36C25919R0115-0003000.docx

DOCX document 21 KB Posted

Attached to
Correct B33 FCA Deficiencies, NRM Construction, Project 575-16-103 (VA-19-00040586)
Solicitation number
36C25919R0115
Issued by

About this file

36C25919R0115 0003 36C25919R0115 0003.docx

View the file

Other files

File Type Posted
36C25919R0115-0004001.docx DOCX document
36C25919R0115-0004000.docx DOCX document
36C25919R0115-0003002.docx DOCX document
36C25919R0115-0003001.pdf PDF
36C25919R0115-0002000.docx DOCX document
36C25919R0115-0001000.docx DOCX document
36C25919R0115-0001002.pdf PDF
36C25919R0115-0001001.pdf PDF
36C25919R0115-001.docx DOCX document
36C25919R0115-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers for 36C25919R0015 B33 Correct FCA Deficiencies

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 05-23-2019 575-16-103 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village

CO

80111 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village

CO

80111 To all Offerors/Bidders

36C25919R0115

X X X

May 31, 2019 at 2:00 PM MT.

See page 2.

The purpose of this amendment is to: add the site visit list of attendees, extend the solicitation closing date in order to answers questions and add the PPQ form.

A. The proposal due date is hereby changed from May 23, 2019 at 2:00 PM Mountain Time (MT) to May 31, 2019 at 2:00 PM MT.

B. The PPQ form and site visit list of attendees is attached.

C. Block 12a on the solicitation is changed from Yes to NO, a IRREVOCABLE LETTER OF CREDIT or PERFORMANCE AND PAYMENT BOND is required.

D. All other terms and conditions remain unchanged.

1. Sheet M001 refers to DDC controls. Are there existing backnet controls in B33? If not, how do we get backnet to B33?

Confirm details with existing controls vendor and provide new functionality as needed.

2. Fire Alarm Floor Plan Detail on sheet TK101 does not reference any of the existing smoke detectors. There are 5 currently installed including one above the FACP for the building. Are these to be removed for construction and reinstalled? Will heat detectors be required during construction?

A. Smoke detectors to remain, construction need to be protected at all times, so, if heat detector is required, then provide one.

3. The fire alarm control panel is not referenced on the drawings. Will this panel continue to have power to avoid it running on batteries or possibly powering down completely?

A. See TK101 note 14. FA panel to remain, and electrical power to remain, so, I do NOT understand the question.

4. Some of the fire alarm and mass notification system's fiber optic networks are routed through this building. Will there be an interruption of these networks?

A. There should be NO interruption, the contractor shall label all fiber per the construction document.

5. The generator for building 33 is currently monitored by the fire alarm system. The generator for building 35 is not. Is the intention to have this generator monitored by the fire alarm system at the completion of this project?

No

6. The technology floor plan on sheet TK101 shows the symbol for a fire alarm ceiling mounted speaker. Is this to take the place of or be in addition to the existing wall mounted speaker strobe ("alert" style for MNS) on the south wall? Should this be a speaker strobe or is it intended to be a speaker only?

A. New fire alarm devices as shown to be connected to the fire alarm panel, the speaker above the fire alarm panel suppose to be a photoelectric smoke detector.

7. The Solicitation bid schedule does not contain a space for the Scope of Work #2, Deduct Alternate. Confirm this will be a Deductive Alternate.

Yes.

8. The solicitation, page 5, Submittals says CAD format as-builts are required. Does the VA have the up to date CAD drawings available for modification?

Response: Yes they will be provided to the successful offerer.

See attached document: Project 575-16-103 B33 Pre-Con Site Visit.

See attached document: 2015-06-05, Past Performance Questionnaire 02.