36C25727R0018.pdf
PDF 738 KB Posted
- Solicitation number
- 36C25727R0018
About this file
Solicitation/Contract/Order for Commercial Products and Commercial Services
This is a Solicitation/Contract/Order (SF 1449) for mold remediation and water intrusion services issued by the Department of Veterans Affairs, Central Texas Veterans Health Care System. The contract is a three-year indefinite-quantity, firm-fixed-price acquisition under FAR Part 12 for commercial services, set aside 100 percent for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and verified through the VA VIP database. The principal NAICS code is 562910 (Remediation Services). The solicitation period runs December 1, 2026, through November 30, 2029, divided into three one-year ordering periods. Proposals are due by November 18, 2027, at 10:00 AM CDT via email to shawn.reinhart@va.gov. Award is anticipated for October 28, 2026, with contract performance adjusted based on actual award date. The contracting officer is Mr. Shawn R. Reinhart, reachable at 254-416-1661. Services are FOB Destination with NET 30 payment terms via electronic funds transfer. Invoices must be submitted monthly upon completion, inspection, and acceptance through the Tungsten Network at http://www.fsc.va.gov/einvoice.asp.
The Performance Work Statement requires the contractor to provide comprehensive mold remediation and water intrusion response services across multiple VA facilities in North Texas (Dallas, Garland, Bonham, Grand Prairie, and Herzog Building locations). Scope includes emergency response with tiered timeframes (Tier 1: 2-hour on-site/6-hour stabilization; Tier 2: 4-hour/12-hour; Tier 3: 8-hour/24-hour), water extraction, structural drying, containment establishment per ICRA/PCRA protocols, mold remediation following ANSI/IICRC S520-2024 standards, HVAC isolation and cleaning, post-remediation verification, and comprehensive documentation and reporting. The contractor must comply with EPA mold remediation guidance, OSHA respiratory protection requirements, VA Directive 7715 infection control standards, and Texas mold licensing rules. Personnel must hold IICRC certifications (AMRT or equivalent), OSHA 30 certification, and maintain compliant respiratory protection programs. Evaluation factors include technical approach/methodology addressing emergency response, containment and air management, remediation protocols, PRV procedures, personnel qualifications, ICRA/PCRA compliance, and quality control documentation; price; and past performance. The Government will award based on best value using comparative evaluation without formal scoring, and intends to make award without discussions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25727R0018 0002.pdf | ||
| 36C25727R0018 0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1 OF 1. REQUISITION NO.
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE
TELEPHONE NO. UEI: EFT:
PHONE: FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19. 20. 21. 22. 23. 24.
ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION (REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
36C25727R0018 10-28-2026
Mr. Shawn R. Reinhart 254-4216661 11-18-2026
10:00 CST
36C257
Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building #171 Temple, TX 76504
X 100
X
562910
1000 Employees
NET 30
N/A
X
36C549
Department of Veterans Affairs North Texas Veterans HCS 4500 S Lancaster Rd
Dallas, TX 75216
36C257
Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building 171
This is accomplished through the Tungsten Network located at:
http://www.fsc.va.gov/einvoice.asp This is mandatory and the sole method for submitting invoices.
(877) 353-9791 (512) 460-5540
See CONTINUATION Page
NEW: Mold Remediation & Water Intrusion Services in accordance with the Performance Work Statement (PWS)
This acquisition is being conducted IAW RFO FAR Part 12.
THE FAR IS CURRENTLY BEING REVISED. DO NOT ADD ANY CLAUSES
OR PROVISIONS THAT ARE NOT INCLUDED IN THIS SOLICITATION.
https://www.acquisition.gov/far-overhaul
PERIOD OF PERFORMANCE: December 1, 2026 to November 30, 2029 Ordering Period 1: December 1, 2026 to November 30, 2027 Ordering Period 2: December 1, 2027 to November 30, 2028 Ordering Period 3: December 1, 2028 to November 30, 2029
(PERIOD OF PERFORMANCE WILL BE ADJUSTED BASED ON AWARD DATE)
Refer to Addendum to RFO FAR 52.212-1, Instructions to Offerors on pages 33 to 38.
Refer to Addendum to RFO FAR 52.212-2, Evaluation Commercial Products and Commercial Services on pages 39 to 42.
SITE VISIT INFORMATION CONTAINED IN ADDENDUM FAR 52.212-1
See CONTINUATION Page
X X
X 1
Mr. Shawn R. Reinhart Contracting Officer
36C25727R0018
Table of Contents
SECTION A
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES
B.1 CONTRACT ADMINISTRATION DATA
B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
B.3 DELIVERY SCHEDULE
B.4 PERFORMANCE WORK STATEMENT
SECTION C - CONTRACT CLAUSES
C.1 ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS –
COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
C.2 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
C.3 FAR 52.216-18 ORDERING (AUG 2020)
C.4 FAR 52.216-19 ORDER LIMITATIONS (OCT (1995)
C.5 FAR 52.216-22 INDEFINITE QUANTITY (NOV 2025) (DEVIATION)
C.6 FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
C.7 FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
C.8 FAR 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES
(MAY 2014)
C.9 FAR 52.222-43 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT
LABOR STANDARDS-PRICE ADJUSTMENT (MULTIPLE YEAR AND OPTION
CONTRACTS) (DEVIATION) (NOV 2025)
C.10 FAR 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL
CONTRACTORS (APR 2026)
C.11 FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
C.12 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR VERIFIED
SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (NOV 2022)
C.13 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—
CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN
2023) (DEVIATION)
C.14 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED
BY REFERENCE (JAN 2008)
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
SECTION E - SOLICITATION PROVISIONS
E.1 ADDENDUM to FAR 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL
PRODUCTS AND COMMERCIAL SERVICES
E.2 52.212-2 EVALUATION - COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (OCT 2025) (DEVIATION)
E.3 52.212-2 ADDENDUM to EVALUATION - COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES
E.4 52.216-27 SINGLE OR MULTIPLE AWARDS (OCT 1995)
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C257 Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building #171
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management
3. INVOICES: Invoices shall be submitted in arrears:
a. Quarterly []
b. Semi-Annually []
c. Other [X] Monthly upon completion, inspection, and acceptance
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:
AMENDMENT NO DATE
B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 INFORMATIONAL
ONLY
NSP
ON-CALL / EMERGENCY RESPONSE
ORDERING PERIOD 1
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services PRODUCT/SERVICE CODE: F108 - Environmental Systems Protection - Environmental Remediation
0001AA
1.00 JB __________ __________
Emergency Response (Tier 1)
Project Supervisor, Remediation Technician, IEP (as-needed), Safety Officer IAW PWS Paragraph 6.1.
ORDERING PERIOD 1
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0001AB
Emergency Response (Tier 2)
IAW PWS Paragraph 6.1
ORDERING PERIOD 1
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0001AC
Emergency Response (Tier 3)
IAW PWS Paragraph 6.1
ORDERING PERIOD 1
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0001AD
Equipment & Consumables: HEPA air scrubbers/negative air machines (daily rate), dehumidifiers (LGR/Desiccant), air movers, moisture meters, particle counters, barriers/containment materials, PPE (unit/daily).
ORDERING PERIOD 1
POP Begin: 12-01-2026
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services PRODUCT/SERVICE CODE: F108 - Environmental Systems
0001AE
Emergency Reports (per incident):. 24-hour stabilization report;
moisture map; initial plan.
ORDERING PERIOD 1
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0.00
SCHEDULED REMEDIATION TASKS
POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0002AA
1.00 JB __________ ___________
Assessment & Written Remediation Protocol
EPA/IICRC references; ICRA/PCRA permit completion.
ORDERING PERIOD 1
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0002AB
1.00 JB ___________ ___________
Containment & Engineering Controls
Barrier installation, negative pressure, HEPA filtration, anteroom, pressure monitoring setup.
ORDERING PERIOD 1
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0002AC
Mold Remediation
Controlled removal and cleaning of porous/non-porous materials per EPA Table 2/IICRC S520; no reconstruction.
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services PRODUCT/SERVICE CODE: F108 - Environmental Systems
0002AD
HVAC Isolation & Cleaning
Only when HVAC is implicated; align to S520 HVAC remediation.
ORDERING PERIOD 1
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0002AE
Drying & Moisture Control
Drying plan, equipment placement, logs, ASHRAE 160 targets;
pricing unit tied to drying duration/volume.
ORDERING PERIOD 1
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0002AF
PRV & Closeout
Visual acceptance, moisture metrics, (IEP sampling if specified), final PRV report; certificate where required.
ORDERING PERIOD 1
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0003 INFORMATIONAL
COMPLIANCE / PERMITS
ORDERING PERIOD 1
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0003AA
ICRA/PCRA Permitting & Posting
Includes VHA forms completion, updates, and daily logs as specified in PWS and directive.
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
ORDERING PERIOD 1
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services PRODUCT/SERVICE CODE: F108 - Environmental Systems
0003AB
1.00 JB ___________ __________
Texas TDLR Notification & Fee Administration
For =25 contiguous sq ft; includes filing, amendments, and evidence of compliance (PWS §17.7).
ORDERING PERIOD 1
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1001 INFORMATIONAL
ORDERING PERIOD 2
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1001AA
Project Supervisor, Remediation Technician, IEP (as-needed), Safety Officer IAW PWS Paragraph 6.1.
ORDERING PERIOD 2
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1001AB
IAW PWS Paragraph 6.1
ORDERING PERIOD 2
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1001AC
1.00 JB ___________ __________
IAW PWS Paragraph 6.1
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
ORDERING PERIOD 2
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services PRODUCT/SERVICE CODE: F108 - Environmental Systems
1001AD
machines (daily rate), dehumidifiers (LGR/Desiccant), air movers, moisture meters, particle counters, barriers/containment materials, PPE (unit/daily).
ORDERING PERIOD 2
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1001AE
1.00 JB ____________ ___________
moisture map; initial plan.
ORDERING PERIOD 2
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1002 INFORMATIONAL
ORDERING PERIOD 2
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1002AA
EPA/IICRC references; ICRA/PCRA permit completion.
ORDERING PERIOD 2
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1002AB
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Containment & Engineering Controls Barrier installation, negative pressure, HEPA filtration, anteroom, pressure monitoring setup.
ORDERING PERIOD 2
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1002AC
Controlled removal and cleaning of porous/non-porous materials per EPA Table 2/IICRC S520; no reconstruction.
ORDERING PERIOD 2
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1002AD
Only when HVAC is implicated; align to S520 HVAC remediation.
ORDERING PERIOD 2
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1002AE
Drying plan, equipment placement, logs, ASHRAE 160 targets;
pricing unit tied to drying duration/volume.
ORDERING PERIOD 2
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1002AF
Visual acceptance, moisture metrics, (IEP sampling if specified), final PRV report; certificate where required.
ORDERING PERIOD 2
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
PRODUCT/SERVICE CODE: F108 - Environmental Systems Protection - Environmental Remediation
1003 INFORMATIONAL
ORDERING PERIOD 2
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1003AA
Includes VHA forms completion, updates, and daily logs as specified in PWS and directive.
ORDERING PERIOD 2
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1003AB
For =25 contiguous sq ft; includes filing, amendments, and evidence of compliance (PWS §17.7).
ORDERING PERIOD 2
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2001 INFORMATIONAL
ORDERING PERIOD 3
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2001AA
Project Supervisor, Remediation Technician, IEP (as-needed), Safety Officer IAW PWS Paragraph 6.1.
ORDERING PERIOD 3
POP Begin: 12-01-2028
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services PRODUCT/SERVICE CODE: F108 - Environmental Systems
2001AB
IAW PWS Paragraph 6.1
ORDERING PERIOD 3
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2001AC
IAW PWS Paragraph 6.1
ORDERING PERIOD 3
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2001AD
machines (daily rate), dehumidifiers (LGR/Desiccant), air movers, moisture meters, particle counters, barriers/containment materials, PPE (unit/daily).
ORDERING PERIOD 3
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2001AE
moisture map; initial plan.
ORDERING PERIOD 3
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2002 INFORMATIONAL
NSP ___________ ___________
ORDERING PERIOD 3
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services PRODUCT/SERVICE CODE: F108 - Environmental Systems
2002AA
EPA/IICRC references; ICRA/PCRA permit completion.
ORDERING PERIOD 3
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2002AB
Containment & Engineering Controls
Barrier installation, negative pressure, HEPA filtration, anteroom, pressure monitoring setup.
ORDERING PERIOD 3
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2002AC
Controlled removal and cleaning of porous/non-porous materials per EPA Table 2/IICRC S520; no reconstruction.
ORDERING PERIOD 3
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2002AD
Only when HVAC is implicated; align to S520 HVAC remediation.
ORDERING PERIOD 3
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2002AE
Drying plan, equipment placement, logs, ASHRAE 160 targets;
pricing unit tied to drying duration/volume.
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
ORDERING PERIOD 3
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services PRODUCT/SERVICE CODE: F108 - Environmental Systems
2002AF
Visual acceptance, moisture metrics, (IEP sampling if specified), final PRV report; certificate where required.
ORDERING PERIOD 3
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2003 INFORMATIONAL
ORDERING PERIOD 3
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2003AA
Includes VHA forms completion, updates, and daily logs as specified in PWS and directive.
ORDERING PERIOD 3
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2003AB
For =25 contiguous sq ft; includes filing, amendments, and evidence of compliance (PWS §17.7).
ORDERING PERIOD 3
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
GRAND
TOTAL
B.3 DELIVERY SCHEDULE
NUMBER SHIPPING INFORMATION QUANTITY
DELIVERY
DATE
0001-
SHIP TO: Department of Veterans Affairs North Texas Healthcare System, Dallas VA Medical C 4500 South Lancaster Rd Dallas, TX 75216
USA
0.00 SEE SCHEDULE
B.2
MARK FOR: Devon D. Mitchell 214-857-2064 devon.mitchell@va.gov
FOB: DESTINATION
B.4 PERFORMANCE WORK STATEMENT
Mold Remediation & Water Intrusion Services
PART 1 - GENERAL
1. PURPOSE. The purpose of this contract is to provide on‑call and scheduled professional services to assess, mitigate, remediate, and prevent mold growth and water intrusion across all facilities operated by the VA North Texas Health Care System (VANTHCS). Services support patient safety, regulatory compliance, and protection of buildings, equipment, and contents.
1.1 The Contractor shall furnish all labor, materials, equipment, PPE, supervision, testing instruments, documentation, containment, drying services, remediation, and environmental services.
1.2 No reconstruction, reinstallation, or new construction is authorized under this PWS. Only service activities directly associated with mold remediation and moisture intrusion response are within scope.
1.3 This PWS is aligned with the VHA Moisture & Mold Management Program (M3P). Services include, but are not limited to:
• Emergency water intrusion response
• Water extraction, dehumidification, structural drying
• Moisture mapping, meter readings, containment setup
• Mold remediation, controlled removal
• Negative air & HEPA filtration per PCRA/ICRA risk categories
• Antimicrobial application
• HVAC isolation & cleaning (as required)
• Coordination with Safety/IH, Engineering, Facility Planning, and Interior Design
• Documentation, reporting, and closeout
2. BACKGROUND. VANTHCS operates multiple hospitals and clinics serving Veterans across North Texas. Healthcare environments require stringent control of moisture, ventilation, and infection risks during any remediation work. Adherence to EPA mold remediation guidance for schools/commercial buildings, ANSI/IICRC S520‑2024 (Mold Remediation), OSHA respiratory protection, CDC/NIOSH dampness and mold recommendations, ASHRAE moisture design criteria, and VHA construction safety directives (PCRA/ICRA) is required.
2.1 Definitions
• ICRA (Infection Control Risk Assessment): VA healthcare process to determine controls for construction/maintenance activities by activity type and patient risk level.
• PCRA (Pre‑Construction Risk Assessment): VA evaluation of non‑infection hazards (noise, vibration, etc.) prior to construction activities.
• PRV (Post‑Remediation Verification): Objective evaluation confirming remediation goals are met per S520 and project protocol.
3. PLACE OF PERFORMANCE. Work is located at the following facilities:
• VAMC Dallas - 4500 S Lancaster Rd, Dallas, TX 75216
• VAMC Garland - 3700 Marie Curie Blvd, Garland, TX 75042
• Sam Rayburn Memorial Veterans Center (SRMVC Bonham) - 1201 E 9th St, Bonham, TX 75419
• Grand Prairie Outpatient Clinic - 2520 W I-20, Grand Prairie, TX 75052
• Herzog Building, 4900 S Lancaster Rd, Dallas, TX 75216
4. PERIOD OF PERFORMANCE. Period of performance is three (3) years with one-year ordering periods.
Ordering Period 1: December 1, 2026 to November 30, 2027 Ordering Period 2: December 1, 2027 to November 30, 2028 Ordering Period 3: December 1, 2028 to November 30, 2029
5. WORK HOURS. Normal operating days and hours Monday - Friday, 8:00 AM - 4:30 PM CDT. Prior to work being performed proper coordination shall be initiated between the contractor and the government to ensure that services/work can be executed when scheduled. Any work, services, and/or other tasks performed during other than normal business hours shall be approved in advance by the Contracting Officer Representative (COR) before such work begins.
5.1 Federal Holidays. The Government observes these holidays:
New Year's Day January 1st
Birthday of Martin Luther King, Jr. Third Monday in January Washington’s Birthday Third Monday in February Memorial Day Last Monday in May Juneteenth National Independence Day June 19th
Independence Day July 4th
Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11th Thanksgiving Day Fourth Thursday in November Christmas Day December 25th
If a holiday falls on a Saturday, then the Friday before shall be considered the holiday. If a holiday falls on a Sunday, then the Monday after shall be considered the holiday.
In addition to the days designated as holidays, the Government observes the following days:
• Any other day designated by Federal Statute
• Any other day designated by Executive Order
• Any other day designated by the President’s Proclamation
The observance of such days by Government personnel shall not otherwise be a reason for an additional period of performance, or entitlement of compensation. In the event the Contractor's personnel work during the holiday, they may be reimbursed by the Contractor, however, no form of holiday or other premium compensation will be reimbursed either as a direct or indirect cost, other than their normal compensation for the time worked.
6. SCOPE OF WORK. The Contractor shall furnish all labor, supervision, materials, equipment, testing, and documentation necessary to:
6.1 Response Time (Emergency)
• Tier 1 (Patient‑Critical Areas): On‑site within 2 hours; stabilization within 6 hours.
• Tier 2 (Clinical Areas): On‑site within 4 hours; stabilization within 12 hours.
• Tier 3 (Administrative/Support): On‑site within 8 hours; stabilization within 24 hours.
(Timeframes support EPA guidance to dry quickly to prevent mold growth.)
6.1.1 Emergency Response & Stabilization
• Respond to water intrusion events (e.g., pipe leaks, roof failures, floods) within the timeframes identified above.
• Stop water sources, stabilize the environment, and initiate drying to prevent microbial amplification in accordance with EPA guidance (e.g., dry within 24–48 hours where feasible).
6.2 Containment Integrity: Maintain negative pressure of ≥‑0.02 in. w.g (or per site protocol) with continuous display; alarms investigated within 30 minutes. (Method aligned to ICRA controls.)
6.3 Drying Targets: Materials brought to equilibrium moisture content appropriate for type and area;
rewet events promptly re‑assessed per ASHRAE 160 principles.
6.4 Safety Compliance: 100% adherence to OSHA 1910.134 program elements (fit tests, medical evals, training, change‑out schedules).
6.5 Documentation: 100% completion of PCRA/ICRA permits before work starts; 100% daily logs;
100% PRV reports for each project.
6.6 Assessment & Protocol Development
• Conduct site assessments, moisture mapping, and root‑cause analysis (building envelope, plumbing, HVAC).
• Develop written Remediation Protocols referencing ANSI/IICRC S520‑2024 and EPA commercial buildings guide, including containment strategy, work area classification, and post‑remediation verification criteria.
• Where healthcare risk exists, complete VA Pre‑Construction Risk Assessment (PCRA) and VA Infection Control Risk Assessment (ICRA) forms and obtain VA approvals prior to mobilization.
6.7 Containment & Infection Control
• Establish engineering controls (e.g., negative pressure, anterooms, hard barriers, HEPA filtration) appropriate to the activity type and patient risk category per the VHA ICRA template (or ICRA
2.0 when directed).
• For cases where exhaust cannot be routed outdoors, follow VHA ICRA update (Oct 2024) requirements for HEPA discharge verification and continuous pressure monitoring.
6.8 Mold Remediation (Structures & Contents)
• Perform remediation using ANSI/IICRC S520‑2024 principles: source removal, cleaning, controlled demolition, and appropriate use of antimicrobial agents and coatings.
• Follow EPA size‑based remediation guidance (e.g., containment recommendations for areas >100 sq ft and HVAC involvement).
• Manage HVAC system contamination per S520 and EPA recommendations (e.g., avoid running contaminated systems; clean components as specified).
6.9 Drying & Moisture Control. Implement drying plans and environmental controls consistent with best practices and ASHRAE 160‑2021 moisture control criteria for durable building performance.
6.6 Post‑Remediation Verification (PRV). Provide visual confirmation, moisture readings, and clearance criteria consistent with S520 and EPA guidance; engage an Indoor Environmental Professional (IEP) when required by protocol.
6.7 Documentation & Reporting. Maintain daily logs, photographs, ICRA/PCRA permits, pressure monitoring records, calibration certificates, chemical SDS, waste manifests, and PRV reports; submit to the COR within five (5) days of completion.
7. APPLICABLE LAWS, REGULATIONS, AND STANDARDS. The Contractor shall comply with, at minimum, the following:
• ANSI/IICRC S520‑2024: Standard for Professional Mold Remediation (latest edition).
• EPA Mold Remediation in Schools and Commercial Buildings (EPA 402‑K‑01‑001).
• CDC/NIOSH guidance on dampness, mold, and remediation (including DMAT).
• OSHA 29 CFR 1910.134 (Respiratory Protection) and relevant OSHA mold/IAQ guidance.
• ASHRAE 160‑2021 (Criteria for Moisture‑Control Design Analysis in Buildings).
• VA VHA Directive 7715(1): Safety and Health During Construction (including required
PCRA/ICRA).
• Joint Commission Physical Environment/Environment of Care resources, as applicable to accredited healthcare facilities.
Note: Where standards conflict, the most stringent requirement applies, and VA directives/ICRA/PCRA govern in patient care areas.
8. CONTRACTOR QUALIFICATIONS
8.1 Firm Qualifications: Demonstrated experience in healthcare mold remediation; familiarity with ICRA/PCRA workflows; 24/7 emergency capability.
8.2 Personnel: Supervisors and technicians trained to ANSI/IICRC S520‑2024 practices; OSHA
1910.134 compliant respiratory protection program (written, fit testing, medical evaluations, cartridge schedules); IEP available as needed.
8.3 Certifications: IICRC (e.g., AMRT), or equivalent; evidence of HEPA equipment maintenance and calibration. (Industry standard expectations per S520.)
9. SAFETY & INFECTION CONTROL REQUIREMENTS
• Comply with VHA Directive 7715(1): use PCRA/ICRA forms, obtain permits, and follow prescribed controls.
• Implement ICRA controls (Class I–IV) based on activity type (A–D) and patient risk category;
maintain negative pressure and HEPA filtration; post signage and barrier permits.
• If exhaust is not feasible to exterior, adopt VHA ICRA 2024 HEPA discharge validation (baseline particle counts, thrice‑daily verification, alarmed pressure device).
• Provide PPE (gloves, eye protection, suits) and NIOSH‑approved respirators under a compliant OSHA program.
10. TECHNICAL REQUIREMENTS & METHODS
10.1 Containment: Rigid barriers, anterooms, controlled access, and continuous monitoring (pressure differential shown at the worksite).
10.2 Removal & Cleaning: Source removal of contaminated materials; clean and restore salvageable items; avoid cosmetic cover‑up (no painting/caulking over mold).
10.3 HVAC: Do not run contaminated HVAC; isolate and remediate per protocol; PRV includes HVAC components if involved.
10.4 Moisture Management: Drying strategies aligned to ASHRAE 160 to mitigate future risk.
10.5 Waste Handling: Proper bagging, decontamination, and disposal per facility procedures and local regulations.
12. DELIVERABLES
• Emergency Response Reports (within 24 hours): event details, actions taken, initial moisture readings.
• Assessment & Remediation Protocols (prior to work): scope, containment plan, ICRA/PCRA approvals, safety plan.
• Daily Logs: workforce, controls, readings, photos.
• Pressure/Particle Monitoring Records (when required by ICRA update).
• PRV Report: visual acceptance, moisture metrics, (optional) sampling if specified by VA, and
IEP sign‑off when used.
• Closeout Package: as‑built photos, root‑cause correction list, warranty statement.
13. GOVERNMENT‑FURNISHED RESOURCES
• Access to affected areas, on‑site coordination, and PCRA/ICRA forms/portal.
• Facility point of contact for Joint Commission compliance documentation when requested.
14. SECURITY & BADGING. Contractor shall comply with VA badging, security screening, and escort policies for patient care areas.
15. QUALITY CONTROL (CONTRACTOR) & QUALITY ASSURANCE (GOVERNMENT)
• Contractor Quality Control Plan (QCP): Procedures to audit containment, readings, PPE, and logs.
• Government QA: The VA COR may audit documentation against Joint Commission Physical Environment expectations and hospital EC document lists (e.g., fire/life safety testing records when areas intersect).
16. ENVIRONMENTAL & INFECTION PREVENTION
• Coordinate with Infection Prevention, Facilities, and Safety.
• Follow EPA guidance regarding porous materials disposal and no paint/caulk over mold.
17. PERFORMANCE REQUIREMENTS. The Contractor shall follow VHA M3P moisture/mold management standards; maintain clean workspaces; comply with ICRA/PCRA; meet response timelines;
achieve PRV clearance; and adhere to VA information security and records requirements. Reports, logs, photographs, and remediation documentation produced under this contract are VA records and shall be handled per VA Directive 6500 requirements.
17.1 Assessment, Testing, & Moisture/Mold Investigation. The Contractor shall follow:
• Follow VA-furnished mold remediation protocol, mold testing, industrial hygiene services, air monitoring, post-remediation assessment, and passed clearance report.
• Provide moisture mapping and water damage restoration plan in accordance with VHA M3P for review and approval by the COR within 24hrs of event notification.
• Ensure moisture-affected areas are dried within the 24-72 hours timeframe as required by VHA M3P.
• Coordinate all access, inspection windows, and remediation scheduling with Industrial Hygienists documented in VANTHCS incident communications
• VA-furnished protocols
• Coordinate access and scheduling with Industrial Hygiene as documented in incident communications.
17.2 Containment & Mold Remediation. The Contractor shall:
• Follow Texas Occupations Code Chapter 1958 and 16 Texas Administrative Code Chapter 78.
• Establish containment per PCRA/ICRA
• Maintain HEPA negative air pressure
• Document containment integrity daily.
• Perform non-construction removal of mold-impacted, non-structural porous materials strictly as part of remediation, without reconstruction or reinstallation.
• Provide PRV test scheduling support and Certificate of Mold Remediation (required within 10 days).
• Follow VA moisture and mold response requirements.
17.3 Removal & Disposal Of Mold‑Impacted Materials (Service Scope Only). The Contractor shall remove carpet, ceiling tiles, drywall, insulation, casework, flooring, and other materials as directed by IH and VHA M3P practices when removal is necessary for remediation. No construction, reconstruction, reinstallation, or restoration activities are included. Removal and disposal shall comply with VA safety, PCRA/ICRA, and waste handling standards.
17.3.1 General Requirements. All moisture and mold events shall be handled in accordance with:
• VHA M3P – Moisture & Mold Management Program
• VA Industrial Hygiene recommendations
• OSHA, EPA, CDC, IICRC S500/S520
• TDLR Mold Rules
17.3.2 Emergency Water Intrusion - Contractor Requirements. Upon notification the contractor shall:
• Respond on site within 12 hours
• Isolate affected areas; post Emergency PCRA/ICRA as directed
• Stop water source (if accessible) or assist Engineering in locating source
• Perform moisture mapping, record RH %, temperature, and wall moisture readings
• Provide moisture mapping and water damage restoration plan to COR within 24 hours
• Remove wet cove base, carpet tiles, ceiling tiles, and drill exploration openings as required
• Deploy dehumidifiers, air movers, and structural drying equipment
• Maintain logs for every shift (moisture readings, equipment performance)
17.3.3 Mold Remediation - Contractor Requirements. Upon notification the contractor shall coordinate; establish containment; isolate HVAC supply/returns; remove contaminated materials; apply antimicrobial; maintain negative air with HEPA; and provide PRV clearance documentation.
• Coordinate relocation of staff with Facility Managers
• Establish containment per ICRA Class.
• Isolate HVAC supply/returns.
• Remove contaminated materials, including but not limited to carpet, drywall, insulation, casework, flooring, ceiling tiles.
• Apply EPA-registered antimicrobial.
• Maintain negative air with HEPA filtration (continuous).
• Provide Post-Remediation V
17.4 Coordination Requirements
• Contractor shall work with Safety/IH, Engineering, Interior Design, and Facility Planning as seen throughout incident communications
• Ensure safe return-to-service steps including PRV clearance support.
17.5 Required Reporting Guidelines For Mold Remediation. To ensure full compliance with VHA M3P, TDLR Mold Rules, IICRC S500/S520, OSHA, EPA, and CDC standards, the Contractor shall provide comprehensive documentation and reporting throughout all phases of moisture intrusion response and mold remediation. Required reporting includes, but is not limited to, the following:
17.5.1 Daily Operational Reporting
• Daily moisture readings, including RH %, temperature, wall/ceiling/floor moisture levels.
• Daily negative air pressure and particle counter logs, confirming HEPA performance and continuous operation.
• Daily restoration progress updates, detailing work completed, equipment used, drying progress, and any changes in conditions.
• Daily containment verification, including integrity checks and photographs.
• Daily shift logs documenting drying equipment performance, meter readings, containment status, and safety compliance.
17.5.2 Remediation Documentation
• Photographs documenting:
o Containment installation, maintenance, and integrity o Removal and disposal of mold affected materials o Before/after conditions of affected areas o Controlled demolition procedures
• Waste manifests for all materials removed and disposed of.
• Logs demonstrating continuous negative air and HEPA filtration operation during remediation.
17.5.3 Clearance & Regulatory Reporting
• All Post Remediation Verification (PRV) clearance documents required for return-to-service.
• Certificate of Mold Damage Remediation, submitted no later than the 10th day after the project stop date, signed by the licensed mold assessment consultant conducting the post remediation assessment.
17.6 Final Closeout Package. The Contractor shall submit a final closeout package containing:
• Comprehensive final report summarizing:
o Leak/water intrusion source o Remediation procedures and containment controls o Drying strategy and drying logs o Materials removed
• All logs, photographs, PRV results, certificates, and clearance documents.
• Documentation demonstrating compliance with all VA standards (M3P, ICRA/PCRA, IH directives).
17.7 Texas State Notification Requirement for Mold Remediation
• In accordance with 16 Texas Administrative Code §78.110, the Contractor shall notify the Texas Department of Licensing & Regulation (TDLR) when mold contamination meets or exceeds 25 contiguous square feet.
• Notification shall be submitted no fewer than five (5) calendar days prior to the start of remediation activities.
• A mandatory $25 state fee applies to each notification filed.
• Contractor shall submit amended notifications when changes occur to start dates, stop dates, or responsible parties.
18. PERSONNEL & SAFETY REQUIREMENTS. The Contractor shall
• Employ qualified personnel to perform the work specified in this PWS.
• Maintain the personnel, organization and administrative control necessary to ensure that the work delivered meets the contract specifications and requirements.
• Provide a qualified On-Site Supervisor shall always be present during work, holding OSHA 30 certification, applicable mold certifications (CMR/AMRT/TDLR), and ICRA training. All personnel shall be trained in mold remediation and safety protocols and shall pass background checks and respirator medical clearance.
• Provide all required PPE, including NIOSH-approved respirators (N95/P100/PAPR as required), Tyvek suits, gloves, goggles, and protective footwear, with donning and doffing per VA ICRA rules.
• Ensure work zones are kept clean and hazard-free, and all tools and equipment secured appropriately.
• Is responsible for supplying, maintaining, and securing all labor, equipment, and machinery.
• Is responsible for verifying required personnel certifications and TDLR notifications prior to mobilization.
19. DOCUMENTATION REQUIREMENTS. Contractor shall maintain and submit:
• Daily moisture logs
• Negative air & HEPA performance logs
• Containment photos
• PRV clearance documentation
• Final closeout package
20. KICKOFF MEETING. The Contractor shall attend a kickoff meeting with the COR within 10 days after contract award.
21. CONTRACTING OFFICERS REPRESENTATIVE. The Contracting Officer’s Representative is:
Email addresses will be added at award Primary Dallas: Devon Mitchell Primary Garland: Andrew Garcia Primary Bonham: Doug Person Primary: Grand Prairie OPC, Devon Mitchell Primary Herzog Building: Devon Mitchell
(END OF PERFORMANCE WORK STATEMENT)
(END OF SECTION B)
SECTION C - CONTRACT CLAUSES
C.1 ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS –
COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
The following clauses are incorporated into FAR 52.212‑4, in addition to the standard text, and have the same force and effect as if set forth in full.
C.2 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/far-overhaul https://www.acquisition.gov/vaar
FAR 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV 2023)
FAR 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL (JAN 2017)
CONFIDENTIALITY AGREEMENTS OR STATEMENTS
FAR 52.204-9
PERSONAL IDENTITY VERIFICATION OF CONTRACTOR
PERSONNEL (JAN 2011)
FAR 52.204-13 SYSTEM FOR AWARD MANAGEMENT - MAINTENANCE (OCT 2018)
FAR 52.222-3 CONVICT LABOR (DEVIATION) (NOV 2025)
FAR 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (DEVIATION) (NOV 2025)
FAR 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH (NOV 2025
DIASABILIITES (DEVIATION)
FAR 52.222-37 EMPLOYMENT REPORTS ON VETERANS (DEVIATION) (NOV 2025)
FAR 52.222-41 SERVICE CONTRACT LABOR STANDARDS (NOV 2025)
(DEVIATION)
FAR 52.222-50 COMBATING TRAFFICKING IN PERSONS (DEVIATION) (NOV 2025)
FAR 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (NOV 2025)
(DEVIATION)
FAR 52.222-55 EMPLOYMENT ELIGIBILITY VERIFICATION (NOV 2025)
(DEVIATION)
FAR 52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (NOV 2025)
(DEVIATION)
FAR 52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT (MAY 2024)
MESSAGING WHILE DRIVING
FAR 52.228-5 INSURANCE - WORK ON A GOVERNMENT (JAN 1997)
INSTALLATION
FAR 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL (MAR 2023)
BUSINESS SUBCONTRACTORS
FAR 52.233-3 PROTEST AFTER AWARD (DEVIATION) (NOV 2025)
FAR 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (NOV 2025)
(DEVIATION)
VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)
VAAR 852.222-71 COMPLIANCE WITH EXECUTIVE ORDER 13899 (NOV 2025)
https://www.acquisition.gov/far-overhaul https://www.acquisition.gov/vaar
(DEVIATION)
VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)
(End of clause)
C.3 FAR 52.216-18 ORDERING (AUG 2020)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from December 6, 2026 through November 30, 2029.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) A delivery order or task order is considered "issued" when—
(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;
(2) If sent by fax, the Government transmits the order to the Contractor's fax number; or
(3) If sent electronically, the Government either—
(i) Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the Contractor; or
(ii) Distributes the delivery order or task order via email to the Contractor's email address.
(d) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.
(End of clause)
C.4 FAR 52.216-19 ORDER LIMITATIONS (OCT (1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $500.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor-
(1) Any order for a single item in excess of $150,000.00;
(2) Any order for a combination of items in excess of $250,000.00; or
(3) A series of orders from the same ordering office within two (2) days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph
(b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within one (1) day after issuance, with written notice stating the Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of clause)
C.5 FAR 52.216-22 INDEFINITE QUANTITY (NOV 2025) (DEVIATION)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum." The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum."
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the ordering period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order, which may include order options to be exercised after the ordering period of this contract but before the end of the period of performance of the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order, including options exercised, to the same extent as if the order were completed during the contract's ordering period; provided, that the Contractor shall not be required to make any deliveries under this contract after November 30, 2029.
(End of clause)
C.6 FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 15 days.
(End of clause)
C.7 FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR
2000)
(a) The Government may extend the term of this contract by written notice to the Contractor within 15 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed three (3) years.
(End of clause)
C.8 FAR 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES
(MAY 2014)
In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor ( 29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C.5341 or 5332. This Statement is for Information Only: It is not a Wage Determination
Employee Class Monetary Wage-Fringe Benefits Environmental Technician $25.86 + Fringe (Tarrant County) Environmental Technician $25.73 + Fringe (Fannin County) Environmental Technician $25.86 + Fringe (Dallas County)
(End of clause)
C.9 FAR 52.222-43 FAIR LABOR STANDARDS ACT AND SERVICE CONTRACT
LABOR STANDARDS-PRICE ADJUSTMENT (MULTIPLE YEAR AND OPTION
CONTRACTS) (DEVIATION) (NOV 2025)
a) This clause applies to both contracts subject to area prevailing wage determinations and contracts subject to collective bargaining agreements.
(b) The Contractor warrants that the prices in this contract do not include any allowance for any contingency to cover increased costs for which adjustment is provided under this clause.
(c) The wage determination, issued under the Service Contract Labor Standards statute, (41 U.S.C.
chapter 67), by the Administrator, Wage and Hour Division, U.S. Department of Labor, current on the anniversary date of a multiple year contract or the beginning of each renewal option period, must apply to this contract. If no such determination has been made applicable to this contract, then the Federal minimum wage as established by section 6(a)(1) of the Fair Labor Standards Act of1938, as amended, (29 U.S.C. 206) current on the anniversary date of a multiple year contract or the beginning of each renewal option period, must apply to this contract.
(d) The contract price, contract unit price labor rates, or fixed hourly labor rates will be adjusted to reflect the Contractor’s actual increase or decrease in applicable wages and fringe benefits to the extent that the increase is made to comply with or the decrease is voluntarily made by the Contractor as a result of:
(1) The Department of Labor wage determination applicable on the anniversary date of the multiple year contract, or at the beginning of the renewal option period. For example, the prior year wage determination required a minimum wage rate of $4.00 per hour. The Contractor chose to pay $4.10. The new wage determination increases the minimum rate to $4.50 per hour. Even if the Contractor voluntarily increases the rate to $4.75 per hour, the allowable price adjustment is $.40 per hour;
(2) An increased or decreased wage determination otherwise applied to the contract by operation of law;
or
(3) An amendment to the Fair Labor Standards Act of1938 that is enacted after award of this contract, affects the minimum wage, and becomes applicable to this contract under law.
(e) Any adjustment will be limited to increases or decreases in wages and fringe benefits as described in paragraph (d) of this clause, and the accompanying increases or decreases in social security and unemployment taxes and…