36C25820Q0269 0002.docx

DOCX document 24 KB Posted

Attached to
V112--644-Shuttle Bus Services Federal contract opportunity
Solicitation number
36C25820Q0269
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22

About this file

This document contains clarifying questions and answers regarding a solicitation for shuttle bus services. The solicitation seeks proposals to provide two shuttle buses and drivers to transport passengers between the Phoenix Veteran Administration Health Care System main facility and two designated off-site parking lots within a two mile radius. The shuttles must make the roundtrip route within 15 minutes and have two buses running continuously during peak hours from 10:00am to 2:00pm, with a third bus on standby if needed. At other times, one bus must run continuously while a second is on standby. Contractors must maintain the shuttles in accordance with CDC guidelines for disinfecting vehicles and limiting capacity to allow for social distancing during the COVID-19 pandemic.

View the file

Other files for this federal contract opportunity

Other files attached to V112--644-Shuttle Bus Services, newest first.
File Type Posted
36C25820Q0269 0004.docx DOCX document
36C25820Q0269 0001.docx DOCX document
36C25820Q0269 0003.docx DOCX document
P09 Attachment Shuttle Services 02.pdf PDF
36C25820Q0269.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) None Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 To all Offerors/Bidders

36C25820Q0269 07-30-2020

X X X

CONTINUATION PAGE

1. In item 2.1 Scope of Work the roundtrip should not exceed 15 minutes. However, the sample schedule provided has each bus making 30 minutes round trips. Can you clarify?

0. 15 minutes is one direction from furthest parking lot to PVAHCS or reverse route. A complete circuit is reasonably 30 minutes. With 2 shuttles running a shuttle is expected at each stop every 15 minutes.

1. 2.5.7. Shuttle Services from 10:00am to 2:00pm says 1 shuttle shall be required to make the 15 minute loop with an additional shuttle available as needed. The schedule provided has both shuttles running all day. Also, Section 2.5.4.1 says 2 need to be available at all times. Can you clarify?

1. Shuttle services require 2 shuttles at all times during peak hours with a 3rd shuttle on standby if needed to prevent a backup of passengers at any stop.

1. During off peak hours 1 shuttle shall maintain a continuous route with a 2nd shuttle on stand-by if needed to prevent a backup of passengers at any stop.

1. The only reference given to a 3rd shuttle running at any time is during the Peak services where it says we should be able to add an additional shuttle as needed to meet passenger demand. Do you require a 3rd shuttle to be running?

2. A 3rd shuttle may be needed to handle increased passenger load during peak hours, or as a stand-by if a shuttle is down for maintenance.

1. With social distancing are you going to require the buses only be at 50% capacity?

3. Contractor shall maintain/operate shuttles in accordance with current CDC guidelines. https://www.cdc.gov/coronavirus/2019-ncov/community/organizations/disinfecting-transport-vehicles.html

File details come from the government source that posted it. Updated .