36C25819B0036-008.pdf
PDF Posted
- Solicitation number
- 36C25819B0036
About this file
36C25819B0036 S02_ATTACHMENT 07_ Drawings R3 Arch 6-21 _ 1 of 1 .pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25819B0036-0001001.pdf | ||
| 36C25819B0036-0001002.pdf | ||
| 36C25819B0036-0001000.docx | DOCX document | |
| 36C25819B0036-0001002.pdf | ||
| 36C25819B0036-0001000.docx | DOCX document | |
| 36C25819B0036-0001001.pdf | ||
| 36C25819B0036-004.pdf | ||
| 36C25819B0036-001.docx | DOCX document | |
| 36C25819B0036-005.pdf | ||
| 36C25819B0036-003.pdf | ||
| 36C25819B0036-007.pdf | ||
| 36C25819B0036-002.pdf | ||
| 36C25819B0036-006.pdf | ||
| 36C25819B0036-001.docx | DOCX document | |
| 36C25819B0036-003.pdf | ||
| 36C25819B0036-002.pdf | ||
| 36C25819B0036-007.pdf | ||
| 36C25819B0036-004.pdf | ||
| 36C25819B0036-005.pdf | ||
| 36C25819B0036-008.pdf | ||
| 36C25819B0036-006.pdf | ||
| 36C25819B0036-000.docx | DOCX document | |
| 36C25819B0036-000.docx | DOCX document |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 07
Drawings (R3 Arch 6-21)
Part 1 of 1
22 pages
12 Aug 2019
San Diego, California VA Health Care System (664)
664-17-403
Cart Washer and Air System
CONSTRUCTION
NON-SHRINK GROUT
TOLERANCE
DESIGN CRITERIA
CAST-IN-PLACE CONCRETE GENERALSTRUCTURAL SHEETS ABBREVIATIONS
REINFORCING STEEL
EQUIPMENT ANCHORAGE
POST-INSTALLED ANCHORAGE INTO CONCRETE
EXPANSION BOLTS IN CRACKED (AND UNCRACKED CONCRETE)
STRUCTURAL TESTS AND INSPECTIONS
SG-001
STRUCTURAL GENERAL NOTES
JR DB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
CONSTRUCTION
DEVELOPMENT
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
664-17-403
Project Director
01/26/2018Revisions: Date:
CARTWASHER AND
COMPRESSED AIR UPGRADE
SAN DIEGO, CA
A/E:
IDS GROUP INC.
A/1 PETERS CANYON RD. STE.130
IRVINE, CA, 92606
(949) 387.8500 A/E firm POC
MEP:
Consultant POC
IDS GROUP INC.
A/1 PETERS CANYON RD. STE.130
IRVINE, CA, 92606
(949) 387.8500
0%
C O
N
ST
R U
C
TI
O N
D
EV
EL
O
PM
EN
T D
R
AW
IN
G
R
DESIGN DEVELOPMENT (DD) 12/13/2017
CONSTRUCTION DOCUMENTS (CD) 01/26/2018
CONSTRUCTION DOCUMENTS (CD) - 100% 03/10/2018
CONSTRUCTION DOCUMENTS (CD) - 100% - R1 05/16/2018
CONSTRUCTION DOCUMENTS (CD) - 100% - R2 06/21/2018
CONSTRUCTION DOCUMENTS (CD) - 100% - R3 07/19/2018
SAWCUT (E) CONC SLAB-ON-GRADE,
FOR DIMENSIONS SEE SHEET AD-101.1
(E) CONC SLAB-ON-GRADE
SE-502
PLAN
NORTH
Project Title
SE-102.1
FLOOR PLAN "SECTOR1:
CART WASHER"
JR DB
87.1765.15
K
J.4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
CONSTRUCTION
DEVELOPMENT
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
664-17-403
Project Director
01/26/2018Revisions: Date:
CARTWASHER AND
COMPRESSED AIR UPGRADE
SAN DIEGO, CA
A/E:
IDS GROUP INC.
A/1 PETERS CANYON RD. STE.130
IRVINE, CA, 92606
(949) 387.8500 A/E firm POC
MEP:
Consultant POC
IDS GROUP INC.
A/1 PETERS CANYON RD. STE.130
IRVINE, CA, 92606
(949) 387.8500
0%
C O
N
ST
R U
C
TI
O N
D
EV
EL
O
PM
EN
T D
R
AW
IN
G
R
DESIGN DEVELOPMENT (DD) 12/13/2017
CONSTRUCTION DOCUMENTS (CD) 01/26/2018
CONSTRUCTION DOCUMENTS (CD) - 100% 03/10/2018
CONSTRUCTION DOCUMENTS (CD) - 100% - R1 05/16/2018
CONSTRUCTION DOCUMENTS (CD) - 100% - R2 06/21/2018
CONSTRUCTION DOCUMENTS (CD) - 100% - R3 07/19/2018
CART WASHER PHASING PLAN: PHASE 3
PLAN
NORTH
CART WASHER PHASING PLAN: PHASE 4
87.1765.15
K
J.4
KEY PLAN AREA OF WORK
NORTH
SE-502
SE-502
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
CONSTRUCTION
DEVELOPMENT
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
664-17-403
Project Director
01/26/2018Revisions: Date:
CARTWASHER AND
COMPRESSED AIR UPGRADE
SAN DIEGO, CA
A/E:
IDS GROUP INC.
A/1 PETERS CANYON RD. STE.130
IRVINE, CA, 92606
(949) 387.8500 A/E firm POC
MEP:
Consultant POC
IDS GROUP INC.
A/1 PETERS CANYON RD. STE.130
IRVINE, CA, 92606
(949) 387.8500
0%
C O
N
ST
R U
C
TI
O N
D
EV
EL
O
PM
EN
T D
R
AW
IN
G
R
DESIGN DEVELOPMENT (DD) 12/13/2017
CONSTRUCTION DOCUMENTS (CD) 01/26/2018
CONSTRUCTION DOCUMENTS (CD) - 100% 03/10/2018
CONSTRUCTION DOCUMENTS (CD) - 100% - R1 05/16/2018
CONSTRUCTION DOCUMENTS (CD) - 100% - R2 06/21/2018
CONSTRUCTION DOCUMENTS (CD) - 100% - R3 07/19/2018
PLAN
NORTH
SE-102.2
JR DB
1 2
J.5
J.4
J.3
FLOOR PLAN
"SECTOR2: COMPRESSOR"
K
L
2 2.1 3.2 43
KEY PLAN AREA OF WORK
NORTH
SE-102.2 ENLARGED PARTIAL FLOOR PLAN
3" M
IN
" M
AX
2" CL
R.
U.
O.
N.
3" M
IN
" M
AX
1" C
LR
#4 @ 16" O.C.
AT CURB
CURB WIDTH AS REQD.
4" MIN. & 7" MAX.
#4 CONT.
ALT. BENT
CONC. CURB
CONC. SLAB-ON-GRADE
WHERE OCCURS
CURB WIDTH AS REQD.
8" MIN. & 12" MAX.
#4 CONT. T&B TYP.
#4 @ 16" O.C.
CONC. CURB
2" CLR.
TYP.
1" C
LR
CONC. SLAB-ON-GRADE
WHERE OCCURS
CONC. SLAB-ON-GRADE,
(TYP.) REINF. NOT SHOWN
FOR CLARITY
SUBGRADE
(SEE SOIL REPORT)
2" CL
R.
U.
O.
N.
(2)-#4
CASE B CASE A
SUBGRADE
(SEE SOIL REPORT)
CONC. SLAB-ON-GRADE,
(TYP.) REINF. NOT
SHOWN FOR CLARITY
NOTES:
1. USE THIS STARTER WALL DETAIL FOR ALL MASONRY AND CONCRETE
WALLS UNLESS FULLY FORMED.
2. FOUNDATION CONC. MAY BE PLACED DIRECTLY INTO NEAT
EXCAVATIONS PROVIDED THE FOUNDATION TRENCH WALLS ARE
STABLE AS DETERMINED BY THE SOIL ENGINEER. IN SUCH CASE, THE
MINIMUM FORM WORK SHOWN ON THE DRAWINGS IS MANDATORY TO
INSURE CLEAN EXCAVATIONS IMMEDIATELY PRIOR TO AND DURING
THE PLACING OF CONCRETE.
3. CLEAN ALL PROPOSED CONCRETE CONTACT SURFACES AFTER
CONCRETE HAS SET.
2" MIN. STARTER WALL
REQUIRED FOR FOOTINGS
BELOW GRADE
FORM WORK NOT
PERMITTED BELOW GRADE
UNLESS FULLY FORMED
FORM WORK
SPECIFICATIONS
APPLICABLE
6" MIN. CONTINUOUS
CLEAN OUT
CUT BACK SPALL TYP.
CURB OR STARTER WALL
2x PLANKING TYP.
WIDTH PER PLAN + 2"
STAKES NOT PERMITTED WITHIN
FOOTING SECTION
SEE
NOTE 3
NOTES:
1. BACK GOUGE TO SOUND METAL BEFORE WELDING OTHER SIDE.
2. A PRE-QUALIFICATION TENSION TEST SHALL BE MADE BY AN APPROVED TESTING
LABORATORY ON SAMPLES OF EVERY SIZE BAR BEING WELDED.
3. USE L=11
2" FOR #3 & #4 BARS, 2" FOR #5 BARS & 21
2" FOR #6 BARS.
USE FOR #8 & SMALLER BARS
USE FOR #6 & SMALLER BARS
TACK AREA
USE FOR #9 & LARGER BARS USE FOR #9 & LARGER BARS
8"
1 8"
D
8"
8"1 8"
45°-60°
45°
3 S L
3 S L
S
2 3 S
SPLIT PIPE BACK-UPD/3 MAX.,
D/4 MIN.
TACK AREA
SEE NOTE 1
SEE NOTE 1
ASTM A706 ASTM A706
ASTM A706
D D D D d
D
D
135°
6d(3" MIN.)
4d
(21
2" MIN.)
135° STD. HOOK
180° STD. HOOK
LEGEND:
d - BAR DIAMETER D - 6d FOR #3 THROUGH #8 D - 8d FOR #9 THROUGH #11
90° STD. HOOK
HORIZ. VERT.
HORIZ. & VERT.
HORIZ. & VERT.
60°
24" MIN.
STAGGER
LAP SPLICE
SEE SCH.
LAP SPLICE
SEE SCH.
LEGEND:
db - BAR DIAMETER
A - CLEAR COVER
B - CLEAR SPACING OF BARS
A B
A db
BAR SPACING DIAGRAM
SPLICE OR
LAPPING BAR
#10
#5
#9
#8
#7
#6
#3
#4
92"71"
44"
64"
82"
73"
63"
56"
34"
49"
24"
29"
37"
TOP
BAR
18"
22"
28"
BASIC BASIC
CLASS OF
LAP SPLICE
f'c = 3,000 PSI fy = 60,000 PSI
TOP
BAR BASICBASIC
38"29"
62"
55"
70"
79"
48"
42"
54"
61"
31"
20"
25"
TOP
BAR
24"
15"
19" f'c = 4,000 PSI fy = 60,000 PSI
50"
71"
81"
91"
103"
26"
41"
33"
TOP
BAR
38"
62"
55"
70"
79"
31"
20"
25"
92"
44"
64"
82"
73"
24"
29"
37"
120"
57"
83"
106"
95"
31"
38"
48"
1. THE SCHEDULED LAP SPLICE LENGTHS ARE FOR EITHER OF THE FOLLOWING CASES:
1.1 CLEAR SPACING OF BARS BEING DEVELOPED OR SPLICED NOT LESS THAN (2db), AND CLEAR COVER NOT LESS THAN (db).
1.2 CLEAR SPACING OF BARS BEING DEVELOPED OR SPLICED SHALL NOT BE LESS THAN (db), CLEAR COVER NOT LESS THAN (db), AND STIRRUPS/TIES THROUGHOUT LAP SPLICE NOT LESS THAN CODE PRESCRIBED MAXIMUM.
2. MULTIPLY LAP SPLICE LENGTHS BY 1.5 FOR CASES NOT MEETING THE CONDITIONS AS DESCRIBED IN NOTE 1.
3. USE CLASS "B" SPLICES FOR VERTICAL & HORIZONTAL BARS TYP. U.O.N.
4. TOP BARS ARE HORIZONTAL BARS PLACED SO THAT 12-INCHES OR MORE OF CONCRETE IS CAST IN THE MEMBER BELOW THE BAR.
5. VALUES SHOWN ARE FOR NORMAL WEIGHT CONCRETE. IF LIGHTWEIGHT CONCRETE, MULTIPY LAP SPLICE LENGTHS BY 1.3.
(REFER TO NOTE 2 FOR ANY ADDITIONAL INCREASES IN LAP SPLICE LENGTHS).
6. VALUES SHOWN ARE FOR UNCOATED GRADE 60 REINFORCEMENT.
STRENGTH
BAR SIZE
CLASS "A" CLASS "B" CLASS "A" CLASS "B"
DIAGRAM AT STAGGERED SPLICES
BA
4"
CONC. S.0.G. TO MATCH (E)
HILTI HIT RE 500-SD
(ICC ESR-2322)
(E) CONC. S.O.G.
SAW CUT
DOWEL #4 x 24" LG. @ 16" O.C.
EQ
SUBGRADE
#4 @ 16" O.C. EA. WAY
ROUGHEN SURFACE
90° STD. HOOK TYP.
(E) CONC.
SLAB-ON-GRADE
CONC. PAD
#4 @ 16" O.C. EA. WAY
2" CL
R.
TY
P.
2"
CLR.
TYP.
0" TY
P. ROUGHEN
SURFACE
4" M
IN
" M
AX
#4 DOWEL
@ 16" O.C. TYP.
HILTI HIT-RE 500 SD,
TYP. (ICC ESR-2322)
4" E
MB
ED
TY
P.
4" CHAMPER
ALL AROUND
1'-6"
MIN.
TYP.
9"
1'-6" MIN.
BACKFILL AS PER
SPECIFICATIONS
6" MI
N.
4" MI
N.
2" MI
N.
NO PIPE SHALL PASS
THROUGH THE FOOTING
PLACE CONCRETE FILL AROUND
SLEEVES BEFORE POURING
FOOTING. FILL SHALL BE SAME
WIDTH AS FOOTING
POUR JOINT
FOOTING
1 LOCATE PIPE TRENCH SO
FOOTING WILL NOT BE
UNDERMINED
PROVIDE METAL SLEEVES
W/ I.D. 2" LARGER THAN
THE O.D. OF THE PIPE TYP.
NO EXCAVATION
BELOW THIS LINE
BACKFILL
PIPE TYP.
PIPE TYP.
NOTE:
1. MAXIMUM PIPE DIAMETER SHALL BE 6"
AND SPACED MINIMUM 18" APART.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
CONSTRUCTION
DEVELOPMENT
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
664-17-403
Project Director
01/26/2018Revisions: Date:
CARTWASHER AND
COMPRESSED AIR UPGRADE
SAN DIEGO, CA
A/E:
IDS GROUP INC.
A/1 PETERS CANYON RD. STE.130
IRVINE, CA, 92606
(949) 387.8500 A/E firm POC
MEP:
Consultant POC
IDS GROUP INC.
A/1 PETERS CANYON RD. STE.130
IRVINE, CA, 92606
(949) 387.8500
0%
C O
N
ST
R U
C
TI
O N
D
EV
EL
O
PM
EN
T D
R
AW
IN
G
R
DESIGN DEVELOPMENT (DD) 12/13/2017
CONSTRUCTION DOCUMENTS (CD) 01/26/2018
CONSTRUCTION DOCUMENTS (CD) - 100% 03/10/2018
CONSTRUCTION DOCUMENTS (CD) - 100% - R1 05/16/2018
CONSTRUCTION DOCUMENTS (CD) - 100% - R2 06/21/2018
CONSTRUCTION DOCUMENTS (CD) - 100% - R3 07/19/2018
SE-501
TYPICAL DETAILS
TYPICAL UNFORMED FOOTING
TYPICAL WELDING AT REINFORCEMENT
TYPICAL CONCRETE CURB AT SLAB-ON-GRADE
TYPICAL BENDS AT REINFORCEMENTTYPICAL REINFORCEMENT LAP SPLICE AT CONCRETE
TYPICAL CONC. SOG TO (E) CONC. SOG
TYP. EQPT. CONC. PAD DETAIL
JR DB
TYP. PIPE & TRENCH AT FOOTING / CONC. S.O.G.
BASE PLAN
- CART WASHER TANK
FRONT ELEVATION
SE-502 DETAIL17
- AIR COMPRESSED TANK
- AIR COMPRESSOR UNIT ANCHORAGE
FRONT ELEVATION
A-A
A
A
BASE PLAN
ELEVATION
- DETAIL AT COOLING COIL SUPPORT
- DETAIL AT COOLING COIL SUPPORT
- DETAIL AT COOLING COIL SUPPORT
J.4
J.4
BASE PLAN
- DETAIL
- DETAIL
J.4
J.4
SE-502 CART WASHER PLAN
- CART WASHER
BASE PLAN
ELEVATION
TYP. ANGLE TO ANGLE
CONNECTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
CONSTRUCTION
DEVELOPMENT
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
664-17-403
Project Director
01/26/2018Revisions: Date:
CARTWASHER AND
COMPRESSED AIR UPGRADE
SAN DIEGO, CA
A/E:
IDS GROUP INC.
A/1 PETERS CANYON RD. STE.130
IRVINE, CA, 92606
(949) 387.8500 A/E firm POC
MEP:
Consultant POC
IDS GROUP INC.
A/1 PETERS CANYON RD. STE.130
IRVINE, CA, 92606
(949) 387.8500
0%
C O
N
ST
R U
C
TI
O N
D
EV
EL
O
PM
EN
T D
R
AW
IN
G
R
DESIGN DEVELOPMENT (DD) 12/13/2017
CONSTRUCTION DOCUMENTS (CD) 01/26/2018
CONSTRUCTION DOCUMENTS (CD) - 100% 03/10/2018
CONSTRUCTION DOCUMENTS (CD) - 100% - R1 05/16/2018
CONSTRUCTION DOCUMENTS (CD) - 100% - R2 06/21/2018
CONSTRUCTION DOCUMENTS (CD) - 100% - R3 07/19/2018
SE-502
SECTIONS AND DETAILS
- TYP. CEILING JOIST BRACING
- BRACING DETAIL A FURRED WALL
- TYP. CEILING JOIST SCHEDULE
- TYP. STL. STUD JAMB ASSEMBLY
- TYP. STL. STUD HEADER ASSEMBLY
- TYP. STUD HEADER JAMB CONN.
- TYP. INTERIOR STUD BRACE TOP ANCHORAGE STEEL COL. CONNECTION AT TOP
- OPENING AT UPPER CEILING LEVEL8
- OPENING AT LOWER CEILING LEVEL
A
A
A - A
A
A
A - A
A
- WALK ON CEILING DETAIL
- WALK ON CEILING DETAIL
CASE A
CASE B
A-A
A
A
A
A
ELEV.
"D" OPENING WIDTH ("W")
PLAN
ELEV.
OPENING WIDTH ("W") SMS EA. LEG OF ANGLE
PLAN
REMARKS
- STEEL COL. CONNECTION AT SLAB
A - A B - B
PLAN
A A
BB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
CONSTRUCTION
DEVELOPMENT
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
664-17-403
Project Director
01/26/2018Revisions: Date:
CARTWASHER AND
COMPRESSED AIR UPGRADE
SAN DIEGO, CA
A/E:
IDS GROUP INC.
A/1 PETERS CANYON RD. STE.130
IRVINE, CA, 92606
(949) 387.8500 A/E firm POC
MEP:
Consultant POC
IDS GROUP INC.
A/1 PETERS CANYON RD. STE.130
IRVINE, CA, 92606
(949) 387.8500
0%
C O
N S
TR
U
C
TI
O N
D E
V E
LO
P
M E
N T
D R
A W
IN
G
R
DESIGN DEVELOPMENT (DD) 12/13/2017
CONSTRUCTION DOCUMENTS (CD) 01/26/2018
CONSTRUCTION DOCUMENTS (CD) - 100% 03/10/2018
CONSTRUCTION DOCUMENTS (CD) - 100% - R1 05/16/2018
CONSTRUCTION DOCUMENTS (CD) - 100% - R2 06/21/2018
CONSTRUCTION DOCUMENTS (CD) - 100% - R3 07/19/2018
SE-503
SECTIONS AND DETAILS
File details come from the government source that posted it. Updated .