Example of Infection Control Permit from COR.docx

DOCX document 20 KB Posted

Attached to
H365--Ceiling Mounted Rail System Structural Inspections Federal contract opportunity
Solicitation number
36C25921Q0792
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

View the file

Other files for this federal contract opportunity

Other files attached to H365--Ceiling Mounted Rail System Structural Inspections, newest first.
File Type Posted
As-Builts.zip ZIP file
36C25921Q0792 0001.docx DOCX document
Vendor Questions and Answer.docx DOCX document
RFQ Amendment 36C25921Q0792 0001.docx DOCX document
Exhibit A_SOW Frequently Asked Questions _ Answers.docx DOCX document
Exhibit C VA Grand Junction Site map.pdf PDF
Exhibit B_DOL Wage Determination 15-5423 Rev 16 Mesa County.pdf PDF
RFQ 36C25921Q0792.docx DOCX document
36C25921Q0792.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Infection Control Permit, Class I

Location of Project: VA Western Colorado Health Care System Contractor Supervisor: Jeremy Morkus Contractor Performing Work: TBD Project: Solicitation 36C25921Q0640, Patient Lift Rail System Structural Inspections

Type A Activities, Inspection and Non-Invasive Activities.

· Removal of ceiling tiles limited to three open tiles per room.

· Inspecting, measuring, and adjusting structural supports for overhead patient lifts.

Unoccupied Low, Medium or High-Risk Areas

· Community Living Center Patient Rooms

· ICU Patient Rooms

· Med/Surg Patient rooms

· Rehabilitation gymnasium

· Ambulatory surgery rooms

· Similar rooms with overhead patient lifts

Class I Infection Control Precautions

· Execute work by methods to minimize dust dispersal from minor flooring or surface disruptions.

· Close the room door for the duration of the inspection.

· Before beginning work, cover all equipment, furniture, casework, or similar items with single use plastic

· Replace a ceiling tiles once access is no longer required

· Remove plastic coverings in a manner that does not disperse any dust on the plastic

· Clean up any dust that may have been generated with HEPA filtered vacuum, damp mop, or sanitizing wipe.

· EMS (VA staff) to preform final clean prior to patient returning to room

Permit Requested by: Jeremy MorkusPermit Start Date: 9/1/2021
Permit Requested: 8/10/2021Permit Expiration Date: 12/31/2026

Permit Authorized by (signature & date): ________________________________________________________________ Authorized Signers: Elizabeth Meyer / Anna Crickmer

Permit Authorized by (signature & date): ________________________________________________________________ Authorized Signers: Brian Saunders / Brad Rough / Terri Hart / Andria Dutcher

Permit Authorized by (signature & date): ________________________________________________________________ Authorized Signers: Jose Trujillo / Christie McVay