This is Amendment 0001 to Solicitation 36C25726Q0776, issued by the Department of Veterans Affairs Central Texas Veterans Health Care System on August 4, 2026.

The amendment corrects the Period of Performance (POP) in the Contract Line Items (CLINs) and Performance Work Statement (PWS) from September 14, 2026 – September 13, 2027 to September 26, 2026 – September 25, 2027. The solicitation seeks Integrated Pest Management (IPM) services for the South Texas Veterans Health Care System, including Audie L. Murphy Medical Center (San Antonio), Kerrville Medical Center, Villa Serena, Poly-Trauma Rehab Program, and two Fisher Houses. The contract is anticipated as Firm Fixed Price. Services include weekly pest inspections and monitoring, routine pest control services with 8-hour response time for non-emergent calls and 2-hour response time for emergencies, initial comprehensive inspections within 10 business days of award, and quarterly and annual pest management reporting. The contractor must be licensed and certified in Texas for structural pest control services, with licensed applicators and technicians performing all work. Normal routine service hours are Monday–Friday, 7:00 a.m.–4:00 p.m. CDT, with varying on-site requirements at different facilities (daily at Audie Murphy; three days per week at Kerrville and Kerrville Campus; weekly or twice weekly at smaller facilities). The contractor must comply with VHA Directive 1850.02, EPA regulations, OSHA standards, and National Pest Management Association guidelines. Six contract line items are detailed: base pest management services (1.00 JB), routine pest control services (10.00 EA), emergency call-back services (10.00 EA), initial comprehensive inspections (1.00 JB), quarterly pest management reporting (4.00 QTR), and annual comprehensive pest management reports (1.00 EA). All unit prices and amounts are blank, to be completed by offerors.

View the file

Other files

File Type Posted
36C25726Q0776 0003.pdf PDF
36C25726Q0776 0002.pdf PDF
36C25726Q0776.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 18

0001 08-04-2026

36C257

Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building #171 Temple, TX 76504

To all Offerors/Bidders

36C25726Q0776

07-30-2026

X

X X

See CONTINUATION Page

X 1

a. The purpose of this amendment is to correct the Period of Performance listed in the CLINs and the Performance Work Statement (PWS).

b. The POP is changed from 9/14/2026 - 9/13/2027 to 9/26/2026 - 9/25/2027.

///SEE CONTINUATION PAGES///

Shawn R. Reinhart Contracting Officer

36C25726Q0776-0001 CONTINUATION PAGES

A.1 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY UNIT

UNIT

PRICE AMOUNT

1.00 JB __________ ___________

Pest Management Services

Description: Contractor shall provide all labor, equipment, materials, supervision, and supplies to perform Integrated Pest Management (IPM) services at all listed facilities, in accordance with the PWS.

Includes:

Weekly, monthly, quarterly, and annual pest inspections as required Monitoring, trap maintenance, rodent and insect control Required routine service hours Monday–Friday, 7:00 a.m.–4:00 p.m.

All documentation and reporting (daily, quarterly, annual) Contract Period: Base POP Begin: 09-26-2026 POP End: 09-25-2027 PRINCIPAL NAICS CODE: 561710 - Exterminating and Pest Control Services PRODUCT/SERVICE CODE: S207 - Housekeeping - Insect/Rodent Control

10.00 EA __________ __________

Routine Pest Control Services (On-Demand / Non-Emergent)

Description: Contractor will respond to non-emergency service calls within 8 hours, perform IPM services, and document findings per PWS section 17.2.

Termite / Wood-Destroying Organism (WDO) Services (If Needed) - Annual termite inspections and treatment if required by facility. Supported under section 11.3 and notes under 15.3.

Fumigation / ULV / Thermal Fogging (If Needed) - Fumigation or ULV/thermal fogging that requires separate approval and scheduling per section 15.2 note.

Contract Period: Base POP Begin: 09-26-2026 POP End: 09-25-2027 PRINCIPAL NAICS CODE: 561710 - Exterminating and Pest Control Services

10.00 EA __________ __________

Emergency Call-Back Services

Description: Contractor shall respond to emergency calls within 2 hours to correct emergent pest-related issues per section 17.1.

Contract Period: Base POP Begin: 09-26-2026 POP End: 09-25-2027

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY UNIT

UNIT

PRICE AMOUNT

PRINCIPAL NAICS CODE: 561710 - Exterminating and Pest Control Services PRODUCT/SERVICE CODE: S207 - Housekeeping -

1.00 JB __________ ___________

Initial Comprehensive Inspections

Description: Initial inspections of every building/site within 10 business days of award. Includes structural assessment, monitoring device mapping, and recommendations.

Contract Period: Base POP Begin: 09-26-2026 POP End: 09-25-2027 PRINCIPAL NAICS CODE: 561710 - Exterminating and Pest Control Services

4.00 QTR __________ ___________

Quarterly Pest Management Reporting

Description: Quarterly reports summarizing pest sightings, pesticide applications, and trend data per section 23.4.

Contract Period: Base POP Begin: 09-26-2026 POP End: 09-25-2027 PRINCIPAL NAICS CODE: 561710 - Exterminating and Pest Control Services

1.00 EA ___________ _________

Annual Comprehensive Pest Management Report

Description: Annual consolidated report with yearly pest trends and analytics. Required once per contract year.

Contract Period: Base POP Begin: 09-26-2026 POP End: 09-25-2027 PRINCIPAL NAICS CODE: 561710 - Exterminating and Pest Control Services

GRAND

TOTAL

B.4 PERFORMANCE WORK STATEMENT

INTEGRATED PEST MANAGEMENT SERVICES

1. OBJECTIVE: Per VHA Directive 1850.02, Pest Management Operations Program, it is the Veterans Health Administration (VHA) policy that Department of Veterans Affairs (VA) medical facilities effectively implement a pest management program that follows Integrated Pest Management (IPM) principles and promotes safe, efficient and environmentally preferred strategies, thereby preventing or controlling disease vectors and other pests that may adversely impact health, impede operations or damage property. AUTHORITY: 38 U.S.C. § 7301(b).

1.2 BUSINESS LICENSURE: The prime Contractor as well as all Sub-Contractors performing pest control duties shall possess a current business license for pest control services in the state of Texas where contract execution is to be conducted and shall directly employ a licensed and certified pesticide applicator in the state of Texas where the services are to be conducted. Preference will be given to QualityPro accredited pest control companies as endorsed by the National Pest Management Association

(NPMA).

NOTE: The prime vendor shall adhere to individual business licensing laws as outlined in each State's pest control laws and regulations and meet all VHA requirements in accordance with VHA Directive 1850.02.

1.2.1 LICENSURE AUTHORITY:

• Texas requires pest control companies to hold a Structural Pest Control business license under Texas Occupations Code Chapter 1951, § 1951.301 and Texas Administrative Code, Title 4 (Agriculture), Part 1, Chapter 7 (Pesticides), Subchapter H (Structural Pest Control Service), Division 2 (Licenses) § 7.121 - Types and Requirements of Licenses.

• Texas requires individuals performing pest control to hold a Structural Pest Control license issued by the Texas Department of Agriculture (TDA) under Chapter 1951 of the Texas Occupations Code.

2. CONTRACTOR RESPONSIBILITIES: The Contractor shall provide all supervision, management, process oversight, laboratory testing, tools, supplies, equipment, pesticides, transportation, and labor to develop and implement an IPM plan for the South Texas Veterans Health Care System, 7400 Merton Minter Blvd, San Antonio, Texas 78299 and all locations shown in Table 1. The Contractor shall execute IPM activities in a manner that prioritizes and safeguards the health, safety and well-being of patients, staff and visitors.

Table 1 – Pest Management Locations Audie L. Murphy Medical Center, 7400 Merton Minter Blvd, San Antonio, Texas, 78229-4404 Kerrville Medical Center, 3600 Memorial Blvd, Kerrville, Texas, 78028 Villa Serena, 4455 Horizon Hill Blvd, San Antonio, Texas, 78229-4404 Poly-Trauma Rehab Program, 4949 Gus Eckert Rd, San Antonio, TX 78240 Fisher House, 7485 Wurzbach Parkway, San Antonio, TX 78229 Fisher House (II), 7485 Wurzbach Parkway, San Antonio, TX 78229

3. PEST MANAGEMENT OFFICER (PMO): For the purpose of this Performance Work Statement (PWS), the PMO is defined as the medical facility’s designated Pest Management Officer in accordance with VHA Directive 1850.02.

3.1 Contracting Officer’s Representative. A Contracting Officer’s Representative and an Alternate Contracting Officer’s Representative will be appointed at time of award for both San Antonio and Kerrville.

4. PERFORMANCE PERIOD: The contract period of performance is September 26, 2026 to September 25, 2027.

5. TYPE OF CONTRACT: The Government anticipates a Firm Fixed Price contract for this requirement.

6. WORK HOURS (FOR EXECUTION OF SERVICES): The service schedule shall be established at the beginning of the period of performance and documented in writing. The schedule shall be developed collaboratively by the Contractor, Contracting Officer (CO), Contracting Officer Representative (COR), and the PMO.

6.1 Normal routine services shall occur 5 days a week on Monday, Tuesday, Wednesday, Thursday, and Friday for the following timeframes from 7:00 am to 4:00 pm CDT. The Contractor shall be on site and perform work on these days and hours. For Audie L. Murphy VA Medical Center services, will be Monday through Friday between the hours of 7:00 AM to 4:00PM CDT. Kerrville VA Medical Center services will be on-site as needed and at least 3 days per week for 4 hours per day between the hours of 7:00 AM to 4:00PM CDT. CBOC’s and Fisher Houses:

• Villa Serena 4455 Horizon Hill Blvd, San Antonio, TX 78229 o Service frequency shall be contractor on-site as needed and at least every Tuesday for not less than 2 hours (between the hours of 7:00 AM to 4:00PM CDT)

• Poly-Trauma Rehab Program 4949 Gus Eckert Rd. San Antonio, TX 78240 o Service frequency shall be contractor on-site as needed and at least every Thursday for not less than 2 hours (between the hours of 7:00 AM to 4:00PM CDT)

• Fisher House 7485 Wurzbach Parkway, San Antonio, TX 78229 o Service frequency shall be contractor on-site as needed and at least every Wednesday for not less than 2 hours (between the hours of 7:00 AM to 4:00PM CDT)

• Fisher House II 7485 Wurzbach Parkway, San Antonio, TX 78229 o Service frequency shall be contractor on-site as needed and at least every Wednesday for not less than 2 hours (between the hours of 7:00 AM to 4:00PM CDT)

• Kerrville Campus (KC), 3600 Memorial Blvd, Kerrville, TX 78028. Contractor shall be on-site 3 days per week for 4 hours per day between the hours of 7:00 AM to 4:00 PM CDT on Monday, Wednesday, and Friday except for Federal Holidays. All grounds and exterior buildings located on the Kerrville Campus shall be serviced to include, but not limited to the following:

Building 1 - Logistics Building 18 - Laundry Building 2 - Education Building 19 – Boiler Plant Building 22 - Paint Shop Building 46 - Transportation Building 29 - Engineering Building 114 - Warehouse Building 96 - KTC

6.2 The Contractor shall physically sign-in upon arrival and sign-out on completion of each service visit in the onsite IPM logbook. Failure to sign-in or sign-out will constitute non-compliance. While on site, the Contractor shall check in with designated facility representative(s) to review the status and progress of the IPM program and to address observed or reported pest management issues. This coordination is required for each visit.

6.3 If special key or badge access is required for sensitive areas or outside regular hours, a written protocol will be developed between the Contractor, COR, and PMO documenting the process and points of contact necessary to ensure all hour access for pest management services.

6.4 Any work performed outside of normal business hours requires prior approval from the COR before commencement. The Contractor shall provide a minimum of no less than one (1) business day advance notice for all after-hour work requests. Exceptions to the advance notice requirement may be granted only when the COR or PMO determine the work constitutes an emergency.

7. FEDERAL HOLIDAYS: The Government observes these holidays:

New Year's Day January 1st Martin Luther King's Birthday Third Monday in January Washington’s Birthday Third Monday in February Memorial Day Last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11th Thanksgiving Day Fourth Thursday in November Christmas December 25th

If a holiday falls on a Saturday, then the Friday before will be considered the holiday. If a holiday falls on a Sunday, then the Monday after will be considered the holiday.

In addition to the days designated as holidays, the Government observes the following days:

• Any other day designated by Federal Statute

• Any other day designated by Executive Order

• Any other day designated by the President’s Proclamation

8. INTERFERENCE TO NORMAL FUNCTION: The Contractor shall suspend or modify work activities to prevent interference with normal facility operations, including but not limited to patient care, utility services, fire protection systems, as well as the safe passage of patients, staff, equipment and carts.

8.1 In the event of an emergency, Contractor services may be suspended temporarily and rescheduled at no additional cost to the government.

8.2 If access is required to secure areas, Contractor personnel shall request access from the COR/PMO.

8.3 Contractor shall provide the COR and the PMO with a contingency plan if the Contractor is unable to perform or provide services.

9. SCOPE OF CONTRACT AND CONTRACT MODIFICATIONS: The final contract will stipulate the responsibilities of the Contractor and/or the government. The Contractor and the government are required to adhere to the scope of the finalized contract. All modifications shall be initiated and approved by the Contracting Officer. The Contractor shall not receive payment for any work/services/deliverables that are/were not specifically authorized under the contract (as written or as modified).

10. CONTRACTOR STAFF/PERSONNEL QUALFICATIONS, EXPERIENCE, AND OTHER

REQUIREMENTS: All personnel performing work and executing services/deliverables shall possess the necessary licensure, qualifications, and experience necessary to execute the specific tasks in this PWS.

Unqualified individuals shall not perform work which is covered under the scope of the finalized contract at any time during the performance period.

11. REQUIREMENTS OF CONTRACTOR: The following requirements/stipulations are mandatory for Contractors/Contractor personnel (e.g., Commercial Pesticide Applicators, Technicians, Pest Helpers).

11.1 Contractor shall be appropriately licensed and permitted in the State of Texas to perform structural or equivalent pest control services, including wood destroying insect control and public health or equivalent. Only Environmental Protection Agency (EPA) and the State of Texas Department of

Agriculture approved pesticides, and equipment shall be used during the performance of services. All pesticides shall be EPA registered and labeled for use in a hospital and healthcare environment.

11.2 The Contractor and all personnel assigned to this contract shall be licensed and certified applicators or certified technicians in Texas, and fully compliant with applicable state licensing and regulatory requirements governing the mixing, handling and application of pesticides. Assigned personnel shall be capable of performing pest identification and providing programmatic recommendations independently, without direct supervision, as defined by state requirements. Individuals supporting this contract shall possess current knowledge and demonstrated experience in the commercial application of pest control treatments and the execution of pest management services within a healthcare setting.

11.3 The Contractor shall have appropriate certifications and licenses to perform yearly inspection for termite infestation and treatment if required by the facility.

11.4 Basic proficiency in speaking, understanding, and writing English is required by the Contractor and Contractor personnel without the use of an interpreter.

11.5 While on VA premises, all Contractor personnel shall comply with the rules, regulations, and procedures governing the conduct of personnel and the operation of the facility. This includes but is not limited to wearing/displaying identification badges and identifiable uniforms which specify the company they are representing.

11.6 Regulations prohibit smoking on VA property. This includes use of cigarettes, cigars, pipes, any other combustion of tobacco and non-Federal Drug Administration (FDA) approved electronic nicotine delivery systems (ENDS), including but not limited to electronic or e-cigarettes, vape pens, or e-cigars.

11.7 Contractor shall ensure that employees assigned to this service contract have a general background check. Employees that do not meet security and clearance requirements will not be allowed to perform work under this contract.

11.8 The Contractor shall park in the appropriate designated parking areas while on-site. Parking arrangements will be coordinated between the government and Contractor at the beginning of the performance period before work begins. The medical facility/government will not/does not validate or make reimbursement for parking violations for Contractor personnel under any circumstances.

11.9 The Contractor shall supply fly lights.

12. SITE SPECIFIC REQUIRMENTS (ADDITIONAL CONTRACTOR QUALIFICATIONS):

Assigned Technicians to the site are required to possess certification in Structural (or equivalent) and Health Related categories as acceptable to the Texas Department of Agriculture or other governing Boards of the State.

12.1 License Types.

• Apprentice Registration: Entry-level, shall work under a licensed technician or applicator

• Technician License: Allows application under the supervision of a Certified Applicator

• Certified Applicator License: For those working in or owning pest-control businesses.

12.2 Technicians shall also hold a Rodent Control License issued by the Texas Department of Agriculture as required under Texas Administrative Code § 7.133.

12.3 Apprentices or Pest Control Helpers are allowed to shadow and receive on-the-job training, provided that a Certified Applicator or Technician is always physically present on-site and remains within visual range of the Apprentice or Helper. Apprentice cards issued by the Texas Department of Agriculture shall be provided to the COR and PMO.

13. SPECIFICATIONS:

13.1 Contractor shall assume full responsibility for compliance with the following as they apply to IPM service in Department of Veterans Affairs (VA) medical facilities.

• VHA Directive 1850.02, Pest Management Operations Program

• VA Directive 0057, VA Environmental Management Program

• VHA Directive 7707, VHA Green Environment Management System and Governing

Environmental Policy

• Federal Insecticide Fungicide Rodenticide Act (FIFRA)

• Environmental Protection Agency (EPA) guidance and regulations

• Occupational Safety and Health Administration (OSHA) regulations

• Federal, State, and local ordinances

• National Pest Management Association (NPMA) guidelines and best practices

NOTE: VA requirements for pest control may be more stringent than U.S., state, and local requirements.

13.2 The Contractor shall implement and maintain practices consistent with the requirements of the VA’s Environmental Management System (EMS) and shall ensure that all personnel performing work under this contract are aware of and adhere to applicable environmental policies, procedures, and requirements.

The Contractor shall promptly report any environmental incidents, spills, or potential violations to the COR and take immediate corrective action as required. Failure to comply with these requirements may result in work stoppage, contract termination, or other remedies available to the government.

13.3 The Contractor shall conform to all federal, state, and local regulations governing examining and licensing of pest control operators, performance of pest control services, use of approved pest control chemicals and equipment, and proper disposal methods for all products/containers, which may be in effect for the area where the work under the contract is performed.

13.4 The Contractor shall develop and implement an IPM plan, and it shall include operational and programmatic approaches that reduce food, water, harborage, and access used by pests. The Contractor’s IPM plan shall include a pest surveillance/monitoring program, pest trending, pest trapping/removal, pesticide application, and all regulatory service reporting. The Contractor shall provide detailed, site-specific recommendations for structural and technical alterations (indoor and outdoor) that exclude and manage pests within the property boundaries and near buildings and structures.

13.5 The Contractor shall provide the COR and PMO with maps identifying the locations of all interior and exterior pest monitoring devices, including but not limited to interior rodent traps, insect monitors, rodent bait stations, and insect light traps.

13.5.1 All equipment used for insect and rodent monitoring services shall correlate with the approved maps and be documented in the logbook and reviewed with the COR and PMO at least annually.

13.5.2 All monitoring devices shall be assigned a unique identification number by the Contractor and the corresponding identification numbers will be annotated on the approved maps.

13.5.3 All exterior rodent bait stations shall be properly marked and dated in accordance with local and State requirements.

14. LOCATIONS OF IPM SERVICES: See Attachment 1 to PWS.

15. INTEGRATED PEST MANAGEMENT (IPM) PLAN:

15.1 The IPM plan requires approval by the COR and PMO prior to implementation and shall be submitted for review as part of the Contractor’s contract submissions.

15.2 The Contractor’s IPM plan shall include but is not limited to the following tasks:

• Inspection of all areas to determine which pest management measures are appropriate and required to mitigate pest risks and infestations.

• Identification of pest entry points and identifying and communicating/documenting necessary structural remediation recommendations, monitoring and follow up to ensure remediation actions are taken.

• Communication of recommendations in writing to the COR and PMO, which include environmental sanitation practices that restrict or eliminate food, water or harborage for pests and engineering practices that limit the entry of pests.

• Selection and utilization of non-chemical control methods, which eliminate, exclude, or repel pests (e.g., traps, caulking, air curtains)

• Collection of live and dead pests, and disposal of all pests off-site.

• Selection and use of the most environmentally safe pesticide(s) that are labeled for use in medical facilities when chemical control is necessary.

• Identification, removal, and cleanup of areas with droppings, feathers, and nesting materials that are known to be health concerns in ceilings, window ledges, crawl spaces or any other area in or around the medical center.

• Monitoring of treated areas to ensure pest control measures were effective and that pests are not resistant to pesticide treatments.

• At a minimum, all food service areas shall be inspected weekly (e.g., Nutrition and Food Services (NFS) and Veteran Canteen Services (VCS)). Sensitive areas of the medical facility (e.g., Operating rooms (OR), Sterile Processing Services (SPS), Cath lab, endoscopy, other invasive procedure areas, Pharmacy and compounded sterile preparation (CSP) areas) shall be inspected monthly at minimum. At a minimum, all patient treatment areas shall be inspected semi-annually.

Inspections shall be documented in service reports, and any risks to health and property shall be immediately reported to the COR and PMO.

• At a minimum, the exterior of buildings and parking structures on campus shall be inspected for pest activity no less than monthly.

• In the event the PMO determines that pest activity within patient care areas or other sensitive areas of the facility exceeds acceptable thresholds, the Contractor shall develop and submit a written corrective action plan to the COR and the PMO. Pest presence and activity override minimum frequencies of inspection and shall be addressed to extermination.

• The corrective action plan shall outline a structured thirty (30) day improvement strategy and, at a minimum, include:

o Actions to reduce and eliminate pest activity.

o Identification of sanitation, environmental, and structural conditions contributing to the pest activity.

o A list of proposed pesticide products and application methods.

o Pest monitoring documentation (e.g., spreadsheets or tables) tracking pest activity, numbers, and trends over time to evaluate treatment effectiveness and eradication progress.

NOTE: Although rare, fumigation and ultra-low volume (ULV)/thermal fogging treatments may be required in dire circumstances. These treatments require separate scheduling and prior approval by the COR, PMO, Engineering and Safety for the convenience and safety of staff, visitors, patients, and the facility.

15.3 Pests included for management in the contract include but are not limited to:

• General structural arthropod pests (e.g., cockroaches, ants, beetles, spiders, carpenter bees, earwigs, silverfish, occasional invaders etc.).

• Flying insect pests (e.g., houseflies, stable flies, blow flies, dung flies, fruit flies, moth flies, fungus gnats, and Phorid flies etc.) which include drain, sink, or food disposal unit treatments for flies breeding in organic habitat.

• Pests of public health concern (e.g., bed bugs, fleas, mites, ticks, bees, wasps, mosquitoes, scorpions, etc.). Control of mosquitoes includes identification of breeding habitat and larval control.

• Stored product pests (e.g., saw tooth grain beetle, red flour or confused flour beetle, Trogoderma beetles, weevils, grain moths etc.)

• Mice and rats (e.g., house mouse, field mouse, roof rat, Norway rats, etc.)

• Pest birds (e.g., pigeons, English sparrows, blackbirds, starlings, grackles, geese, etc.)

• Other vertebrate pests (e.g., dogs, cats, bats, squirrels, gophers, groundhogs, moles, skunks, snakes, rabbits, raccoons, etc.).

NOTE: If required, control of wood destroying organisms (e.g., subterranean termites, dry wood termites, wood boring beetles, fungi etc.) may be included. An additional service outline would be necessary.

16. INITIAL BUILDING INSPECTIONS: Both primary and sub-contracted Contractor(s) shall complete a thorough initial, documented inspection of each building or site within the first ten (10) business days of the starting date of the contract. The purpose of the initial inspection is for the Contractor to evaluate the pest control needs of all locations and to identify problem areas and any equipment, structural features, or management practices that are or could be contributing to pest issues or infestations.

Access to building space shall be coordinated with the COR and PMO. The COR and/or PMO will inform the Contractor of restrictions or areas requiring special scheduling.

17. CALL BACKS:

17.1 EMERGENCY CALL BACK: The Contractor shall arrive on site at the facility within two (2) hours after receipt of notification by the COR or designee, perform IPM Services to correct an emergent condition. This call back service shall be accomplished at no additional charge to the government.

17.2 NON-EMERGENT CALLS: Contractor shall arrive on site at the facility within eight (8) hours for non-scheduled service requests without additional charge to the government.

17.3 ALL CALL BACKS: Contractor shall report the response time and plan of action to the COR and PMO. Contractor shall respond to all after hours voice messages within the time frame allotted for the type of call received. Response time will start at the time that notification is left for the Contractor.

Emergency or after-hours point of contact information for the Contractor shall be made available to the COR and PMO.

18. REPORTING FOR SCHEDULED SERVICES:

• Mandatory Logbook Sign In/Out: All pest control technicians shall sign in upon arrival and sign out upon departure using the Pest Control Logbook located at each facility’s designated entry point.

• Notification to PMO/COR: Technicians shall notify the Facilities PMO or COR (or designated representative) upon arrival and completion of service. Notification may be via phone, email, or radio, depending on the site.

• CBOCs and Separate Buildings: Some sites do not have onsite Facilities staff. In these locations, technicians shall notify the site POC and the Facilities PMO before beginning work and after completing services.

• Access-Controlled Areas: For restricted or sensitive areas, technicians shall coordinate entry with the area supervisor before performing services.

• Unscheduled Findings: Any unusual pest activity, access issues, or safety concerns shall be reported to the Facilities PMO immediately.

19. SAFETY FACTORS: All rodent bait stations that use rodenticides including all interior rodent traps shall be placed only at times and in areas approved by the COR and the PMO. Rodent bait stations that utilize rodenticides shall be replaced as necessary and follow all manufacturers’ recommendations. No pest control material or trap will be placed where it may be recovered by patients, non-target animals, nor will such material be allowed to contact food, cooking utensils, children, staff or patients.

NOTE: The Contractor shall not spray pesticides inside the medical facility without prior written approval from the PMO.

20. STORAGE AND PROHIBITIONS OF PEST CONTROL MATERIALS: Storage of pest control materials or equipment on VA property is prohibited without the written approval of the COR and PMO.

In addition, per VHA Directive 1850.02, the use of the selective herbicide 2,4-Dichlorophenoxyacetic Acid (2,4-D) is banned on VA property.

21. QUALITY CONTROL PLAN. The Contractor shall establish and maintain an effective Quality Control Plan (QCP) to ensure the services provided under this contract meet all requirements of the PWS.

The QCP shall describe the methods, processes, and metrics the Contractor will use to monitor, assess, and ensure quality performance.

21.1 The Contractor shall submit the QCP to the Contracting Officer (CO) and the Contracting Officer’s Representative (COR) for review within five (5) calendar days after contract award. The QCP shall, at a minimum, include the following elements:

• The purpose and scope.

• Quality control objectives.

• Roles and responsibilities (QC Manager, Licensed Pest control technicians, and administrative support)

• Service delivery procedures (initial inspection, routine services, and on demand services)

• Integrated Pest Management Approach

• Inspection and testing procedures.

• Documentation and reporting procedures.

• Nonconformance and corrective actions.

• Communication procedures.

• Training and certifications of licensed technicians.

• Approach to safety and environmental compliance.

• Methods for continuous improvement.

• Process for updating the QCP as needed throughout contract performance.

21.2 The Contractor shall implement the approved QCP throughout the life of the contract and shall provide updated versions to the CO whenever changes occur.

22. QUALITY ASSURANCE SURVEILLANCE PLAN:

Table 1. Quality Assurance Surveillance Plan

PERFORMANCE

BASED TASK INDICATOR STANDARD QUALITY

ASSURANCE

Weekly service hours.

Time-in and time-out logged. Total number of service hours.

Contractor utilizes designated logbooks and fulfills schedule of service hours.

Weekly review

PERFORMANCE

BASED TASK INDICATOR STANDARD QUALITY

ASSURANCE

Annual/Monthly/Weekly Inspections

Schedule of inspection

Contractor checks all traps for activity and completes inspections related to all pests annotated under the specifications section.

Monthly/Weekly Inspection/Review

Emergency Trouble Call Response

Time to respond after call

Contractor arrives within two (2) hours for Emergency calls. 100% inspection

Routine Trouble Call Response

Time to respond after call

Contractor arrives within eight

(8) hours for Non-Emergent / Routine calls

100% inspection

Response to pest infestations or issues that impact facility operations

Action plan provided

Written 30-day plan and monitoring spreadsheet for pest numbers and products used till eradication.

100% inspection

Quarterly and annual reports

Written reports provided

Quarterly reports that annotate the total numbers and locations of pest sightings and pesticide applications on all VA property.

A consolidated annual report, including historical trending of pests provided to the PMO each year contract is active.

Quarterly/Annual review

Record keeping Accuracy and timeliness of records and required reports

Contractor maintains all required records and provides all required service reports on time. Reports are submitted to COR and PMO.

Monthly Inspections/Review

23. REQUIRED CONTRACTOR REPORTING:

23.1 After each service (scheduled or non-scheduled) Contractor personnel shall submit documentation (service reports) that include but are not limited to:

• The name and company address of the individual who applied the pesticide.

• The location, including the building and room number and location(s) inside room(s) where pesticide was applied (e.g., along baseboards, crack/crevice, on windowsills, etc.).

• The target pest(s) against which the pesticide was applied.

• The date and time of application.

• The trade name of the pesticide applied.

• The federal Environmental Protection Agency registration number of pesticides.

• The rate of application or amount of the pesticide applied, and the total area treated. Square, cubic, or linear feet will be noted if applicable to the pesticide application.

• Pest monitoring activities (e.g., inspection of insect monitoring devices, insect light traps, rodent traps, rodent bait stations etc.).

• If pest monitoring devices or pest control devices are relocated, the Contractor will identify the number, location, and date devices were identified and moved.

23.2 Service reports and documentation shall be provided to the PMO and COR by the end of the next business day. If the service was performed on a Friday, Saturday, or Sunday, then the service report and documentation shall be provided by end of the next business day (e.g., Monday). Service and pesticide application reports shall be provided by the Contractor/Company that performs the service on-site and shall conform to Texas rules and laws regulating pest control business and operations.

23.3 The Contractor shall be responsible for supplying, completing, and submitting all reports required or requested by Federal, State, or local ordinances which pertain to any duties contained in the contract.

23.3 The Contractor shall furnish the COR and the PMO’s office, prior to initial pesticide application, the trade names and chemical names of all approved pesticides/chemicals along with current labels and Safety Data Sheet (SDS). The Contractor shall supply this information as new products are submitted for approval to the COR and PMO.

23.4 The Contractor shall supply a quarterly report that annotates the total numbers and locations of pest sightings and pesticide applications on all VA property. A consolidated annual report, including historical trending of pests shall be provided to the PMO each year that the contract is active.

24. CONTRACTOR PERSONNEL ID BADGES AND PARKING:

24.1 The Contractor shall provide the COR and the PMO with a list of Contractor employees expected to enter the buildings to pick up confidential documents. While on VA premises, all Contractor personnel shall comply with the rules, regulations, and procedures governing the conduct of personnel and the operation of the facility.

24.2 An access badge will be given to the Contractor’s employees after completion of a background check. The Contractor employee shall safeguard the access badge and immediately report any lost, stolen, or destroyed badges to the COR or the PMO. All contract personnel shall properly display their access badges while on the VA property. Access badges shall be worn at or above the waist (facing forward).

The Contractor shall ensure the badges of Contractor personnel who quit or are terminated are returned to the VA within three (3) working days of the event.

24.3 The Contractor shall be required to comply with all security policies and entrance requirements of the facility. All security policies/requirements shall be met, and employees cleared prior to the Contractor performing work. Employees that cannot meet the security and clearance requirements will not be allowed to perform work under this contract.

24.4 The Contractor shall be responsible for ensuring Contractor personnel park in the appropriately designated parking areas. Parking information shall be coordinated with each facility COR or the PMO.

24.4 The VA does not validate or make reimbursement for parking violations of the Contractor’s personnel under any circumstance.

25. REFERENCES:

• Code of Federal Regulations, Title 7. Accessed at: https://www.ecfr.gov/current/title-7/section- 205.271

• Environmental Protection Agency, “Introduction to Integrated Pest Management”. Accessed at:

https://www.epa.gov/ipm/introduction-integrated-pest-management

• National Pest Management Association, “Pest Management Guidelines for Healthcare Facilities, A Guide for Pest Management Professionals”. Accessed at: https://npmapwcdn-afabcafzhkfnebcs.z02.azurefd.net/media/epgcc12w/pest-managment-gudielines-for-healthcare-facilities_v10-1.pdf

• QualityPro, The Mark of Excellence in Pest Management, QualityPro Credentials. Accessed at:

https://www.npmaqualitypro.org/available-credentials/qualitypro/

• U.S. Code, Title 38 § 7301(b). Accessed at: https://www.govinfo.gov/app/details/USCODE- 2023-title38/USCODE-2023-title38-partV-chap73-subchapI-sec7301/context

• VA Directive 0057, “VA Environmental Management Program”, October 25, 2022.

• VHA Directive 1850.02, “Pest Management Operations Program”, December 22, 2022.

https://www.ecfr.gov/current/title-7/section-205.271 https://www.ecfr.gov/current/title-7/section-205.271 https://www.epa.gov/ipm/introduction-integrated-pest-management https://npmapwcdn-afabcafzhkfnebcs.z02.azurefd.net/media/epgcc12w/pest-managment-gudielines-for-healthcare-facilities_v10-1.pdf https://npmapwcdn-afabcafzhkfnebcs.z02.azurefd.net/media/epgcc12w/pest-managment-gudielines-for-healthcare-facilities_v10-1.pdf https://npmapwcdn-afabcafzhkfnebcs.z02.azurefd.net/media/epgcc12w/pest-managment-gudielines-for-healthcare-facilities_v10-1.pdf https://www.npmaqualitypro.org/available-credentials/qualitypro/ https://www.govinfo.gov/app/details/USCODE-2023-title38/USCODE-2023-title38-partV-chap73-subchapI-sec7301/context https://www.govinfo.gov/app/details/USCODE-2023-title38/USCODE-2023-title38-partV-chap73-subchapI-sec7301/context

• VHA Directive 7707, “VHA Green Environmental Management System and Governing Environmental Policy”, April 1, 2021.

ATTACHMENT 1:

LIST OF AREAS/BUILDINGS TO BE SERVICED

List of buildings, sites, and areas.

South Texas Veterans Health Care System

Kerrville

Audie Murphy VAMC Asset Number

Asset Name

Total GSF

Ware Warehouse Lease 9,586 VS Villa Serena 28,039 DP Datapoint 34,057 Gold Wonderland of the Americas 36,939 SP Shavano Park OPC 8,232

HVHC HCHV 6,750

SBOPC South Bexar OPC 8,040

PTRP PTRP 18,535

Radiation Oncology Radiation Oncology 7,390

PAS PAS 15,700

NB North Bexar 13,249 PL Plaza Lecea - ELT 4,812 1Tk One Technology 42,001 1 Main Hospital 1,060,208 1A Storage Building 2,831 3 Generator Building 2,200 4 Police Service 3,000 5 Building 5 4,500 671GV North East Bexar VA Clinic 8,159 671GS Northwest HCC 190,840 671GF Warehouse 9,586 671FH Fisher House 26,012

671GO NCFC 35,000

671GB Victoria OPC 9,595 Totals: 1,585,261 Kerrville VAMC Asset Number

Asset Name

Total GSF

1 Auditorium 10,848 2 Chapel 5,654

11 MAIN HOSPITAL 209,808

18 LAUNDRY 17,516

19 POWER PLANT 5,593

20 Training Building 2,684 21 Director's Garage 490

22 PAINT SHOP 1,560

29 ENGINEERING SHOPS 9,329

32 Two Car Garage 409 40 Supply Storage 3,250 41 Storage 294

46 GARAGE 7,377

47 A&MM WAREHOUSE 5,112

javascript:__doPostBack('ctl00$BodyContentPlaceHolder$TabContainer1$tabBldgs$tabBuildings$tabMeasures$gvMeasures','Sort$BuildingNumber') javascript:__doPostBack('ctl00$BodyContentPlaceHolder$TabContainer1$tabBldgs$tabBuildings$tabMeasures$gvMeasures','Sort$FunctionTitle') javascript:__doPostBack('ctl00$BodyContentPlaceHolder$TabContainer1$tabBldgs$tabBuildings$tabMeasures$gvMeasures','Sort$TotalGSF') javascript:__doPostBack('ctl00$BodyContentPlaceHolder$TabContainer1$tabBldgs$tabBuildings$tabMeasures$gvMeasures','Sort$BuildingNumber') javascript:__doPostBack('ctl00$BodyContentPlaceHolder$TabContainer1$tabBldgs$tabBuildings$tabMeasures$gvMeasures','Sort$FunctionTitle') javascript:__doPostBack('ctl00$BodyContentPlaceHolder$TabContainer1$tabBldgs$tabBuildings$tabMeasures$gvMeasures','Sort$TotalGSF')

48 Hospital Storage 2,754 49 Personnel Quarters 2,898 50 Personnel Quarters 2,754 51 Personnel Quarters 2,754 85 Two Car Garage 409 87 Two Car Garage 409 88 Two Car Garage 409

90 GENERATOR/SWITCHGEAR 1,997

96 NURSING HOME 63,726

97 CHILLER PLANT 1,200

98A EMS Storage 4,405 Totals: 363,639

(END OF PERFORMANCE WORK STATEMENT)

(END OF SECTION B)

(END OF AMENDMENT)

A.1 PRICE/COST SCHEDULE
ITEM INFORMATION

B.4 PERFORMANCE WORK STATEMENT

File details come from the government source that posted it. Updated .