S06-Schedule for Finishes_Amendment 3 Attatchment.doc
DOC document 58 KB Posted
- Solicitation number
- 36C25922Q0573
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25922Q0573 0004.docx | DOCX document | |
| S05-Questions From Contractors.docx | DOCX document | |
| S06-Install Eye Glass Dispensing Station B45_C1.1 Amendment 3 attatchment.pdf | ||
| S06-Non-Structural Metal Framing Amentment 3 Attatchment.doc | DOC document | |
| 36C25922Q0573 0003.docx | DOCX document | |
| S06-Install Eye Glass Dispensing Station B45_C1 Amendment 3 attatchment.pdf | ||
| S06-Install Eye Glass Dispensing Station B45_C1.2 Amendment 3 attatchment.pdf | ||
| 36C25922Q0573 0002.docx | DOCX document | |
| 36C25922Q0573 0001.docx | DOCX document | |
| 36C25922Q0573_1.docx | DOCX document | |
| P01-Specifications.pdf | ||
| P01-Plan_Drawing.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
575-23-106 Install Eye Glass Dispensing Station
SECTION 09 06 00
SCHEDULE FOR FINISHES
PART I – GENERAL
1.1 DESCRiPTION
This section contains a coordinated system in which requirements for materials specified in other sections shown are identified by abbreviated material names and finish codes in the room finish schedule or shown for other locations.
1.2 MANUFACTURERS
Manufacturer’s trade names and numbers used herein are only to identify colors, finishes, textures and patterns. Products of other manufacturer’s equivalent to colors, finishes, textures and patterns of manufacturers listed that meet requirements of technical specifications will be acceptable upon approval in writing by contracting officer for finish requirements.
1.3 applicable publications
A.
Publications listed below form a part of this specification to the extent referenced. Publications are referenced in text by basic designation only.
B.
MASTER PAINTING INSTITUTE: (MPI)
Architectural Painting Specification Manual
PART 2- PRODUCTS
2.1 Division 05 – METALS – (NOT USED)
2.2 Division 06 WOOD, PLASTICS, AND COMPOSITES - (NOT USED)
2.3 Division 07 - THERMAL AND MOISTURE PROTECTION
A.
SECTION 07 92 00, JOINT SEALANTS
| Location |
| Color |
| Manufacturer |
| Manufacturer Color |
| Casework to Wall |
| Clear |
| Door frame to Painted Wall |
| Match wall paint color |
| Wall Mounted Devices |
| Match Wall Paint Color |
| Wood to other Material |
| Clear |
2.4 Division 08 – OPENINGS
D. SECTION 08 71 00 DOOR HARDWARE
¾” CABINET DOOR LOCK, KEYED LOCK, PROVIDE VA (2) KEYS AND PRODUCT DATA SUBMITTAL FOR VA APPROVAL PRIOR TO MATERIAL PROCUREMENT.
(ADDENDUM 1)
2.5 Division 09 - FINISHES
A.
SECTION 09 30 13, CERAMIC TILING
1. GLAZED PORCELAIN TILE
| Finish Code |
| Manufacturer |
| Mfg. Color Name/No |
| Size |
| CT-1a |
| Match Existing |
| Match Existing |
| Match Existing |
3. TILE GROUT
| Finish Code |
| Manufacturer |
| Mfg. Color Name/No. |
| Match Existing |
| Match Existing |
B.
SECTION 09 51 00, ACOUSTICAL CEILINGS – (NOT USED)
C.
SECTION 09 65 19, RESILIENT TILE FLOORING - (Addendum 1)
| Finish Code |
| Size |
| Material/Component |
| Manufacturer |
| Mfg Finish |
| LINO GLUE-DOWN FLOOR PLANKS |
| 2.5mm planks 6”x48” |
| 2.5mm Glue-down planks |
| LSI Healthcare Wood |
| MATCH EXISTING FINISH – SKU: HC22319 Full |
| WALL RESILIENT COVE BASE |
| 6” COVE |
| RESILIENT WALL BASE |
| ROPPE |
| MATCH EXISTING FINISH - #193 BLACK BROWN, PINNACLE – TYPE TS 1/8” |
(ADDENDUM 1)
D.
SECTION 09 67 23 20, RESINOUS (EPOXY BASE, FLOOR) – (NOT USED)
E.
SECTION 09 68 00, CARPET MODULES (CFT) – (NOT USED)
G.
SECTION 09 91 00, PAINT AND COATINGS
1.
MPI Gloss and Sheen Standards
Gloss @60
Sheen @85
Gloss Level 1 a traditional matte finish-flat max 5 units, and max 10 units
Gloss Level 4 a “satin-like” finish
20-35 units, and min. 35 units
| 1. Paint code |
| Gloss |
| Manufacturer |
| Mfg. Color Name/No. |
| SATIN |
| Sherwin Williams |
| Match existing - Alabaster (White Down) SW7008 |
(Addendum 1)
2.6 Division 10 - SPECIALTIES
A.
SECTION 10 21 23, CUBICLE CURTAINS TRACKS – (NOT USED)
B.
SECTION 10 26 00, Handrail/WALL CORNER GUARDS – (NOT USED)
PART III EXECUTION
3.1 FINISH SCHEDULES & MISCELLANEOUS ABBREVIATIONS
FINISH SCHEDULE & MISCELLANEOUS ABBREVIATIONS
| Term |
| Abbreviation |
| Acoustical Ceiling |
| AT |
| Carpet Module Tile |
| CPT |
| Ceramic Mosaic Tile |
| FTCT |
| Existing |
| E |
| Gypsum Wallboard |
| GWB |
| Plastic Laminate |
| HPDL |
| Rubber Base |
| RB |
| Vinyl Composition Tile |
| VCT |
| Wood |
| WD |
--- E N D---
SCHEDULE FOR FINISHES
09 06 00 - 2
File details come from the government source that posted it. Updated .