site Restoration includes the following statement:

“Site Restoration: Contractor will restore the site to existing conditions including backfilling, compacting and asphalt resurfacing.”

Q6. If removing the dispenser islands, will we need to replace the light present and would we be required to remove the concrete bases below the dispensers. Additionally, if we remove the dispensers, will we be required to remove the concrete ground surface around the dispenser. If so, can we replace with asphalt to match the existing ground surface around this area.

R6. A.3 SOW Section 4e states, “Removal of tanks will include fuel piping and dispenser island excavation and removal.” Dispenser island includes the concrete bases and the light. The light doesn’t need to be replaced and any concrete removed associated with dispenser islands may be replaced with asphalt.

Q7. Please provide the working hours and days of the week that the contractor will be allowed to work onsite at the UST removal location.

R7. The contractor will be allowed to work Monday through Friday 0700 – 1700.

Q8. Please confirm the type and percentage of the bond that is required and when it is due. The RFP, Section I.5B Quote requirements (pg 13/52) states that a 20% bid bond is required. However, our notes from the site visit indicate that the meeting facilitator said a bid bond would not be required, but a payment bond would be required.

R8. If the quote is under $150,000 bid bond is not required, only payment bond. If quote exceeds $150,000 then payment and bid bonds are both required. Refer to FAR 28.102-2 for additional information on bonding requirements.

Q9. Will the government consider extending the period of performance to beyond 30 days? While 30 days is achievable under nearly ideal conditions, it is questionable given the unknowns about this site and the extent of subsurface contamination. There are already at least two deliverable submittal events that require draft and final iterations with a review/comment/revise interval in between. In a worst-case scenario, where contaminated soil removal requires the removal and replacement of carports, reinforced concrete, fencing and a gate, or other elements, a limit of 30 days could easily be missed. Given the degree of unknowns at this site, this scenario should be accounted for.

R9. See response to question 1.

Q10. Will the government consider providing a different pricing approach for the site structures removal/replacement? RFP Section A.3 4d and 4h (pgs 6 &7 of 52) include the requirements of removing and replacing site structures, including carport, gate, pavement, fencing, “and others” as needed. However, the footprint and depth of soil contamination is unknown so it is impossible to accurately evaluate the risk of having to remove/replace these structures. The usage of “as needed” in this context is not appropriate for a lump sum job where offerors are required to address the risk of needing to replace the site structures but insufficient information is made available. The one soil boring where contamination has been identified had contamination above the screening levels at its deepest sample (so contamination extent is open at depth) and there has been insufficient sampling along the fuel lines leading to the dispensary island, especially in the areas directly south of the USTs and on the upstream side of the dispenser island. The previous consultant recommended additional sampling be done to evaluate the extent of impact.

R10. No, bid on the base project. If additional work is identified in other areas, a change order can be considered.

Q11. What is the thickness of the Asphalt where the Fuel tanks need to be removed.

R11. The asphalt thickness is unknown; standard industry practices should be referenced to form a basis for the estimated thickness. The VA has a specification on asphalt that might give some indication as to a thickness but the thickness cannot be guaranteed. See attachment Asphalt Paving Specifications.

Q12. Does the electrical and any other utility need to be disconnected or removed for the removal.

R12. Electrical and/or utility outages will be determined after utility locations have been confirmed.

See attached document: Asphalt Paving Specifications.