Specifications B71 B71N COVID HVAC October 06 2020.pdf
PDF 742 KB Posted
- Solicitation number
- 36C25920R0142
About this file
This is a presolicitation notice for a request for quote posted on or about September 16, 2020. The solicitation is for HVAC construction services at the Sheridan, Wyoming VA Medical Center with a magnitude between $500,000 and $1 million. The project involves installing energy recovery units to serve the air handling systems for the north and south portions of the medical ward to provide 100% outside air without wasting heating and cooling energy. It also requires monitoring pressure relationships to surrounding areas with BACnet compatible room pressure sensors displaying locally and at a remote monitor in room C310A of the Nurses Station. Sensors are required in 33 rooms of buildings 71 and 71N. The performance period is no more than 180 days after notice to proceed, with sensors in three rooms to be installed within 30 days. The solicitation is set aside as 100% for Service-Disabled Veteran-Owned Small Businesses. The point of contact is Ilze Karklins-Powers at the Sheridan VA Medical Center.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI 2 Drawings 1989 1.pdf | ||
| RFI 2 Drawings 1932.pdf | ||
| RFI 2 Drawings 1989 2.pdf | ||
| 36C25920R0142 0002.docx | DOCX document | |
| 36C25920R0142 0001.docx | DOCX document | |
| Pre Bid Walk Sign In B71 B71N Covid HVAC.pdf | ||
| Drawings Sheridan B71N B71 HVAC AUG.pdf | ||
| Wage Determination WY20200014.pdf | ||
| 36C25920R0142.docx | DOCX document | |
| 7 Specs Gaurantee Period.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
BUILDING 71 AND 71N HVAC REMODEL
VA MEDICAL CENTER, SHERIDAN, WYOMING
VA #666-20-108
VA Medical Center, Sheridan, Wyoming Cover - 1 666-20-108 B71 B71N HVAC Remodel Cover and Table of Contents
TOC-1
OWNER:
VA Medical Center
1898 Fort Road
Sheridan, WY 82801
DATE:
April 24, 2020
PREPARED BY:
Lenny Spaulding
Energy Engineer
Sheridan VAMC
SPECIFICATIONS
BUILDING 71 AND 71N HVAC REMODEL
VA MEDICAL CENTER, SHERIDAN, WYOMING
VA #666-20-108
VA Medical Center, Sheridan, Wyoming Cover - 2 666-20-108 B71 B71N HVAC Remodel Cover and Table of Contents
TOC-2
TABLE OF CONTENTS
TECHNICAL SPECIFICATIONS
DIVISION 1 – GENERAL REQUIREMENTS
01 00 00 General Requirements
Division 7 – THERMAL AND MOISTURE PROTECTION
07 84 00 Fire Stopping
DIVISION 22 – PLUMBING
22 05 23 Valves
DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING
23 07 11 Pipe Insulation
23 09 23 DDC Controls
23 21 13 HVAC Piping
23 31 00 Ductwork
23 72 00 Energy Recovery Equipment
DIVISION 26 – ELECTRICAL
26 05 21 Electrical Wire
MCM 140-2, CONSTRUCTION SAFETY POLICY
06-11
VA Project #666-17-110 01 00 00 -1 666-20-108 B71 B71N HVAC Remodel General Requirements
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 GENERAL INTENTION
1.2 STATEMENT OF BID ITEM(S)
1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.4 CONSTRUCTION SECURITY REQUIREMENTS
1.5 FIRE SAFETY
1.6 OPERATIONS AND STORAGE AREAS
1.7 INFECTION/DUST PREVENTION MEASURES
1.8 DISPOSAL AND RETENTION
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS
1.10 RESTORATION
1.11 LAYOUT OF WORK
1.12 AS-BUILT DRAWINGS
1.13 USE OF ROADWAYS
1.14 AVAILABILITY AND USE OF UTILITY SERVICES
1.15 TESTING
1.16 INSTRUCTIONS
1.17 HISTORIC PRESERVATION
1.18 Construction Progress Meeting
1.19 Construction Waste
1.20 Shop Drawings
MCM 140-02
VA Project #666-17-110 01 00 00 -2 666-20-108 B71 B71N HVAC Remodel General Requirements
THIS PAGE INTENTIONALLY LEFT BLANK
VA Project #666-17-110 01 00 00 -3 666-20-108 B71 B71N HVAC Remodel General Requirements
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the Sheridan VA Medical Center
– Building 4 and 5 HVAC Remodel project as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the
Contracting Officer’s Representative (COR).
C. Project COR will render certain technical services during construction.
Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by the Contracting Officer.
E. All employees of general contractor and subcontractors shall comply with
VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access. Work shall be coordinated 2 weeks in advance that will not be performed within the normal working hours.
F. Prior to commencing work, general contractor shall provide proof that a
OSHA certified “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present.
G. Training:
1. All employees of general contractor or subcontractors shall have the
10-hour OSHA certified Construction Safety course and /or other relevant competency training, as determined by VA CP with input from the ICRA team.
2. Submit training records of all such employees for approval before the start of work.
VA Project #666-17-110 01 00 00 -4 666-20-108 B71 B71N HVAC Remodel General Requirements
H. Hours of Operation: Hours of operation shall be Monday through Friday from 7:30am to 4:00pm. The following Government holidays and shutdowns must also be observed:
New Year’s Day
Martin Luther King, Jr. Birthday
Washington’s Birthday
Memorial Day
Independence Day
Labor Day
Columbus Day
Veterans Day
Thanksgiving Day
Christmas Day
New Year’s Day
1.2 STATEMENT OF BID ITEM(S)
A. Refer to the contract drawings for specific items to be included.
Mainly, this includes all Demolition, Electrical, HVAC and piping work in Building 9 third floor and attic. Base bid shall be the price for all the work indicated in the plans and specifications.
B. DEDUCTIVE ALTERNATES: The Government may or may not determine it necessary to remove certain identified alternates. These alternates are proposal “options” under the Federal Acquisition Regulation (FAR) for the Government to exercise at the Government’s sole discretion. The
Government may exercise all, none or a selection of these options at its discretion, as is the Government’s right. There is no required order for acceptance of the options. The evaluation of price will be in accordance with (IAW) FAR 525-217-3 Evaluation Exclusive of Options.
C. DEDUCTIVE ALTERNATE NO.1: Shall be the price for the work related to the installation of the South Energy Recovery Unit (ERU).
VA Project #666-17-110 01 00 00 -5 666-20-108 B71 B71N HVAC Remodel General Requirements
1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings posted in the solicitation for bid, in PDF format may be reproduced by the Contractor, at Contractor's expense.
Note: Provide, as used in these documents, means furnish and install for a complete working system per industry standards.
1.4 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
a. Prior to commencement of work, all Contractor employees and subcontractors shall be issued appropriate 30 day or PIV Flash badges. Contractor shall coordinate with COR for badge issuance.
All Contractors employees and subcontractor personnel must wear appropriate badges at all times.
b. PIV Flash Badges are the property of the U.S. Government and must be returned at the close of the project, or upon changes in onsite personnel. Final contract payment amounts of $250.00 minimum per
PIV badge shall be held back until Government issued badges are returned.
2. For working outside the “regular hours” as defined in the contract, The General Contractor shall give 3-days-notice to the COR so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
VA Project #666-17-110 01 00 00 -6 666-20-108 B71 B71N HVAC Remodel General Requirements
3. No photography of VA premises is allowed without written permission of the COR.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the COR.
C. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of
“sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
4. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the COR upon request.
5. These security documents shall not be removed or transmitted from the project site without the written approval of the COR.
6. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
7. Notify COR and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
8. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document
Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the
EDMS system.
VA Project #666-17-110 01 00 00 -7 666-20-108 B71 B71N HVAC Remodel General Requirements
b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
D. Motor Vehicle Restrictions
1. Parking along curbs shall be for loading and unloading only.
2. General Contractor, its employees, and sub-contractors shall park in designated areas only.
E. Upon receipt of award of contract General Contractor and subcontractors shall start the identification badge process. Contractors who will be on site 90 days or longer will be required to have a flash badge.
Contractors on site for less than 90 days will be required to have a temporary badge issued in 30 day increments.
1.5 FIRE SAFETY
A. Applicable Publications: Publications listed below form part of this
Article to extent referenced. Publications are referenced in text by basic designations only.
1. American Society for Testing and Materials (ASTM):
E84-2009.............Surface Burning Characteristics of Building
Materials
2. National Fire Protection Association (NFPA):
10-2010..............Standard for Portable Fire Extinguishers
30-2008..............Flammable and Combustible Liquids Code
51B-2009.............Standard for Fire Prevention During Welding, Cutting and Other Hot Work
70-2011..............National Electrical Code
241-2009.............Standard for Safeguarding Construction, Alteration, and Demolition Operations
3. Occupational Safety and Health Administration (OSHA):
29 CFR 1926..........Safety and Health Regulations for Construction
VA Project #666-17-110 01 00 00 -8 666-20-108 B71 B71N HVAC Remodel General Requirements
B. Fire Safety Plan: Establish and maintain a fire protection program in accordance with 29 CFR 1926. Prior to start of work, prepare a plan detailing project-specific fire safety measures, including periodic status reports, and submit to the COR and Facility Safety Officer for review for compliance with contract requirements in accordance with
Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES Prior to any worker for the contractor or subcontractors beginning work, they shall undergo a safety briefing provided by the general contractor’s competent person per OSHA requirements. This briefing shall include information on the construction limits, VAMC safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of VAMC equipment, etc.
Documentation shall be provided to the COR that individuals have undergone contractor’s safety briefing.
C. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.
D. Separate temporary facilities, such as trailers, storage sheds, and dumpsters, from existing buildings and new construction by distances in accordance with NFPA 241. For small facilities with less than 6 m (20 feet) exposing overall length, separate by 3m (10 feet).
G. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with COR and facility Safety Manager Officer.
I. Fire Extinguishers: Provide and maintain extinguishers in construction areas and temporary storage areas in accordance with 29 CFR 1926, NFPA
241 and NFPA 10.
J. Flammable and Combustible Liquids: Store, dispense and use liquids in accordance with 29 CFR 1926, NFPA 241 and NFPA 30.
M. Existing Fire Protection: Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions immediately under construction, and temporarily for connections. Provide fire watch for impairments more than 4 hours in a 24-hour period. Request interruptions in accordance with Article, OPERATIONS AND STORAGE AREAS, and coordinate with Resident Engineer and facility Safety Officer. A
VA Project #666-17-110 01 00 00 -9 666-20-108 B71 B71N HVAC Remodel General Requirements
N. Smoke Detectors: Prevent accidental operation. Remove temporary covers at end of work operations each day. Coordinate with Resident Engineer and facility Safety Officer.
O. Hot Work: Perform and safeguard hot work operations in accordance with
NFPA 241 and NFPA 51B. Coordinate with Resident Engineer. Obtain permits from facility Safety Officer at least 24 hours in advance.
P. Fire Hazard Prevention and Safety Inspections: Inspect entire construction areas weekly. Coordinate with, and report findings and corrective actions weekly to Resident Engineer and facility Safety
Officer.
Q. Smoking: Smoking is prohibited in and adjacent to construction areas inside existing buildings and additions under construction. In separate and detached buildings under construction, smoking is prohibited except in designated smoking rest areas.
R. Dispose of waste and debris in accordance with NFPA 241. Remove from buildings daily. Large dumpsters shall have a lockable top, or have a fence, with lock, on all sides and top.
S. Perform other construction, alteration and demolition operations in accordance with 29 CFR 1926.
T. If required, submit documentation to the COR that personnel have been trained in the fire safety aspects of working in areas with impaired structural or compartmentalization features.
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the
COR. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the
Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the COR and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the
VA Project #666-17-110 01 00 00 -10 666-20-108 B71 B71N HVAC Remodel General Requirements
Contractor at its expense upon completion of the work. With the written consent of the COR, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the COR, use only established roadways, or use temporary roadways constructed by the
Contractor when and as authorized by the COR. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
(FAR 52.236-10)
D. Working space and space available for storing materials shall be as determined by the COR.
E. Workmen are subject to rules of Medical Center applicable to their conduct.
F. Execute work so as to interfere as little as possible with normal functioning of the Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of
Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.
G. Phasing: To insure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor
VA Project #666-17-110 01 00 00 -11 666-20-108 B71 B71N HVAC Remodel General Requirements intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to insure accomplishment of this work in successive phases mutually agreeable to the Medical Center Director, COR and Contractor. Additional phasing requirements are described on drawing Cover Sheet.
L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
M. To minimize interference of construction activities with flow of Medical
Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times.
2. Method and scheduling of required cutting, altering and removal of existing roads; walks and entrances must be approved by the COR.
N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
1.7 INFECTION/DUST PREVENTION MEASURES
A. Implement the requirements of VAMC’s Infection Control Risk Assessment
(ICRA) team. ICRA Group may monitor dust in the vicinity of the construction work and require the Contractor to take corrective action immediately if the safe levels are exceeded. MCM-140-02.
B. Establish and maintain a dust control program as part of the
Contractor’s infection preventive measures in accordance with the guidelines as specified here. Prior to start of work, prepare a plan
VA Project #666-17-110 01 00 00 -12 666-20-108 B71 B71N HVAC Remodel General Requirements detailing project specific dust protection measures, including periodic status reports and submit to COR for review for compliance with contract requirements in accordance with Section 01 33 23 SHOP DRAWINGS, PRODUCT
DATA ND SAMPLES.
C. In general, following preventive measures shall be adopted during construction to keep down dust.
1. Dampen debris to keep down dust and provide temporary construction partitions in existing structures where directed by COR. Blank-off ducts and diffusers to prevent circulation of dust into occupied areas during construction.
a. Analyze each site during design to determine the effects of blocking HVAC ducts and their impact on existing air handling systems that must remain operational before initiating a dust control program.
2. Construct anteroom to maintain negative airflow from clean area through anteroom and into work area where required.
D. Do not perform dust producing tasks within occupied areas without the approval of the COR. For construction in any areas that will remain jointly occupied by the Medical Center and Contractor’s workers, the
Contractor shall:
1. Provide dust proof temporary drywall construction barriers to completely separate construction from the operational areas of the hospital in order to contain dirt, debris and dust. Barriers shall be sealed and made presentable on hospital occupied side. Install a self-closing rated door in a metal frame, commensurate with the partition, to allow worker access.
a. Maintain negative air at all times. A fire retardant polystyrene, 6-mil thick or greater plastic barrier meeting local fire codes may be used where dust control is the only hazard, and an agreement is reached with the COR.
b. HEPA filtration is required where the exhaust dust may reenter the breathing zone. Contractor shall verify that construction exhaust to exterior is not reintroduced to the medical center through
VA Project #666-17-110 01 00 00 -13 666-20-108 B71 B71N HVAC Remodel General Requirements intake vents, or building openings. Install HEPA (High Efficiency
Particulate Accumulator) filter vacuum system rated at 95% capture of 0.3 microns including pollen, mold spores and dust particles.
Insure continuous negative air pressures occurring within the work area. HEPA filters should have ASHRAE 85 or other pre-filter to extend the useful life of the HEPA. Provide both primary and secondary filtrations units. Exhaust hoses shall be heavy duty, flexible steel reinforced and exhausted so that dust is not reintroduced to the medical center.
c. Adhesive Walk-off/Carpet Walk-off Mats, minimum 600mm x 900mm (24” x 36”), shall be used at all interior transitions from the construction area to occupied medical center area. These mats shall be changed as often as required to maintain clean work areas directly outside construction area at all times.
d. Vacuum and wet mop all transition areas from construction to the occupied medical center at the end of each workday. Vacuum shall utilize HEPA filtration. Maintain surrounding area frequently.
Remove debris as they are created. Transport these outside the construction area in containers with tightly fitting lids.
e. The contractor shall not haul debris through patient-care areas without prior approval of the COR and the Medical Center. When, approved, debris shall be hauled in enclosed dust proof containers or wrapped in plastic and sealed with duct tape. No sharp objects should be allowed to cut through the plastic. Wipe down the exterior of the containers with a damp rag to remove dust. All equipment, tools, material, etc. transported through occupied areas shall be made free from dust and moisture by vacuuming and wipe down.
f. Using a HEPA vacuum, clean inside the barrier and vacuum ceiling tile prior to replacement. Any ceiling access panels opened for investigation beyond sealed areas shall be sealed immediately when unattended.
g. There shall be no standing water during construction. This includes water in equipment drip pans and open containers within the construction areas. All accidental spills must be cleaned up
VA Project #666-17-110 01 00 00 -14 666-20-108 B71 B71N HVAC Remodel General Requirements and dried within 12 hours. Remove and dispose of porous materials that remain damp for more than 72 hours.
h. At completion, remove construction barriers and ceiling protection carefully, outside of normal work hours. Vacuum and clean all surfaces free of dust after the removal.
E. Final Cleanup:
1. Upon completion of project, or as work progresses, remove all construction debris from above ceiling, vertical shafts and utility chases that have been part of the construction.
2. Perform HEPA vacuum cleaning of all surfaces in the construction area. This includes walls, ceilings, cabinets, furniture (built-in or free standing), partitions, flooring, etc.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from the Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
VA Project #666-17-110 01 00 00 -15 666-20-108 B71 B71N HVAC Remodel General Requirements
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed, and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the COR.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the
Contractor fails or refuses to repair the damage promptly, the COR may have the necessary work performed and charge the cost to the Contractor.
(FAR 52.236-9)
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR.
Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, VA Project #666-17-110 01 00 00 -16 666-20-108 B71 B71N HVAC Remodel General Requirements reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone).
1.11 LAYOUT OF WORK
A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The
Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the COR. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the
COR until authorized to remove them. If such marks are destroyed by the
Contractor or through Contractor's negligence before their removal is authorized, the COR may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.
1.12 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, as-built drawings shall be made available for the COR's review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
VA Project #666-17-110 01 00 00 -17 666-20-108 B71 B71N HVAC Remodel General Requirements
1.13 USE OF ROADWAYS
A. For hauling, use only established public roads and roads on Medical
Center property.
1.14 AVAILABILITY AND USE OF UTILITY SERVICES
A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The Contractor shall carefully conserve any utilities furnished without charge.
1.15 TESTS
A. Pre-test mechanical and electrical equipment and systems and make corrections required for proper operation of such systems before requesting final tests. Final test will not be conducted unless pre-tested.
B. Conduct final tests required in various sections of specifications in presence of an authorized representative of the COR. Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.
C. Mechanical and electrical systems shall be balanced, controlled and coordinated. A system is defined as the entire complex which must be coordinated to work together during normal operation to produce results for which the system is designed.
D. All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a reasonably short period of time during which operating and environmental conditions remain reasonably constant.
E. Individual test result of any component, where required, will only be accepted when submitted with the test results of related components and of the entire system.
1.16 INSTRUCTIONS
A. Contractor shall furnish Maintenance and Operating manuals and verbal instructions when required by the various sections of the specifications and as hereinafter specified.
VA Project #666-17-110 01 00 00 -18 666-20-108 B71 B71N HVAC Remodel General Requirements
B. Manuals: Maintenance and operating manuals (four copies each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and sub-assembly components. Manuals shall include an index covering all component parts clearly cross-referenced to diagrams and illustrations.
Illustrations shall include "exploded" views showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, component, accessory and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of the piece of equipment and system being furnished. Manuals referencing equipment similar to but of a different model, style, and size than that furnished will not be accepted.
C. Instructions: Contractor shall provide qualified, factory-trained manufacturers' representatives to give detailed instructions to assigned
Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment. All such training will be at the job site. These requirements are more specifically detailed in the various technical sections. Instructions for different items of equipment that are component parts of a complete system shall be given in an integrated, progressive manner. All instructors for every piece of component equipment in a system shall be available until instructions for all items included in the system have been completed. This is to assure proper instruction in the operation of inter-related systems. All instruction periods shall be at such times as scheduled by the COR and shall be considered concluded only when the COR is satisfied in regard to complete and thorough coverage. The Department of Veterans Affairs reserves the right to request the removal of, and substitution for, any instructor who, in the opinion of the COR, does not demonstrate sufficient qualifications in accordance with requirements for instructors above.
VA Project #666-17-110 01 00 00 -19 666-20-108 B71 B71N HVAC Remodel General Requirements
1.17 HISTORIC PRESERVATION
Where the Contractor or any of the Contractor's employees, prior to, or during the construction work, are advised of or discover any possible archeological, historical and/or cultural resources, the Contractor shall immediately notify the COR verbally, and then with a written follow up.
1.18 CONSTRUCTION PROGRESS MEETING
The attached Construction Progress Meeting Agenda form shall be utilized for the weekly construction meetings.
1.19 CONSTRUCTION WASTE
Recycle all locally recyclable materials. At start of project provide a written demolition debris management plan to COR. Contractor shall provide storage receptacles on site, or store offsite. At minimum recycle Metal Ductwork, Soil, Inerts (e.g. Concrete, masonry and asphalt), clean dimensional wood and palette wood, Green waste
(biodegradable landscaping materials), Engineered wood products
(plywood, particle board and I-joists, etc.), Metal products (e.g.
steel, wire, beverage containers, etc.), Cardboard, paper and packaging, Bitumen roofing materials, Plastics (e.g. ABS, PVC), Carpet and/or pad, Gypsum board, Insulation, and Paint. Provide manifest of where materials went. Submit copy of manifest to COR. With each application for progress payment, submit a summary of construction and demolition debris diversion and disposal including beginning and ending dates of period covered.
1.20 SHOP DRAWINGS
Provide manufacturers cut sheet/submittals for all equipment and material provided and used in this contract. Submittals shall be in PDF format.
- - - E N D - - -
Construction Progress Meeting Agenda Contract #:
Date:
RE:
Introductions:
1. New attendees
Discussion Items:
1. Construction activities
2. Scheduled activities
3. Coordination items with the VA
4. Safety items
5. Outstanding RFI’s (Request for Information)
6. Submittal status
7. Pay Applications
8. VA provided items (status/delivery)
9. Concerns/Comments
10. As-built drawings
See attached sign-in sheet for attendees.
08-08M
VA Medical Center, Sheridan, Wyoming 07 84 00 - 1
666-20-108 B71 B71N HVAC Remodel Firestopping
SECTION 07 84 00
FIRESTOPPING
PART 1 GENERAL
1.1 DESCRIPTION
A. Closures of openings in walls, floors, and roof decks against penetration of flame, heat, and smoke or gases in fire resistant rated construction.
B. Closure of openings in walls against penetration of gases or smoke in smoke partitions.
1.2 RELATED WORK
A. Sealants and application: Section 07 92 00, JOINT SEALANTS.
1.3 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES.
B. Manufacturers literature, data, and installation instructions for types of firestopping and smoke stopping used.
C. List of FM, UL, or WH classification number of systems installed.
D. Certified laboratory test reports for ASTM E814 tests for systems not listed by FM, UL, or WH proposed for use.
1.4 DELIVERY AND STORAGE
A. Deliver materials in their original unopened containers with manufacturer’s name and product identification.
B. Store in a location providing protection from damage and exposure to the elements.
1.5 WARRANTY
Firestopping work subject to the terms of the Article “Warranty of
Construction”, FAR clause 52.246-21, except extend the warranty period to five years.
1.6 QUALITY ASSURANCE
FM, UL, or WH or other approved laboratory tested products will be acceptable.
1.7 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only.
B. American Society for Testing and Materials (ASTM):
E84-07..................Surface Burning Characteristics of Building
Materials
VA Medical Center, Sheridan, Wyoming 07 84 00 - 2
666-20-108 B71 B71N HVAC Remodel Firestopping
E814-06.................Fire Tests of Through-Penetration Fire Stops
C. Factory Mutual Engineering and Research Corporation (FM):
Annual Issue Approval Guide Building Materials
D. Underwriters Laboratories, Inc. (UL):
Annual Issue Building Materials Directory
Annual Issue Fire Resistance Directory
1479-03.................Fire Tests of Through-Penetration Firestops
E. Warnock Hersey (WH):
Annual Issue Certification Listings
PART 2 - PRODUCTS
2.1 FIRESTOP SYSTEMS
A. Use either factory built (Firestop Devices) or field erected (through-
Penetration Firestop Systems) to form a specific building system maintaining required integrity of the fire barrier and stop the passage of gases or smoke.
B. Through-penetration firestop systems and firestop devices tested in accordance with ASTM E814 or UL 1479 using the "F" or "T" rating to maintain the same rating and integrity as the fire barrier being sealed. "T" ratings are not required for penetrations smaller than or equal to 100 mm (4 in) nominal pipe or 0.01 m2 (16 sq. in.) in overall cross sectional area.
C. Products requiring heat activation to seal an opening by its intumescence shall exhibit a demonstrated ability to function as designed to maintain the fire barrier.
D. Firestop sealants used for firestopping or smoke sealing shall have following properties:
1. Contain no flammable or toxic solvents.
2. Have no dangerous or flammable out gassing during the drying or curing of products.
3. Water-resistant after drying or curing and unaffected by high humidity, condensation or transient water exposure.
4. When used in exposed areas, shall be capable of being sanded and finished with similar surface treatments as used on the surrounding wall or floor surface.
E. Firestopping system or devices used for penetrations by glass pipe, plastic pipe or conduits, unenclosed cables, or other non-metallic materials shall have following properties:
VA Medical Center, Sheridan, Wyoming 07 84 00 - 3
666-20-108 B71 B71N HVAC Remodel Firestopping
1. Classified for use with the particular type of penetrating material used.
2. Penetrations containing loose electrical cables, computer data cables, and communications cables protected using firestopping systems that allow unrestricted cable changes without damage to the seal.
3. Intumescent products which would expand to seal the opening and act as fire, smoke, toxic fumes, and, water sealant.
F. Maximum flame spread of 25 and smoke development of 50 when tested in accordance with ASTM E84.
G. FM, UL, or WH rated or tested by an approved laboratory in accordance with ASTM E814.
H. Materials to be asbestos free.
2.2 SMOKE STOPPING IN SMOKE PARTITIONS
A. Use silicone sealant in smoke partitions as specified in Section 07 92
00, JOINT SEALANTS.
B. Use mineral fiber filler and bond breaker behind sealant.
C. Sealants shall have a maximum flame spread of 25 and smoke developed of
50 when tested in accordance with E84.
D. When used in exposed areas capable of being sanded and finished with similar surface treatments as used on the surrounding wall or floor surface.
PART 3 - EXECUTION
3.1 EXAMINATION
Submit product data and installation instructions, as required by article, submittals, after an on site examination of areas to receive firestopping.
3.2 PREPARATION
A. Remove dirt, grease, oil, loose materials, or other substances that prevent adherence and bonding or application of the firestopping or smoke stopping materials.
B. Remove insulation on insulated pipe for a distance of 150 mm (six inches) on either side of the fire rated assembly prior to applying the firestopping materials unless the firestopping materials are tested and approved for use on insulated pipes.
VA Medical Center, Sheridan, Wyoming 07 84 00 - 4
666-20-108 B71 B71N HVAC Remodel Firestopping
3.3 INSTALLATION
A. Do not begin work until the specified material data and installation instructions of the proposed firestopping systems have been submitted and approved.
B. Install firestopping systems with smoke stopping in accordance with FM, UL, WH, or other approved system details and installation instructions.
C. Install smoke stopping seals in smoke partitions.
3.4 CLEAN-UP AND ACCEPTANCE OF WORK
A. As work on each floor is completed, remove materials, litter, and debris.
B. Do not move materials and equipment to the next-scheduled work area until completed work is inspected and accepted by the COTR.
C. Clean up spills of liquid type materials.
11-04M
VA Medical Center, Sheridan, Wyoming 22 05 23 - 1
666-20-108 B71 B71N HVAC Remodel Valves
SECTION 22 05 23
GENERAL-DUTY VALVES FOR PLUMBING PIPING
PART 1 - GENERAL
1.1 DESCRIPTION
A. General-duty valves for domestic water and sewer systems.
1.2 RELATED WORK
A. Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING.
1.3 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES.
B. Manufacturer's Literature and Data:
1. Valves.
2. Backflow Preventers.
3. All items listed in Part 2 - Products.
1.4 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. American Society for Testing and Materials (ASTM):
A536-84(R1999) E1.......Ductile Iron Castings
C. National Association of Plumbing - Heating - Cooling Contractors
(PHCC):
National Standard Plumbing Code - 1996
D. Manufacturers Standardization Society of the Valve and Fittings
Industry, Inc. (MSS):
SP-72-99................Ball Valves With Flanged or Butt Welding For
General Purpose
SP-80-03................Bronze Gate, Globe, Angle and Check Valves.
SP-110-96...............Ball Valve Threaded, Socket Welding, Solder
Joint, Grooved and Flared Ends
E. American Society of Sanitary Engineers (ASSE):
1013-99.................Reduced Pressure Principle Backflow Preventers
1015-99.................Double Check Backflow Prevention Assembly
PART 2 - PRODUCTS
2.1 VALVES
A. Asbestos packing is prohibited.
VA Medical Center, Sheridan, Wyoming 22 05 23 - 2
666-20-108 B71 B71N HVAC Remodel Valves
B. All valves of the same type shall be products of a single manufacturer.
Provide gate and globe valves with packing that can be replaced with the valve under full working pressure.
C. Shut-off:
1. Cold, Hot and Recirculating Hot Water:
a. Fifty millimeter (2 inches) and smaller:
1) Ball, Mss SP-72, SP-110, Type II, Class 125, Style 1, three piece or double union end construction, full ported, full flow, with solder end connections, 2750 kPa (400 psi) WOG, MSS-SP-67.
Provide chain operators for valves 100 mm (4 inches) and larger when the centerline is located 2400 mm (8 feet) or more above the floor or operating platform.
D. Gate Valves:
1. 50 mm (2 inches) and smaller for modulation: MSS-SP80, Bronze, 1034 kPa (150 lb.), wedge disc, rising stem, union bonnet.
2. 65 mm (2 1/2 inches) and larger: Flanged, outside screw and yoke.
a. MSS-SP 70, iron body, bronze mounted, 861 kPa (125 psig) wedge disc.
E. Globe, Angle and Swing Check Valves:
1. 50 mm (2 inches) and smaller: MSS-SP 80, bronze, 1034 kPa (150 lb.)
Globe and angle valves shall be union bonnet with metal plug type disc.
2. 65 mm (2 1/2 inches) and larger: 861 kPa (125 psig), flanged, iron body, bronze trim, MSS-SP-85 for globe valves and MSS-SP-71 for check valves.
F. Water Temperature Mixing Valves:
1. 20 GPM at 30 PSI, Single Valve Design, Meets ANSI Standard Z358.1-2004, Reliable Liquid Filled Thermostat with 10 year warranty, Integral strainer
Check-stops on inlets, accurate temperature control within +/- 3 deg. F.
Factory Pre-Set at 85°F, Adjustable Temperature Range of 65°F - 95°F , Universal Mounting Capability, Positive Shut-off of Hot Supply when Cold
Supply is Lost, Built-In Cold Water Bypass Assures Cold Flow, and Dial
Thermometer, Rough Bronze Finish, and 18 gauge Stainless Steel Cover with
Full length hinge, cylinder lock, and inlet and outlet knock out holes.
G. Backflow Preventer:
1. Bronze body construction, Stainless Steel Bolts, Single Service
Access Cover, Double Check Valve Assembly, replaceable seat discs, shall meet ASSE Std. 1015 and AWWA Std. C510.
H. Check:
VA Medical Center, Sheridan, Wyoming 22 05 23 - 3
666-20-108 B71 B71N HVAC Remodel Valves
1. Less than 100 mm (3 inches) and smaller): Bronze body and trim, swing type, MSS-SP-80, 850 kPa (125 pound) WSP.
PART 3 - EXECUTION
3.1 INSTALLATION
A. General: Comply with the PHCC National Standard Plumbing Code and the following:
1. Install valves with stem in horizontal position whenever possible.
All valves shall be easily accessible. Install valve in each water connection to fixture.
2. Install union and shut-off valve on pressure piping at connections to equipment.
3. Backflow prevention device shall be installed in an accessible location, 5 (five) feet above finish floor.
- - E N D - - -
08-01-19
23 05 93.01 - 1
SECTION 23 05 93.01
DVA PROJECTS TESTING, ADJUSTING, AND BALANCING FOR HVAC
A. Testing, adjusting, and balancing (TAB) of heating, ventilating and air conditioning (HVAC) systems. TAB includes the following:
1. Planning systematic TAB procedures.
2. Design Review Report.
3. Systems Inspection report.
4. Duct Air Leakage test report.
5. Systems Readiness Report.
6. Balancing air and water distribution systems; adjustment of total system to provide design performance; and testing performance of equipment and automatic controls.
7. Vibration and sound measurements.
8. Recording and reporting results.
B. Definitions:
1. Basic TAB used in this Section: Chapter 38, "Testing, Adjusting and
Balancing" of 2011 ASHRAE Handbook, "HVAC Applications".
2. TAB: Testing, Adjusting and Balancing; the process of checking and adjusting HVAC systems to meet design objectives.
3. AABC: Associated Air Balance Council.
4. NEBB: National Environmental Balancing Bureau.
5. Hydronic Systems: Includes heating hot water and chilled water systems.
6. Air Systems: Includes all outside air, supply air, return air, exhaust air and relief air systems.
7. Flow rate tolerance: The allowable percentage variation, minus to plus, of actual flow rate from values (design) in the contract documents.
1.2 RELATED WORK
A. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC
H. Section 23 31 00, HVAC DUCTS AND CASINGS
1.3 QUALITY ASSURANCE
A. Refer to Articles, Quality Assurance and Submittals, in this Section.
B. Qualifications:
23 05 93.01 - 2
1. TAB Agency: The TAB agency shall be a subcontractor of the General
Contractor and shall report to and be paid by the General
Contractor.
2. The TAB agency shall be either a certified member of AABC or certified by the NEBB to perform TAB service for HVAC, water balancing and vibrations and sound testing of equipment. The certification shall be maintained for the entire duration of duties specified herein. If, for any reason, the agency loses subject certification during this period, the General Contractor shall immediately notify the COR (Contracting Officer Representative) and
VA COR and submit another TAB firm for approval. Any agency that has been the subject of disciplinary action by either the AABC or the
NEBB within the five years preceding Contract Award shall not be eligible to perform any work related to the TAB. All work performed in this Section and in other related Sections by the TAB agency shall be considered invalid if the TAB agency loses its certification prior to Contract completion, and the successor agency’s review shows unsatisfactory work performed by the predecessor agency.
3. TAB Specialist: The TAB specialist shall be either a member of AABC or an experienced technician of the Agency certified by NEBB. The certification shall be maintained for the entire duration of duties specified herein. If, for any reason, the Specialist loses subject certification during this period, the General Contractor shall immediately notify the COR and submit another TAB Specialist for approval. Any individual that has been the subject of disciplinary action by either the AABC or the NEBB within the five years preceding Contract Award shall not be eligible to perform any duties related to the HVAC systems, including TAB. All work specified in this Section and in other related Sections performed by the TAB specialist shall be considered invalid if the TAB Specialist loses its certification prior to Contract completion and must be performed by an approved successor.
4. TAB Specialist shall be identified by the General Contractor within
60 days after…