36C25725Q0662 0002.pdf
PDF 127 KB Posted
- Attached to
- CTX Emergency Department Mold Remediation
- Solicitation number
- 36C25725Q0662
About this file
This document is a Request for Quote (RFQ) Amendment for Emergency Department Mold Remediation at the Central Texas Veterans Health Care Facility in Temple, TX. The solicitation (Number 36C25725Q0662) is set aside exclusively for Service-Disabled Veteran Owned Small Business (SDVOSB) and requires active SAM registration and SBA VetCert certification. The amendment extends the quote submission deadline to July 9, 2025 at 3:00 P.M. Central Time and provides responses to 53 detailed contractor questions about the project scope, including specifics on mold remediation requirements, wall and flooring replacement, equipment removal, and project protocols.
Key project details include comprehensive mold remediation in specific rooms (Trauma rooms 1E121 and 1E145), requiring full wall removal up to 4 feet, replacement of drywall, flooring, handrails, and corner guards, and potential replacement of metal studs. The contractor will be responsible for developing a mold remediation protocol, maintaining negative air pressure during work, and ensuring all removed and replaced materials meet VA specifications. The VA will provide additional documentation like building plans and product information to support the bidding process. Contractors must submit quotes via email to the designated Contract Specialist, with technical questions accepted until June 19, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25725Q0662 0003.pdf | ||
| Product Info.pdf | ||
| Site Visit Sign in Sheet.pdf | ||
| Bldg. 163 Plan.pdf | ||
| 36C25725Q0662 0001.pdf | ||
| Service Contract Act WD 2015-5237.pdf | ||
| 36C25725Q0662.pdf | ||
| 36C25725Q0662_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 8
0002 07-01-2025
36C257
Department Of Veterans Affairs Network Contracting Office 17
1901 Veterans Memorial Dr. Bldg. 171 Temple TX 76504
To all Offerors/Bidders
36C25725Q0662
06-13-2025
X
X X
QUOTES DUE DATE EXTENDED TO JULY 9, 2025 AT 3:00 P.M. CENTRAL TIME
X 1
Project: Emergency Department Mold Remediation Location: Central Texas Veterans Health Care Facility 1901 S. 1st St, Temple TX 76504
This amendment is issued to provide the following:
1. Site visit sign in sheet
2. Response to questions submitted (See Continuation Page)
3. Bldg. 163 Plan
All other terms and conditions remain the same.
Continuation Page
Response to Questions:
1. Is there a cost estimate, budget or ballpark figure for the project listed? Is there an actual start date for the project?
Government Response: Since this is a service contract, we don’t provide a magnitude of the project unlike construction. The proposal should be based on the scope of work outlined in the solicitation. The project is scheduled to start right after award. The exact date will need to be coordinated with the facility.
2. We would like to submit RFI on the following documents:
a. IH Protocol
b. ACM Survey
c. Leased medical equipment
Government Response: These documents were not handled in house this is to be part of the contract.
3. Will the particle counter only be required if the air scrubbers cannot be exhausted to the exterior of the building? If so, how often are the readings of the air scrubber exhaust to be recorded?
Government Response: A particulate will not be required if air is exhausted outdoors. If the air is unable to be exhausted outdoors, then a particulate counts every 8 hours will be required.
4. If exhausting air scrubbers to the exterior are through an exterior doorway, will the exhaust be able to remain through the doorway overnight/shift to shift?
Government Response: Yes
5. If exhausting through a doorway, will it need to be blocked off/inaccessible with plywood etc?
Government Response: Yes
6. Will a manometer be required?
Government Response: A positive / negative air pressure monitor will be required to ensure area stays negative.
7. Will a mold remediation protocol be developed by the VA? If not, is the VA requiring the contractor to engage a Mold Assessment Company to develop a protocol prior to job start?
Government Response: It will be the responsibility of the contractor.
8. In 1E121 and 1E145, will the VA be disconnecting the wall mounted equipment before it is removed?
Government Response: As Stated in the SOW 4.e. – Removal and Replacement of wall mounted equipment will be done by the Contractor.
9. In 1E121 and 1E145, will the VA be removing the fixed equipment in the rooms or will it be solely the contractor’s responsibility?
Government Response: Answered in question 8.
10. In section 4. Work to be performed: l. Use approved egress routes designated by the COR. Will a drawing or a map be provided?
Government Response: Yes.
11. In section 4. Work to be Performed: c. Replace any rusted or damaged metal studs.
Government Response: Yes
12. In some areas the metal studs were not exposed, how should these be figured? Or would this fall under the 52.236-2 Differing Site Conditions, 36.502 Differing site conditions, 52.243-5 Changes and Changed Conditions, and or 43.205 Contract clauses?
Government Response: If some metal studs were not exposed during the mold remediation process, promptly notify the contracting officer of this differing site condition.
Refer to FAR 52.212-4(c) Changes, which allows for modifications within the general scope of the contract by mutual agreement. Request a change order and provide detailed documentation to support the need for adjustments in cost, scope, or schedule.
13. Will the VA supply a list of previous Vendors that were used for the flooring, wall guards and handrails? As mentioned in 4. Work to be Performed:
a. Remove and properly dispose of all damaged/contaminated materials to include sheetrock, handrails, wall guards, flooring and any other materials to be replaced during project.
g. In the Corridor behind Mechanical and Trauma rooms, all flooring shall be removed and replaced with vinyl flooring to match flooring in the Emergency Department area.
i. Handrails, kick rails, and corner guards will be removed. Dove colored 2 inches by 10-inch Carbon Fiber boards will be added to all walls at a mid-height ( TBD ) and at a lower height (
TBD ). ?
Government Response: Yes, VA will provide what information is known.
14. Is there an Industrial Hygienist Report Available for this job?
Government Response: No
15. Scope of Work Clarification No clear definition of the “contaminated areas.” While some rooms are named (e.g., 1E118, 1E121), there's no drawing reference or detailed map.
No mention of the size (sq. ft.) of areas to be remediated or repaired. This limits bidders' ability to accurately estimate labor and materials. No IH Report
Government Response: Measurements were available to be taken during the site visit.
16. Third-Party Verification / Clearance Testing No requirement for third-party post-remediation verification or clearance testing (e.g., air sampling or surface testing by an industrial hygienist). This is standard in mold remediation projects, especially in healthcare settings. Is there a requirement for this project?
Government Response: Yes. A protocol is required to be requested by the Contractor.
17. Has this project been determined to be a mold abatement and build-back project. If yes, under TDLR a Mold abatement protocol by a TDLR licensed Mold Consultant has to be prepared for the abatement and clearance portion of the project and the work must be performed by a licensed TDLR Mold Abatement Contractor. I am a Mold Consultant and my firm is also a Mold abatement Contractor. That should be a requirement for the contract. Firms with these licenses should be a requirement under this contract.
Government Response: Yes, the mold protocol will be Contractor responsibility
18. If it is a Mold Project, the entire abatement and clearance activities must be performed in a negative air environment and clearance must be obtained before any build back activities are commenced. The clearance monitoring must be done under the supervision of the Mold consultant not the contractor.
Government Response: Yes
19. It appears that the initial abatement in the boiler room was performed by someone. Was the work done in in negative air and clearance obtained? Are there photos and data confirming the initial abatement was performed in accordance with a TDLR approved protocols and clearances.
Government Response: Initial abatement was started by VA protocol and determined too large for in-house project.
20. Please provide as-built floor plans and specifications for the areas to be abated based on the assessment.
Government Response: VA will provide what print is available
21. Please indicate on the drawings which specifically the areas are to be abated as determined by the protocol. This will determine the areas that must be maintained in a negative air containment until clearance is obtained. Only built back after clearance is obtained.
Government Response: Will be highlighted on print
22. We need specifications for the build back materials and elevations of each wall showing what needs to be removed and replaced. The original as-builts and specs should meet that requirement unless you want to change some materials. Including flooring, trim, rails, etc. Is there any insulation in the walls and are the studs metal. What materials can be reused. Sinks, lights, etc.
Government Response: 4 foot all walls
23. The build back includes the reinstallation of the plates with gases. These normally will need to be certified by the gas vendors. Will you arrange for this.
Government Response: No, all work is the responsibility of the Contractor
24. Due to high work volumes, we were not able to view the solicitation until today. Upon review, we noticed the site visit was yesterday. Please let us know if this eliminates or otherwise negatively impacts our ability to visit the site later (before submittal date) and/or bid on this RFQ.
Government Response: While the site visit was highly recommended, it is not required to submit a quote.
25. Can we please get as-builts for the project area or a list of existing material we must match?
Government Response: The VA will provide what information is known
26. What type of flooring is in the ER and hallway?
Government Response: Surgical and vinyl planking
27. Regarding treatment room, the requirement is to go up 4 feet. Would it be acceptable to go up 2 feet for the wall that has the med-gas and oxygen so that those items can remain in place?
Government Response: No.
28. Has there been a protocol written for the mold? If yes, can you please provide it?
Government Response: A protocol is required to be requested by the Contractor.
29. Are environmental testing and consulting required for this project as well?
Government Response: Answered in question 30.
30. Under Work to be Performed: Note i calls for “Dove colored 2 inches by 10-inch Carbon Fiber boards.” We believe this to be a typo. We could not find this product and close equivalents seem extremely expensive. Could you please provide the specific spec sheet on boards?
Government Response: Yes typo, “Composite”. We will provide Vendor and Item description / number.
31. We reached out to a Carbon Fiber Board manufacturer, and they said we would have to paint the boards the color dove gray as these boards only come in the color black.
Would painting them be acceptable?
Government Response: “TYPO”. Answered in question 30.
32. Does the government want us to provide stainless steel corner guards to replace the ones that will be removed?
Government Response: Yes
33. Who will be responsible for moving all “movable items”?
Government Response: The VA will remove movable items
34. How many damaged metal studs are we to assume require replacement for bidding purposes? This information will provide a level of uniformity among the various proposals.
Government Response: Unknown
35. Regarding paint, are there any special specification we should adhere to?
Government Response: The VA will provide paint colors
36. Does the VA have a TDLR mold remediation protocol associated with the project?
Government Response: Answered in question 28.
37. Does the VA have analytical sampling of the contamination levels associated with the project?
Government Response: No
38. The SOW does not have Clearance criteria for the project?
Government Response: Answer in question 28.
39. Does the mold contamination exceed 50 contiguous square feet in any part of the project?
Government Response: Undetermined
40. This requirement includes build back. Does the VA have the build back substate, paint type, wallboard type, flooring and other engineering aspects associated to be able to quote the required materials?
Government Response: Yes, VA will provide what Vendor and product information that is known.
41. There are no drawing of the impacted area, does the VA have that?
Government Response: See Bldg. 163 Plan attachment.
42. Can the VA release the site visit sign in sheet?
Government Response: The site visit sign in sheet is attached to this amendment.
43. The SOW section 4 section i. states : “Handrails, kick rails, and corner guards will be removed. Dove colored 2 inches by 10-inch Carbon Fiber boards will be added to all walls at a mid-height ( TBD ) and at a lower height ( TBD ).”
a. Does the VA currently have Carbon Fiber boards? Are they sure they mean Carbon Fiber?
Government Response: This was a typo, Composite was meant.
44. Does the VA have a facility map of the location f the impacted area?
Government Response: See Bldg. 163 Plan attachment.
45. Does the VA have an area map where contractor vehicles, disposal containers, and other remediation items can be staged?
Government Response: Space information will be provided after award.
46. How many square feet of work is contained in each area of this project?
Government Response: See Bldg. 163 Plan attachment.
47. Where is mechanical room 1E118 in relation to Trauma room 1E121 and 1E145?
Government Response: All next door to each other.
48. What is the VA expectation for the contractor if upon removal of substrate in a trauma room and additional mold or damage is discovered in adjoining trauma or other rooms?
Government Response: It will be addressed at the time of discovery
49. Are adjoining rooms going to be occupied by patients during work?
Government Response: N/A
50. The ICRA / PICRA Type IV set up will require a minimum 2 stage entrance, is there adequate room for this in the area?
Government Response: Yes
51. SOW section 4 e. states: “In the Trauma rooms 1E121 and 1E145, any wall mounted equipment that needs removal shall be removed and replaced by the contractor.” Upon removal who will be responsible for storage until return to service. Also if these items are not in working order who will be responsible for replacing them with functioning units?
Government Response: The contractor will be responsible
52. SOW section 4 f.,g.,h. states: “ f. Any drywall removed is to be replaced, textured, and repainted. g. In the Corridor behind Mechanical and Trauma rooms, all flooring shall be removed and replaced with vinyl flooring to match flooring in Emergency Department area. h. Cove base will be replaced.” Does the VA have the salient characteristics of these products for quotation purposes?
Government Response: VA will provide what information is known.
53. Can you provide a budget for mold remd. Project, and total sq footage please?
Government Response: Sq. footage will be provided with prints
ATTACHMENTS
Bldg. 163 Plan
Product Info