36C25726Q0733 0001.pdf
PDF 274 KB Posted
- Attached to
- Sam Rayburn Memorial HVAC Rooftop Unit Replacement Federal contract opportunity
- Solicitation number
- 36C25726Q0733
About this file
This document is Amendment 0001 to Solicitation 36C25726Q0733, issued by the Department of Veterans Affairs Network Contracting Office 17 on July 29, 2026, effective July 13, 2026. The amendment provides answers to 51 questions received from offerors regarding an HVAC replacement and ductwork modification project at Building 9.
The project involves replacing a 7-ton Carrier rooftop unit (Model 50Tm-008-A-501--, Serial 2608G30853) that serves a conference room and front offices. Key scope elements include: contractor responsibility for building automation system controls work; field verification of existing duct routing since no as-built drawings exist; redistribution of the HVAC system into two operating zones per areas identified during site visits; routing, adding, and removing ductwork throughout Building 9 without requirement for rebalancing; reuse of existing ceiling grid with contractor replacement of any damaged tiles; installation of a new roof curb adapter; and future HVAC work for Room 103A. Contractor design services are not required. Testing, adjusting, and balancing services are required with installation of necessary dampers to maintain proper airflow for up to 12 conference room occupants. The replacement rooftop unit must not be an AAON manufacturer model. Structural engineering and stamped roof load verification drawings are required. Work must be completed within 90 days of receipt of order. Warranties include 5-year manufacturer coverage and 1-year installation labor warranty. The project is classified as HVAC trade work, not construction; therefore, bonds and progress payments are not required. Permits and inspections are contractor responsibility. Offerors must obtain Texas sales tax exemption certificates. Siemens Apogee integration and programming are not required. FAR Clause 52.217-8 regarding option to extend services has been added.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25726Q0733.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 5
0001 07-29-2026
36C671
Department Of Veterans Affairs Network Contracting Office 17
5441 Babcock Road Ste. 302 San Antonio, TX 78240
To all Offerors/Bidders
36C25726Q0733
07-13-2026
X
X X
X 1
The purpose of this amendment is to provide answers to questions that were received by the due date and time.
///SEE CONTINUATION PAGES///
Shawn R. Reinhart Contracting Officer
36C25726Q0733-0001 CONTINUATION PAGES
Questions and Answers
Question 1: Who is responsible for the building automation system (BAS)/controls work? Please identify the controls contractor.
Answer: Contractor
Question 2: Please provide the manufacturer and model number of the existing rooftop unit (RTU).
Answer: Carrier/ Model;50Tm-008-A-501--, Serial: 2608G30853
Question 3: Is the contractor required to submit a site-specific crane or lift plan prior to mobilization?
Answer: Yes, and COR will provide to VA Safety Team
Question 4: What areas of the facility does the existing RTU serve, and what is the occupancy or intended use of the building?
Answer: Conference room, and front offices
Question 5: Where are the designated laydown and staging area for equipment, materials?
Answer: This will be coordinated with COR upon award
Question 6: Existing HVAC Layout and Duct Routing: Please provide any available as-built drawings identifying the existing supply and return ductwork. If none exist, please confirm whether field verification and identification of all existing duct routing is part of the contractor's scope.
Answer: No as-built for HVAC system
Question 7: Required Final Air Distribution: Please confirm whether the contractor is required to redistribute the building HVAC system into two operating zones. If this is a contract requirement, please revise the solicitation to identify the required final HVAC distribution.
Answer: Yes to areas mentioned on site visit
Question 8: Contractor Design Responsibility: Please clarify whether the contractor is expected to provide HVAC design services, duct sizing, airflow calculations, balancing calculations, and engineering necessary to establish the final duct configuration, or whether the Government will provide the required design criteria.
Answer: No
Question 9: Duct Transitions vs. Branch Duct Modifications: Please clarify whether the requirement for new duct transitions is limited to connecting the new rooftop unit to the existing supply and return ductwork, or whether the contractor is expected to modify, reroute, add, remove, or rebalance branch ductwork throughout Building 9.
Answer: Contractor is expected to route, add, remove duct work. Rebalance is not required.
Question 10: Ceiling Grid and Roofing Restoration: Please clarify:
Which ceiling grid and tiles are to be replaced vs: reused:
Whether roofing restoration is required:
Provide applicable roofing specifications if required:
Answer: Ceiling grid must be reused. If damaged contractor must replace
Question 11: Future Office Build-Out: Please confirm whether any HVAC work associated with future office construction is included within this solicitation:
Answer: Yes, Room 103A
Question 12: Siemens Apogee Integration: Please identify the Government's Siemens representative and clarify responsibility for controller programming, BACnet integration, graphics, point mapping, database revisions, commissioning, and final system verification:
Answer: Not Required
Question 13: Testing, Adjusting and Balancing (TAB): Please confirm whether TAB services are required and provide acceptance criteria, testing procedures, and report format:
Answer: Yes, Contractor to provide and install necessary dampers if needed to maintain proper air flow for each room and support up to 12 occupants in the conference room.
Question 14: Scope Confirmation: Please confirm that contractor responsibility is limited to the written solicitation unless additional requirements are specified:
Answer: Contractors are responsible for what is written in the solicitation and resultant contract.
Question 15: Statement of Work Section 3 – Replacement Equipment: Please provide manufacturer, model, serial number, nameplate information, voltage, phase, heating type, cooling capacity, efficiency rating, and refrigerant type for the existing 7-ton rooftop unit:
Answer: Carrier / Model;50Tm-008-A-501--, Serial: 2608G30853
Question 16: Statement of Work Section 3 – Replacement Equipment: Is a specific manufacturer/model required for the replacement rooftop unit, or will any technically compliant unit be acceptable?
Answer: No, but prefer not to have the AAON manufacture unit. This make/model has the drive installed inside the unit and can’t be remotely reset.
Question 17: Statement of Work Section 3 – Existing Conditions: Please provide available photographs, drawings, equipment schedules, roof plans, duct dimensions, curb dimensions, and electrical information:
Answer: Contractors conducted site visit, no designs available.
Question 18: Statement of Work Section 3 – Roof Curb: Please confirm whether the replacement unit must fit the existing roof curb or if a manufactured curb adapter may be used:
Answer: A manufacture curb adaptor may be used.
Question 19: Statement of Work Section 3 – Crane Operations: Please provide the approximate roof height, crane setup location, access limitations, and any restrictions applicable to crane and rigging operations:
Answer: Roof height approximately 20 feet
Question 20: Statement of Work Section 3 – Ductwork and Ceiling Grid: Please clarify the estimated extent of selective demolition and restoration including affected rooms/offices:
Answer: Reuse existing ceiling tiles
Question 21: Statement of Work Section 3 – Condensate Drain: Please confirm the distance from the rooftop unit to the nearest roof gutter and whether heat tracing, supports, or drainage modifications are required:
Answer: 10-30 feet
Question 22: Statement of Work Section 3 – Siemens Apogee Integration: Please provide existing system version, control drawings, BACnet point list, sequence of operations, and Siemens contact:
Answer: Not Required
Question 23: Confirm whether new curb/support system is required or whether treated 4x4 supports may be reused:
Answer: Curb
Question 24: Confirm replacement unit specifications including manufacturer, efficiency, refrigerant, economizer, filtration, outside air, heating, cooling, electrical, sound, wind rating, and controls:
Answer: See question 2 for answer
Question 25: Provide all mechanical, electrical, controls, structural drawings, and roof plans:
Answer: No as-builts just electrical see attached
Question 26: Confirm whether structural engineering, roof load verification, stamped drawings, or calculations are required:
Answer: Yes
Question 27: Identify existing Siemens APOGEE system and clarify programming responsibilities:
Answer: Not Required
Question 28: Clarify Siemens pricing requirements versus VA service agreements:
Answer: Not Required
Question 29: Confirm project classification (services, general construction, or specialty trade construction):
Answer: HVAC trade
Question 30: Clarify VAAR 852.219-76 certification selections:
Answer: VAAR 852.219-76 replaced by VAAR 852.219-75.
Question 31: Confirm whether bid, payment, or performance bonds are required:
Answer: This is not a construction project, therefore, bid, payment or performance bonds are not required
Question 32: Confirm whether permits and inspections are required and responsible party:
Answer: Yes and by contractor
Question 33: Confirm whether progress payments are permitted:
Answer: No, this is not a construction project
Question 34: Clarify definition of 'recent' past performance (3 years vs 5 years):
Answer: Recent is defined as work performed within the last 5 years. This is defined in Addendum FAR 52.212-1 on page 16.
Question 35: Confirm temporary heating or cooling requirements:
Answer: Cooling Between 60-70 degrees Heating between 75-90 degrees
Question 36: Confirm presence of asbestos, lead, mold, or hazardous materials:
Answer: None known.
Question 37: Provide roof access requirements, work hours, crane staging locations, lifting restrictions, traffic/pedestrian control measures:
Answer: Provided by contractor for VA approval
Question 38: Confirm required minimum manufacturer warranty and contractor labor warranty:
Answer: 5yr Manufacturer 1yr installation warranty
Question 39: Confirm whether contractor must replace disturbed ceiling grid, tiles, insulation, drywall, paint, and finishes:
Answer: Yes must be replaced if damaged
Question 40: Confirm availability of matching ceiling tiles or provide specifications:
Answer: Contractor to confirm availability
Question 41: Confirm whether entire ceiling area must be replaced if matching tiles are unavailable:
Answer: Yes
Question 42: Confirm whether one individual may serve as Superintendent, SSHO, and QCM simultaneously:
Answer: Must be different personnel
Question 43: Confirm whether performance period may be extended if lead times exceed stated duration:
Answer: FAR Clause 52.217-8, Option to Extend Services added.
Question 44: Confirm occupancy of Building 9 during construction and identify phasing, shutdown, noise, work hour restrictions:
Answer: This is not a construction project, but work must be coordinated through VA
Question 45: Confirm partitioning, dust containment, negative air machines, infection control measures:
Answer: Only when required
Question 46: Identify roofing manufacturer, warranty holder, and contractor requirements:
Answer: Carrier. No warranty holder. Contractor requirements are specified in the SOW, paragraph 6.
Question 47: Confirm whether third-party inspections, testing, certifications, or commissioning are required beyond VA inspections:
Answer: No, just VA inspection
Question 48: Confirm Texas sales and use tax exemption status and required documentation:
Answer: Offerors need to obtain a tax-exempt certificate from the Texas Comptroller’s Office
Question 49: Provide anticipated notice-to-proceed date and expected construction start date:
Answer: As this is not a construction projection work must be completed within 90 days After Receipt of Order (ARO). This is the date the contract countersigned by CO once contractor signs, and returned to contractor from CS.
Question 50: Confirm preferred Siemens DDC contractor or service provider and provide contact information:
Answer: Not Required
Question 51: Confirm VA access to Siemens APOGEE system including passwords, database files, graphics, point lists, backups, network info, and operator access:
Answer: Not Required