36C25918R0547-0002000.docx

DOCX document 19 KB Posted

Attached to
(CON)(660) Demolish Building 1 G Zone (VA-18-00075144)
Solicitation number
36C25918R0547
Issued by

About this file

36C25918R0547 0002 36C25918R0547 0002.docx

View the file

Other files

File Type Posted
36C25918R0547-0001000.docx DOCX document
36C25918R0547-004.docx DOCX document
36C25918R0547-006.pdf PDF
36C25918R0547-001.docx DOCX document
36C25918R0547-003.pdf PDF
36C25918R0547-002.docx DOCX document
36C25918R0547-005.docx DOCX document
36C25918R0547-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 660-18-232 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village

CO

80111 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village

CO

80111 To all Offerors/Bidders

36C25918R0547

X X X The purpose of this modification is to provide answers to questions.

Questions and Answers.

1. Is the Offeror required to submit Standard Form 1442 (SF1442) with the Phase I proposal? If yes, please advise under what Factor it is to be submitted.

The SF 1442 will be submitted for both Phase I and Phase II.

2. Is the Offeror Required to submit Representations and Certifications with the Phase I proposal? If yes, please advise under which Factor it is to be submitted.

Representations and Certifications will be submitted with Phase II.

3. On the SF 1442, it states “a hard copy bid bond must be received at the address listed in block 7 prior to the closing date and time” and Item 13b box is checked for an offer guarantee. Is this a requirement for Phase I even though no pricing is submitted by the Offeror under Factor I?

Bid bond will be submitted with Phase II.

4. FACTORS REQUIRED FOR PHASE 1 SUBMITTAL: The SOW states this is a two step proposal with only Factors 1 thru 4 to be turned in with the first phase (no pricing). However, Factors 5, 6, & 7 are listed under Phase 1 Submittal Requirements. Please confirm which Factors are required for Phase 1 submission.

Please see page 12 and 13 for which factors are required for each phase.

5. CLARIFICATION OF BID FORM: The Bid form on page 11 of 68 of the RFP requires a total price for the entire project. It also states on the bid form 90 days for total completion. Also in the RFP page 1 and the SOW the time for performance is 260 days with 130 days for construction after approval of design documents. Please Clarify.

The Period of Performance is a total of 260 days. 140 days for design and 120 days for construction.

6. CLARIFICATION ON PROJECT EXPERIENCE MINIMUM AMOUNT: On Factor 1 page 14 the required size of project experience is states as a minimum of $500,000. On page 15 under (2) design experience it requires: $5000,000. Please clarify the required experience is $500,000. For both the prime and the designer.

Yes, the minimum is $500,000 for both the prime and designer.

7. ARRANGEMENT FOR SITE VISIT: In the RFP it recommends a site visit prior to proposal and that it will be arranged by the CO. The proposal date for Phase 1 is July 23. It also states no visit will be conducted until after the Phase selection for Phase 2. A site visit is very much needed for a proper Phase 1 proposal. Please arrange a site visit for all or allow us to contact the COR to visit the site. Please provide the name and contact information of the COR.

A site visit will be conducted for Phase II offerors only.

8. CONFIRMATION THAT DESIGN TEAM MEMBER AND/OR MAJOR SUB MAY HAVE EXPERIENCE THAT MEETS DESIGN/BUILD $500,000 REQUIREMENT: Please confirm that the design team member and/or a major subcontractor’s relevant experience may be used under Factor 1 as long as documentation of commitment is provided if the Prime does not have 1-3 relevant projects.

Please review paragraph one of page 15. This will answer your question.

9. PREVIOUS EXPERIENCE FOR DESIGN BUILD TEAM MEMBER PRIOR TO CURRENT COMPANY: May the design subcontractor (A/E) use experience from previous firm or employer for proof of experience and qualifications under Factor 1 part (2) as long as it is indicated as such?

No, experience shall be with current employer.