36C25919R0115-0004001.docx

DOCX document 15 KB Posted

Attached to
Correct B33 FCA Deficiencies, NRM Construction, Project 575-16-103 (VA-19-00040586)
Solicitation number
36C25919R0115
Issued by

About this file

36C25919R0115 0004 Bid Schedule.docx

View the file

Other files

File Type Posted
36C25919R0115-0004000.docx DOCX document
36C25919R0115-0003002.docx DOCX document
36C25919R0115-0003000.docx DOCX document
36C25919R0115-0003001.pdf PDF
36C25919R0115-0002000.docx DOCX document
36C25919R0115-0001000.docx DOCX document
36C25919R0115-0001002.pdf PDF
36C25919R0115-0001001.pdf PDF
36C25919R0115-001.docx DOCX document
36C25919R0115-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

The contractor shall furnish all labor, equipment, materials, and supervision to demolish and remodel the East and West wings of the 3rd floor in Building 1 at the Grand Junction VA campus, 2121 North Ave., Grand Junction, CO 81501.

The contractor shall provide two (2) prices; The contractor shall provide two (2) prices; Line Item 0001 through Line Item 0002 (deductive pricing). The contractor shall include prices for all items listed in the pricing schedule and include all costs associated for work in the SOW, if specifically listed in the pricing schedule. Work will be accomplished at the Grand Junction VA campus, 2121 North Ave., Grand Junction, CO 81501.

CLIN
Description
Qty
Unit of issue

Firm Fixed Price Lump Sum amount

0001
Base Pricing

(SEE SOW FOR DETAILS)

Provide all work as described by attached plans, specifications, and Wage Determinations for Veterans Administration project Project 575-16-103 CORRECT BUILDING 33 FCA DEFICIENCIES AT THE Grand Junction VAMC. as described in the attached scope of work. Price includes all costs for construction. Cost shall include but not be limited to direct and indirect costs including profit, overhead, general and administration, insurance, labor, bonds, taxes, necessary for 100% completion of the project as indicated in the attached SOW. The construction performance period is 60 calendar days from receipt of notice to proceed.

1
Job
$_________

Alternate 1 Deduct Pricing

(SEE SOW FOR DETAILS)

All work in the Base Bid minus any work, labor, profit, and overhead related to the Replace Distribution panel with 1200 A NEMA 3R Distribution panelboard.

1
Job
$_____________

Grand Total $_________________

Note: Offerors shall provide prices on the base bid and the deductive alternates. The base bid shall be priced exclusive of the deductive Line Items. The deductive alternate shall have its own price exclusive of the base bid price. The deductive line items are in ascending order of importance (e.g., Alternate 1 will be removed first, Alternate 2 second, etc.).

The Government intends to award the base bid if the lowest technically acceptable offeror is within funding limitations. If the low offeror for base bid is not within funding limitations, the Government will award to the lowest technically acceptable offeror for the base bid and alternate one if within funding limitations. If not within funding limitations the Government will then award to the lowest technically acceptable offeror for the base bid and alternates one and two. The Government will continue evaluating pricing in this order until within funding limitations.