36C25819Q0465-0002001.pdf
PDF Posted
- Attached to
- 36C25819Q0465 l 664-19-3-5046-0050 l B171B SPS Steril Rm Remediation l 664-19-426 l San Diego (664)
- Solicitation number
- 36C25819Q0465
About this file
36C25819Q0465 0002 S02_ATTACHMENT 04_Site Walk Sign-in Sheet_36C25819C0465.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25819Q0465-0003000.docx | DOCX document | |
| 36C25819Q0465-0003001.pdf | ||
| 36C25819Q0465-0003002.pdf | ||
| 36C25819Q0465-0003000.docx | DOCX document | |
| 36C25819Q0465-0003001.pdf | ||
| 36C25819Q0465-0003002.pdf | ||
| 36C25819Q0465-0002000.docx | DOCX document | |
| 36C25819Q0465-0002000.docx | DOCX document | |
| 36C25819Q0465-0002002.pdf | ||
| 36C25819Q0465-0002001.pdf | ||
| 36C25819Q0465-0002002.pdf | ||
| 36C25819Q0465-0001000.docx | DOCX document | |
| 36C25819Q0465-0001000.docx | DOCX document | |
| 36C25819Q0465-004.pdf | ||
| 36C25819Q0465-003.pdf | ||
| 36C25819Q0465-002.pdf | ||
| 36C25819Q0465-001.docx | DOCX document | |
| 36C25819Q0465-004.pdf | ||
| 36C25819Q0465-002.pdf | ||
| 36C25819Q0465-001.docx | DOCX document | |
| 36C25819Q0465-003.pdf | ||
| 36C25819Q0465-000.docx | DOCX document | |
| 36C25819Q0465-000.docx | DOCX document |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 04
Request for Information (RFI) Log
Part 1 of 1
2 pages
19 September 2019
San Diego, California VA Health Care System (664)
664‐19‐426
B171B SPS Sterilization Room Remediation
CONSTRUCTION
| Request | for | Information | (RFI) | Log |
| B171B | SPS | Sterilization | Room | Remediation |
Construction 18 September 2019
San Diego, California VA Health Care System (664)
RFI
Number
Date Question Answer
001. 16 Sep 2019
Per detailed SOW issued with this solicitation, all walls and ceiling shall be demolished and rebuilt to match existing epoxy paint finishes as the main focus of this remediation project, please confirm.
Yes. Intent is to match existing epoxy paint finish.
002. 16 Sep 2019
It wasn’t made clear during the job walk if the interstitial space directly above the affected project is asbestos free. If so, please state formally
The interstitial space above the project space is asbestos free.
003. 16 Sep 2019
The 20 – calendar day duration may not be enough to carry out all the project requirements. Please check if this can be extended to 30‐45 days.
The period of performance will remain 20 days.