RFIs 36C25725R0084.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- 36C25725R0084
About this file
This Request for Information (RFI) details a Department of Veterans Affairs construction project for replacing condensate return units and pumps at the Garland VA facility. The solicitation is a 100% Service-Disabled Veteran Owned Small Business set-aside under NAICS 238220, with an estimated procurement value between $100,000 to $250,000. The project involves replacing condensate return units and pumps in five different mechanical locations, including the Boiler Plant, East Tower Mechanical Room, Chiller Room, Sub-Basement, and Mechanical Room, with specific requirements for unit replacements, pump specifications, and control panel work.
Key project parameters include a 180-day performance period after Notice to Proceed, work to be completed during regular business hours, and general construction contract type. The project will utilize existing Siemens Apogee control systems, requires Lock Out Tag Out procedures with VA guidance, and involves steam pressures ranging from 15-25 psi. The solicitation is tax-exempt under Texas state code for materials incorporated into VA real estate, and no design-build services are required. Contractors will need to follow VA specifications for HVAC and boiler plant insulation and ensure all replaced units meet or exceed existing specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| site visit.pdf | ||
| 36C25725R0084 0001.docx | DOCX document | |
| 36C25725R0084_1.docx | DOCX document | |
| PCRA Project 549-25-178.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| RFI | ASSIGNED | RESPONSE | |
| 1 | Are we to dispose/abate of any asbestos, lead, mold or other hazardous material as part of this project? If so, provide appropriate hazardous material site survey report | No | |
| 2 | What will the ICRA level be for this project? | Low Level II | |
| 3 | Are there any required/proprietary subcontractors the general contractor is to hire associated with this project? | No, as long as the units are of the same size or better, and meet the specifications SOW. | |
| 4 | Will all work associated with this project able to be performed during regular working hours? | Yes | |
| 5 | It is our understanding that the Solicitation is a negotiated Bid (RFP) design-bid-build project with the Government's AE being responsible for the design portion (providing a full and complete set of Specifications and Plans) and the successful offeror being responsible for bidding and building the project based on the Specifications and Plans provided by the Government's AE. Put another way, the successful offeror will not be required to perform any design-build services as part of the contract - correct? | No design-build out. One for one replacement | |
| 6 | Are we required to provide a 24 hour/day on-site fire watch during demolition? | No | |
| 7 | Please confirm 1) Fire Suppression to be left in place as-is. 2) Parts of the fire suppression are to be replaced. If so, please specify what is to be replaced. 3) The entire fire suppression system is to be removed and replaced throughout the entire construction space | No Fire Suppression work involved with this job. | |
| 8 | What is the period of performance for the project? | 180 days after NTP | |
| 9 | Are there any drawings associate with the project? (If so, please share.) | No | |
| 10 | Will the project be completed as a services, general construction, or special trade contract? | General construction | |
| 11 | Will the return units be allowed to be replaced all at once, or will each require its own shutdown/phasing? | All units can be worked on at the same time as long condensate being returned is routed to an appropriate drain. | |
| 12 | Are there specific pumps that the VA wants the contractors to provide? If so, please specify | No | |
| 13 | How many total pumps and returns are required to be replace under this project | See SOW | |
| 14 | Will new controls work be needed/required by the contractor for this project | Just the control panels specified in the SOW | |
| 15 | What is the existing controls system and is this to continue for use for the project | Siemens Apogee, Yes | |
| 16 | Is this project tax exempt? | V.T.C.A. Tax Code §151.311--Offerors are hereby notified that in accordance with V.T.C.A., Tax Code §151.311, the purchase of tangible personal property for use in the performance of a contract for an organization exempted under Section 151.309 or 151.310 of this code is exempt if the tangible personal property is incorporated into realty in the performance of the contract. Additionally, the purchase of tangible personal property, other than machinery or equipment and its accessories and repair and replacement parts, for use in the performance of a contract for an improvement to realty for an organization exempted under Section 151.309 or 151.310 of the code is exempt if the tangible personal property is necessary and essential for the performance of the contract and completely consumed on the job. The VA is an exempt organization.Therefore, the contractor’s purchase of such building and construction materials within the State of Texas to be incorporated into the real property belonging to the U.S. Department of Veterans Affairs (VA) or completely used in the performance of the contract is subject to exemption from Texas Sales and Use taxes under the code. To take advantage of the tax exemption the successful offeror under this solicitation must complete a Texas Sales and Use Tax Exemption Certificate when it purchases construction materials for this contract. Notwithstanding FAR 52.229-3, all bids received in response to this solicitation are presumed to reflect this tax exemption, and therefore should not include Texas’ Sales or Use Taxes on sales of materials for incorporation into VA real estate under this contract or used in the performance of this contract. | |
| 17 | Are there hazardous materials on the mechanical piping or hangers | No | |
| 18 | What is the model and serial number for the following return units/ |
a. BD-106 Boiler Plant
b. 1B-169 East Tower Mechanical Room
c. BD-131C Chiller Room
d. BD-101 Sub-Basement
| e. BC-100 Mechanical Room | A. Model C321299-1/41CP37A Paco Condensate. B. Model 303PCD 3/Serial No 10410. C. Sterling Model 41415-JDAX Serial No 4540795. D. No name has (2) 1/4 hp pumps 460v 3 phase condensate body size 24"x24" housekeeping pad. E. No name has (2) 2hp 460v 3 phase pumps with 25x25 reservoir | ||
| 19 | Will the contractor be responsible for the Lock Out Tag Out of electrical, steam piping, and associated condensate piping | Yes, with VA guidance | |
| 20 | What is the steam pressure in the 5 locations? | 15-25 psi | |
| 21 | What is the condensate pressure in these 5 locations? | Steam pressure and rated pump pressure of existing units. | |
| 22 | What are the specifications for the condensate piping insulation? | See VA Specification Section 23 07 11 HVAC and Boiler Plant Insulation | |
| 23 | Does this solicitation meet the Buy American Act? | There are no exempted materials for this project. | |
| 24 | Will this work be conducted during normal business hours? | Yes | |
| 25 | Will the VA utilize Procore for document management? | No |