AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
This document is an amendment (0004) to a federal solicitation for environmental remediation services issued by the Department of Veterans Affairs (VA), Central Texas Veterans Health Care System, located in Temple, Texas. The amendment extends the proposal deadline to December 2, 2026, at 10:00 AM CST, updates Schedule B.2 based on contractor questions, and provides comprehensive answers to 62 questions submitted by potential offerors.
The solicitation seeks on-call and scheduled mold remediation and water intrusion services across VA facilities in Texas under a firm-fixed-price contract with three one-year ordering periods from December 1, 2026, through November 30, 2029. Services include emergency response (tiered by severity with 2-, 4-, and 8-hour on-site response requirements), assessment and protocol development, containment and engineering controls, mold remediation, HVAC isolation, drying and moisture control, post-remediation verification and closeout, and regulatory compliance including Texas Department of Licensing and Regulation (TDLR) permitting. All pricing uses a "JB" (job) unit of measure with quantity 1.00, representing one complete job for each line item; contractors may bill multiple times across the contract period. The contract incorporates Service Contract Act wage determinations (minimum $25.86 plus fringe for Environmental Technicians in Dallas County) and requires TDLR Mold Remediation Contractor licensing, OSHA 30 certification, and IICRC training for supervisors. Key clarifications in the amendment address pricing structure (firm fixed price per complete job regardless of scope variables), emergency response content, equipment and consumables billing, the VA's provision of third-party assessment services and asbestos/lead surveys, the contractor's responsibility for waste disposal and industrial hygiene clearance testing, and confirmation that this is a new requirement with no historical data or guaranteed minimum quantities. The principal NAICS code is 562910 (Remediation Services) with product/service code F108.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25727R0018 0003.pdf | ||
| 36C25727R0018 0002.pdf | ||
| 36C25727R0018 0001.pdf | ||
| 36C25727R0018.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 21
0004 11-24-2026
36C257
Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building #171 Temple, TX 76504
To all Offerors/Bidders
36C25727R0018
10-28-2026
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to: 12-02-2026 10:00 AM CST
See CONTINUATION Page
X 1
The purpose of this amendment is to:
a. Update Schedule B.2 based on a question.
b. Provide answers to questions asked by the due time and date in the solicitation.
c. Extend the time and date for receipt of proposals to 1000 AM CST, December 2, 2026.
///SEE CONTINUATION PAGES///
Mr. Shawn R. Reinhart Contracting Officer
36C25727R0018-0004 CONTINUATION PAGES
B.2 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 INFORMATIONAL
ONLY
ON-CALL / EMERGENCY RESPONSE
ORDERING PERIOD 1
PRINCIPAL NAICS CODE: 562910 - Remediation Services PRODUCT/SERVICE CODE: F108 - Environmental Systems Protection - Environmental Remediation
0001AA
1.00 JB __________ __________
Emergency Response (Tier 1)
Project Supervisor, Remediation Technician, IEP (as-needed), Safety Officer IAW PWS Paragraph 6.1.
ORDERING PERIOD 1
Contract Period:
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0001AB
Emergency Response (Tier 2)
IAW PWS Paragraph 6.1
ORDERING PERIOD 1
Contract Period:
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0001AC
1.00 JB ___________ ___________
Emergency Response (Tier 3)
IAW PWS Paragraph 6.1
ORDERING PERIOD 1
Contract Period:
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0001AD
Equipment & Consumables: HEPA air scrubbers/negative air machines
(daily rate), dehumidifiers (LGR/Desiccant), air movers, moisture meters, particle counters, barriers/containment materials, PPE
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(unit/daily).
ORDERING PERIOD 1
Contract Period:
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services PRODUCT/SERVICE CODE: F108 - Environmental Systems
0001AE
1.00 JB ___________ __________
Emergency Reports (per incident):. 24-hour stabilization report;
moisture map; initial plan.
ORDERING PERIOD 1
Contract Period:
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0002 INFORMATIONAL
0.00
SCHEDULED REMEDIATION TASKS
ORDERING PERIOD 1
0002AA
Assessment & Written Remediation Protocol
EPA/IICRC references; ICRA/PCRA permit completion.
ORDERING PERIOD 1
Contract Period:
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0002AB
1.00 JB ___________ __________
Containment & Engineering Controls
Barrier installation, negative pressure, HEPA filtration, anteroom, pressure monitoring setup.
ORDERING PERIOD 1
Contract Period:
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0002AC
Mold Remediation
Controlled removal and cleaning of porous/non-porous materials per
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
EPA Table 2/IICRC S520; no reconstruction.
ORDERING PERIOD 1
Contract Period:
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services PRODUCT/SERVICE CODE: F108 - Environmental Systems
0002AD
HVAC Isolation & Cleaning
Only when HVAC is implicated; align to S520 HVAC remediation.
ORDERING PERIOD 1
Contract Period:
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0002AE
Drying & Moisture Control
Drying plan, equipment placement, logs, ASHRAE 160 targets; pricing unit tied to drying duration/volume.
ORDERING PERIOD 1
Contract Period:
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0002AF
PRV & Closeout
Visual acceptance, moisture metrics, (IEP sampling if specified), final PRV report; certificate where required.
ORDERING PERIOD 1
Contract Period:
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0003 INFORMATIONAL
COMPLIANCE / PERMITS
ORDERING PERIOD 1
PRINCIPAL NAICS CODE: 562910 - Remediation Services
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
PRODUCT/SERVICE CODE: F108 - Environmental Systems
0003AA
ICRA/PCRA Permitting & Posting
Includes VHA forms completion, updates, and daily logs as specified in PWS and directive.
ORDERING PERIOD 1
Contract Period:
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
0003AB
Texas TDLR Notification & Fee Administration
For =25 contiguous sq ft; includes filing, amendments, and evidence of compliance (PWS §17.7).
ORDERING PERIOD 1
Contract Period:
POP Begin: 12-01-2026 POP End: 11-30-2027 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1001 INFORMATIONAL
ORDERING PERIOD 2
PRINCIPAL NAICS CODE: 562910 - Remediation Services
1001AA
Project Supervisor, Remediation Technician, IEP (as-needed), Safety Officer IAW PWS Paragraph 6.1.
ORDERING PERIOD 2
Contract Period:
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1001AB
IAW PWS Paragraph 6.1
ORDERING PERIOD 2
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Contract Period:
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services PRODUCT/SERVICE CODE: F108 - Environmental Systems
1001AC
IAW PWS Paragraph 6.1
ORDERING PERIOD 2
Contract Period:
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1001AD
(daily rate), dehumidifiers (LGR/Desiccant), air movers, moisture meters, particle counters, barriers/containment materials, PPE (unit/daily).
ORDERING PERIOD 2
Contract Period:
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1001AE
moisture map; initial plan.
ORDERING PERIOD 2
Contract Period:
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1002 INFORMATIONAL
1002AA
EPA/IICRC references; ICRA/PCRA permit completion.
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Contract Period:
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services PRODUCT/SERVICE CODE: F108 - Environmental Systems
1002AB
Barrier installation, negative pressure, HEPA filtration, anteroom, pressure monitoring setup.
ORDERING PERIOD 2
Contract Period:
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1002AC
Controlled removal and cleaning of porous/non-porous materials per EPA Table 2/IICRC S520; no reconstruction.
ORDERING PERIOD 2
Contract Period:
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1002AD
Only when HVAC is implicated; align to S520 HVAC remediation.
ORDERING PERIOD 2
Contract Period:
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1002AE
Drying plan, equipment placement, logs, ASHRAE 160 targets; pricing unit tied to drying duration/volume.
ORDERING PERIOD 2
Contract Period:
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
PRODUCT/SERVICE CODE: F108 - Environmental Systems
1002AF
Visual acceptance, moisture metrics, (IEP sampling if specified), final PRV report; certificate where required.
ORDERING PERIOD 2
Contract Period:
POP Begin: 12-01-2027 POP End: 11-30-2028 PRINCIPAL NAICS CODE: 562910 - Remediation Services
1003 INFORMATIONAL
ORDERING PERIOD 2
PRINCIPAL NAICS CODE: 562910 - Remediation Services
1003AA
Includes VHA forms completion, updates, and daily logs as specified in PWS and directive.
ORDERING PERIOD 2
PRINCIPAL NAICS CODE: 562910 - Remediation Services
1003AB
For =25 contiguous sq ft; includes filing, amendments, and evidence of compliance (PWS §17.7).
ORDERING PERIOD 2
PRINCIPAL NAICS CODE: 562910 - Remediation Services
2001 INFORMATIONAL
ORDERING PERIOD 3
PRINCIPAL NAICS CODE: 562910 - Remediation Services
2001AA
Project Supervisor, Remediation Technician, IEP (as-needed), Safety
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Officer IAW PWS Paragraph 6.1.
ORDERING PERIOD 3
Contract Period:
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services PRODUCT/SERVICE CODE: F108 - Environmental Systems
2001AB
IAW PWS Paragraph 6.1
ORDERING PERIOD 3
Contract Period:
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2001AC
IAW PWS Paragraph 6.1
ORDERING PERIOD 3
Contract Period:
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2001AD
(daily rate), dehumidifiers (LGR/Desiccant), air movers, moisture meters, particle counters, barriers/containment materials, PPE (unit/daily).
ORDERING PERIOD 3
Contract Period:
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2001AE
moisture map; initial plan.
ORDERING PERIOD 3
Contract Period:
POP Begin: 12-01-2028
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services PRODUCT/SERVICE CODE: F108 - Environmental Systems Protection - Environmental Remediation
2002 INFORMATIONAL
ORDERING PERIOD 3
2002AA
EPA/IICRC references; ICRA/PCRA permit completion.
ORDERING PERIOD 3
Contract Period:
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2002AB
Barrier installation, negative pressure, HEPA filtration, anteroom, pressure monitoring setup.
ORDERING PERIOD 3
Contract Period:
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2002AC
Controlled removal and cleaning of porous/non-porous materials per EPA Table 2/IICRC S520; no reconstruction.
ORDERING PERIOD 3
Contract Period:
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2002AD
Only when HVAC is implicated; align to S520 HVAC remediation.
ORDERING PERIOD 3
Contract Period:
POP Begin: 12-01-2028
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services PRODUCT/SERVICE CODE: F108 - Environmental Systems
2002AE
1.00 JB _________ __________
Drying plan, equipment placement, logs, ASHRAE 160 targets; pricing unit tied to drying duration/volume.
ORDERING PERIOD 3
Contract Period:
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2002AF
Visual acceptance, moisture metrics, (IEP sampling if specified), final PRV report; certificate where required.
ORDERING PERIOD 3
Contract Period:
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2003 INFORMATIONAL
ORDERING PERIOD 3
PRINCIPAL NAICS CODE: 562910 - Remediation Services
2003AA
Includes VHA forms completion, updates, and daily logs as specified in PWS and directive.
ORDERING PERIOD 3
Contract Period:
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services
2003AB
For =25 contiguous sq ft; includes filing, amendments, and evidence of
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
compliance (PWS §17.7).
ORDERING PERIOD 3
Contract Period:
POP Begin: 12-01-2028 POP End: 11-30-2029 PRINCIPAL NAICS CODE: 562910 - Remediation Services PRODUCT/SERVICE CODE: F108 - Environmental Systems Protection - Environmental Remediation
GRAND
TOTAL
QUESTIONS WITH ANSWERS
QUESTION 1: Is this a new requirement?
ANSWER 1: Yes
QUESTION 2: Wo is the incumbent and obligation number?
ANSWER 2: This is a new requirement.
QUESTION 3: Section 6.6 States “6.6 Assessment & Protocol Development
• Conduct site assessments, moisture mapping, and root cause analysis (building envelope, plumbing, HVAC).
• Develop written Remediation Protocols referencing ANSI/IICRC S520 2024 and EPA commercial buildings guide, including containment strategy, work area classification, and post remediation verification criteria.
• Where healthcare risk exists, complete VA Pre Construction Risk Assessment (PCRA) and VA Infection Control Risk Assessment (ICRA) forms and obtain VA approvals prior to mobilization.”
The question we have is. Texas Department of Licensing and Regulation (TDLR) does not allow for a remediation company or its agents to perform both the assessment and the remediation on the same project. This must be two (2) separate companies. The NTXVAHCS as a current contract at last check for the assessment of indoor air, asbestos, and mold. Would not this contract in place account for mold ANSWER 3: Facility Industrial Hygienist will assess if it require contracted work or not; a nonaffiliated party will provide a report of the extent of damage and write the SOW to be given to the contractor.
QUESTION 4: Section 7 does not list TDLR as a applicable law. Since TDLR regulated mold in Texas this agency needs to be listed due to reporting of regulated mold project. Can this be adjusted? However, it is listed in Section 17.3.2, 17.5, 17.7.
ANSWER 4: Yes, TDLR rule can be added to section 7.
QUESTION 5: Section 8 contractor qualifications Does not list TDLR licensed workers, MAC or MRC.
ANSWER 5: Contractor should say TDLR license workers shall follow the guidelines of section 8.
QUESTION 6: Who will be responsible for asbestos and lead paint surveys which are required by law to be conducted prior to remolding or remediation activities? These inspections are not identified in the Scope of work.
ANSWER 6: Safety Service HERC will contact the outside third-party asbestos and lead consulting company.
QUESTION 7: Section 6.1 identifies response time for (Emergency) however what is the response time for non-emergency (scheduled under CLIN xxx2)?
ANSWER 7: 24-48 hours
QUESTION 8: CLINxxx1AD Equipment & Consumables: HEPA air scrubbers/negative air machines (daily rate), dehumidifiers (LGR/Desiccant), air movers, moisture meters, particle counters, barriers/containment materials, PPE (unit/daily).
a. Is this a unit count of one unit each? Since the number and size of equipment will vary greatly based on the size of the are to be addressed.
b. The number and type of equipment needed will need to be initially assed after callout and assessment of the project.
c. HEPA air scrubbers are not normally considered consumable. Filters, PPE, etc. are consumable.
d. Does this CLIN account for the ridged containment needed for a site? Again, the amount of containment and expanse of that containment will not be known until after assessment.
ANSWER 8: A. Correct B. Correct D. Correct
QUESTION 9: CLIN xxx2AB installation of barriers and setup cannot be determined is since some projects may only take 2-3 pieces of rigid barrier and some projects may take 20 pieces.
ANSWER 9: Correct
QUESTION 10: CLIN xxx2AC should this be per square foot or similar quantifiable unit since mold remediation cannot have a flat number associated and more time than most mold remediation is dynamic and changes as the project progresses.
ANSWER 10: Correct, this number will be associated with the scale of the remediation and cannot be on a fixed price basis per event.
QUESTION 11: CLIN xxx2AE same as above drying equipment needed is this simply the reporting or the actual equipment covered under CLINxxx1AD.
ANSWER 11: Yes
QUESTION 12: CLIN xxx1 is for Emergency operations. CLIN xxx2 is for scheduled operations, however, there is no mention in CLIN xxx2x of consumables or equipment for the projects. Are those items charged under CLIN xxx1AD?
ANSWER 12: Yes
QUESTION 13: Incumbent Contractor Information: Could the Government please identify the incumbent contractor currently performing mold remediation and water intrusion services across the VA North Texas Health Care System (VANTHCS)?
ANSWER 13: This is a new requirement.
QUESTION 14: Previous Award / Contract Identifier: What is the contract number or task order award ID associated with the prior/current contract for these services?
ANSWER 14: This is a new requirement.
QUESTION 15: CLIN 0001AA calls for Project Supervisor, Remediation Technician, IEP (as-needed), Safety Officer. Is this the same personnel count and types for all Emergency callouts tiers?
ANSWER 15: No, situation dictates personnel.
QUESTION 16: What is the determining factor for a CLIN 0001 vs. CLIN 0002 situation. What constitutes an Emergency (i.e. after hours, weekends, holidays).
ANSWER 16: Any water intrusion event that cannot dry within 72 hours and is beyond the capability of available manpower. Anything that directly impacts patient care and facility operations.
QUESTION 17: CLIN 0002 none of the sub CLIN lines has personnel labor, can a sub CLIN be added for labor for each class of person per hour?
ANSWER 17: No, must be in compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C.5341 or 5332.
This Statement is for Information Only: It is not a Wage Determination.
Employee Class Monetary Wage-Fringe Benefits Environmental Technician $25.86 + Fringe (Dallas County)
QUESTION 18: CLIN 0002AB-AD can these items be further described to what size and quantities a “Job” would encompass.
ANSWER 18: During the assessment process the size and quantities are determined. This cannot be forecasted or predicted ahead of time.
QUESTION 19: CLIN 0002AA calls for an assessment and protocol “job” however in the PWS section
17.1 a protocol is VA furnished. Is this not a duplicate requirement?
ANSWER 19: Post assessment is done by a third party. The Contractor shall follow VA-furnished protocols; provide moisture mapping and restoration plans per VHA M3P; and coordinate access and scheduling with Industrial Hygiene as documented in incident communications.
QUESTION 20: The CLIN 0001AD and 0002AB for equipment does the VA intend on getting a Daily menu pricing sheet for each piece of equipment all at a quantity of one each then taking that one-day total if ALL items are used would be the 1 each JB.
Dehumidifier lg7000 equivalent
Standard Daily rate $00.00
Emergency Daily $00.00
Dehumidifier lg 3000 equivalent
Air Mover HEPA 2000
CFM
Air Mover HEPA 500
CFM
Containment per 24 square foot panel
Other items as provided by vendor
Entered into CLIN line for 0002AB or
0001AD
THEN only charged for actual items and quantities utilized on the project
TOTAL $00.00 $00.00
ANSWER 20: All CLINs will be Firm Fixed Price with a unit of measure of JB and quantity of 1.
QUESTION 21: Clarify that the VA responsible for shutting down of systems i.e. HVAC, plumbing, electrical, steam in both Emergency and standard operations. With the direction and coordination from the contractor?
ANSWER 21: Yes
QUESTION 22: Would l the VA could accommodate an additional site visit at the facilities. If another site visit is not feasible, would it be possible to provide photographs of any known problem areas, affected rooms, or locations where mold or water intrusion has previously occurred?
ANSWER 22: Yes
QUESTION 23: Pricing Structure and Job Quantities. Section B.2 requires firm-fixed unit prices for each "JB" line item. However, the solicitation does not establish specific job sizes or quantities for these services. Could the Government clarify what assumptions offerors should use when developing their pricing, particularly regarding affected square footage, labor hours, equipment quantities, and anticipated job duration? Alternatively, would the Government consider accepting a supporting schedule of labor rates, equipment daily rates, and unit prices?
ANSWER 23: Job means you can bill multiple times. Government doesn’t advise under assumptions.
No.
QUESTION 24: Emergency Response Charges. For the Tier 1, Tier 2, and Tier 3 emergency response line items, what services must be included in the fixed emergency response charge? Should these charges cover mobilization, initial assessment, and stabilization only, with subsequent mold remediation, equipment rental, water extraction, and ongoing structural drying billed separately under their respective line items?
ANSWER 24: Contractor needs to categorize for each tier.
QUESTION 25: Emergency Response Time Requirements. Section 6.1 establishes emergency response times of two, four, and eight hours depending on the affected area's classification. However, Section
17.3.2 specifies a 12-hour on-site response requirement. Could the Government confirm which requirement governs? Additionally, does the two-hour Tier 1 response requirement apply to all facilities, including the Sam Rayburn Memorial Veterans Center in Bonham, Texas?
ANSWER 25: All 3 tiers apply to all facilities equally.
QUESTION 26: Mold Assessment, Testing, and Clearance Responsibilities. Section 17.1 references VA-furnished mold remediation protocols, mold testing, industrial hygiene services, and post-remediation clearance reports. However, Sections 6.6 and 6.7, along with the pricing schedule, identify assessment, remediation protocol development, and post-remediation verification as contractor responsibilities. Could the Government clarify which party will be responsible for providing and paying for the licensed mold assessment professional, written remediation protocol, environmental sampling, post-remediation verification, and final clearance certification?
ANSWER 26: The Government will use a third-party contractor to do this service.
QUESTION 27: Historical Workload and Guaranteed Minimum Quantities. To help offerors develop realistic pricing, could the Government provide any available historical information regarding:
• Average annual number of water intrusion and mold remediation incidents.
• Typical affected square footage and project duration.
• Average structural drying duration.
• Historical annual expenditures or anticipated contract spending.
ANSWER 27: No
QUESTION 28: Allocation of Costs Across CLINs. The pricing schedule separately identifies equipment and consumables (0001AD), emergency reporting (0001AE), containment (0002AB), drying (0002AE), post-remediation verification (0002AF), and permitting (0003AA/0003AB). Could the Government clarify how equipment rental, moisture monitoring, reporting, containment monitoring, and permit administration costs should be allocated among these line items to prevent overlapping or duplicate charges?
ANSWER 28: All items identified above will be billed under the respective CLIN.
QUESTION 29: After-Hours, Weekend, and Holiday Emergency Services. Section 5 requires advance COR approval for work outside normal business hours, while the emergency response provisions require rapid mobilization that may occur during nights, weekends, or holidays. Could the Government clarify how emergency work will be authorized outside normal operating hours? Should offerors incorporate all anticipated after-hours, weekend, and holiday costs into the fixed emergency response rates, or will separate charges be permitted when authorized?
ANSWER 29: It will be authorized by the COR when the issue occurs.
QUESTION 30: Second-Year Permit Line Items. In Ordering Period 2, CLINs 1003AA and 1003AB identify quantities of zero and do not specify billing units. Could the Government confirm whether these are intentional or whether the quantities and units should match the corresponding permit-related CLINs in Ordering Periods 1 and 3?
ANSWER 30: See updated Schedule B.2
QUESTION 31: Required Mold Remediation Licenses and Certifications. Section 18 references supervisor qualifications as "CMR/AMRT/TDLR." Could the Government clarify whether "CMR" refers to a specific ACAC or NORMI certification, or whether "MRC" was intended to reference the Texas
Mold Remediation Contractor license? Additionally, would a current Texas TDLR Mold Remediation Contractor license, together with applicable IICRC certifications, OSHA 30, and ICRA training, satisfy the supervisor qualification requirements? Could the Government also confirm whether any specific insurance limits, additional certifications, or documented healthcare remediation experience must be submitted with the technical proposal?
ANSWER 31: There was no specification given. MRC shall refer to the Texas Mold Remediation contractor license. A current TDLR Mold Remediation Contractor license, OSHA 30 and ICRA training would suffice for the supervisor qualifications.
QUESTION 32: Response time: Section 6.1 requires Tier 1 on-site within 2 hours with stabilization within 6 hours (Tier 2: 4/12 hours; Tier 3: 8/24 hours), but Section 17.3.2 states the contractor shall respond on site within 12 hours for emergency water intrusion. Which timeframe controls for an emergency water intrusion event, and does the 12-hour figure apply to a different category of work?
ANSWER 32: Section 6 will be for emergency water intrusion that is too much for the VA manpower. 17 will be just general, non-emergent water intrusion work.
QUESTION 33: Dallas-area response: TA is based in El Paso. May the Tier 1 two-hour response be met through a Dallas-area subcontractor or on-call partner with personnel stationed in the Dallas area, with TA as prime? Is response time measured from Government notification to on-site arrival?
ANSWER 33: In accordance with VAAR 852.219‑75 and 13 CFR 125.6, for a services contract the SDVOSB prime contractor may not pay more than 50 percent of the amount paid by the Government to firms that are not similarly situated SDVOSBs. Labor performed by a subcontractor that is not a similarly situated SDVOSB will therefore count toward this 50% limitation. Offerors are responsible for ensuring that the total amount subcontracted to non‑similarly situated entities does not exceed the applicable limitation. If the sub-contracted work to a non‑similarly situated firm would cause the prime to exceed the 50% threshold for services, the arrangement would not comply with the limitation on subcontracting. The Government cannot advise offerors on how to structure their proposals, but compliance with the limitation on subcontracting is a material requirement of the solicitation.
QUESTION 34: On-site supervisor: must the OSHA 30 + IICRC AMRT supervisor be an employee of the prime contractor, or may a qualified subcontractor supervisor satisfy the requirement when that subcontractor is performing the work?
ANSWER 34: In accordance with VAAR 852.219‑75 and 13 CFR 125.6, for a services contract the SDVOSB prime contractor may not pay more than 50 percent of the amount paid by the Government to firms that are not similarly situated SDVOSBs. Labor performed by a subcontractor that is not a similarly situated SDVOSB will therefore count toward this 50% limitation. Offerors are responsible for ensuring that the total amount subcontracted to non‑similarly situated entities does not exceed the applicable limitation. If the sub-contracted work to a non‑similarly situated firm would cause the prime to exceed the 50% threshold for services, the arrangement would not comply with the limitation on subcontracting. The Government cannot advise offerors on how to structure their proposals, but compliance with the limitation on subcontracting is a material requirement of the solicitation.
QUESTION 35: Task-order pricing: the solicitation is task-order driven with no fixed quantities and no government estimate. How will individual task orders be priced - against the CLIN schedule as job orders at time of order, or is a separate unit-price schedule required with the proposal?
ANSWER 35: The solicitation does not contemplate a task-order contract. The CLIN schedule is intended to establish fixed contract pricing for anticipated services and materials so that the Government may request performance as needed. Offerors are not required to submit a separate task-order pricing schedule or job-order pricing proposal. Pricing shall be submitted only for the CLINs identified in the solicitation. The COR may coordinate and schedule services within the scope of the awarded contract;
however, only the Contracting Officer may authorize work outside the contract scope or otherwise modify the contract.
QUESTION 36: Existing Mold Conditions: Are there currently any known or identified mold issues, water intrusion incidents, or areas requiring remediation at any of the five facilities listed above?
ANSWER 36: Contractors that attend the site visit did inspections of the areas.
QUESTION 37: Historical Mold Reports and Remediation Protocols: If mold or water intrusion issues have previously been identified at any of these locations, are historical mold assessment reports, inspection findings, moisture reports, or existing remediation protocols available for review?
ANSWER 37: All historical information wasn’t comprehensive or detailed and outdated.
QUESTION 38: Availability of Reports for Quotation Preparation: If such reports and remediation protocols are available, would interested offerors be permitted to review them before submitting their quotations? Access to this information would help us better understand the potential scope of work and develop accurate and competitive pricing.
ANSWER 38: At this time, the Government does not anticipate providing offerors access to inspection reports, assessment reports, remediation protocols, or similar internal facility documentation for quotation-preparation purposes. Offerors are expected to base their quotations on the information provided in the solicitation, including the Performance Work Statement (PWS), and to propose an approach and pricing that adequately addresses the stated requirements. The Government has provided the information necessary to permit vendors to compete on a common basis. Any reports, assessments, or remediation documentation that may exist are intended for internal Government use and will not be made available to offerors as part of this solicitation. Offerors should prepare their quotations based on the solicitation requirements and their professional judgment regarding the labor, materials, equipment, and resources necessary to successfully perform the work described in the PWS.
QUESTION 39: Nature of the Requirement - On-Call vs. Scheduled Remediation: Could the Government clarify whether this requirement is primarily intended to provide on-call/emergency response services for future mold and water intrusion incidents, or whether there are existing remediation projects anticipated at any of the identified facilities that the contractor will be expected to address upon award?
ANSWER 39: Primarily this contract is for existing large-scale remediation projects to get fulfilled, but as well as being able to respond to large-scale water intrusions or mold events when necessary.
QUESTION 40: Existing Surveys: Given that the scope requires selective removal of drywall, plaster, flooring/mastics, and ceiling assemblies in older facilities, could the Government provide existing Asbestos (ACM) and Lead-Based Paint (LBP) survey reports for each location?
ANSWER 40: Existing survey reports will be provided as needed.
QUESTION 41: Identified Hazards: Has the VA pre-identified any known ACM, PACM, or lead in the pipe chases, cavities, or mechanical spaces commonly impacted by water intrusion?
ANSWER 41: Yes, asbestos and lead surveys were done and will be provided to the awardee.
QUESTION 42: Abatement Protocols: If intrusive exploratory work or remediation disturbs asbestos- or lead-containing materials, will the VA provide a facility-specific hazard protocol, or will a separate abatement contractor be engaged prior to mold remediation?
ANSWER 42: The Government will abate the asbestos as needed, depending on the scale. If too large a separate contractor may be used.
QUESTION 43: Clearance & Disposal: Will the VA Industrial Hygiene team perform baseline and clearance testing for asbestos/lead fibers if disturbed, and what specific waste profiling/manifesting procedures apply?
ANSWER 43: No, this will be done through the awardee.
QUESTION 44: Unit of Measure. Every priced CLIN in Section B.2 (0001AA through 0003AB, and the 1000- and 2000-series equivalents) is quantity 1.00, unit "JB." Emergency response, drying, containment, and removal scale with affected area, duration, and crew size, and the Addendum to FAR 52.212-1 (Price) requires an all-inclusive firm fixed unit price that "covers in full those services under each CLIN." Please define what one "JB" represents for each CLIN (per event, per day, per square foot, or per labor hour), or revise the schedule to unit rates (labor hour by category, equipment per day, and square feet of removal) with estimated quantities so that all offerors price on a common basis.
ANSWER 44: 1 JB typically means 1 Job. The Government is buying one complete job for that CLIN rather than a specific quantity of hours, days, units, or materials. The contractor must perform all work necessary to complete the requirement described in that CLIN for the fixed price proposed. This allows the awardee to submit multiple invoices across the period of performance.
QUESTION 45: Estimated Quantities and Historical Usage. The Addendum to FAR 52.212-1 (Options) states that "the total evaluated price will be based on the quantities identified in the schedule." Please provide estimated quantities by CLIN and ordering period, and historical data for the past three years: the number of emergency water intrusion events by tier and facility, the number of scheduled remediation projects, and typical affected square footage. Please also identify the incumbent contractor and current contract number, if any.
ANSWER 45: This is a new requirement; therefore, the Government has no estimated quantities or historical data.
QUESTION 46: Equipment and Consumables (CLIN 0001AD). CLIN 0001AD lists HEPA air scrubbers, negative air machines, dehumidifiers, air movers, meters, particle counters, containment materials, and PPE "(unit/daily)" under a single 1.00 JB. Please confirm whether offerors are to submit a daily rate table for this equipment and, if so, how the table will be evaluated, or whether CLIN 0001AD is a single lump sum per event.
ANSWER 46: CLIN 0001AD is a single lump sum per event.
QUESTION 47: Documentation CLINs. Emergency reports (CLIN 0001AE), ICRA/PCRA permitting (CLIN 0003AA), and PRV and closeout (CLIN 0002AF) are priced separately, yet PWS 6.5, 6.7, 12, and
17.5 also make the same documents part of each response and remediation task. Please confirm whether these deliverables are to be priced only in their own CLINs or carried in each task CLIN, so the same cost is not priced twice.
ANSWER 47: These deliverables are to be priced only in their own CLINs and are part of each response per the PWS.
QUESTION 48: TDLR Notification Fee (CLIN 0003AB). PWS 17.7 sets a mandatory $25 state fee for each TDLR notification. Please confirm whether CLIN 0003AB is to include the fee or the fee will be reimbursed at cost on each task order.
ANSWER 48: The TDLR fee is to be included in the CLIN. The solicitation does not contemplate a task-order contract. The CLIN schedule is intended to establish fixed contract pricing for anticipated services and materials so that the Government may request performance as needed. Offerors are not required to submit a separate task-order pricing schedule or job-order pricing proposal. Pricing shall be submitted only for the CLINs identified in the solicitation. The COR may coordinate and schedule services within the scope of the awarded contract; however, only the Contracting Officer may authorize work outside the contract scope or otherwise modify the contract.
QUESTION 49: Contract Minimum and Maximum. FAR 52.216-22(b) refers to the minimum and maximum "designated in the Schedule," but Section B.2 states neither. Please state the guaranteed contract minimum and the contract maximum (ceiling) for the three ordering periods.
ANSWER 49: Refer to FAR Clause 52.216-19.
QUESTION 50: Option Year 4 Reference. The Addendum to FAR 52.212-1 (Options) states the Government "will take the pricing for Option Year 4 and divide in half" to determine the FAR 52.217-8 price. The schedule has three ordering periods and no option years, and FAR 52.217-9(c) limits the total duration to three years. Please confirm whether Ordering Period 3 pricing will be used for the FAR 52.217-8 evaluation, and whether Ordering Periods 2 and 3 are options or part of the base ordering period.
ANSWER 50: In regard to Option Periods, the Ordering Periods are considered the same. Since there is no Ordering Period 4, the statement applies to Ordering Period 3.
QUESTION 51: Response Times and After-Hours Work. PWS 6.1 requires Tier 1 on site within 2 hours, Tier 2 within 4 hours, and Tier 3 within 8 hours, while PWS 17.3.2 requires the contractor to "respond on site within 12 hours." Please confirm which governs. Please also confirm that emergency response applies 24 hours a day, 7 days a week, including holidays (PWS 8.1), and whether offerors may price after-hours emergency labor separately, given PWS 5 (COR approval for work outside normal hours) and PWS 5.1 (no premium compensation).
ANSWER 51: PWS 6.1 governs. Emergency response applies 24 hours a day, 7 days a week, including holidays and offerors may price after-hours emergency labor separately by COR approval for work outside normal hours.
QUESTION 52: Mold Assessment Consultant and IEP. PWS 17.1 directs the contractor to follow a "VA-furnished mold remediation protocol, mold testing, industrial hygiene services, air monitoring, post-remediation assessment, and passed clearance report," while PWS 6.6 and CLIN 0002AA require the contractor to develop the written protocol, and PWS 17.5.3 requires the Certificate of Mold Damage Remediation to be signed by "the licensed mold assessment consultant conducting the post remediation assessment." Texas Occupations Code Chapter 1958 and 16 TAC Chapter 78 do not permit the same license holder to perform both assessment and remediation on a project. Please confirm whether VA (Industrial Hygiene or a separate VA contract) will furnish the Texas-licensed mold assessment consultant for the protocol, sampling, PRV, and clearance on every task order, or whether the contractor must engage an independent licensed consultant. If the latter, please confirm that the consultant's cost is priced in CLINs 0002AA and 0002AF.
ANSWER 52: The Government will use a third-party contractor to do this service.
QUESTION 53: Limitations on Subcontracting. If the contractor must engage an independent mold assessment consultant (RFI-09), please confirm how that Texas-required, independent service and laboratory analysis fees will be treated under VAAR 852.219-75 (Section C.13, services).
ANSWER 53: VAAR 852.219-75 clearly states that for services the prime contractor shall not pay more than 50% of the amount paid to the contractor to firms that are not certified SDVOSBs in the SBA Certification database (https://search.certifications.sba.gov/.)
QUESTION 54: Asbestos and Lead-Containing Materials. PWS 17.3 and 17.3.3 require removal of drywall, ceiling tiles, flooring, carpet, insulation, and casework. Please confirm whether VA will furnish asbestos and lead survey results for each affected area before removal, and that abatement of asbestos-containing or lead-containing materials is excluded from this contract.
ANSWER 54: VA will furnish asbestos and lead survey results for each affected area before removal, and that abatement of asbestos-containing or lead-containing materials is excluded from this contract.
QUESTION 55: Scope Boundary, Warranty, and Root-Cause Correction. PWS 1.2 and 17.3 exclude reconstruction and reinstallation. Please confirm whether temporary protection after removal (closing open wall cavities, maintaining fire and smoke barrier integrity, and temporary ceiling closure in patient areas) is in scope or performed by VA. Please also define the "warranty statement" and "root-cause correction list" required in the closeout package (PWS 12), including the warranty term and what it covers when the contractor does not repair the water source.
ANSWER 55: Scope shall be in accordance with VA ICRA/PCRA protocols. Warranty Statement -
QUESTION 56: HVAC Isolation and Cleaning. PWS 6.8, 10.3, and CLIN 0002AD require HVAC isolation and cleaning. Please confirm whether VA Engineering will perform HVAC shutdown, lockout, and restart, and whether duct cleaning must be performed by a NADCA-certified firm.
ANSWER 56: The Government will perform HVAC shutdown, lockout, and restart, and whether duct cleaning must be performed by a NADCA-certified firm.
https://search.certifications.sba.gov/
QUESTION 57: Waste Disposal. PWS 10.5 requires disposal "per facility procedures," and PWS 6.7 and
17.5.2 require waste manifests. Please confirm whether VA provides on-site containers for remediation debris or the contractor hauls off site, and what manifest form VA requires for non-hazardous mold debris.
ANSWER 57: Contractor hauls off site, and no VA manifest form is required for non-hazardous mold debris.
QUESTION 58: Wage Determinations. Section D incorporates Service Contract Act Wage Determinations 2015-5223, 2015-5227, and 2015-5231, and FAR 52.222-42 lists only the Environmental Technician class. Please confirm that no Davis-Bacon wage determination will apply to removal work on any task order, and that the Herzog Building falls under WD 2015-5227 (Dallas County).
ANSWER 58: This is not a construction contract; therefore, Davis-Bacon Wage determinations are not applicable.
QUESTION 59: Basis of Award. The Addendum to FAR 52.212-2 (E.3) describes a Lowest Price Technically Acceptable evaluation, and in the same section states that the Government may select "a higher-priced proposal" if its technical advantages justify the difference. Please confirm which basis of award applies and the relative importance of Technical, Price, and Past Performance.
ANSWER 59: E.3a state the evaluation is a comparative analysis IAW RFO FAR Part 12. It also states the Government is not required to select the lowest priced proposal. The evaluation factors are listed in order of importance as shown in FAR 52.212-2.
QUESTION 60: Past Performance Count and Font. Section E.1 asks for "two (2) to three (3) examples" of similar work, while the volume table allows "no more than 5 references." Please confirm the number of references allowed. Please also confirm that the Times New Roman 11 requirement applies to the technical narrative only, and not to the Government forms, the B.2 schedule, or technical exhibits (resumes, licenses, and certificates).
ANSWER 60: Times New Roman Font 11 applies to all submitted documentation, except the SF 1449 and SF30’s.
QUESTION 61: TDLR License Timing. PWS 8.3 and 18 and Subfactor (e) call for AMRT and TDLR licenses. Please confirm whether the TDLR Mold Remediation Contractor license must be held by the offeror at proposal submission or may be held by the firm and on-site supervisor performing the remediation at the time of the first task order.
ANSWER 61: The TDLR Mold Remediation Contractor license must be held by the offeror at proposal submission.
QUESTION 62: Ordering Start Date. FAR 52.216-18(a) permits orders from 6 December 2026, while Section B.2 shows Ordering Period 1 beginning 1 December 2026. Please confirm the start date for pricing Ordering Period 1.
ANSWER 62: Block 20 of the SF 1449 clearly states that the period of performance will be adjusted based on the award date.
(END OF QUESTIONS AND ANSWERS)
(END OF AMENDMENT)
| B.2 PRICE/COST SCHEDULE |
| ITEM INFORMATION |