PCRA Audie Murphy VA.pdf

PDF 320 KB Posted

Attached to
Z2DA-- Project 671-22-179 Install Devices for Legionella Control and Prevention
Solicitation number
36C25725R0071
Issued by

About this file

The document is a Pre-Construction Risk Assessment (PCRA) Permit for a large-scale construction project at the Audie L. Murphy Memorial Veterans Hospital. The project involves installing devices for Legionella control, including removing and replacing shower heads, water fountains, plumbing, electrical, sheet-rock, tape, and float work. The project is scheduled to start on 03/01/2025 and complete by 02/28/2026, with a permit expiration date of 02/28/2026.

The permit details extensive control measures for a large-scale activity, including requirements for excavation safety, dust control, pollution prevention, dig safe paperwork, crane lift planning, fall protection, and confined entry plans. An Infection Control Risk Assessment (ICRA) is required for the activity. The project manager is Joseph Leung, and the contact phone number is 361-277-5383. The contractor is currently to be determined (TBD). The permit emphasizes comprehensive safety protocols, weekly site visits, hazard communication, and mitigation measures to minimize impact on patients, employees, and the facility.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Construction Risk Assessment (PCRA) Permit This page must be posted at the entrance to the project area, or other designated area

Unique permit number:

Location and brief description of construction/renovation/maintenance

Project manager Project start date Contact phone number Completion date Contractor or lead shop Permit expiration date

Activity Type Inspection/Upkeep, Small-scale, or Large-scale)

Activity Type Control measures to be in place for the duration of the activity (Check the box for the Activity Type to indicate the Control Measures)

Inspection/Upkeep

1. Immediately replace any ceiling tile, close access panels, etc., upon completion of work.

2. Site visits of construction area are required weekly by member of multi-disciplinary team. Site visits will be documented on standard checklist.

3. Site specific safety plan, task hazard analysis, and hazard communication required to be provided by the contractor and approved.

4. Must address identified hazards and controls that will be implemented to ensure minimal impact patients, employees, contractors and facility.

5. Communication and coordination plan for all affected areas

Small-scale

All control measures in the row above and the following:

1. Hazard communication chemical inventory required to be provided by the contractor and approved.

2. ILSMs in place and staff trained on situation

3. Hot Work or burn permits in place and staff trained

4. LOTO procedures in place and staff trained on their use

5. Site visits will be reviewed using the criteria in standardized guide.

6. Daily inspections of the site are to be conducted by the General Contractor and documented on their daily log.

Large-scale

All control measures in both rows above and the following Activity Hazard Analyses and Control Plans as applicable (check all that apply):

1. Excavation safety plan in place

2. Dust control plan in place

3. Pollution prevention plan in place

4. Dig safe paperwork in place

5. Crane lift plan in place

a. Crane placement

b. Crane swing

c. Crane load evaluation

6. Fall protection plan in place and staff trained

7. Confined entry plan in place and staff trained

*The location of all Activity Hazard Analyses and Control Plans (excavation, dust, pollution, etc.) as applicable shall be identified on this permit and shall be made available to all workers on the job.

Additional requirements:

Is an Infection Control Risk Assessment (ICRA) required for the Activity? Yes No

Infection Prevention and Control signature:

Date:

Project Manager signature Date

Safety Officer signature Date

Chair, Construction Safety Committee signature

Date

2024-12-10T16:37:17-0600
MARCEAU DOZE-GUILLORY

File details come from the government source that posted it. Updated .