This is Amendment 0001 to Solicitation 36C25726Q0463 for soil remediation services issued by the Department of Veterans Affairs Network Contracting Office 17 in San Antonio, Texas. The amendment extends the deadline for receipt of offers from May 20, 2026 to May 25, 2026 at 3:00 PM CDT and provides responses to 48 questions submitted by potential offerors before May 13, 2026.

The solicitation involves remediation of soil contaminated by approximately 1,000 gallons of CHEM-AQUA 51709 (a chilled water treatment chemical) released on January 28, 2026 from a frozen/burst line supplying a rooftop HVAC unit on Building 53. The affected area is approximately 1,900 square feet located near Building 53's main entrance serving the hospital's rehab and prosthetics service. The contractor must conduct site assessment and sampling to determine contamination extent, perform excavation with limits driven by field screening and confirmation sampling based on TCEQ requirements, and restore all disturbed grounds to existing conditions including topsoil, sod, irrigation, pavement, sidewalk, grading, drainage, and landscaping. Work must be completed within 45 days of start date. The contractor may pursue either direct load-out or on-site treatment (such as stabilization) if compliant with TCEQ regulations. The scope includes utility location responsibility, Stormwater Pollution Prevention Plan development, daily reporting with photos, and coordination with the Contracting Officer regarding access restrictions due to hospital operations. Referenced specification documents (31 20 00 and 03 30 00) and a utility drawing will be provided as attachments, along with the Safety Data Sheet for CHEM-AQUA 51709.

View the file

Other files

File Type Posted
312000-2023-08.pdf PDF
Utility Drawing.pdf PDF
36C25726Q0463 0001_1.docx DOCX document
Chem Aqua.pdf PDF
033000-2021-01.pdf PDF
S02 - 36C25726Q0463 Soil Remediation Service.pdf PDF
36C25726Q0463_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 7

05/18/2026

36C257

Department Of Veterans Affairs Network Contracting Office 17

5441 Babcock Road Ste. 302 San Antonio, TX 78240

To all Offerors/Bidders

36C25726Q0463

04-28-2026

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 05-25-2026 3:00pm CDT

See CONTINUATION Page

X 1

The purpose of this Amendment is to:

a. Answer all the questions that were submitted before 5/13/2026.

b. Extend the submission date from 5/20/2026 to 5/25/2026.

///SEE CONTINUATION PAGES///

Shawn R. Reinhart Contracting Officer

36C25726Q0463 0001 CONTINUATION PAGES

Questions - 36C25726Q0463 Soil Remediation Service

1. Attachment 1 - Safety Data Shet CHEM-AQUA 51709: was not attached to the Statement of Work (SOW). Please either confirm if this is the appropriate SDS (msdsview.aspx) or provide the SDS so that the applicable TCEQ remedial standards and receiving facility acceptance criteria can be determined for the release.

Safety Data Shet CHEM-AQUA 51709 will be attached in amendment.

2. SOW Section B.4 / Schedule of Work: Please confirm the estimated square footage of the impacted area shown in the page 8 figure. Is the affected area approximately 1,900 SF, or should bidders use a different area for pricing?

The figure provided with the SOW showing the approximate area is where we believe the released substance contacted the soil. It is expected that the selected vendor will conduct a site assessment to determine the extent of the contamination. The figure provided with the SOW showing the approximate area is approximately 1,900 SF.

3. SOW Section B.4 / Disposal: Can the VA provide additional information on the scenario of the release, as potential receiving facilities have inquired:

A. Was the released substance unused or was it used in a process (i.e. boilers, cooling towers, and HVAC systems The substance was in use in our facilities chilled water loop. It was released from a frozen/burst chilled water line that was supplying a rooftop unit on B53.

B. Is this a recent or historical release event.

This release event occurred on Jan. 28th 2026.

4. SOW Section B.4 / Affected Area Figure: The SOW includes text that states that “Work shall be completed within forty-five (30) days of start date.” Please confirm if the intention is for work to be completed within 45 or 30 days of the start date.

The intention is for the work to be completed within 45 days of the start date.

5. SOW Section B.4 / Excavation Depth: Can VA confirm the anticipated excavation depth? Will the contractor be required to excavate to a predetermined depth, or will excavation limits be driven by field screening and confirmation sampling?

The excavation limit will be driven by the site assessment and sampling performed by the awarded contractor.

6. SOW Section B.4 / Remediation Method: Will the VA accept excavation, direct load-out, transportation, and off-site disposal as the remediation approach, or is the contractor required to evaluate and/or perform on-site treatment such as stabilization or soil washing?

Either direct load out or on-site treatment is acceptable if the treatment or disposal activities comply with TCEQ regulations. Please note that the scope includes back filling and site restoration requirements.

7. SOW Section B.4 / Utilities: Please provide available utility drawings for the Building 53 work area and identify any known underground utilities, irrigation/sprinkler lines, communications, electrical, gas, steam, water, sanitary, or storm lines in or near the excavation area.

Please reference attached file “Utility Drawing.pdf”. Note this utility drawing is for reference only and approximates the know underground utilities on campus. The awarded contractor will be responsible for performing utility location where necessary.

8. SOW Section B.4 / Utility Locates: is there an internal VA department responsible for utility locates inside the VA campus, and will VA staff mark VA-owned/private utilities before excavation?

The awarded contractor will be responsible for performing utility location where necessary.

9. SOW Section B.4 / Backfill Material: Please specify required clean backfill material, topsoil requirements, gradation, source approval, and whether imported material must be certified clean.

Please reference specification document 31 20 00 that will be attached.

10. SOW Section B.4 / Compaction: What compaction standard is required for backfilled areas, including lift thickness, moisture conditioning, density testing, and testing frequency?

Please reference specification document 31 20 00 that will be attached.

11. SOW Section B.4 / Surface Restoration: Please confirm the required final restoration by area:

turf/seed/sod, landscaping, irrigation, concrete sidewalk, curb/gutter, asphalt, base course, striping, or other surface repairs.

All disturbed grounds shall be restored to existing conditions. This includes topsoil, sod, irrigation repair, pavement, sidewalk, grading, drainage, and landscaping as applicable.

12. SOW Section B.4 / Hardscape Removal: Does the red-outlined area include any concrete, asphalt, curb, sidewalk, or pavement removal/replacement? If yes, please provide limits, thicknesses, reinforcement requirements, and finish requirements.

The figure provided with the SOW showing the approximate area is where we believe the released substance contacted the soil. The excavation limit will be driven by the site assessment and sampling performed by the awarded contractor. Specification document 03 30 00 will be attached for reference.

13. Can you provide the MSDS for the product contaminant?

Safety Data Shet CHEM-AQUA 51709 will be attached in amendment.

14. What is the estimated release volume, duration, and date of incident?

We estimate that approximate 1000 gallons of our chilled water was released. The chemical SDS that was provided is diluted into our chilled water system. This release happened over a few hours on Jan. 28th 2026.

15. Has any interim cleanup, flushing, excavation, neutralization, or soil removal already occurred?

No.

16. Are the SDS, incident reports, maintenance records, photos, or prior field notes available for review?

Safety Data Shet CHEM-AQUA 51709 will be attached in amendment. Images “IMG_0033.jpeg” and “IMG_0032.jpeg” are attached for reference.

17. Where is the suspected release point relative to Building 53, pavement, landscaped areas, utilities, storm drains, roof drains, sidewalks, and traffic/pedestrian routes?

The subject release point was from a roof top HVAC unit. The green dot on the figure below shows the approximate location that this roof drains to a concrete sidewalk.

18. Are there known underground utilities, irrigation lines, stormwater lines, or utility corridors that could have acted as preferential migration pathways?

Please reference attached file “Utility Drawing.pdf”. There are underground utilities and irrigation lines in the area.

19. Has impacted liquid or runoff entered any storm drain, sanitary sewer, trench drain, utility vault, or landscaped drainage feature?

To our knowledge nothing entered the storm drains. They were blocked off during the spill.

20. What is the approximate depth to groundwater in this area, and has groundwater ever been encountered during nearby excavation or utility work?

Approximate depth of ground water in this area is not known.

21. Are there access restrictions due to hospital operations, patient routes, emergency access, parking, noise, dust, vibration, or work hours?

Impacts will have to be coordinated with the COR before beginning work. The courtyard between B29 and B53 is currently closed to patient and staff access for other construction activities. The main entrance to B53, which houses the hospital’s rehab and prosthetics service, is near the anticipated impacted area.

22. Are previous soil, water, or waste analytical results available, including pH, conductivity/TDS, sodium, chloride, sulfate, metals, or RCRA characterization?

No.

23. Has TCEQ been notified, and if so, is there a spill number, incident number, regional contact, or written direction already issued?

TCEQ was notified on Jan. 28th 2026. Lindell Kottke is the regional contact at the Amarillo office for TCEQ. (lindell.kottke@tceq.texas.gov)

24. Is the VA expecting cleanup to background/pre-release conditions, or has the project already been placed under TRRP cleanup procedures?

Cleanup to background/pre-release conditions is expected.

25. Are there known background soil data for pH, conductivity, sodium, chloride, sulfate, or other naturally occurring salts in this area?

No.

26. Will confirmation sampling be required from excavation bottoms and sidewalls, and does the VA have a preferred confirmation sampling frequency?

Confirmation sampling frequency and location should be based on TCEQ requirements.

27. Is there adequate onsite space for temporary soil staging, roll-offs, lined stockpiles, soil mixing, equipment access, and decontamination?

The station does have some on site construction laydown areas that can be assigned. The awarded contractor will need to coordinate expected size of the area needed with the COR.

28. Will the VA allow ex-situ onsite treatment/stabilization of impacted soil if bench testing shows it can neutralize pH and reduce disposal classification?

Onsite treatment is acceptable if the treatment or disposal activities comply with TCEQ regulations.

29. Are there restrictions on generating, containerizing, treating, storing, or transporting decontamination water or treatment residuals onsite?

The contractor is responsible for having a Stormwater Pollution Prevention Plan (SWP3) and disposal of decontamination water.

30. Are there preferred or pre-approved disposal facilities for non-hazardous industrial waste, Class 1 waste, or hazardous waste if corrosivity applies?

No.

31. Does the VA require all impacted soil to be disposed offsite, or may treated/confirmed soil potentially be reused onsite if acceptable under regulatory criteria?

Either direct load out or on-site treatment is acceptable if the treatment or disposal activities comply with TCEQ regulations.

32. What surface restoration is required after remediation — topsoil, sod, irrigation repair, pavement, sidewalk, grading, drainage, or landscaping?

All disturbed grounds shall be restored to existing conditions. This includes topsoil, sod, irrigation repair, pavement, sidewalk, grading, drainage, and landscaping as applicable.

33. For backfill, should we assume engineered select fill compacted in lifts with field density testing, or is restoration limited to matching existing grade and surface condition?

Please reference specification document 31 20 00 that will be attached.

34. Are there VA-specific requirements for compaction testing, imported fill certification, topsoil quality, seed/sod type, irrigation repair, or pavement section replacement?

Please reference specification document 31 20 00 that will be attached. All disturbed grounds shall be restored to existing conditions. This includes topsoil, sod, irrigation repair, pavement, sidewalk, grading, drainage, and landscaping as applicable.

35. What daily documentation does the COR expect — daily reports, photos, air monitoring logs, waste tickets, disposal receipts, sampling logs, and progress quantities?

The COR expects daily reports including photos. Air monitoring logs, waste tickets, disposal receipts, sampling logs, TCEQ reporting, and testing results will also be required before final invoicing.

36. Are there any VA infection control, safety, escort, badging, parking, or equipment staging requirements that need to be built into the remediation plan?

Infection Control - Per our infection prevention staff confirmed that no ICRA was needed since this work will be performed outdoors.

Safety - The work area will need to be fenced off to prevent accidental patient access. OSHA safety standards should be followed for excavations.

Escort - Will not be required unless the contractors need into secure access areas, which they should not for this contract.

Badging - The contractors will be required to check in each morning with the campus police service to receive day badges for the work.

Parking - The contractors will be asked to park either within the construction laydown yard that will be assigned or park within general parking on campus. We do not allow contractors to park on grass/landscape areas or within patient parking.

Equipment Staging - Once we discuss the contractor’s space needs, the campus will evaluate space to provide to the contractor as a construction laydown area.

37. Can you provide the dimensions of the outlined area in question?

The figure provided with the SOW showing the approximate area is approximately 1,900 SF.

38. Most postings on SAM.Gov list an anticipated contract dollar value. What is the value range anticipated for this work by the VA?

IGCE or value range is not shared with vendors.

39. What Is the overall SQFT of the area?

The figure provided with the SOW showing the approximate area is approximately 1,900 SF.

40. How deep are you anticipating we will need to dig?

The excavation limit will be driven by the site assessment and sampling performed by the awarded contractor.

41. Source and Cause of Contamination: Can the Government provide information on the source of the contamination near Building 53 and how the release occurred?

The substance was in use in our facilities chilled water loop. It was released from a frozen/burst chilled water line that was supplying a rooftop unit on B53. This release event occurred on Jan. 28th, 2026. The subject release point was from a roof top HVAC unit. The green dot on the figure below shows the approximate location that this roof drains to a concrete sidewalk.

42. TCEQ Reporting: Was the release reported to the Texas Commission on Environmental Quality at the time of the incident? If so, what incident number was assigned, and can copies of the associated TCEQ reporting forms be provided to offerors as part of this solicitation?

TCEQ was notified on Jan. 28th, 2026. Lindell Kottke is the regional contact at the Amarillo office for TCEQ. (lindell.kottke@tceq.texas.gov)

43. Product Confirmation – CHEM-AQUA 51709: Can the Government confirm that CHEM-AQUA 51709 is the product that was released and is the primary contaminant requiring remediation at this site?

Yes, Safety Data Shet CHEM-AQUA 51709 will be attached in amendment.

44. Safety Data Sheet (SDS) – Attachment 1: The Statement of Work references "Attachment 1 - Safety Data Sheet CHEM-AQUA 51709," however this document does not appear to have been posted with the solicitation. Please provide the SDS as a formal solicitation amendment so offerors can properly assess handling, transportation, and disposal requirements when developing their proposals.

Safety Data Shet CHEM-AQUA 51709 will be attached in amendment.

45. Existing Site Data: Does the Government have any existing delineation maps, soil analysis data, or depth/volume estimates from a prior site assessment?

No.

46. Depending upon the spread of ‘alkali salts’ and what they are, they may be able to be treated in place.

On-site treatment is acceptable if the treatment or disposal activities comply with TCEQ regulations.

47. Need more information, including photographs and what specific chemical contaminate is of concern and how much of that chemical was spilled.

Safety Data Shet CHEM-AQUA 51709 will be attached in amendment. We estimate that approximate 1000 gallons of our chilled water was released. The chemical SDS that is provided is diluted into our chilled water system.

48. What kind of contaminants were in the soil, if known, or if there is an SDS on the chemicals.

Safety Data Shet CHEM-AQUA 51709 will be attached in amendment.

See attached document: Safety Data Sheet.

See attached document: 312000-2023-08.

See attached document: Utility Drawing.

See attached document: 033000-2021-01.

(END OF QUESTIONS AND ANSWERS)

(END OF AMENDMENT)