Revised RFIs Log as of 8-14-2020 .pdf
PDF 499 KB Posted
- Attached to
- RENOVATE BLDG. 126 OP BASEMENT FOR ADMIN OFFICES Federal contract opportunity
- Solicitation number
- 36C25820B0019
About this file
This document contains a log of questions and answers related to a solicitation for renovations to Building 126 at the VA Medical Center in Long Beach, California. The solicitation involves renovating the basement of Building 126 for administrative offices and correcting facility condition assessment deficiencies. Key project details include renovating restrooms, corridors, installing new mechanical equipment, replacing feeders from the transmission substation, and hiring commissioning and third-party firestopping inspectors. The document clarifies specifications around safety roles, access routes, phasing plans, finishes, telecommunications cabling quantities, discontinued flooring products, and the scope of work inside elevators and the elevator penthouse.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 600-16-114 _ attendance bidders sheet 7 30 2020.pdf | ||
| RFIs Questions and Answers Log 8-12-2020 .pdf | ||
| 36C25820B0019 0004.pdf | ||
| 600-16-114 FINALSPEC-VOL2.pdf | ||
| 36C25820B0019 0003.pdf | ||
| 36C25820B0019 0001.pdf | ||
| 36C25820B0019.pdf | ||
| OPM Form 306.pdf | ||
| RFI Form.doc | DOC document | |
| 600-14-114 SPECS and DWGs 2.zip | ZIP file | |
| PIV Office Fingerprint Request Form.pdf | ||
| 7.31.2019 Matrix for CFMs Contractors PIV Process.sc.pdf | ||
| 600-14-114 SPECS Folder.zip | ZIP file | |
| 600-16-114 APPENDIX-CD.pdf | ||
| BIDSET_VOL-1.pdf | ||
| VA Form 0710.pdf | ||
| Contractor Background Investigation Request Form.pdf | ||
| 600-15-136 SPECS Folder.zip | ZIP file | |
| Self Certification.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information (RFI) Log Project 600-16-114|600-15-136
126OP Renovate Bldg 126 OP Basement to Admin Offices Long Beach, California VA Health Care System (600)
RFI
Number
Date Question Answer
Date Question Answer
001 7/30/2020
Reference: RFI deadline
The VA issued Amendment 0001 on 07/29/20 that extended the Bid Date to August 28, 2020. Will the VA also extend the RFI Deadline currently set at August 5, 2020? This RFI date is less than a week after the Site Visit for a large project.
Amendment 0002 is skipped.
This amendment 0003 is provided to responds to RFI 001 The RFI's due date is extended to August
07, 2020 @ 1:00 PM
All amendments must be acknowledged on the solicitation
ALL OTHER REQUIREMENTS REMAIN
AS STATED IN THE SOLICITATION.
002 7/30/2020
Keynote 2 on sheet A-101 states to replace the flooring in Elevators with Resilient Sheet Flooring. Keynote 2 on sheet AD-101 states to replace the flooring in Elevators with VCT.
Will the VA please specify which flooring is to be installed in the elevators?
For Elevator floor, install LVT-5, refer to 600-16-114 VOLUME -1 Sheet AF-101 and Specifications #09 06 00.
SRD Architects Inc.
8/4/2020
003 7/31/2020
Specification Section 01 32 16.15 Part 1.3 Contractors Consultant seems to indicate that the VA is requiring the contractor to use a third party scheduling consultant. Will the VA please verify that a member of the project team may be used to build and maintain the project schedule and a third-party scheduler is not required?
Contractor can use in-house scheduler, provided the schedule is approved and accepted by VA.
004 7/31/2020
Will the VA clarify whether the Site Superintendent, if duly qualified, may also serve in the roles of the Site Safety & Health Officer and as the Contractor Quality Control manager, or will a separate individual be required for either of those two roles?
Assuming one person is qualified to perform the roles of Superintendent, Quality Control Manager and Site safety Officer, does the VA expect the roles of Superintendent, Quality Control Manger and Site Safety Officer to be filled by one person, two people or three different people?
Provide two separate persons to fill the roles of superintendent & SSHO. The contractual general contractor’s (GC) Site Safety & Health Officer (SSHO) is acceptable, provided performances of safety inspection duties meets the OSHA definition requirement of a competent person, and where appropriate, up to a Qualified Person;
where applicable (ex: fall protection design, etc.). In addition to minimum OSHA 30 hour training requirements, 5 yr. req., and our local best policy; to include providing COR/Safety, copies of safety inspections performed.
Please see attached inspections form the committee will utilize for reference. Being that were not going to enforce the CSP, I agree the separation of the roles performed by the SSHO and Superintendent remain separate. The final decision authority is on the resident engineer/COR, on behalf of the
CO.
1.8. A. The designated Prime Contractor SSHO
must meet the requirements of all applicable OSHA standards and be capable (through training, experience, and qualifications) of ensuring that the requirements of 29 CFR
1926.16 and other appropriate Federal, State and local requirements are met for the project.
As a minimum the SSHO must have completed the OSHA 30-hour Construction Safety class and have five (5) years of construction industry safety experience or three (3) years if he/she possesses a Certified Safety Professional (CSP) or certified Construction Safety
7/31/2020
Specification section 01 74 19 makes reference to LEED record keeping and LEED Template. Is the government going to be pursuing a LEED certifications? if yes what level of certifications are they pursuing? If yes has it been registered and is there going to be any cost/fees that the contractor is going to be expected to pay to the LEED Council? If yes will the VA please provide the project score card?
Records shall be kept in accordance with the LEED Reference Guide and LEED Template, but VA may not pursue LEED Certification
SRD Architects Inc.
8/4/2020
006 7/31/2020
Spec section 01 91 00 1.8.C states that the commissioning agent will be hired by the VA under a separate contract, please confirm that the hiring of the commissioning agent is the responsibility of the VA.
Contractor to hire commissioning agent per spec #01 91 00 article 1.11 and approved by VA.
007 7/31/2020
Specification Section 07 84 00 Firestopping, Part 1.5 appears to require all firestopping to be installed by an “FM Global approved firm” or that meets UL’s “Qualified Firestop Contractor Program Requirements”. The specification section also appears to require a 3rd party inspection of all firestopping installed under this contract. Will the VA please confirm that this requirement for installation and 3rd party inspection will be enforced on this contract? Or will the contractor installing the
Yes, the contractor shall hire a third party inspection of all firestopping per specs
Date Question Answer penetration be allowed to install fire stopping?
7/31/2020
Since some systems are proprietary or are only allowed to be worked on by specific contractors will the VA please provide the VA preferred vendor who has the maintenance contract or who must do the final tie in and programming or can any certified installer do the tie in and programming:
a. Fire Alarm
b. DDC
c. Access Controls
d. CCTV
e. Nurse Call
Refer to Drawing M402 for Control Diagram.
Existing DDC System is Johnson Controls Metasys System (JCI). New Thermostat and Controls by JCI.
Access Control - Vector USA is used for Access control. Provide new one card reader to match existing and connect to existing system. Contractor to hire the contractors to do final tie in and programming
Existing Nurse call system – Responder 4
DDC: Johnsons Control, Metasys System.
Programming will be done Johnson Control- Phone No . 561-760-1914
Fire Alarm is EST3 by Hirsh.
Call Cal Building Systems at 14-993-9650, Contact: John Haffler and programing will be done by Cal Building. Contractor can hire Cal building for programming of the fire Alarm system
009 7/31/2020
Does this facility have a maintenance & operations standard that specifies what brand of door hardware, electrical, plumbing, and mechanical equipment is preferred or is a facility standard?
Door Hardware: Schlage, large primus interchangeable locks Existing DDC System is Johnson Controls Metasys System (JCI) and this is Facility standard.
Phone No . 561-760-1914 Access controls- Hirsh RP40 and RFK 40 readers
010 7/31/2020
Reference: Fire Sprinklers Will it be required for the contractor to relocate the sprinkler heads to within 18" of the ceiling upon demolition of
Comply with Fire Sprinkler requirements per NFPA code, GI-004 and construction sequence note #12 on AD-101 during construction and for final installation.
Date Question Answer the acoustical/hard lid ceiling and maintain sprinklers in such a manner until the new ceiling is installed?
Contractor to coordinate with VA for additional requirements.
011 8/3/2020
Reference: roof Access Dwg._ Bid Set Volume II MH- BIDSET_VOL II calls for new mechanical equipment in the elevator penthouse. During the site visit access to the elevator penthouse was shown to be through a newly remodeled Eye Clinic, access appeared to be difficult as it took about 45 minutes to gain access. Can the VA confirm that there is a more direct and easy route for gaining access for workers, tools and equipment?
Access will be through the Loading dock , Bldg 1 thru the Connecting corridor I Bldg 126 thru 126 OP Basement . Take the Elevators at Bldg 126 OP Basement to the third floor. All materials to the elevator penthouse will be done after hours.
012 8/3/2020
Reference:
BIDSET_VOL II Mark ups Drawing: BIDSET_VOL II P-002
Please confirm that all red mark ups shown on BIDSET_VOL II Plumbing sheets are referring the reader to BIDSET_VOL I even in cases where the note does not include the project number and volume number such as shown on sheet P-002 and all the other plumbing sheets.
Please confirm that the red mark ups on the Plumbing sheets in BIDSET_VOL II are included in the scope of work of VOL II and are not excluded
All red mark on BIDSET_VOL II refer to
BIDSET_VOL I.
All read mark in BIDSET_VOL II are included in the scope of work.
8/6/2020
Date Question Answer
Reference: BIDSET_VOL I Existing furniture Drawing BIDSET_VOL
During the site visit it was noted that there is existing furniture, trash and hospital supplies.
Will the VA be removing these items prior to turning over the space to the contractor? If the contractor is responsible for removing furniture can the VA quantify how much is to be salvaged and turned over to the VA and how much is to be disposed of by the contractor?
VA will remove all existing furniture and materiel management supplies
All other left will be removed by GC Either send to trash and or to VA's recycle area per VA's direction.
Reference: BIDSET_VOL I Sequence Dwgs. BIDSET_VOL I AD-101
Sheet AD-101 addresses sequencing of the work.
Restroom remodel is in sequence II. Will the contractor need to maintain public access to the restrooms during Sequence I and III? If Sequence I is to remodel the north section and the south section at the same time, would it not be more efficient and less costly to remodel the two restrooms at the same time the south section is being renovated?
For Sequence III Corridors, please confirm which corridors are included, CC-4, CC-2 or CC-9? Is the elevator lobby included in sequence III?
Contractor to submit alterative phasing plan for VA review and approval during construction. The existing two restrooms do not need to maintain public access during construction.
For sequence III corridors include CC-2, CC3, CC-4, OP-00 and elevator. CC-9 belongs to sequence I.
Date Question Answer
Can the VA provide a plan showing their expected boundaries of each sequence?
015 8/5/2020
Reference: Specifications
Since there are two separate sets of specifications from two different Design Teams, how will the VA wish the contractor to proceed where specification sections are in both specification books? Which specification book will rule over the other in the case that there are conflicts?
Use 600-16-114 specifications as the primary specs, and it supersedes the 600- 15-136 specs when there are differences.
016 8/5/2020
Reference: New Feeder Drawing- E-201 note 14, E202 note 1 Sheet E-201 in BIDSET_VOL II Key Note 14 requires the contractor to replace the existing feeders A1 and A2 from the existing transmission substation located in building B-
148. Can the VA please provide the feeder size and rating for the medium voltage replacement?
For fair bidding purposes can the VA please provide the total footage of cable replacement for A1 and A2?
Can the VA please provide the number of pull boxes between the basement of bldg. 126 and 148?
1.The feeder size 3#2/0 & 1#2 15KV 133% insulation EPR cables or to match existing.
2.Refer to the Electrical Site Plan ES101 for the total footage of cable replacement for feeders A1 and A2.
3.In the absence of As-built drawings, the number of pull boxes (underground and exposed) between Bldgs. 148 and 126 is assumed to be 4. Actual number of pull boxes shall be coordinated with Electric Shop 4.Refer to Electrical Site Plan ES101
Romeo Canave PBS 8-6-2020
Date Question Answer
Will the VA please provide the distances between pull boxes from bldg. 126 and 148?
017 8/5/2020
Reference: Backing Material Drawings: BIDSET_VOL I AE- 506 detail F9
Detail F9 on sheet AE-505 shows a 6” 16 GA unpunched steel track for in wall backing.
Will the VA accept 6” flat strap in lieu of the 6” 16 GA track for in wall backing?
6” x 16 GA flat strap is acceptable with filler strips, per detail F9/AE-506.
018 8/5/2020
Reference: ACT-3 Drawings: AE111 & AF-601
L Sheet AE -111 shows 3 types of Acoustical Ceiling Tile, ACT- 3 is listed as a 2’x8’ grid & tile, however on sheet AF-601 ACT- 3 is not listed nor shown in any rooms. Please confirm there is not ACT-3 within the scope of this project
ACT-3 is removed from the project. Sheet AF-601 is accurate.
019 8/5/2020
Reference: Finish Schedule Drawings: AD-111, AE-112 &
AF-601
Sheet AD -111 Keynote 1 shows ACT being removed north of grid line 6.2, sheet AE- 112 shows new ceiling tile in this same area. These areas are north of column line 6.2 are not included in the finish schedule on sheet AF-601.
What additional finishes if any will be applied to this area? Are the existing offices to be repainted and receive new flooring?
For ceiling finish, refer to AE-112. There is no flooring nor interior paint scope of work for this area.
020 8/5/2020
Reference: Data/Voice Cables Drawings: BIDSET_VOL I sheet
EE-002
The symbols list on sheet EE- 002 for the symbol that represents Computer system conduit run states that the data is Cat 6 and voice is Cat5e.
Please clarify if data cable is to be Cat 6A or regular Cat 6 cable and confirm that Cat5e is wanted for voice.
Use Cat. 6A for voice and data per Specification 27 15 00, VA IT standards for Telecom Spaces and OIT Design Guide Templates
021 8/7/2020
We have been notified by Mannington, the manufacturer of the flooring specified for this project that several specific selections are discontinued and no longer available. The following are discontinued and no longer available:
a. LVT-9
b. LVT-10
c. LVT-11
d. LVT-12
Please provide a new selection for each of the above specified
LVT.
For LVT-9, use the same material as
LVT-1.
For LVT-10, use the same material as
LVT-3
For LVT-11, use the same material as
LVT-1
For LVT-12, use Mannington, the Divergent Collection, style: Fen, Cumulus 13506.
8/10/2020
022 08/7/2020
In regards to the above mentioned project, can you send me a substitute request form in regards to the 10 56 26 (Mobile Storage Shelving Units). We are a manufacturer direct sale and would come in 20% less expensive than Space Saver with a comparable product and warranty.
Space Solutions
BRAND NAME OR EQUAL:
Contractor shall comply with FARs 852.211-73 and 852.214-74 requirements for brand name or equal.
Brand Name or Equal (Aug 1999
(a) If an item in this solicitation is identified as “brand name or equal,” the purchase description reflects the characteristics and level of quality that will satisfy the Government’s needs. The salient physical, functional, or performance characteristics that “equal” products must meet are specified in the solicitation.
(b) To be considered for award, offers of “equal” products, including “equal” products of the brand name manufacturer, must-
(1) Meet the salient physical, functional, or performance characteristic specified in this solicitation;
(2) Clearly identify the item by-
(i) Brand name, if any; and
(ii) Make or model number;
(3) Include descriptive literature such as illustrations, drawings, or a clear reference to previously furnished descriptive data or information available to the Contracting Officer; and
(4) Clearly describe any modifications the offeror plans to make in a product to make it conform to the solicitation requirements. Mark any descriptive material to clearly show the modifications.
(c) The Contracting Officer will evaluate “equal” products on the basis of information furnished by the offeror or identified in the offer and reasonably available to the Contracting Officer. The
Date Question Answer
Contracting Officer is not responsible for locating or obtaining any information not identified in the offer.
(d) Unless the offeror clearly indicates in its offer that the product being offered is an “equal” product, the offeror shall provide the brand name product referenced in the solicitation.
(End of provision)
BIDSET_VOL I sheet EE-002, The combination Telephone/Data outlet symbol states that there are 2 data Cables and one Voice at each drop location.
Sheet EE-404 detail 1 the telecommunications single line diagram note #2 states that there are 3 data and 1 voice per drop location.
Please clarify the correct quantity of data and voice per each drop location.
Provide 3 data and 1 voice at each drop location.
8/10/2020
24 8/7/2020
Reference: Price Cost Schedule Form
PRICES OR COSTS in Section B of the solicitation document has two sections, such as 0001
Each Project has its own funding .These two project needs to be tracked separately.
Date Question Answer
Project No. 600-16-114 and 0002 Project No. 600-15-136.
Is it available to consolidate the two sections into one if there is no specific reason to divide the total price/cost?
25 8/7/2020
Reference: Existing Furniture and Material in Work Area
It was found that exiting furniture and material in rooms of the work area during the site visit.
Please verify the furniture and material in the work area is to be removed by the VA
The VA Wil remove all existing furniture from the site. Logistics will remove all of the boxes in the HAS Area.
26 8/7/2020
Reference: Existing Wall Between OP14 and OP15
A partition wall was found between OP14 and OP15 during the site visit while there is no wall between the rooms on drawing AD101 and AE100.
Please verify that demolition of the wall between OP14 and OP15 is not in the work scope.
The wall between OP14 and OP15 at Grid Line 4.9, is located outside the limit of work.
8/7/2020
27 8/7/2020
Reference: Suspension System and Ceiling Tile Replacement Drawing Volume 1 - AE100 Volume 1 - AE111
Drawing AE100 General Note
no. 2 says that “LIMIT OF WORK-2: Construct all mechanical ducts and diffusers.
Protect the ceiling suspension system, lights and fire sprinklers in place. If required remove and
Follow the work description for general notes #2 on AE-111.
Date Question Answer replace suspension system and ceiling tiles. Modify sprinkler lines and fire sprinkler heads due to new duct work.” while Drawing AE111 General Note
no. 2 says that “LIMIT OF WORK-2: Remove existing lights, ceiling suspension system, ceiling tiles to install new HVAC ducts and install new ceiling suspension system and acoustical ceiling tiles, lights, fire sprinkler, etc.”.
Please clarify the work scope by using one of the work descriptions. If the work description of AE100 is correct, please clarify the quantity of the suspension system and ceiling tiles to be removed and replace for estimate purpose.
28 8/7/2020
Reference: TV Monitors Drawings: Volume 1 - AE-402
Volume 1 - QJ-100
Drawing AE-402 Key Note no.
15 says that “TV monitors by owner. Install support brackets and provide power/data.”, but there are EQ-500 and EQ-600 for monitors in the equipment schedule on Drawing QJ-100.
Please clarify the discrepancy.
Provide TV monitors and support per QJ- 100.
29 8/7/2020
Reference: Sizes of White Marker Board and Bulletin Board Drawing: Volume 1 - AE-422 Volume 1 - QJ-100
Build per AE-422.
Date Question Answer
The sizes of EQ-008 White Marker Board and EQ-011 Bulletin Board are 6’x3’ and 6’x3’ respectively in Equipment Schedule of Drawing AE-422 while they are 72”x48” and 72”x48” respectively in Equipment Schedule of Drawing QJ-100.
Please clarify the discrepancy
Wing
30 8/7/2020
Reference: Interior Elevation B5, D7, F5, and F7
The viewpoints of Interior Elevations B5, D7, F5, and F7 on Drawing AE-423 are not specified in other drawings.
Please indicate the viewpoints on plan.
Refer to D7/AE-402 for interior elevation B5, and C1/AE-402 for interior elevation D7, F5 and F7.
31` 8/7/2020
Reference: Finish Works inside Elevator and Elevator Penthouse Project Scope of Work in Drawing G-001 has the note which says the architectural scope is removed from this project and refer to Volume 1, while Drawing A-101 Key Note 2 calls for flooring work to replace existing VCT floor with new resilient sheet floor in elevator, and Drawing A-103 Note 1 &2 call for existing flooring replacement & interior wall paint inside elevator penthouse. And there is no finish work inside elevator and elevator penthouse in drawing Volume 1.
All scopes listed in VOL-2 (# 600-15-136) remain, expect for the one that is marked-up with red cloud and notes is removed, and refer to VOL-1. The scope of work for elevator flooring and elevator penthouse remain in VOL-2.
Date Question Answer
Please clarify the discrepancy.
32 8/10/2020
Asbestos Inspection Report
The asbestos inspection report of the solicitation documents does not include room OP-39 in ACM Finish Haz Assess Schedule.
Please inform the inspection result of room OP-39.
The Contractor can perform the inspection for this space. Abatement was done on another project.