This is a Sources Sought Notice for a Department of Veterans Affairs (VA) HVAC maintenance contract at the Dallas VA Medical Center. The solicitation (36C25726Q0191) seeks a contractor to perform chiller repairs in Building 6, with a specific focus on Circuit 2 VFD replacement, Circuit 1 VFD contactor replacement, air handling unit (AHU) repairs, leak checks, and comprehensive system testing. The period of performance is 60 days post-award, with a response deadline of January 5, 2026, at 10 AM Central Time.

The contract requires certified HVAC technicians with minimum 4 years of experience, EPA Section 608 Certification, and state/local licensing. The scope includes preventative maintenance, corrective repairs, and emergency services, with a $150,000 budget for corrective/emergency repairs and a $600,000 budget for repairs and corrective maintenance in the first contract year. A full-time project coordinator is mandated to manage on-site operations, coordinate subcontractors, and ensure compliance with VA standards. The contract will cover multiple buildings and air handling units, with detailed maintenance requirements for filters, equipment inspections, and system checks on a quarterly, semi-annual, and annual basis.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT B – BONHAM CAMPUS

HVAC MAINTENANCE CONTRACT

SUBJECT*
NEW: BUILDING 6 CHILLER REPAIR | 549

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
76504
SOLICITATION NUMBER*
36C25726Q0191
RESPONSE DATE/TIME/ZONE
01-05-2026 10AM CENTRAL TIME, CHICAGO, USA
ARCHIVE
65 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
J041
NAICS CODE*
238220
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Network Contracting Office (NCO) 17

1901 Veterans Memorial Drive Temple TX 76504

POINT OF CONTACT*

Contract Specialist Abduel Sanford abduel.sanford@va.gov 254-922-1975

PLACE OF PERFORMANCE

ADDRESS
Department of Veterans Affairs

Dallas VA Medical Center

4500 S. Lancaster Rd.

Dallas TX

POSTAL CODE
765216
COUNTRY
USA

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS
abduel.sanford@va.gov

EMAIL DESCRIPTION

DESCRIPTION

The Department of Veterans Affairs (VA), Veterans Health Administration, Veterans Integrated Service Network 17, Network Contracting Office (NCO) 17 is seeking sources to Chiller Repairs, Department of Veteran Affairs, Dallas VA Medical Center, 4500 S. Lancaster Rd. Dallas, TX 75216

• Statement of Work (Draft) Period of Performance: 60 Within Days After Award Overview: The contractor shall furnish all labor, material, equipment, supplies, transportation, and supervision. Contractor is to provide supervision, labor, and specified material below on Chiller Repairs located at Dallas VA Medical Center.

This notice is NOT a formal request for quote or proposals. No formal solicitation document exists currently. The information in this notice is for information and planning purposes only and is not to be construed as a commitment by the government. No contract will be awarded from this notice. The acquisition strategy will be decided based on responses and other market research efforts. If parties choose to respond, any cost associated with preparation and submission of data or cost incurred in response to this announcement shall be the sole responsibility of the contractor and will not be reimbursed by the Government.

Sources Sought Notice Sources Sought Notice Notice: DO NOT respond to this notice in the Interested Vendors List. Interested firms must respond directly to Abduel Sanford, Contract Specialist at: abduel.sanford@va.gov.

*= Required Field
Sources Sought Notice

Sources Sought Notice

1.0 SCOPE OF WORK

Building 6 Chiller 1: Circuit 2 VFD Replacement, Circuit 1 VFD Contactor Replacement, AHU's Air Bleed Repairs, Leak Check Circuit 1, Air Flow Issues, test boiler, perform complete system check along with air-balancing and programing.

1.1 Place of Performance

Dallas VA Medical Center 4500 S. Lancaster Rd.

Dallas, TX 75216

1.2 Period of Performance

60 days post award

2.0 CONTRACTOR CERTIFICATIONS

Qualified technicians shall be certified and have 4 years’ minimum experience working on the equipment. Contractors must have the following certifications per equipment.

· Certified HVAC Technicians skilled in the installation, maintenance, and repair of heating, ventilation, air conditioning systems.

· EPA Section 608 Certification

· HVAC License and Certifications

· Conditioned Air Contractor License

· State and Local Licensing Requirements

· Contractor has documented knowledge and experience in the VA’s standards for construction and testing of safety devices. Technicians shall have demonstrated experience in conducting equipment assessments and performing testing in compliance with the VA Safety Standards & Device Testing Manual on at least 3 sites with 3 years related to HVAC Systems.

3.0 DESIGNATED FULL TIME PROJECT COORDINATOR

The prime contractor will provide a full-time project coordinator to provide ONSITE MANAGEMENT of this contract for while all work is being performed. Prime contractors shall not use subcontractors for standing in on authority.

· The Project Coordinator shall oversee, direct, coordinate activities of the service providers and sub-contractors, and will be responsible for maintenance coordination of directing, planning, and remote troubleshooting provided by service providers and subcontractors.

· The Project Coordinator shall organize & schedule for the site related issues for the maintenance, corrective repairs, and emergencies. Includes scheduling service providers for all services covered in this contract via the equipment maintenance schedule and/or provided based on equipment, location, application, and running time.

· Project Coordinator is responsible to assure that all contractors follow check in & check out processes per VA standards.

· The project coordinator shall manage and coordinate all documentation via VA standards & procedures in the testing section. This preventative maintenance program is based on the (OEM) manufacturer’s recommendation, and the project coordinator will check with the OEM manufacturer annually for any changes/recommendations to the preventative maintenance program and adjust accordingly.

3.1 CONTRACTOR FULL-TIME PROJECT COORDINATOR REQUIREMENTS:

· Project Coordinator experience.

· You shall have 3 - 5 years in Electrical, HVAC, operations.

4.0 CONTRACTOR PROCUREMENT CAPABILITES

Contractors shall be required to establish that all subcontractors are in VA vendor profile. The contractor shall ensure work will be performed within the signed agreement and shall execute active funding to subcontractors within 5 days for special projects/emergencies. Sub-Contractors plan shall mirror agree/operate under VA’s terms and conditions of this contract.

5.0 PREVENTATIVE MAINTENANCE

This program covers preventative maintenance and includes on-site labor, travel labor, travel, travel, living expenses, tools, maintenance parts procurement (locating, ordering, and transporting) and equipment such as cranes, scaffolding, and rigging.

All maintenance materials, parts, filters etc. are necessary to perform preventative maintenance tasks outline in 7.0 Preventive Maintenance and Exhibit A & Exhibit B (maintenance) and are provided by the contractor as part of this contract.

Repair labor, repair parts, emergency labor and emergency parts are defined and directed in Paragraph 6.0 Program Definitions

6.0 PROGRAM DEFINITIONS.

6.1 TEST & INSPECT: Inspections shall include on site labor, travel labor and travel and living expenses to visually INSPECT and TEST equipment to determine its operating condition and efficiency.

6.2 TESTING for excessive vibration, motor winding resistance, refrigerant charge, refrigerant oil (acid) water condition, normal wear and tear/deterioration per manufacture guidelines & limits, equipment control systems, control safety devices etc.

6.3 INSPECTING for worn, failed or doubtful parts, mountings, shafts, bearings, blades, housing, drive couplings, bolts, rotation, and steam, water, oil and/refrigerant leaks, steam coil and cooling coil etc.

6.4 RECORDING – as per tasking sheets.

6.5 INCLUDED - The Project Coordinator shall review and consolidate all service documentation as directed by the COR as per tasking sheets.

7.0 PREVENTATIVE MAINTENANCE:

Preventative Maintenance includes on site labor, tools, travel labor and travel and living expenses required to replace, clean, align, calibrate, tighten, adjust, lubricate. These activities are intended to extend equipment life and ensure proper operating conditions and efficiency. All maintenance materials and parts are provided by the contractor.

Typical activities include:

· Quarterly Maintenance Tasks Inspect and Replace Filters- Replace all scheduled Quarterly filters and necessary seating to ensure proper airflow and efficiency.

Inspect Fan and Blower- Check the fan blades for dust buildup and ensure they are free of cracks and excessive wear. Test fan RPM to meet design specifications.

Lubricate Moving Parts-Apply manufactured lubricant to all moving parts, including bearings and motors, to reduce friction and wear.

Inspect Dampers and Actuators- Confirm that dampers are operational and aligned and clear any dirt accumulations.

· Semi-Annual Maintenance Task Inspect and Replace Filters- Replace all scheduled Semi-Annual filters and necessary seating to ensure proper airflow and efficiency.

Check Belts and Pulleys- Inspect belts for signs of wear such as cracks, fraying, or glazing. A shiny or smooth surface indicates slippage and must be replaced. Alignment must be made. Noise check, Tension check of belt, Replacement belt must match manufactures specifications and operations of air handler.

Inspect Drain Pans and Lines- Check for rust and ensure that drains pans are free of debris to prevent water damage and mold growth. Drains are clear and unclogged for proper drainage when required to remove standing water by removing all moisture with shop vacuum. Unclogging of drain per vacuum or pressure system may be required. Clean Chill Water Coil and Steam Coil using hospital safety cleaner.

· Annual Maintenance Task Inspect and Replace Filters- Replace all scheduled Annual filters and necessary seating to ensure proper airflow and efficiency.

Scheduled a comprehensive inspection with a qualified HVAC technician to assess the overall condition of the air handler and perform any necessary repairs.

A thorough cleaning of the air handler coils systems to include cooling coils, evaporator and heating coils.

Accessing coil system, soft brushing surface debris, applying coil cleaners, soft power washing or air system for deep cleaning of coil system, vacuum away residue, cleaning the coils dry where required, drip pan cleaning and removal of residue and debris.

A thorough cleaning air handlers Louver system. Lubrication will be required. Operation of free movement shall be reached.

Review all-Inlet Damper, Pre-filter, Bag filter, cooling coil, heating coil, blower fan, outlet dampers, supply fan, return fans, evaporator, condensers, motor, belt, bearings, shaft, motor slide base, pedestal, access hole for mounting bolts, out flange, housing wheel/impeller, inlet funnel, inlet collar, flanged inlet.

· Maintenance Log- Contractor shall document all maintenance activities, including dates and tasks performed, to track the history of the air handler’s upkeep. The contractor shall provide maintenance log to the VA on all scheduled & unscheduled Preventive Maintenance. No later than 3 working days from completion of all work.

7.1 CORRECTIVE REPAIR, EMERGENCY REPAIR HOURS & PARTS

· All corrective maintenance/repair and emergency/repair labor outside the scope of preventative maintenance defined in Paragraph 5.0 shall be drawn from a pre-estimated amount tied to this contract and not to exceed the estimated amount that may increase or decrease depending on number and price of repair. The line item must be approved by the Government COR/POC prior to any work performed. (For normal business hours and emergencies).

· Additional line item for funds outside of the preventive maintenance of the amount for coverage of year contract $150,000.00 for corrective repair, emergency repair hours & parts. Item Number 0002.

All corrective repair/emergency repair includes on site labor, travel labor, travel and living expenses, tools, maintenance parts procurement (location, ordering, expediting, and transporting and equipment such as cranes, scaffolding, and rigging.

See Paragraph 7.4 Parts & Parts Specifications regarding parts for corrective repair/emergency service.

7.2 REPAIRS & CORRECTIVE MAINTENACE

· Repairs & Corrective Maintenance is to restore equipment, a machine, or a system to an operational condition and include troubleshooting, disassembly, adjustment, repair, replacing failed/defective parts, and alignment so it can perform its intended function. Repairs & Corrective Maintenance will be drawn from a pre-estimated amount tied to this contract and not to exceed the estimated amount that may increase or decrease depending on number and price of repair.

· Additional line item for funds outside of the preventive maintenance for the amount for coverage of year contract $600,000.00 for repairs & corrective maintenance for the first year of the service contract and $300,000.00 for every year thereafter. Item Number 0003.

Any parts required for repair/corrective maintenance shall be provided by the Contractor. See parts requirement section 7.3

· Contractor has the option to conduct repairs at an offsite location or VANTXHCS at no additional cost to the VA.

· If a part or component has become obsolete preventing the contractor from supporting or repairing the equipment, the contractor shall notify the Contracting Officer Representative (COR) before any further work is completed and will be advised how to proceed by the COR.

7.3 PACKAGE PARTS AND CONSUMABLES

Contractor shall provide certified manufacturer replacement parts to cover defects in workmanship. Equipment must be proprietary per manufacturer.

7.4 PARTS & PARTS SPECIFICATIONS

· Any parts/materials outside the scope of testing, inspecting, and preventative maintenance shall be approved and supplied by the VA. Corrective Repair and/or Emergency Repair parts will be purchased by the VA or will be purchased by the contractor upon approval of the COR.

· Contractor reserves the right to replace any component or part with either a new or manufacturer rebuilt part, or replace complete assemblies instead of individual components, and must be approved and purchased by the VA.

· No refurbished parts that are not provided by the manufacturer.

· Equipment must be proprietary per manufacturer.

8.0 LOCK OUT TAG OUT PROCEDURES

Subcontractors are responsible to make sure equipment is Locked Out Tagged Out (LOTO) in accordance with VA approved LOTO procedures.

(SEE Exhibit A & B Below for Filters) Dallas, Herzog, Grand Prairie

UNIT I.D.
SERVICE TYPE
FILTER QTY
FILTER SIZE
FILTER TYPE
BELT SIZE
BELT SIZE

BLDG 1

AHU 1
Qtrly
50
12x24x2
Pleated
SF-B-56 (3)
RF B-112 (2)

Exh Fan 59 A-51 (2)

AHU 2
Qtrly
50
12x24x2
Pleated
SF B-68 (4)
Rf B-105 (2)

Exh Fan 34 A-51 (2)

AHU 3
Qrtly
18x24x2
Pleated
SF A-51
RF A-46
AHU 7
Qtrly
2
16x24x2
Pleated
2
24x24x2
Pleated
2
24x24x4
Pleated

AHU 8

5
24x24
Links
SF A-32 (!0
RF A-26 (1)
4
24x24x4
Pleated
Exh Fan 2 A-60 (2)
24x24x21
Bags

BLDG 2

Basement

AHU 31

20x25x2
Pleated
SF A-66 (1)
15x25x2
Pleated

AHU 34

4
12x24x2
Pleated
SF B-86 (2)
RF B-44 (2)
8
20x24x2
Pleated

AHU 35B

6
20x20x2
Pleated
1
20x20

AHU 42

9
24x24x2
Pleated
SF A-66 (1)

Media Roll

AHU 32

6
24x24x4
Pleated
6
24x24x15
Cube

AHU 35

8
16x20x2
Pleated
SF B-58
RF A-26 (2)
16x20x21
Bags

AHU 36

2
24x24x2

AHU 16A

8
16x25x2
Pleated
SF- B79 (2)
2
20x25x2
Pleated

MAS

2
20x20x1

SF A-43 (1)

AHU 33

27
24x24x22
Bags
SF A-48
27
24x24x2
Pleated
27
24x24x4
Pleated
28
24x24
Cube

AHU 35A

2
20x20x2
Pleated
SF A-48
1
20x20x21
Bags

AHU 41

3
16x25x2
Pleated
SF A-41
3
20x25x2
Pleated

AHU 16B

16
20x25x2
Pleated
SF B108 (2)
20
20x20x2
Pleated
20
20x20x22
Bags

1st Floor

AHU 1

3
20x24x2
Pleated
SF A-40 (1)

2nd Floor

AHU 2A

6
24x24x21
Bags
SF B-44 (3)
RF A-70 (2)
2
12x24x21
Bags
6
24x24x2
Pleated
2
12x24x2
Pleated
6
24x24x21
Bags
2
12x24x21
Bags

AHU 2B

20
24x24x2
Pleated
15
24x24x2
Pleated
15
24x24x21
Bags

AHU 2C

18
12x24x2
Pleated
SF B-36 (3)
3
20x24x2
Pleated
3
24x24x2
Pleated
3
24x24x21
Bags

AHU 2D

12
20x24x22
Bags
SF B-44 (3)
12
20x24x2
Pleated
32
12x24x2
Pleated

3rd Floor

AHU 3

3
16x24x4
Pleated
SF B36 (2)
3
20x24x4
Pleated
4
16x20x2
Pleated
8
16x25x2
Pleated

4th Floor

AHU 4

15
20x20x4
Pleated
SF B-82 (3)
RF A-60 (2)
12
24x24
Cube
B-72 (2)
15
20x20x2
Pleated
15
20x20x21
Bags

AHU 15

2
30x15x11.5
HEPA
SF B-76 (2)
8
30x24x11.5
HEPA
18
20x24x2
Pleated
6
16x20x2
Pleated

MAU 16

AHU 17

8
24x24x2
Pleated
SF B-76 (2)
RF B-86 (1)
8
24x24x21
Pleated
8
24x24x2
Pleated

AHU 18

3
12x24x2
Pleated
SF B-64 (3)
RF A-71(1)
3
24x24x2
Pleated
3
24x24x21
Bags

AHU 28

3
12x24x2
Pleated
SF B-36 (3)
2
24x24x2
Pleated
3
12x24x2
Pleated
2
24x24x2
Pleated

5th Floor

AHU Bronc Lab

1
12x24x11.5
HEPA
SF A-40 (1)

AHU 15

5
24x24x2
Pleated
SF B-62 (2)
RF B-70 (1)
5
24x24x21
Bags
8
20x20x2
Pleated

AHU 14

2
12x24x2
Pleated
SF A64 (20
2
12x24x21
Bags
2
20x24x2
Pleated
2
20x24x21
Bags

6th Floor

AHU 6

3
12x24x4
Pleated
SF B-84 (3)
RF B-92 (2)
12
24x24x4
Pleated
15
24x24x21
Bags

AHU 6C

9
20x20
Canister
Direct Drive
RF A-50(2)
9
20c20x4
Pleated

7th Floor

AHU 7A

3
12x24x11.5
HEPA
Direct Drive
RF B-98 (2)
12
24x24x11.5
HEPA

RF A-72 (1)

18
20x20x2
Pleated
5
16x20x2
Pleated

8th Floor

AHU 12

AHU 30

9th Floor

AHU 9

3
24x24x21
Bags
SF B-80 (3)
6
24x20x21
Bags
3
24x24x2
Pleated
6
20x24x2
Pleated

AHU 10

6
24x24x21
Bags
SF B-64 (3)
RF A-46 (2)
9
20x25x2
Pleated
5
20x20x2
Pleated

AHU 11

6
24x24x21
Bags
SF B-64 (3)
RF A-46 (2)
9
20x25x2
Pleated
5
20x20x2
Pleated

10th Floor

BCU 1

BLDG 2J

PENTHOUSE

AHU 31

2
24x80
Links
SF -B-58 (2)
RF B-98 (3)
15
24x24
Bags

AHU 32

15
24x24x21
Bags
SF B-90 (4)
RF
6
24x120
Links

AHU 33

15
20x20x21
Bags
SF B-100 (2)
RF B-112 (2)

AHU 34

3
24x20
Links
15
24x24x21
Bags
SF B-90
RF B-133 (4)

1st Floor Bay 1 to Bay 7

AHU 8

5
24x24
Links
SF B-84 (3)
4
24x24x4
Pleated
RF B-124 (3)

HEPA

HEPA
Exh Fan A-27

Electric Rm

AHU 9

1
20x280
Links
SF B-48 (3)
RF B-68 (2)
1
12x80
Links
Ex Fan A-28 (1)
4
20x20x22
Bags
3
12x24x22
Bags
9
24x24
Cube

Electric Rm

1
16x25
Pleated

AHU 10

8
24x24x22
Bags
SF B-82 (3)
RF B-90 (2)
10
20x20
Links
Ex Fan A-27 (1)
24
20x24
Cube

Electic Rm

1
12x24
Pleated

AHU 11B

12
16x20x2
Pleated
SF B-40 (2)
RF A-56 (1)

Gen Ex A-32 (1)

AHU 11A

15
20x24x22
Bags
SF B-90 (3)
RF B-97 (2)
15
20x20
Links
16
20x24
Cube

Electrical Rm

1
12x24x1

AHU 13

8
24x24x22
Bags
SF B-65 (2)
RF B-105
2
24x100
Links
Gen Ex A-54 (1)
20
20x20
Cube
12
20x25x2
Pleated

Electric Rm

1
12x24x1
Pleated

AHU 14B

20
24x24x22
Bags
SF B-66 (4)
RF 93 or 94 (4)
20
24x24x4
Pleated
21
16/20/2
Pleated
Ex Fan A-72 (2)

Gen Ex B-96 (2)

AHU 14A

8
24x24x4
Pleated
SF B-65 (2)
RF B-105 (2)
8
24x24x22
Bags
15
20x24
Cubes

BLDG 3T

AHU 4

4
12x24x22
Bags
4
24x24x22
Bags
4
12x24x2
Pleated
4
24x24x2
Pleated

BLDG 2J

3rd FloorBay 1 to Bay 7

AHU 15

15
20x20x21
Bags
SF B-112 (3)
B-104 (3)
8
20x20
Links

AHU 16

12
24x24
Links
SF B-74 (2)
12
24x24x21
Bags

AHU 17

1
20x80
Links
SF B-48 (2)
RF A-80 (1)
1
12x80
Links
3
20x202x21
Bags
3
12x24x21
Bags

AHU 18

3
20-120
Links
SF B-92
RF B-98 (2)
18
20x20x21
Bags

AHU 19

2
24x80
Links
SF B-63 (2)
RF B-69 (2)
6
24x24x21
Bags

AHU (MRI)

4
12x24x12
Bags
4
24x24x12
Canister (Box)

AHU 20

15
20x20x4
Pleated
SF B-78 (2)
Rf B103 (2)

AHU 21

14
20x20x21
Bags
SF B-104 (5)
RF B-154 (4)
14
20x24x21
Bags
24
20x24
14
20x20
Links

5th Floor Bay 1-Bay 7

AHU 22

15
20x24x21
Bags
SF B-62/64 (3)
RF B-100
15
20x24x4
Pleated
15
20x24
Cube
Exh Fan B-70

AHU 23

12
20x24x4
Pleated
SF B-62 (3)
RF B-98/99 (G293
6
30x30
HEPA
24
20x20
Cube
Exh B-60

AHU 24

12
24x24x21
Bags
SF _B-58 (3)
2
24x100
Links

AHU 25

18
20x24x4
Pleated
SF -B-96
RF B--136
18
20x24x2
Pleated
18
20x24x21
Bags

AHU 26

18
20x20x
Links
SF B-95 (3)
RF B112-(2)
5
12x24x21
Bags
16
20x20x
Cubes
10
24x24x4
Pleated
5
12x24x4
Pleated
2
24x24
Links
3
15x30
HEPA
6
24x30
HEPA

AHU 27

3
24x30
HEPA
SF B-42

AHU 28

24
24x24
Links
8
24x24
Cubes
SF B100 (5)
RF B-133 (4)
1
30x30x11.5
HEPA
6
24x30x11.5
HEPA
1
15x30x11.5
HEPA
1
15x25x11.5
HEPA

Fan Coil A-31 (1)

AHU 29

3
24x24x4
Pleated
3
12x24x4
Pleated

AHU30

24
20x20
Links
SF B-95/97 (3)
Rf B-120 (2)
24
24x24x21
Bags
Fan Coil A-31 (1)
16
24x24
Cube
15
24x24x4
3
30x30x11.5
HEPA
2
24x24x11.5
HEPA
7
24x30x11.5
HEPA

PB1 North Main Mech.

PB1

AHU 1

3
20x120
Links
SF B-112 (3)
RF B-64 (4)
15
20x20
Links
Ex Fan A-55 (1)
12
24x20
Bags

Electric Rm

1
12x24
Pleated

AHU 36

12
24x24
Canister
SF 5VX550 (3)
3
12x24
Canister
3
12x24x2
Pleated
12
24x24x2
Pleated

PB2

AHU 2

12
24x24x2
Pleated
SF B-68
RF
20
24x24
Cube
3
20x120
Links
Ex Fan B108 (2)
12
20x24x22
Bags

Electrical Rm

1
12x24x1
Pleated

PB 3

AHU 3

15
20x20
Bags
SF B-108 (2)
3
20x20x120
Links
RF B-9 (3)
25
20x20
Cube
Ex Fan B-72 (1)

Gen Ex A-27 (1)

Electric Rm

1
12x24x1

PB 4

AHU 4

2
20x80
Links
SF B-60 (2)
RF A-55 (2)
10
20x20x22
Bags
9
24x24
Cube

FC-17

1
12x24
Pleated

PB5

AHU 5

15
20x20x22
Bags
12
24x24
Cube

FC 15

1
12x24x1
Pleated

PB-

AHU 7

8
24x24x22
Bags
SF B-70 (1)
RF B-90 (2)
24
24x24
Links
16
20x24
Cube
Gen Ex A-32 (1)

AHU 6

15
24x24x2
Pleated
SF B-90 (1)
RF B-80 (2)
24
24x24
Cube

Electrical Rm

1
16x25x1
Pleated

AHU 12

8
24x24x22
Bags
SF B-70 (2)
RF B-94 (2)
12
24x24
Links

BLDG 3

AHU 1

12
20x20x2

SF B-52 (3)

AHU 2

12
20x20x2

SF B-51 (3)

AHU 3

2
20x20x2

SF B-42

BLDG 43

AHU 1

24
24x24x4
Direct Drive

Fan Wall

AHU 2

24
24x24x4
Pleated
Direct Drive

FanWall

AHU 3

2
24x24x2
Pleated
SF A-41 (1)

AHU 4

2
24x24x2
Pleated
Sf A-41 (1)

AHU 5

8
24x24xx2
Pleated
SF A-68 (2)

BLDG 60 CLC

AHU 1

10
12x24x4
Pleated
SF B-62 (3)
RFB-88/90 (2)
10
24x24x21
Bags
8
24x24x4
Pleated

Exh Fan

AHU 2

15
20x20x2
Pleated
SF B-54 (2)
RF B-85(2)

Exh Fan

AHU 3

15
20x20x2
Pleated
SF B-54 (2)
RF B-85 (2)

Exh Fan

AHU 4

12
20x20x21
Bags
SF
RF

Exh Fan

BLDG 72 In-House

AHU 1

4
20x20x2
Pleated
SF B-36
RF- B-48
2
20x25x2
Pleated
4
20x20x22
Bag
2
20x24x22
Bag

BLDG 74 SCI

AHU 1

5
20x24x4
Pleated
SF B-98 (5)
RF B-108 (2)
15
24x24x4
Pleated
4
12x24x4
Pleated
15
24x24x22
Bag
3
12x24x22
Bag
5
20x24x22
Bag

AHU 2

4
12x24x4
Pleated
SF B-98 (5)
RF B-110 (2)
15
24x24x4
Pleated
5
20x24x4
Pleated
3
12x24x22
Bag
15
24x24x22
Bag
5
20x24x22
Bag

AHU 3 Pool Pak

4
20x20x2
Pleated
SF B-36
RF B-48
2
20x25x2
Pleated
2
20x24x22
Bags
4
20x20x22
Bags

AHU 4

20x24x4
Pleated
SF B-56 (2)
RF B-70 (2)
20x24x22
Bag
Ex. Fan A-51

BLDG 5

BLDG 6

BLDG 8

HERZOG

AHU 2

2
20X25X2
Pleated
SF B-41 (1)

AHU 3

2
20X25X2
Pleated
SF B-41 (41)

AHU 4

2
20X25X2
Pleated
SF B-41 (1)

AHU 5

2
20X25X2
Pleated
SF B-40 (1)

New wing AHU 5

2
16x20x2

SF B-50 (1)

AHU 7

2
20x25x2

SF B-45 (1)

AHU 8

1
20x25x2

SF B-40 (1)

AHU 9

1
20x25x2

SF B-40 (1)

AHU 10

1
2x25x2

SF B-40 (1)

GRAND PRAIRIE

STATEMENT OF WORK

BUILDING 6 CHILLER REPAIR

VA MEDICAL CENTER DALLAS

Page 1 of

Page of

HVAC MAINTENANCE CONTRACT

Page 1 of Page 1 of

Page 1 of

File details come from the government source that posted it. Updated .