36C25819B0036-0001002.pdf
PDF Posted
- Solicitation number
- 36C25819B0036
About this file
36C25819B0036 0001 S02_ATTACHMENT 09_Request for Information Log_Cart Washer 664-17-403.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25819B0036-0001001.pdf | ||
| 36C25819B0036-0001000.docx | DOCX document | |
| 36C25819B0036-0001002.pdf | ||
| 36C25819B0036-0001000.docx | DOCX document | |
| 36C25819B0036-0001001.pdf | ||
| 36C25819B0036-004.pdf | ||
| 36C25819B0036-008.pdf | ||
| 36C25819B0036-001.docx | DOCX document | |
| 36C25819B0036-005.pdf | ||
| 36C25819B0036-003.pdf | ||
| 36C25819B0036-007.pdf | ||
| 36C25819B0036-002.pdf | ||
| 36C25819B0036-006.pdf | ||
| 36C25819B0036-001.docx | DOCX document | |
| 36C25819B0036-003.pdf | ||
| 36C25819B0036-002.pdf | ||
| 36C25819B0036-007.pdf | ||
| 36C25819B0036-004.pdf | ||
| 36C25819B0036-005.pdf | ||
| 36C25819B0036-008.pdf | ||
| 36C25819B0036-006.pdf | ||
| 36C25819B0036-000.docx | DOCX document | |
| 36C25819B0036-000.docx | DOCX document |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 09
Site Walk Sign in Sheet
Part 1 of 1
2 pages
26 Aug 2019
San Diego, California VA Health Care System (664)
664-17-403
Cart Washer and Air System
CONSTRUCTION
Request for Information (RFI) Log Cart Washer & Air System
Construction Project: 664-17-403 26 Aug 2019
San Diego, California VA Health Care System (664)
RFI
Number Date Question Answer
001. 26 Aug 2019
Will the VA set up a conference call for contractors to participate in the public bid opening for those who emailed bids sent from outside of Phoenix?
The VA does not intend to host a teleconference as part of the public bid opening.
002. 26 Aug 2019
Will a scanned executed copy of the bid bond be sufficient for electronic bid submission?
Electronic Copies of the Bonding will be acceptable for bid opening so long as all other elements of the executed bond are present. Physical copy of the actual bonding, with the raised seal shall be received mail from the apparent low offeror within 48 hours of the conclusion of the public opening, or will be ineligible for award.
003. 13 Aug 2019
Is the contractor who is awarded the project expected to do the actual installation of the VA furnished cart washer and air compressor equipment or just make the project areas ready for the VA to install the equipment via the vendor they purchased the equipment from, and then
For Cartwasher SOW see plans especially QF-1.0 with NOTE at each detail. “Note: Successful bidder/contractor shall be responsible for all coordination and insure that all final utility connections to the new cart washer as well as any subsequent operational testing is provided and/or approved by the cart washer manuf./installer in order to provide have the contractor connect the utilities to the equipment that the VA purchased? Will the VA please furnish the complete operations and installation manuals for all of the equipment that they have purchased for this project?
the VA with a fully operational and verified system”.
Air compressor equipment shall be shall be installed by the contractor per the plans.
See Keynote # 9 on sheet AE-301.1 for operations & installation manuals.