J041--644 Boiler Water Treatment
Solicitation number
36C25821Q0062
Issued by

About this file

This is a solicitation for boiler water treatment services at the Phoenix VA Healthcare System. The Department of Veterans Affairs is seeking monthly preventative maintenance and treatment of boilers, chillers, cooling towers, and closed loop heating and cooling systems covering approximately 900,000 square feet. Services include personnel, equipment, tools, supervision, and other items necessary to provide water treatment and materials. The period of performance is one base year plus up to four option years. Pricing is to be provided for monthly and annual recurring services. The solicitation identifies mechanical equipment, required services, testing requirements, chemical delivery standards, and other terms. The response due date is March 17, 2021.

View the file

Other files

File Type Posted
36C25821Q0062 0001.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25821Q0062

PAGE 1 OF

1. REQUISITION NO.

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

CODE

TELEPHONE NO.

DUNS:

DUNS+4:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. 2/2012)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

36C25821Q0062 03-08-2021 Dennis Cantrell 03-1 -2021 4:30pm

MDT

Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 X X 221310 $30 Million N/A X Department of Veterans Affairs Phoenix VA Healthcare System 777 E. Missouri, Suite 300 Phoenix AZ 85014 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014

This is accomplished through the Tungsten Network located at:

http://www.fsc.va.gov/einvoice.asp This is mandatory and the sole method for submitting invoices.

See CONTINUATION Page The Phoenix Arizona VA Health Care System (PVAHCS) requires maintenance services for water treatment and cooling tower (75,000 gallons chilled loop system) that covers about 900,000 square feet. The required services are to include all personnel, equipment, tools, supervision, and other items and services necessary to provide water treatment services and materials for all boilers, chillers, cooling towers and closed loop heating and cooling system.

See CONTINUATION Page X X James Moran Table of Contents

SECTION A1
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS1
SECTION B - CONTINUATION OF SF 1449 BLOCKS3
B.1 CONTRACT ADMINISTRATION DATA3
B.2 PRICE/COST SCHEDULE4
ITEM INFORMATION4
B.3 Statement of Work10
SECTION C - CONTRACT CLAUSES25
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (OCT 2018)25
C.2 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)31
C.3 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)31
C.4 SUPPLEMENTAL INSURANCE REQUIREMENTS31
C.5 VAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA ACQUISITION OF COMMERCIAL ITEMS (APR 2020)32
C.6 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018)33
C.7 VAAR 852.219-75 SUBCONTRACTING COMMITMENTS MONITORING AND COMPLIANCE (JUL 2018)34
C.8 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)35
C.9 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL ITEMS (NOV 2020)35
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS44
D.1 Wage Determination No.: 2015-546944
SECTION E - SOLICITATION PROVISIONS54
52.212-1 INSTRUCTIONS TO QUOTERS—COMMERCIAL ITEMS54
E.1 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)58
E.2 52.233-2 SERVICE OF PROTEST (SEP 2006)61
E.3 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)61
E.4 52.212-2 EVALUATION – SIMPLIFIED ACQUISTITION PROCEDURES62
E.5 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL ITEMS (NOV 2020)63

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C258

Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X]
52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[]
52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly[]
b. Semi-Annually[]
c. Other[X] Monthly in Arrears

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

This is accomplished through the Tungsten Network located at:

http://www.fsc.va.gov/einvoice.asp This is mandatory and the sole method for submitting invoices.

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO
DATE

· All pricing shall be entered into the following schedule.

B.2 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12.00
MO
__________________
__________________

MONTHLY PREVENTATIVE MAINTENANCE ON MAIN COOLING SYSTEM

Contract Period:

POP Begin: 04-01-2020 POP End: 03-30-2021

12.00
MO
__________________
__________________

MONTHLY PREVENTATIVE MAINTENANCE ON STEAM SYSTEMS

12.00
MO
__________________
__________________

PREVENTATIVE MAINTENANCE FOR 1.45 MILLION GALLON UNDERGROUND CHILL WATER STORAGE TANK

12.00
MO
__________________
__________________

MONTHLY TRADITIONAL TREATMENT OF CENTRAL PLANT CHILLERS

2.00
JB
__________________
__________________

CLEANING AND DISINFECTING COOLING TOWERS AND SUMP PIT (APRIL & OCTOBER)

1.00
JB
__________________
__________________

TESTING AND TREATMENT OF HEATING HOT WATER LOOP

1.00
JB
__________________
__________________

EMERGENCY REPAIR SERVICES AND ADDITIONAL SERVICES

12.00
MO
__________________
__________________

MONTHLY PREVENTATIVE MAINTENANCE ON MAIN COOLING SYSTEM

POP Begin: 04-01-2021 POP End: 03-30-2022

12.00
MO
__________________
__________________

MONTHLY PREVENTATIVE MAINTENANCE ON STEAM SYSTEMS

12.00
MO
__________________
__________________

PREVENTATIVE MAINTENANCE FOR 1.45 MILLION GALLON UNDERGROUND CHILL WATER STORAGE TANK

12.00
MO
__________________
__________________

MONTHLY TRADITIONAL TREATMENT OF CENTRAL PLANT CHILLERS

2.00
JB
__________________
__________________

CLEANING AND DISINFECTING COOLING TOWERS AND SUMP PIT (APRIL & OCTOBER)

1.00
JB
__________________
__________________

TESTING AND TREATMENT OF HEATING HOT WATER LOOP

1.00
JB
__________________
__________________

EMERGENCY REPAIR SERVICES AND ADDITIONAL SERVICES

12.00
MO
__________________
__________________

MONTHLY PREVENTATIVE MAINTENANCE ON MAIN COOLING SYSTEM

POP Begin: 04-01-2022 POP End: 03-30-2023

12.00
MO
__________________
__________________

MONTHLY PREVENTATIVE MAINTENANCE ON STEAM SYSTEMS

12.00
MO
__________________
__________________

PREVENTATIVE MAINTENANCE FOR 1.45 MILLION GALLON UNDERGROUND CHILL WATER STORAGE TANK

12.00
MO
__________________
__________________

MONTHLY TRADITIONAL TREATMENT OF CENTRAL PLANT CHILLERS

2.00
JB
__________________
__________________

CLEANING AND DISINFECTING COOLING TOWERS AND SUMP PIT (APRIL & OCTOBER)

1.00
JB
__________________
__________________

TESTING AND TREATMENT OF HEATING HOT WATER LOOP

1.00
JB
__________________
__________________

EMERGENCY REPAIR SERVICES AND ADDITIONAL SERVICES

12.00
MO
__________________
__________________

MONTHLY PREVENTATIVE MAINTENANCE ON MAIN COOLING SYSTEM

POP Begin: 04-01-2023 POP End: 03-30-2024

12.00
MO
__________________
__________________

MONTHLY PREVENTATIVE MAINTENANCE ON STEAM SYSTEMS

12.00
MO
__________________
__________________

PREVENTATIVE MAINTENANCE FOR 1.45 MILLION GALLON UNDERGROUND CHILL WATER STORAGE TANK

12.00
MO
__________________
__________________

MONTHLY TRADITIONAL TREATMENT OF CENTRAL PLANT CHILLERS

2.00
JB
__________________
__________________

CLEANING AND DISINFECTING COOLING TOWERS AND SUMP PIT (APRIL & OCTOBER)

1.00
JB
__________________
__________________

TESTING AND TREATMENT OF HEATING HOT WATER LOOP

1.00
JB
__________________
__________________

EMERGENCY REPAIR SERVICES AND ADDITIONAL SERVICES

12.00
MO
__________________
__________________

MONTHLY PREVENTATIVE MAINTENANCE ON MAIN COOLING SYSTEM

POP Begin: 04-01-2024 POP End: 03-30-2025

12.00
MO
__________________
__________________

MONTHLY PREVENTATIVE MAINTENANCE ON STEAM SYSTEMS

12.00
MO
__________________
__________________

PREVENTATIVE MAINTENANCE FOR 1.45 MILLION GALLON UNDERGROUND CHILL WATER STORAGE TANK

12.00
MO
__________________
__________________

MONTHLY TRADITIONAL TREATMENT OF CENTRAL PLANT CHILLERS

2.00
JB
__________________
__________________

CLEANING AND DISINFECTING COOLING TOWERS AND SUMP PIT (APRIL & OCTOBER)

1.00
JB
__________________
__________________

TESTING AND TREATMENT OF HEATING HOT WATER LOOP

1.00
JB
__________________
__________________

EMERGENCY REPAIR SERVICES AND ADDITIONAL SERVICES

GRAND TOTAL
__________________

B.3 Statement of Work

Water Treatment and Cooling Tower Maintenance Services

Introduction:

This requirement is for water treatment maintenance services and materials for all boilers, chillers, cooling towers, closed loop heating and cooling systems at the Phoenix Arizona Veterans Affairs Health Care System (PVAHCS) located at 650 E Indian School Rd Phoenix Arizona 85012.

Background:

PVAHCS requires maintenance services for water treatment and cooling tower (75,000 gallons chilled loop system) that covers about 900,000 square feet. The required services are to include all personnel, equipment, tools, supervision, and other items and services necessary to provide water treatment services and materials for all boilers, chillers, cooling towers and closed loop heating and cooling system.

Qualifications:

Service representative must possess a Certified Water Technologist Certification (CWT) and (10+) years’ experience in the Water Treatment Industry. Service representatives that do not possess such a certification must have no less than 15 years’ experience in the water treatment industry (include diploma / degree and or experience resume for each service representative that must service facilities.

Contractor must be able to provide Emergency chemical deliveries within 2-hours of the identification of need.

Equipment:

Mechanical Equipment List

Boiler Plant:

· Boiler # 1Water Tube6,900 lbs./hour (200 hp.)
· Boiler # 3Water Tube18,500 lbs./hour (530 hp.)

· The following are the expectations for operation based on historical usage:

· Steam load ~ 30,000,000 lbs./year

· 15 cycles of concentration

· Base boiler internal treatment on a feedwater hardness average 0.15 ppm

· Condensate Return ~ 60%

Contractor to provide protection for the entire system including but not exclusive of all associated components and equipment listed below:

· Deaerator

· Feedwater pumps

· Feedwater lines

· Steam boilers

· Condensate lines

· Condensate receivers & pumps

· Condensate storage tank

Main Chiller Plant:

· Chiller # 1750-ton York
· Chiller # 2500-ton Smardt
· Chiller # 3870-ton York
· Chiller # 4870-ton York
· Cooling TowersFour (4) 750-ton Evapco towers

(PVAHCS’s 2-year average for the cooling towers:

· Makeup water 18,400,000 gallons/year

· Blowdown water 3,680,000 gallons/year

· 5.0 cycles of concentration

· Condenser System Volume ~ 32,000 gallons

· Chilled Water Loop Volume = 75,000

· Chilled Water Loop Makeup ~ 18,000 gallons/year (per your logs 2 yr. avg.)

Packaged Chiller Plant:

· Chiller # 5750-ton Trane
· Chiller # 6750-ton Trane
· Cooling TowersTwo (2) 750-ton Marley

· Base your bid on the following assumptions/baseline volumes which may fluctuate annually:

· Cooling tower makeup rate of 20,000,000 gallons/ year

· Blowdown rate of 4,000,000 gallons/year

· 5.0 cycles of concentration

· Closed loop chilled water makeup approximately 250,000 gallons/ year.

· Condenser System Volume ~ 15,000 gallons

· Thermal Storage Volume ~1,450,000 gallons

· Thermal Storage Makeup ~ 50,000 gallons/ year

Heating Hot Water System:

· Base your bid on the following assumptions/baseline volumes which may fluctuate annually:

· HHW System Volume ~ CLC 5,000 gallons

· CLC HHW Makeup ~ 1,250 gallons/year

· HHW System Volume ~ C/D Wing 8,000

· C/D Wing HHW Makeup ~ 2,000 gallons/year

· ACC HHW System Volume ~ 15,000

· ACC HHW Makeup ~ 3700 gallons/year

· Building # 31 HHW System – 5000 gallons/year

· Building #31 HHW system Makeup1200 gallons/year

· Building # 29 HHW system -5000 gallons/year

· Building #29 HHW system Makeup 1200 gallon/year

Contractor to provide protection for the entire system including but not exclusive of all associated components and equipment listed below:

· Cooling tower hot deck, fill, basin

· Condenser water pumps

· Condenser piping

· Cooling tower sump

Required Services A. General

1) Purpose: The purpose of these specifications is to identify required water treatment services and materials for all Phoenix VA boilers, chillers, cooling towers and closed loop heating and cooling systems for the Department of Veterans Affairs, Phoenix VA Health Care System, 650 E. Indian School Road, Phoenix, Arizona. This water treatment contract Scope of Work includes five sections:

a. Traditional Water Treatment for Boiler # 1 & 3, Chillers 1, 2, 3 & 4, and Current Chilled Water Loop System (75,000 gallons), Hot Water Reheat Loop

b. Cooling Tower Cleaning and Disinfection (2x/yearly)

c. 1.45M gallon Thermal Storage Maintenance Program with quarterly biocide treatment

d. Traditional Water Treatment for Packaged Central Plant/Chillers 5 & 6

e. Cooling Tower Cleaning and Disinfection for Packaged Central Plant/Towers 5 & 6

2) Contractor Furnished Supplies and Services: Services established by these specifications require the contractor to supply all chemicals and testing agents, hardware, monitoring software (if applicable), supervision, and labor. Contractor represents and warrants that all articles and services covered by this proposal meet or exceed the safety standards established and promulgated under the Federal Occupational Safety and Health Act of 1970 No. 2006, and its regulations in effect or proposed as of the date of the proposal.

3) Submittal Items:

a. Program Description. This should include an overview of contractor’s intent for all products and test agents used, tests performed and explanations of product performance and influence on final results. This program description must detail how each of the required parameters must be maintained, how the validation of each of the parameters to the contract requirement must be accomplished, what is your response to an ‘Out Of Control’ (OOC) occurrence

b. Complete Specifications for all products proposed for use. This information must include the following:

1. Product name

2. Ingredients

3. Control Range

4. Test procedures

5. Physical state (liquid, powder, etc.)

6. Container size

7. Delivery method

8. Technical data

9. Compatibility with feed system materials presently in use

10. Product bulletins

11. Materials safety data sheets (MSDS)

c. Formal Training Plan. Plan must be submitted with specific examples of training program, protocol, etc. This training must be two-fold (hands-on system & testing training as well as cooling/boiler water theory and fundamentals) for all operations personnel.

4) Government Owned Supplies available for contractor use: The PVAHCS will provide general testing hardware in the form of glassware, sample containers, conductivity meters, etc.

5) Contract Security: The C&A requirements do not apply; a Security Accreditation Package is not required.

B. PRODUCTS AND EXECUTION:

1. Purpose: The purpose of these specifications is to establish the guidelines for a water treatment program for the Phoenix VA Health Care System, Phoenix, AZ that must prevent corrosion, promote higher performance efficiency and extend equipment life. A weekly report must indicate boiler water, soft water, condensate return, feed water, chilled water, condenser water, and in year two after new construction warrantee is provided, the packaged condenser system, thermal storage and heating hot water systems. Boiler Plant logs of work accomplished by Operator on every shift must also be checked for accuracy or discrepancies and report any problems or recommendations to the Plant Supervisor.

A. Boiler Plant Operations:

(1) Tubes must be kept be free of scale and sludge deposits

(2) Deaerator (DA) tank, boiler, and condensate systems must be kept free of deposits, scale and corrosion.

(3) Boiler to run at highest cycles of concentration allowable based on condensate return (currently ~ 15 cycles of concentration)

B. Chiller Plant Operations:

(1) All chiller condenser tubes must be kept free of scale and biofilm.

(2) Cooling towers must be kept free of scale, biofilm and algae

(3) Cooling tower should average > 5.0 cycles of concentration to minimize water use and environmental impact

(4) Steel & copper corrosion rates must be minimized below best practice standards and achieve “Very Good” or “Excellent” corrosion rates as shown below.

Quantitative Classification of Corrosion Rates for Open Recirculation Cooling Water Systems Corrosion Rates (mpy)

Description
Carbon Steel
Copper Alloys
Negligible or Excellent
Less than or equal to 1
Less than or equal to 0.1
Mild or Very Good
1 to 3
0.1 to 0.25
Good
3 to 5
0.25 to 0.35
Moderate to Fair
5 to 8
0.35 to 0.5
Poor
8 to 10
0.5 to 1
Very Poor to Severe
>10
>1

C. Closed loop systems:

(1) Central Plant, Thermal Storage and Heating Hot Water closed loops must show decreased sediment and corrosive indicators such as turbidity, copper, iron, etc.

(2) Steel & copper corrosion rates must be minimized below best practice standards and achieve “Excellent” corrosion rates as shown below.

Quantitative Classification of Corrosion Rates for Closed Recirculating Cooling Water Systems Corrosion Rates (mpy)

Description
Carbon Steel
Copper Alloys
Excellent
Less than or equal to 0.2
Less than or equal to 0.1
Good
0.2 to 0.5
0.1 to 0.25
Moderate
0.5 to 0.8
0.25 to 0.35
Poor
0.8 to 1
0.35 to 0.5
Very Poor to Severe
Greater than or equal to 1
Greater than or equal to 0.5

2. Onsite Water Treatment Service Requirements: This is a full-service contract. Contractor must provide all chemicals, materials, equipment, and labor sufficient to maintain the treatment program at the expected level of performance. The contractor must provide a detailed report on the condition of the treatment program, water quality, and usage, etc. in all treated areas for every service visit.

The purpose of the service visits is to prevent potential problems from arising that may reduce equipment efficiency and/or result in equipment damage. All scheduled visits must be scheduled by contractor in advance and should be during normal business working hours.

A. Automation requirements:

(1) Scale, dispersion, pH, and microbio control should be achieved with the use of a cooling tower controller. A new controller must be installed by the contractor with the latest water treatment technology and left in place during the contract, but must be maintained by the water treatment contractor & must be returned to the contractor upon termination of the contract.

(2) The system must continuously monitor and adjust the product level of the scale and corrosion inhibitor proposed by the service plan submitted in the contractor’s proposal.

(3) The system must control the proposed water treatment program with minimal operator attention and adjustments

(4) Graphical reporting of the chemical dosage levels in the condenser water systems (scale/corrosion inhibitor)

(5) The system must be capable of compensating for load swings, makeup and blowdown variations (i.e. overflow situations and/or unmetered blowdown).

(6) The system must be capable of controlling chemical levels regardless of the number and/or control of the cycles of concentration

(7) The system must be capable of product dosage to +/- 5.0 ppm.

(8) The Contractor must submit the controller’s specification sheet and operations manual with the quote as well as a minimum of three (3) references of similar healthcare facilities using this technology serviced by the contractor’s local service team.

(9) If such controller is not quoted, the exception to the automation must be outlined. Describe how the automation will be programmed and the expectations of testing and adjustment frequency. Describe how the program will control the scale and corrosion inhibitor within +/- 5% of the set point.

(10) Biocide Feed Control: The Cooling Tower Conductivity Controller’s dual biocide timers should both be used for the application of both the bleach (oxidizing) and & 50% Glutaraldehyde (non-oxidizing). Oxidizing biocide feed should be slug fed a minimum of 3 times per week. Non-Oxidizing biocide feed should be slug fed on a weekly basis. Lockout timers are required to prevent bleed immediately after biocide feed. Each biocide dose / slug must be within the parameters on the biocide label as per EPA/FIFRA requirements.

B. Weekly service tasks:

Service visits are required weekly, and during each visit the following minimum services must be performed:

(1) Perform boiler plant, chiller plant, and closed loop system tests.

(2) Check all controllers, pumps, blowdown valves, etc. for proper operation and check piping for any leaks and/or replacement needs.

(3) Review tests with Operations Personnel for training and the expected actions based on the test results.

(4) Review weekly microbio dipslides performed by PVAHCS.

(5) Prepare a written report detailing the status of the water tests, personnel training and inventory of materials.

C. General service requirements & testing:

All tests expected to be performed weekly unless otherwise noted.

(1) City Water must be tested for:

a. Conductivity

b. Total Hardness

c. Calcium Hardness

d. M-Alkalinity (monthly)

(2) Water Softener must be tested for:

a. Conductivity

b. Total Hardness (low level)

c. Chloride Test (monthly, Feed water/Soft Water for an accurate percentage of condensate return)

(3) Online Boiler Water must be tested for:

a. Neutralized Conductivity

b. Hydroxide Alkalinity / OH-Alkalinity

c. Sulfite

d. Boiler Internal Treatment (polymer)

(4) Offline Boiler Water must be tested for:

a. Neutralized Conductivity

b. Sulfite (high range)

c. pH or Hydroxide Alkalinity / OH-Alkalinity

(5) Feed Water must be tested for:

a. Conductivity

b. pH

c. Total Hardness (low level)

d. Chloride Test (monthly, Feed water/Soft Water for an accurate percentage of condensate return)

(6) Return Condensate must be tested for:

a. Conductivity

b. pH

c. Total Hardness (low level)

d. Iron (low level, monthly)

e. Dissolved Oxygen Testing (monthly) Testing Station provided & installed by contractor

(7) Condenser Water must be tested for:

a. Conductivity

b. pH

c. Scale & Corrosion Inhibitor

d. Free Chlorine Biocide

e. Total Aerobic Bacteria (weekly)

f. Iron (monthly)

g. Copper (monthly)

h. Differential Microbio Analysis (quarterly)

i. Sessile Microbio Laboratory Analysis (quarterly) by swabbing the copper coupon twice per side and performed in conjunction with coupon analyses

j. Corrosion Coupon Laboratory Analysis (quarterly)

k. Azole (quarterly)

(8) Closed Loops (CHW, TES, and HHW) must be tested for:

a. Conductivity

b. Corrosion Inhibitor (nitrite until <100 ppm & organic phosphate)

c. Chilled Loop Total Aerobic Bacteria (weekly by PVAHCS)

d. HHW Total Aerobic Bacteria (monthly by PVAHCS)

e. Iron (monthly)

f. Copper (quarterly)

g. Differential Microbio Analysis (quarterly)

h. Sessile Microbio Laboratory Analysis (quarterly) by swabbing the copper coupon twice per side and performed in conjunction with coupon analyses

i. Corrosion Coupon Laboratory Analysis (quarterly)

Results of test are to be discussed with Plant Supervisor and a written report is to be emailed to the Plant Supervisor for each test performed. The report will be provided upon completion.

D. Annual service tasks:

(1) Contractor must be present during boiler and chiller inspections to observe interior of the vessels. COR will provide date and time.

(2) Document all equipment inspections with external photographs as well as photos of equipment internals (i.e. boroscope inspections). It is expected that if the PVAHCS provides 2-week notice, a boroscope will be available for inspection and a formal report with photos must be provided subsequent to the inspection.

(3) Conduct water softener elution studies and Rexnord dissolved oxygen tests. The contractor must provide a Dissolved Oxygen sampling test kit with ampoules for 0-100 ppb.

E. Training service requirements:

(1) In order to ensure that plant personnel are adequately trained, the contractor must conduct a comprehensive evaluation of each operator involved in testing and training to ensure the program is implemented properly. Training must be conducted quarterly as a review or earlier if there are any Shift-to-shift discrepancies during the first 90 days of the agreement on all personnel present in the plant at the time of the visit.

(2) Contractor must develop a comprehensive operator’s manual for each of the systems to be treated and this manual must be used in the training program.

(3) Contractor must have a checklist for certification that each operator trained is competent in testing, adjustments, water chemistry fundamentals, etc. The check list must be reviewed in a practical “test” with the operators by a different member of the contractor’s organization to certify/qualify each operator’s competency. Each operator must have a dated checklist to be maintained by the contractor.

F. Chemical requirements:

(1) All chemical products must be approved by the Food and Drug Administration and there must be no objection by that agency to the use of the chemicals for the treating of boiler water where steam contacts food or food products. Chemicals must be delivered to the VA Utility Plant and placed in the contractor provided portable feed containers by the contractor. Plant personnel must not handle the chemicals. MSDS must be provided on all chemical products and must be attached on each bulk tank.

(2) Cooling tower compounds must be liquid form and must be injected into a common header or the sump. PVAHCS owns chemical injection pumps and chemical tubing, but the contractor is to both repair and provide pump repair kits (liquid ends) and additional chemical tubing to maintain the pumps if appropriate. The contractor is expected to provide proper troubleshooting and due diligence before recommending any chemical pump or other equipment replacement. PVAHCS will purchase replacement equipment after proper evaluation of the failed equipment has been performed and must be approved by plant management.

(3) Condenser Water Scale & Corrosion Inhibitor: The inhibitor must be a multi-functional blend of the following:

a. Phosphoric Acid (steel corrosion inhibitor)

b. Benzotriazole/Tolyltriazole [BZT/TT] (copper corrosion inhib.)

c. High Stress Polymer (dispersant & stabilizer)

d. Organic Phosphate that does not revert to orthophosphate (corrosion & scale Inhibitor)

e. Inert Chemical Tracer (testing & monitoring)

(4) Condenser Water Oxidizing Biocide (12.5% bleach): Because PVAHCS uses pH adjustment, the oxidizing biocide must be bleach. The contractor must supply bleach through bulk fills through only closed connections. Under no circumstances may bleach be pumped or poured from a drum into the base tank. The base tank may be owned/supplied by a commodity chemical supplier, but the contractor will be responsible for the chemical fills and cost of the material.

(5) Condenser Water Non-Oxidizing Biocide: Isothiazolin is the non-oxidizing biocide of choice, but we understand that there may be certain instances where other non-oxidizers may be used to supplement the condenser or evaporator water treatment’s biocide program. Other non-oxidizing biocides must be approved by PVAHCS prior to use.

(6) Condenser water pH Control (93% sulfuric acid): The contractor must supply acid through bulk fills through only closed connections. Under no circumstances may acid be pumped or poured from a drum into the base tank. The base tank may be owned/supplied by a commodity chemical supplier, but the contractor will be responsible for the chemical fills and cost of the material.

(7) Closed Loop Corrosion Inhibitor: Previously nitrites were used in the system. Currently Non-nitrite, non-molybdate is used as the closed loop corrosion inhibitors. PVAHCS does not expect the contractor to re-charge the loop initially but is required to test both the old (nitrite) and new inhibitor chemistry until the nitrite is <100 ppm.

(8) The closed loop inhibitor must contain:

a. An organic phosphonate that does not revert to orthophosphate or silicate (steel corrosion inhibitor)

b. A high stress polymer (dispersion & stabilization)

c. Azole (copper corrosion inhibition)

d. Inert tracer (troubleshooting and leak detection) Note: Silicate corrosion inhibitors are not acceptable because they do not offer cathodic protection. No heavy metal corrosion inhibitors (ex. molybdate) will be used.

(9) Closed Loop Biocide: Due to its acute health hazard, Isothiazolin (a sensitizer) must not be used unless plant training is conducted annually and signage exceeding the “legal requirements” of OSHA/FIFRA requirements is hung to identify to the hazard clearly to even casual visitors to the plant. The acute sensitizer must be handled with extreme care and all plant personnel must be trained to understand the hazard.

(10) The PVAHCS prefers chlorine dioxide (ClO2) as the closed chilled and thermal storage biocide of choice. The main chilled water loop previously contained nitrite, so chlorine dioxide must not be used in the main chilled water loop until the nitrite level is <100 ppm. The thermal storage system must not be on nitrite and ClO2 can be used immediately.

(11) Isothiazolin and Glutaraldehyde are the non-oxidizing biocides of choice, but the ability to provide ClO2 dosing is heavily weighted and preferred.

(12) Closed loop biocides should be dosed a minimum of four times per year on both the Main Chilled Loop and the Thermal Storage System.

(13) Boiler Internal Treatment (all polymer): The boiler internal treatment must be an all-polymer program. Phosphate, polyphosphate, organophosphate, chelant, phosphate/chelant blended programs must not be proposed and are not an acceptable boiler internal treatment chemistry.

(14) Boiler Oxygen Scavenger (sulfite): The oxygen scavenger must be catalyzed sulfite in liquid form. Powdered sulfite must not be proposed.

(15) Boiler Condensate Treatment (amine): The amine must be a blend of three different volatility amines to ensure protection of the various legs of the condensate return system. The amine must be a blend of:

a. Cyclohexylamine

b. Diethylaminoethanol

c. Morpholine

(16) Boiler water treatment must be of the liquid form. PVAHCS owns chemical injection pumps and chemical tubing, but the contractor is to both repair and provide pump repair kits (liquid ends) and additional chemical tubing to maintain the pumps if appropriate. The contractor is expected to provide proper troubleshooting and due diligence before recommending any chemical pump or other equipment replacement. PVAHCS will purchase replacement equipment after proper evaluation of the failed equipment has been performed and must be approved by plant management.

(17) Volatile Oxygen Scavengers (VOS) must be fed similar to the amine, recommendations from the Contractor and determination by Plant Supervisor as to the best way to inject.

G. Water chemistry operational parameters:

(1) Boiler Water:

a. Neutralized Conductivity4,000 - 4,500 mmho
b. Total Alkalinity100 - 800 ppm
c. Suspended Solids< 500 ppm
d. Polymer600-800 ppm (unless other documentation is provided for your appropriate range)
e. Residual Sulfite30-60 ppm

(2) Feedwater:

a. Conductivity200-400 mmho (record)
b. Hardness< 1.0 ppm
c. pH8.5 - 9.5
d. Chloride Test (monthly)record

e. Chloride condensate return percentage calculation (monthly, FW/Soft chlorides)

(3) Condensate Return:

a. pH range8.2 - 8.8
b. Conductivity< 100 mmho (record)
c. Hardness< 0.1 ppm
d. Condensate Return> 75 % (record)

(4) Condenser water:

a. “M” Alkalinity range (with acid)50-150 ppm
b. Conductivity Levels4.5- 5.5 cycles
c. Calcium Hardness500 - 800 ppm
d. Free Chlorine Residual0.2 – 0.5 ppm

e. Scale & corrosion inhibitor control expected +/- 5% variance from target (Ex. Target = 2.0 ppm Moly; Control range = 1.9 – 2.1 ppm)

(5) Closed loop cooling and heating hot water:

a. Conductivityrecord
b. Non-Reverting Organic Phosphate80-120 ppm
c. Total Azole> 10 ppm
d. Inert TraerTBD, contractor specific

H. Chemical storage, handling and delivery requirements:

We are concerned with chemical storage, drum handling and disposal at our site. To reduce our risk associated with drum handling, we prefer all products delivered to the point of feed. Mild steel drums of any size >5-gallon pails are not acceptable. 5-gallon pails are not acceptable for biocides. To eliminate chemical handling by site personnel, all products must be capable of being fed neat (without dilution or contact) by our operators or your service professionals (no manual dilution onsite will be accepted). The following is required regarding chemical delivery and storage.

(1) The contractor must provide a comprehensive delivery program that removes the burden of chemical deliveries and handling. This program utilizes either plastic or stainless steel mini-bulk tanks as the point of use container.

(2) The point of use container must be more than a double walled container and must serve as appropriate spill containment as well. The spill containment must be able to contain a minimum of 150% of the volume of the base tank within.

(3) All storage tanks (except bleach and acid) must have a fixed bottom drain/suction capabilities to ensure positive, flooded suction for chemical pumping and injection as well as to allow complete emptying of the vessel without turning it on its side. Contractor will retain ownership of the chemical storage tanks.

(4) Chemical transport equipment must comply with DOT requirements for transporting hazardous materials. This includes subcontractor’s acid and bleach deliveries.

(5) Deliveries must be made by chemical handlers who are:

a. Certified in HAZMAT compliance

b. Equipped with PPE on-site for delivery and transfer of chemical.

c. Equipped with items required to handle spills and any unexpected incidents.

d. The government may request evidence of any of the above at any time and may refuse delivery for non-compliance with no cost or impact to the government for refusal.

(6) No empty or full chemical transport equipment is to be stored on-site.

(7) If chemical transfers into the base tank are to be made by either hand-filling (pouring 5 gallon pails into base tank) or via unsealed chemical transfer pumps, a formal written base tank filling safety protocol must be supplied with this proposal for the. If this is the contractor’s only option for bulk tank deliveries, disclose this information for proper evaluation purposes.

(8) Chemical inventory level sensors must be installed to record accurate inventory within +/- 0.5 gallons without exposing personnel to an open drum PVAHCS to evaluate this delivery method for consideration

(9) inventory inspection.

(10) Base tanks must have a shelf for each pump within the area of the containment basin to catch potential chemical pump leaks. Each pump must be permanently mounted to the shelf without penetrating the base tank or containment basin.

(11) Base tanks must be sized appropriately and must not run below 15% full at any time to avoid interruption to the water treatment program.

(12) Closed/sealed chemical transporters are highly recommended. If used, 5, 15, 30- & 55-gallon drums must be removed from the site after triple rinsing.

(13) Base tanks and any drum brought onsite must both be labeled per OSHA guidelines. All biocides must adhere to the EPA’s FIFRA requirements and labeling practices.

(14) The PVAHCS is satisfied with the bleach and acid delivery and installation. We recommend the acid and bleach be delivered in a manner similar to the current program. The contractor will be responsible for ordering and supplying both 12.5% sodium hypochlorite and 93% sulfuric acid within the contract. Absolutely no bleach or acid drums or transporters must be left onsite or shipped to the site without immediate transfer into the containment basin by a certified HAZMAT material handler. Fills must occur only through a closed connection (ex. Cam lock fitting and permanently fixed hose)

I. Laboratory analysis requirements: Contractor must have an in-house laboratory or access to a contract laboratory capable of assisting in solving challenges that arise which may cause loss of efficiency or equipment damage. When samples are taken for resolution of problem or routine analyses (differential microbio analysis, coupons, etc.), the results must be supplied, and a written report delivered to the PVAHCS within three weeks. Contractor must provide the name and address of your in-house laboratory.

J. Emergency Services and Additional Services: Upon request, the contractor must provide a quote for any additional chemistry, equipment or services needed to:

(1) Address unexpected emergencies

(2) Recharge any system

(3) Perform additional laboratory testing outside of this scope

(4) Perform special studies not outlined in this scope

3. Cooling Tower and Sump Pit Cleanings with Disinfection:

A. Health and Safety: All of the contractor's service technicians must be respirator fit-tested annually. They also must be formally trained on all aspects of Fall Prevention, Confined Space Entry, and Personal Protective Equipment. Safety is a concern for the PVAHCS and we expect the contractor to be able to supply documentation of training immediately if requested.

B. OSHA Compliance: Cleaning and disinfection must follow Section III, Chapter 7 of the OSHA Technical Manual, Legionnaire’s Disease. This is critical in complying with the OSHA Title 29 USC Section 654, “Each employer shall furnish to each of his employees employment and a place of employment which are free from recognized hazards that are causing or are likely to cause death or serious physical harm to his employees”. The contractor must follow the cleaning and disinfection guidelines prescribed to reduce the risk of Legionnaire’s Disease and provide a safer work environment.

C. To follow OSHA recommendations, Cooling towers and Sump Pit must be cleaned and disinfected at least twice per year prior to and after peak cooling systems. Typically, this is in April and October.

D. Documentation: All aspects of the Cleaning and Disinfection project are to be documented for PVAHCS records. This record is to show the PVAHCS’ diligence and compliance in following the guidelines and recommendations to reduce the risk of waterborne pathogens in your facility.

E. Frequency: Cleanings and disinfections must be scheduled and performed twice yearly.

F. Procedure and PPE: During the cleaning procedure, all contractor employees must wear all required personal protective equipment, including Tivek suits, hardhats, gloves, rubber boots, and respirators with appropriate cartridges. During procedures that require fall prevention measures, harnesses and appropriate equipment must be used. For areas that are considered confined space, whether permit-required or non-permit required, the Cleaning Supervisor must complete a Confined Space Entry form.

(1) Pre-Disinfecting: This step must be done before the mechanical cleaning of the tower as a precursor to the actual cleaning process, and must be facilitated by the contractor’s water treatment representative.

If possible, all cooling tower fans will be OFF, and all recirculation pumps for these systems will be ON. Contractor must initiate a thorough disinfecting of the tower by adding elevated levels of an oxidizing biocide to elevate the free chlorine residual, per OSHA and TS425G recommendations. A biodispersant must also be added to the system to increase the performance of the oxidizing biocide. This procedure is done to break up and remove the organics, bacteria, and slime that are trapped in the fill as well as for personal health and safety reasons of the contractor’s employees entering the cooling tower, as well as patients and employees of the PVAHCS.

(2) Manual Cleaning of Cooling Tower: Isolate and drain each cell for cleaning. PVAHCS engineering staff will assist the contractor in tower isolation and proper lockout tag-out.

The contractor must provide and utilize high-pressure washers to wash the entire internal and external areas, (as available) to remove as much of the dirt, bacteria, and debris as possible and have it collect in the actual tower sump. Once the majority of the dirt and debris has collected in the tower sump, the contractor must clean the entire sump and remove the existing debris for disposal.

(3) Final Disinfecting and Passivation of Complete System: After each tower cell is completely refilled, the contractor’s water treatment representative must again disinfect the system, per step 1. Once completed, the water treatment program can be resumed, and re-passivation of the metal surfaces initiated (because using an oxidizing biocide increases the potential for flash corrosion).

(4) Cleaning and disinfection of Sump Pit: The contractor must provide and utilize high-pressure washers to wash the entire internal and external areas, (as available) to remove as much of the dirt, bacteria, and debris as possible and have it collect in the sump pit. Once the majority of the dirt and debris has collected in the sump, the contractor must clean the entire sump and remove the existing debris for contractor disposal.

(5) Documentation and Certification: The contractor must provide documentation and certification of professional cleaning and disinfecting per The OSHA Technical Manual. The documentation must include the pre-cleaning inspection report, the documentation of the procedures, as well as a completion certificate for your records.

G. PVAHCS will provide the following to facilitate the cleanings:

(1) Isolate the cooling tower (cells) and/ or turn off the chillers before cleaning if applicable.

(2) Remove and clean any system strainers.

(3) Provide a 25 amp, 110V, 60 Hz single-phase electrical supply near to the working area.

(4) Access to water and electricity for any cleaning equipment.

(5) Free, safe and unrestricted access to the cooling tower(s) and associated pipe work for the duration of the cleaning.

(6) A responsible engineering contact that is fully conversant with the system and its operation.

(7) Parking and off-loading facilities near the cooling towers to be cleaned.

(8) PVAHCS’s Lock-out/Tag-out procedures in accordance with OSHA guidelines are addressed, and responsible operators will be available to facilitate all staff and onsite contractors to follow the procedures.

(9) Updates on any operational changes or requirements of the facility that may affect the contractor’s ability to conduct cleaning and disinfections in a safe and effective manner.

(10) Access to dumpsters for disposal of permitted debris

Conformance Standards:

A. Contract service must ensure that the equipment functions in conformance with the latest published edition of the applicable standards, related to licensing for performance. Standards must include but are not limited to: NFPA-99, UL, OSHA, VA, CDRH, etc. and the “Manufacturer's Performance standards/ specifications” as used when the equipment was originally procured and that any upgrades/updates must meet the stated standards/specifications.

Hours of Coverage:

A. Normal hours of coverage are Monday through Friday from 6:00 am to 4:00 pm Arizona time (no daylight savings). All service/repairs should be performed during normal hours of coverage unless requested or approved by the COR.

B. Preventive maintenance must be performed as scheduled by the COR. Preventive maintenance may be performed during normal hours of coverage.

C. Work performed outside the normal hours of coverage must be approved by the COR. Funding for services that are outside the normal coverage hours or on holidays, where additional compensation is expected, must have approved funding prior to any additional charged being accrued.

NOTE: Hardware/software update/upgrade installations must be scheduled and performed during normal hours of coverage at no additional charge to the government.

D. Federal Holidays observed by PVAHCS are:

https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/

IDENTIFICATION, PARKING, SMOKING, AND VA REGULATIONS:

A. The Contractor's FSEs must wear visible identification issued by PVAHCS Police Section at all times while on the premises of PVAHCS. It is the responsibility of the Contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Section. PVAHCS will not invalidate or make reimbursement for parking violations of the Contractor under any conditions. Smoking is prohibited inside any buildings at PVAHCS. Possession of weapons is prohibited. Enclosed containers, including tool kits, are subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.

B. Contractor personnel must comply must all PVAHCS policies regarding health and security measures to enter PVAHCS facility. Measures may include but are not limited to answering health screening questions, having temperature taken, or any other measures PVAHCS may use to maintain health and safety of public entering facility.

Information Security:

A. In accordance with Appendix A, Handbook 6500.6 Checklist blocks 7, the C&A requirements do not apply to this requirement, and Security Accreditation Package is not required. The nature of this requirement is technical; however, there is no information to be protected.

Other Pertinent Information or Special Considerations:

A. Delivery of preventative maintenance will be coordinated through the Operations and Maintenance Office located at:

Phoenix Arizona VA Health Care System (644) 650 E. Indian School Road Phoenix, Arizona 85012-1839 Point of Contact – To Be Determined Period of Performance:

A. The period of performance will be for one base year PLUS up to four (4) option years.

36C25821Q0062

Page 1 of Page 1 of

SECTION C - CONTRACT CLAUSES

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (OCT 2018)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of…