This document is an Amendment of Solicitation/Modification of Contract (Standard Form 30) for a cabling service project at the Sam Rayburn Memorial Veterans Center in Bonham, Texas. The amendment, issued by the Department of Veterans Affairs Network Contracting Office 17, addresses a contractor question regarding electrical and coax cabling specifications. The government response clarifies that data cabling is not within the project's scope and provides specific communication closet locations (1B-117, 1C-152, 2B-116, and 2C-140) where coax termination will be required. The amendment allows for electrical wiring to be reused by shortening or extending it, provided the work is done to code, and references an attached Excel file with additional details about cabling rooms.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bonham Cabling Rooms.xlsx | XLSX spreadsheet | |
| 24-E18 Power Plan First Floor Bldg B.pdf | ||
| Bonham Bldg 24 1ST FL C Wing.pdf | ||
| Statement of Work SOW_Cabling Rev.1.pdf | ||
| Bonham Bldg 24 2nd FL C Wing.pdf | ||
| 36C25725Q0602 0001.pdf | ||
| 24-E16 Power Plan First Floor Bldg A1.pdf | ||
| 24-E23 Power Plan Second Floor Bldg C.pdf | ||
| 24-E21 Power Plan Second Floor Bldg A1.pdf | ||
| 24-E24 Power Plan Third Floor Bldg B.pdf | ||
| 24-E20 Power Plan First Floor Bldg D.pdf | ||
| Bonham Bldg 24 1ST FL B Wing.pdf | ||
| 24-E19 Power Plan First Floor Bldg C.pdf | ||
| 24-E22 Power Plan Second Floor Bldg B.pdf | ||
| 24-E17 Power Plan First Floor Bldg A2.pdf | ||
| 24-E26 Power Plan Crawl Space.pdf | ||
| 24-E25 Power Plan Third Floor Bldg C.pdf | ||
| Bonham Bldg 24 2nd FL B Wing.pdf | ||
| Service Contract Act WD 2015-5273.pdf | ||
| BONHAM CAMPUS Parking.pdf | ||
| 36C25725Q0602_1.pdf | ||
| 36C25725Q0602.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0002 06-24-2025
36C257
Department Of Veterans Affairs Network Contracting Office 17
1901 Veterans Memorial Dr. Bldg. 171 Temple TX 76504
To all Offerors/Bidders
36C25725Q0602
05-28-2025
X
X X
X 1
The purpose of this amendment is to provide the following:
1. Answer remaining question
2. Provide attachment for areas that will need coax and power
All changes and clarifications included in this amendment are hereby incorporated into the solicitation.
All other terms and conditions remain the same.
See continuation page.
36C25725Q0602 0002
CONTINUATION PAGE
Question
While reviewing the provided floor plans, it appears that the drawings only reflect the electrical layout and do not include any markings for coax or data cabling.
Would it be possible for you to share any available markups or specifications that indicate the required locations or quantities for coax and data drops?
Government Response: We do not have plans depicting the coax. Data is not within the scope of this installation. The areas that will need coax and power are listed in the attached Excel file.
The new comms closets are below. This is where the coax will need to be terminated:
1B-117
1C-152
2B-116
2C-140
Electrical wiring can be reused (shorten or extended), as long as it is done to code.
Attachment
See attached document: Bonham Cabling Rooms.
File details come from the government source that posted it. Updated .