P01 - 2013-02-11 FH SA HVAC As-Built_SAN ANTONIO 02-09-13 MECHANICAL AS BUILTS.pdf

PDF 2 MB Posted

Attached to
Replace Fisher House 1 HVAC System
Solicitation number
36C25727Q0006
Issued by

About this file

This document is a set of architectural and mechanical plans for the Fisher House Foundation, Inc. facility located at 1110 29th Street, Suite 21, Mesquite, Texas 75149.

The plans comprise a comprehensive building design package including first and second floor mechanical plans with detailed HVAC systems, condenser enclosure details, trench sections, MEP room layouts and elevations, equipment schedules, piping diagrams for both floors, boiler piping schematics, and fire damper details. The first floor mechanical plan depicts the primary HVAC distribution, condensing units, and supporting mechanical infrastructure serving the main occupied spaces. The second floor mechanical plan shows secondary mechanical systems, equipment scheduling, and distribution routing. Supporting detail drawings illustrate condenser enclosure configurations (Enclosures A and B), mechanical equipment room (MEP) layouts and elevations, fire damper installation specifications, and complete boiler piping schematic with color-coded supply and return lines. The equipment schedule provides comprehensive specifications for all mechanical systems integrated throughout the facility. The architectural drawings indicate a multi-story residential or institutional facility with multiple bedrooms, bathrooms, and common areas typical of a Fisher House operation, which provides housing for military families during medical treatment or recovery of their service member relatives.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H-1ab (02-09-13)

H-2ab (02-09-13)
H-3 (08-30-12)

File details come from the government source that posted it. Updated .