36C25726Q0431 0005.docx

DOCX document 123 KB Posted

Attached to
36C25726Q0431 504-26-006 RE FINISH B4 N AND F ADM
Solicitation number
36C25726Q0431
Issued by

About this file

This is an Amendment 0005 to solicitation 36C25726Q0431, issued by the Department of Veterans Affairs Central Texas Veterans Health Care System in Temple, Texas, responding to timely Requests for Information (RFIs) submitted by offerors. The amendment provides clarifications and responses to 27 RFIs related to Project 504-26-006, a flooring replacement project at the facility.

Key specifications and requirements clarified include: five (5) flooring transitions are required; desired LVT plank dimensions are approximately 7-3/4 inches by 52 inches in a gray oak appearance; the 28-40 mil thickness requirement refers to total product thickness (not wear-layer thickness alone), and USA-manufactured direct-glue LVT with a 30-mil wear layer and approximately 3 mm overall thickness is acceptable; approximately 1,200 square feet of flooring and approximately 500 linear feet of four-inch rubber cove base are required; the pre-bid site visit on September 22, 2026 was not mandatory; no bid guarantee is required; no additional RFIs will be accepted; Project 504-26-006 is the correct project number throughout; and the procurement includes PCRA permit number 504-26-027 with applicable ICRA Level 4 requirements. Additional clarifications address contractor responsibilities including furniture removal/reinstallation by the VA, manufacturer-specified moisture testing, asbestos-free confirmation, contractor-determined means and methods for negative-air containment (continuous throughout the 45-day performance period), contractor-provided waste disposal and dumpster, and coordination with the Contracting Officer's Representative for scheduling including after-hours and weekend work options. The contracting officer is Jennifer Parker.

View the file

Other files

File Type Posted
36C25726Q0431 0004.docx DOCX document
36C25726Q0431 0003 final.docx DOCX document
36C25726Q0431 0002 Final.docx DOCX document
36C25726Q0431 0001 final.docx DOCX document
36C25726Q0431 Final.docx DOCX document
36C25726Q0431.docx DOCX document
504-26-006 VHA ICRA Jan 3 2025 ICRA.pdf PDF
504-26-027 F and N Flooring PCRA.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

10-15-2026

504-26-006 36C257

Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building #171 Temple TX 76504

36C257

Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building 171 Temple TX 76504 To all Offerors/Bidders

36C25726Q0431

X

The purpose of this amendment is to respond to timely RFIs. Please review the responses on the following pages.

All other terms and conditions remain the same.

Jennifer Parker Contracting Officer

RFIs 36C25726Q0431 – Replace LVT Flooring (Amarillo), Project 504-26-006

1. How many flooring transitions will be required as part of this project?

· Five (5) flooring transitions will be required.

2. What width/dimensions of LVT flooring does the Government desire for the new flooring?

· The desired LVT plank dimensions are approximately 7-3/4 inches by 52 inches.

3. Regarding the flooring color, should the new flooring be color-matched to the existing flooring being replaced, matched to another existing floor/area within the facility, or will the Government select a new color from the contractor’s submitted product options?

· The Government desires a gray oak appearance. A comparable example is Sterling Light Oak

4. Site visit: Please confirm that attendance at the September 22, 2026 pre-bid site visit was not mandatory and that non-attendance does not make an otherwise responsive quote ineligible.

· The site visit was not mandatory

5. LVT requirement: The SOW states that the LVT should have a “thickness between 28-40 mils.” Commercial LVT commonly expresses 28-40 mils as the wear-layer thickness. Please confirm whether a USA-manufactured direct-glue LVT with a 30-mil wear layer and approximately 3 mm overall product thickness satisfies this requirement.

· Yes. A USA-manufactured, direct-glue LVT with a 30-mil wear layer and an overall product thickness of approximately 3 mm is acceptable.

6. Project number: The solicitation/SOW identifies Project 504-26-006, while one quote-submission instruction references Project 504-26-002 in the email subject line. Please confirm that 504-26-006 is the correct project number to use throughout the quote.

· Project number 504-26-006 is the correct project number

7. Bonds: Please confirm whether an offer guarantee/bid bond is required with the quote and whether performance and payment bonds will be required after award. If required, please identify the applicable percentage/amount and timing.

· Reference block13.b. of the solicitation, a bid guarantee is not required

8. Site visit: Please confirm that attendance at the September 22, 2026 pre-bid site visit was not mandatory and that non-attendance does not make an otherwise responsive quote ineligible.

· Refer to Response No. 4

9. LVT requirement: The SOW states that the LVT should have a “thickness between 28-40 mils.” Commercial LVT commonly expresses 28-40 mils as the wear-layer thickness. Please confirm whether a USA-manufactured direct-glue LVT with a 30-mil wear layer and approximately 3 mm overall product thickness satisfies this requirement.

· Refer to Response No. 5

10. Project number: The solicitation/SOW identifies Project 504-26-006, while one quote-submission instruction references Project 504-26-002 in the email subject line. Please confirm that 504-26-006 is the correct project number to use throughout the quote.

· Refer to Response No. 6

11. Bonds: Please confirm whether an offer guarantee/bid bond is required with the quote and whether performance and payment bonds will be required after award. If required, please identify the applicable percentage/amount and timing.

· Refer to Response No. 7

12. Amendment 0001 states that it corrects the site-visit, RFI and proposal dates. The amended site-visit and proposal dates are provided, but we did not identify the revised RFI deadline. Please confirm the deadline for submitting RFIs.

· No additional RFI’s will be accepted

13. The quotation-submission instructions specify an email subject containing Project 504-26-002, while SF 1442 and the SOW identify Project 504-26-006. Please confirm that proposals and RFIs should reference Project 504-26-006.

· Proposals and RFIs should reference Project 504-26-006.

14. The attached PCRA permit identifies permit/project number 504-26-027, while the solicitation identifies Project 504-26-006. Please confirm that the attached PCRA applies to this procurement.

· Yes. The attached PCRA applies to this procurement. The applicable ICRA and PCRA requirements shall be followed.

15. SOW paragraph 16.5 requires LVT with a “thickness between 28–40 mils.” Is this requirement intended to specify the wear-layer thickness, rather than the total product thickness?

· The 28–40 mil requirement refers to the total product thickness, not solely the wear-layer thickness.

16. Please provide the approximate linear footage of four-inch rubber cove base and the number and dimensions of required transition strips, or confirm that offerors should determine these quantities during the site visit.

· Approx 500 FT

17. Please confirm whether the approximately 1,200 square feet includes all waste, or whether offerors should include an additional material waste factor.

· Approximately 500 linear feet of four-inch rubber cove base will be required. Five (5) flooring transitions will also be required.

18. Who is responsible for removing and reinstalling furniture, equipment and other contents from the affected rooms?

· The VA will be responsible for removing and reinstalling furniture, equipment, and other contents from the affected rooms.

19. Is moisture testing required before floor preparation and installation? If so, please identify the required testing standard and acceptable moisture limits.

· Moisture testing shall be performed in accordance with the flooring manufacturer’s specifications, including the manufacturer’s required testing procedures and acceptable moisture limits.

20. Please confirm whether asbestos-containing flooring or adhesive has been ruled out. If testing has been performed, please provide the applicable survey or report.

· Asbestos-containing flooring and adhesive have been ruled out. No asbestos was identified.

21. The Level III ICRA requires exterior HEPA exhaust at least 25 feet from entrances, air intakes and operable windows. Will the VA identify and approve an exterior exhaust route during the site visit?

· The project will be performed under ICRA Level 4 requirements. The contractor is responsible for determining the means and methods, including the exterior HEPA exhaust route and associated requirements.

22. Please clarify whether negative-air containment must remain operational continuously throughout the entire 45-day performance period or only while demolition, floor preparation and other dust-generating work is underway.

· Negative-air containment shall remain operational continuously throughout the entire 45-day performance period.

23. The ICRA’s additional requirements state that negative-air monitors must provide readings “24/7/365.” Please confirm that this means continuously for the duration of the applicable construction activities.

· The requirement for negative-air monitors to provide readings “24/7/365” means that monitoring shall occur continuously for the duration of the applicable construction activities.

24. Please confirm whether hard-wall containment is required or whether properly secured plastic critical barriers meeting the Level III requirements are acceptable.

· The project will be performed under ICRA Level 4 requirements. The contractor is responsible for determining the appropriate means and methods of containment in accordance with the applicable ICRA requirements.

25. Are after-hours or weekend work and phased execution anticipated to minimize disruption to the occupied administrative areas?

· After-hours work is permitted. The contractor shall coordinate the schedule with the Contracting Officer’s Representative (COR). Phased execution and weekend work may be coordinated as necessary to minimize disruption to occupied administrative areas.

26. Please confirm whether the Government will provide an onsite dumpster or whether the contractor must furnish offsite disposal and transportation.

· The contractor is responsible for providing its own dumpster and for all related waste transportation and disposal.

27. The proposal instructions state that failure to submit documents “a–m” will result in rejection. Please confirm the complete list of documents represented by items a through m.

· Instructions to offerors was updated in Amendment 0004.