EXHIBIT B – BONHAM CAMPUS
HVAC MAINTENANCE CONTRACT
| SUBJECT* |
| NEW: BUILDING 6 CHILLER REPAIR | 549 |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 76504 |
| SOLICITATION NUMBER* |
| 36C25726Q0191 |
| RESPONSE DATE/TIME/ZONE |
| 01-05-2026 10AM CENTRAL TIME, CHICAGO, USA |
| ARCHIVE |
| 65 DAYS AFTER THE RESPONSE DATE |
| PRODUCT SERVICE CODE* |
| J041 |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
Network Contracting Office (NCO) 17
1901 Veterans Memorial Drive Temple TX 76504
POINT OF CONTACT*
Contract Specialist Abduel Sanford abduel.sanford@va.gov 254-922-1975
PLACE OF PERFORMANCE
| ADDRESS |
| Department of Veterans Affairs |
Dallas VA Medical Center
4500 S. Lancaster Rd.
Dallas TX
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
| AGENCY CONTACT’S EMAIL ADDRESS |
| abduel.sanford@va.gov |
EMAIL DESCRIPTION
DESCRIPTION
The Department of Veterans Affairs (VA), Veterans Health Administration, Veterans Integrated Service Network 17, Network Contracting Office (NCO) 17 is seeking sources to Chiller Repairs, Department of Veteran Affairs, Dallas VA Medical Center, 4500 S. Lancaster Rd. Dallas, TX 75216
• Statement of Work (Draft) Period of Performance: 60 Within Days After Award Overview: The contractor shall furnish all labor, material, equipment, supplies, transportation, and supervision. Contractor is to provide supervision, labor, and specified material below on Chiller Repairs located at Dallas VA Medical Center.
This notice is NOT a formal request for quote or proposals. No formal solicitation document exists currently. The information in this notice is for information and planning purposes only and is not to be construed as a commitment by the government. No contract will be awarded from this notice. The acquisition strategy will be decided based on responses and other market research efforts. If parties choose to respond, any cost associated with preparation and submission of data or cost incurred in response to this announcement shall be the sole responsibility of the contractor and will not be reimbursed by the Government.
Sources Sought Notice Sources Sought Notice Notice: DO NOT respond to this notice in the Interested Vendors List. Interested firms must respond directly to Abduel Sanford, Contract Specialist at: abduel.sanford@va.gov.
| *= Required Field |
| Sources Sought Notice |
Sources Sought Notice
1.0 SCOPE OF WORK
Building 6 Chiller 1: Circuit 2 VFD Replacement, Circuit 1 VFD Contactor Replacement, AHU's Air Bleed Repairs, Leak Check Circuit 1, Air Flow Issues, test boiler, perform complete system check along with air-balancing and programing.
1.1 Place of Performance
Dallas VA Medical Center 4500 S. Lancaster Rd.
Dallas, TX 75216
1.2 Period of Performance
60 days post award
2.0 CONTRACTOR CERTIFICATIONS
Qualified technicians shall be certified and have 4 years’ minimum experience working on the equipment. Contractors must have the following certifications per equipment.
· Certified HVAC Technicians skilled in the installation, maintenance, and repair of heating, ventilation, air conditioning systems.
· EPA Section 608 Certification
· HVAC License and Certifications
· Conditioned Air Contractor License
· State and Local Licensing Requirements
· Contractor has documented knowledge and experience in the VA’s standards for construction and testing of safety devices. Technicians shall have demonstrated experience in conducting equipment assessments and performing testing in compliance with the VA Safety Standards & Device Testing Manual on at least 3 sites with 3 years related to HVAC Systems.
3.0 DESIGNATED FULL TIME PROJECT COORDINATOR
The prime contractor will provide a full-time project coordinator to provide ONSITE MANAGEMENT of this contract for while all work is being performed. Prime contractors shall not use subcontractors for standing in on authority.
· The Project Coordinator shall oversee, direct, coordinate activities of the service providers and sub-contractors, and will be responsible for maintenance coordination of directing, planning, and remote troubleshooting provided by service providers and subcontractors.
· The Project Coordinator shall organize & schedule for the site related issues for the maintenance, corrective repairs, and emergencies. Includes scheduling service providers for all services covered in this contract via the equipment maintenance schedule and/or provided based on equipment, location, application, and running time.
· Project Coordinator is responsible to assure that all contractors follow check in & check out processes per VA standards.
· The project coordinator shall manage and coordinate all documentation via VA standards & procedures in the testing section. This preventative maintenance program is based on the (OEM) manufacturer’s recommendation, and the project coordinator will check with the OEM manufacturer annually for any changes/recommendations to the preventative maintenance program and adjust accordingly.
3.1 CONTRACTOR FULL-TIME PROJECT COORDINATOR REQUIREMENTS:
· Project Coordinator experience.
· You shall have 3 - 5 years in Electrical, HVAC, operations.
4.0 CONTRACTOR PROCUREMENT CAPABILITES
Contractors shall be required to establish that all subcontractors are in VA vendor profile. The contractor shall ensure work will be performed within the signed agreement and shall execute active funding to subcontractors within 5 days for special projects/emergencies. Sub-Contractors plan shall mirror agree/operate under VA’s terms and conditions of this contract.
5.0 PREVENTATIVE MAINTENANCE
This program covers preventative maintenance and includes on-site labor, travel labor, travel, travel, living expenses, tools, maintenance parts procurement (locating, ordering, and transporting) and equipment such as cranes, scaffolding, and rigging.
All maintenance materials, parts, filters etc. are necessary to perform preventative maintenance tasks outline in 7.0 Preventive Maintenance and Exhibit A & Exhibit B (maintenance) and are provided by the contractor as part of this contract.
Repair labor, repair parts, emergency labor and emergency parts are defined and directed in Paragraph 6.0 Program Definitions
6.0 PROGRAM DEFINITIONS.
6.1 TEST & INSPECT: Inspections shall include on site labor, travel labor and travel and living expenses to visually INSPECT and TEST equipment to determine its operating condition and efficiency.
6.2 TESTING for excessive vibration, motor winding resistance, refrigerant charge, refrigerant oil (acid) water condition, normal wear and tear/deterioration per manufacture guidelines & limits, equipment control systems, control safety devices etc.
6.3 INSPECTING for worn, failed or doubtful parts, mountings, shafts, bearings, blades, housing, drive couplings, bolts, rotation, and steam, water, oil and/refrigerant leaks, steam coil and cooling coil etc.
6.4 RECORDING – as per tasking sheets.
6.5 INCLUDED - The Project Coordinator shall review and consolidate all service documentation as directed by the COR as per tasking sheets.
7.0 PREVENTATIVE MAINTENANCE:
Preventative Maintenance includes on site labor, tools, travel labor and travel and living expenses required to replace, clean, align, calibrate, tighten, adjust, lubricate. These activities are intended to extend equipment life and ensure proper operating conditions and efficiency. All maintenance materials and parts are provided by the contractor.
Typical activities include:
· Quarterly Maintenance Tasks Inspect and Replace Filters- Replace all scheduled Quarterly filters and necessary seating to ensure proper airflow and efficiency.
Inspect Fan and Blower- Check the fan blades for dust buildup and ensure they are free of cracks and excessive wear. Test fan RPM to meet design specifications.
Lubricate Moving Parts-Apply manufactured lubricant to all moving parts, including bearings and motors, to reduce friction and wear.
Inspect Dampers and Actuators- Confirm that dampers are operational and aligned and clear any dirt accumulations.
· Semi-Annual Maintenance Task Inspect and Replace Filters- Replace all scheduled Semi-Annual filters and necessary seating to ensure proper airflow and efficiency.
Check Belts and Pulleys- Inspect belts for signs of wear such as cracks, fraying, or glazing. A shiny or smooth surface indicates slippage and must be replaced. Alignment must be made. Noise check, Tension check of belt, Replacement belt must match manufactures specifications and operations of air handler.
Inspect Drain Pans and Lines- Check for rust and ensure that drains pans are free of debris to prevent water damage and mold growth. Drains are clear and unclogged for proper drainage when required to remove standing water by removing all moisture with shop vacuum. Unclogging of drain per vacuum or pressure system may be required. Clean Chill Water Coil and Steam Coil using hospital safety cleaner.
· Annual Maintenance Task Inspect and Replace Filters- Replace all scheduled Annual filters and necessary seating to ensure proper airflow and efficiency.
Scheduled a comprehensive inspection with a qualified HVAC technician to assess the overall condition of the air handler and perform any necessary repairs.
A thorough cleaning of the air handler coils systems to include cooling coils, evaporator and heating coils.
Accessing coil system, soft brushing surface debris, applying coil cleaners, soft power washing or air system for deep cleaning of coil system, vacuum away residue, cleaning the coils dry where required, drip pan cleaning and removal of residue and debris.
A thorough cleaning air handlers Louver system. Lubrication will be required. Operation of free movement shall be reached.
Review all-Inlet Damper, Pre-filter, Bag filter, cooling coil, heating coil, blower fan, outlet dampers, supply fan, return fans, evaporator, condensers, motor, belt, bearings, shaft, motor slide base, pedestal, access hole for mounting bolts, out flange, housing wheel/impeller, inlet funnel, inlet collar, flanged inlet.
· Maintenance Log- Contractor shall document all maintenance activities, including dates and tasks performed, to track the history of the air handler’s upkeep. The contractor shall provide maintenance log to the VA on all scheduled & unscheduled Preventive Maintenance. No later than 3 working days from completion of all work.
7.1 CORRECTIVE REPAIR, EMERGENCY REPAIR HOURS & PARTS
· All corrective maintenance/repair and emergency/repair labor outside the scope of preventative maintenance defined in Paragraph 5.0 shall be drawn from a pre-estimated amount tied to this contract and not to exceed the estimated amount that may increase or decrease depending on number and price of repair. The line item must be approved by the Government COR/POC prior to any work performed. (For normal business hours and emergencies).
· Additional line item for funds outside of the preventive maintenance of the amount for coverage of year contract $150,000.00 for corrective repair, emergency repair hours & parts. Item Number 0002.
All corrective repair/emergency repair includes on site labor, travel labor, travel and living expenses, tools, maintenance parts procurement (location, ordering, expediting, and transporting and equipment such as cranes, scaffolding, and rigging.
See Paragraph 7.4 Parts & Parts Specifications regarding parts for corrective repair/emergency service.
7.2 REPAIRS & CORRECTIVE MAINTENACE
· Repairs & Corrective Maintenance is to restore equipment, a machine, or a system to an operational condition and include troubleshooting, disassembly, adjustment, repair, replacing failed/defective parts, and alignment so it can perform its intended function. Repairs & Corrective Maintenance will be drawn from a pre-estimated amount tied to this contract and not to exceed the estimated amount that may increase or decrease depending on number and price of repair.
· Additional line item for funds outside of the preventive maintenance for the amount for coverage of year contract $600,000.00 for repairs & corrective maintenance for the first year of the service contract and $300,000.00 for every year thereafter. Item Number 0003.
Any parts required for repair/corrective maintenance shall be provided by the Contractor. See parts requirement section 7.3
· Contractor has the option to conduct repairs at an offsite location or VANTXHCS at no additional cost to the VA.
· If a part or component has become obsolete preventing the contractor from supporting or repairing the equipment, the contractor shall notify the Contracting Officer Representative (COR) before any further work is completed and will be advised how to proceed by the COR.
7.3 PACKAGE PARTS AND CONSUMABLES
Contractor shall provide certified manufacturer replacement parts to cover defects in workmanship. Equipment must be proprietary per manufacturer.
7.4 PARTS & PARTS SPECIFICATIONS
· Any parts/materials outside the scope of testing, inspecting, and preventative maintenance shall be approved and supplied by the VA. Corrective Repair and/or Emergency Repair parts will be purchased by the VA or will be purchased by the contractor upon approval of the COR.
· Contractor reserves the right to replace any component or part with either a new or manufacturer rebuilt part, or replace complete assemblies instead of individual components, and must be approved and purchased by the VA.
· No refurbished parts that are not provided by the manufacturer.
· Equipment must be proprietary per manufacturer.
8.0 LOCK OUT TAG OUT PROCEDURES
Subcontractors are responsible to make sure equipment is Locked Out Tagged Out (LOTO) in accordance with VA approved LOTO procedures.
(SEE Exhibit A & B Below for Filters) Dallas, Herzog, Grand Prairie
| UNIT I.D. |
| SERVICE TYPE |
| FILTER QTY |
| FILTER SIZE |
| FILTER TYPE |
| BELT SIZE |
| BELT SIZE |
BLDG 1
| AHU 1 |
| Qtrly |
| 50 |
| 12x24x2 |
| Pleated |
| SF-B-56 (3) |
| RF B-112 (2) |
Exh Fan 59 A-51 (2)
| AHU 2 |
| Qtrly |
| 50 |
| 12x24x2 |
| Pleated |
| SF B-68 (4) |
| Rf B-105 (2) |
Exh Fan 34 A-51 (2)
| 18x24x2 |
| Pleated |
| SF A-51 |
| RF A-46 |
| AHU 7 |
| Qtrly |
| 2 |
| 16x24x2 |
| Pleated |
AHU 8
| 5 |
| 24x24 |
| Links |
| SF A-32 (!0 |
| RF A-26 (1) |
| 4 |
| 24x24x4 |
| Pleated |
| Exh Fan 2 A-60 (2) |
BLDG 2
Basement
AHU 31
| 20x25x2 |
| Pleated |
| SF A-66 (1) |
AHU 34
| 4 |
| 12x24x2 |
| Pleated |
| SF B-86 (2) |
| RF B-44 (2) |
AHU 35B
AHU 42
| 9 |
| 24x24x2 |
| Pleated |
| SF A-66 (1) |
Media Roll
AHU 32
AHU 35
| 8 |
| 16x20x2 |
| Pleated |
| SF B-58 |
| RF A-26 (2) |
AHU 36
AHU 16A
| 8 |
| 16x25x2 |
| Pleated |
| SF- B79 (2) |
MAS
SF A-43 (1)
AHU 33
AHU 35A
| 2 |
| 20x20x2 |
| Pleated |
| SF A-48 |
AHU 41
| 3 |
| 16x25x2 |
| Pleated |
| SF A-41 |
AHU 16B
| 16 |
| 20x25x2 |
| Pleated |
| SF B108 (2) |
1st Floor
AHU 1
| 3 |
| 20x24x2 |
| Pleated |
| SF A-40 (1) |
2nd Floor
AHU 2A
| 6 |
| 24x24x21 |
| Bags |
| SF B-44 (3) |
| RF A-70 (2) |
AHU 2B
AHU 2C
| 18 |
| 12x24x2 |
| Pleated |
| SF B-36 (3) |
AHU 2D
| 12 |
| 20x24x22 |
| Bags |
| SF B-44 (3) |
3rd Floor
AHU 3
| 3 |
| 16x24x4 |
| Pleated |
| SF B36 (2) |
4th Floor
AHU 4
| 15 |
| 20x20x4 |
| Pleated |
| SF B-82 (3) |
| RF A-60 (2) |
AHU 15
| 2 |
| 30x15x11.5 |
| HEPA |
| SF B-76 (2) |
MAU 16
AHU 17
| 8 |
| 24x24x2 |
| Pleated |
| SF B-76 (2) |
| RF B-86 (1) |
AHU 18
| 3 |
| 12x24x2 |
| Pleated |
| SF B-64 (3) |
| RF A-71(1) |
AHU 28
| 3 |
| 12x24x2 |
| Pleated |
| SF B-36 (3) |
5th Floor
AHU Bronc Lab
| 1 |
| 12x24x11.5 |
| HEPA |
| SF A-40 (1) |
AHU 15
| 5 |
| 24x24x2 |
| Pleated |
| SF B-62 (2) |
| RF B-70 (1) |
AHU 14
| 2 |
| 12x24x2 |
| Pleated |
| SF A64 (20 |
6th Floor
AHU 6
| 3 |
| 12x24x4 |
| Pleated |
| SF B-84 (3) |
| RF B-92 (2) |
AHU 6C
| 9 |
| 20x20 |
| Canister |
| Direct Drive |
| RF A-50(2) |
7th Floor
AHU 7A
| 3 |
| 12x24x11.5 |
| HEPA |
| Direct Drive |
| RF B-98 (2) |
RF A-72 (1)
8th Floor
AHU 12
AHU 30
9th Floor
AHU 9
| 3 |
| 24x24x21 |
| Bags |
| SF B-80 (3) |
AHU 10
| 6 |
| 24x24x21 |
| Bags |
| SF B-64 (3) |
| RF A-46 (2) |
AHU 11
| 6 |
| 24x24x21 |
| Bags |
| SF B-64 (3) |
| RF A-46 (2) |
10th Floor
BCU 1
BLDG 2J
PENTHOUSE
AHU 31
| 2 |
| 24x80 |
| Links |
| SF -B-58 (2) |
| RF B-98 (3) |
AHU 32
| 15 |
| 24x24x21 |
| Bags |
| SF B-90 (4) |
| RF |
AHU 33
| 15 |
| 20x20x21 |
| Bags |
| SF B-100 (2) |
| RF B-112 (2) |
AHU 34
| 15 |
| 24x24x21 |
| Bags |
| SF B-90 |
| RF B-133 (4) |
1st Floor Bay 1 to Bay 7
AHU 8
| 5 |
| 24x24 |
| Links |
| SF B-84 (3) |
| 4 |
| 24x24x4 |
| Pleated |
| RF B-124 (3) |
HEPA
Electric Rm
AHU 9
| 1 |
| 20x280 |
| Links |
| SF B-48 (3) |
| RF B-68 (2) |
| 1 |
| 12x80 |
| Links |
| Ex Fan A-28 (1) |
Electric Rm
AHU 10
| 8 |
| 24x24x22 |
| Bags |
| SF B-82 (3) |
| RF B-90 (2) |
| 10 |
| 20x20 |
| Links |
| Ex Fan A-27 (1) |
Electic Rm
AHU 11B
| 12 |
| 16x20x2 |
| Pleated |
| SF B-40 (2) |
| RF A-56 (1) |
Gen Ex A-32 (1)
AHU 11A
| 15 |
| 20x24x22 |
| Bags |
| SF B-90 (3) |
| RF B-97 (2) |
Electrical Rm
AHU 13
| 8 |
| 24x24x22 |
| Bags |
| SF B-65 (2) |
| RF B-105 |
| 2 |
| 24x100 |
| Links |
| Gen Ex A-54 (1) |
Electric Rm
AHU 14B
| 20 |
| 24x24x22 |
| Bags |
| SF B-66 (4) |
| RF 93 or 94 (4) |
| 21 |
| 16/20/2 |
| Pleated |
| Ex Fan A-72 (2) |
Gen Ex B-96 (2)
AHU 14A
| 8 |
| 24x24x4 |
| Pleated |
| SF B-65 (2) |
| RF B-105 (2) |
BLDG 3T
AHU 4
BLDG 2J
3rd FloorBay 1 to Bay 7
AHU 15
| 15 |
| 20x20x21 |
| Bags |
| SF B-112 (3) |
| B-104 (3) |
AHU 16
| 12 |
| 24x24 |
| Links |
| SF B-74 (2) |
AHU 17
| 1 |
| 20x80 |
| Links |
| SF B-48 (2) |
| RF A-80 (1) |
AHU 18
| 3 |
| 20-120 |
| Links |
| SF B-92 |
| RF B-98 (2) |
AHU 19
| 2 |
| 24x80 |
| Links |
| SF B-63 (2) |
| RF B-69 (2) |
AHU (MRI)
| 4 |
| 24x24x12 |
| Canister (Box) |
AHU 20
| 15 |
| 20x20x4 |
| Pleated |
| SF B-78 (2) |
| Rf B103 (2) |
AHU 21
| 14 |
| 20x20x21 |
| Bags |
| SF B-104 (5) |
| RF B-154 (4) |
5th Floor Bay 1-Bay 7
AHU 22
| 15 |
| 20x24x21 |
| Bags |
| SF B-62/64 (3) |
| RF B-100 |
| 15 |
| 20x24 |
| Cube |
| Exh Fan B-70 |
AHU 23
| 12 |
| 20x24x4 |
| Pleated |
| SF B-62 (3) |
| RF B-98/99 (G293 |
AHU 24
| 12 |
| 24x24x21 |
| Bags |
| SF _B-58 (3) |
AHU 25
| 18 |
| 20x24x4 |
| Pleated |
| SF -B-96 |
| RF B--136 |
AHU 26
| 18 |
| 20x20x |
| Links |
| SF B-95 (3) |
| RF B112-(2) |
AHU 27
AHU 28
| 8 |
| 24x24 |
| Cubes |
| SF B100 (5) |
| RF B-133 (4) |
Fan Coil A-31 (1)
AHU 29
AHU30
| 24 |
| 20x20 |
| Links |
| SF B-95/97 (3) |
| Rf B-120 (2) |
| 24 |
| 24x24x21 |
| Bags |
| Fan Coil A-31 (1) |
PB1 North Main Mech.
PB1
AHU 1
| 3 |
| 20x120 |
| Links |
| SF B-112 (3) |
| RF B-64 (4) |
| 15 |
| 20x20 |
| Links |
| Ex Fan A-55 (1) |
Electric Rm
AHU 36
| 12 |
| 24x24 |
| Canister |
| SF 5VX550 (3) |
PB2
AHU 2
| 12 |
| 24x24x2 |
| Pleated |
| SF B-68 |
| RF |
| 3 |
| 20x120 |
| Links |
| Ex Fan B108 (2) |
Electrical Rm
PB 3
AHU 3
| 15 |
| 20x20 |
| Bags |
| SF B-108 (2) |
| 3 |
| 20x20x120 |
| Links |
| RF B-9 (3) |
| 25 |
| 20x20 |
| Cube |
| Ex Fan B-72 (1) |
Gen Ex A-27 (1)
Electric Rm
PB 4
AHU 4
| 2 |
| 20x80 |
| Links |
| SF B-60 (2) |
| RF A-55 (2) |
FC-17
PB5
AHU 5
FC 15
PB-
AHU 7
| 8 |
| 24x24x22 |
| Bags |
| SF B-70 (1) |
| RF B-90 (2) |
| 16 |
| 20x24 |
| Cube |
| Gen Ex A-32 (1) |
AHU 6
| 15 |
| 24x24x2 |
| Pleated |
| SF B-90 (1) |
| RF B-80 (2) |
Electrical Rm
AHU 12
| 8 |
| 24x24x22 |
| Bags |
| SF B-70 (2) |
| RF B-94 (2) |
BLDG 3
AHU 1
SF B-52 (3)
AHU 2
SF B-51 (3)
AHU 3
SF B-42
BLDG 43
AHU 1
Fan Wall
AHU 2
| 24 |
| 24x24x4 |
| Pleated |
| Direct Drive |
FanWall
AHU 3
| 2 |
| 24x24x2 |
| Pleated |
| SF A-41 (1) |
AHU 4
| 2 |
| 24x24x2 |
| Pleated |
| Sf A-41 (1) |
AHU 5
| 8 |
| 24x24xx2 |
| Pleated |
| SF A-68 (2) |
BLDG 60 CLC
AHU 1
| 10 |
| 12x24x4 |
| Pleated |
| SF B-62 (3) |
| RFB-88/90 (2) |
Exh Fan
AHU 2
| 15 |
| 20x20x2 |
| Pleated |
| SF B-54 (2) |
| RF B-85(2) |
Exh Fan
AHU 3
| 15 |
| 20x20x2 |
| Pleated |
| SF B-54 (2) |
| RF B-85 (2) |
Exh Fan
AHU 4
Exh Fan
BLDG 72 In-House
AHU 1
| 4 |
| 20x20x2 |
| Pleated |
| SF B-36 |
| RF- B-48 |
BLDG 74 SCI
AHU 1
| 5 |
| 20x24x4 |
| Pleated |
| SF B-98 (5) |
| RF B-108 (2) |
AHU 2
| 4 |
| 12x24x4 |
| Pleated |
| SF B-98 (5) |
| RF B-110 (2) |
AHU 3 Pool Pak
| 4 |
| 20x20x2 |
| Pleated |
| SF B-36 |
| RF B-48 |
AHU 4
| 20x24x4 |
| Pleated |
| SF B-56 (2) |
| RF B-70 (2) |
| 20x24x22 |
| Bag |
| Ex. Fan A-51 |
BLDG 5
BLDG 6
BLDG 8
HERZOG
AHU 2
| 2 |
| 20X25X2 |
| Pleated |
| SF B-41 (1) |
AHU 3
| 2 |
| 20X25X2 |
| Pleated |
| SF B-41 (41) |
AHU 4
| 2 |
| 20X25X2 |
| Pleated |
| SF B-41 (1) |
AHU 5
| 2 |
| 20X25X2 |
| Pleated |
| SF B-40 (1) |
New wing AHU 5
SF B-50 (1)
AHU 7
SF B-45 (1)
AHU 8
SF B-40 (1)
AHU 9
SF B-40 (1)
AHU 10
SF B-40 (1)
GRAND PRAIRIE
STATEMENT OF WORK
BUILDING 6 CHILLER REPAIR
VA MEDICAL CENTER DALLAS
Page 1 of
Page of
HVAC MAINTENANCE CONTRACT
Page 1 of Page 1 of
Page 1 of