36C25725Q0602 0001.pdf
PDF 152 KB Posted
- Attached to
- NTX Cabling Service Federal contract opportunity
- Solicitation number
- 36C25725Q0602
About this file
This document is an Amendment to a Request for Quote (RFQ) for a cabling service project at the Sam Rayburn Memorial Veterans Center in Bonham, Texas. The amendment, issued by the Department of Veterans Affairs Network Contracting Office 17, provides floor plans, a revised Statement of Work (SOW), and responses to 41 vendor questions. Key project details include installing new cable and electrical outlets in patient rooms, with specific requirements such as using MC cable, 10 AWG wire, surface installations, and white devices/cover plates. The work will be performed during regular hours (8:00 AM - 5:00 PM CT), with patient rooms temporarily relocated during installation.
The solicitation emphasizes several technical and procedural specifications: cable reuse is permitted in certain circumstances, hospital-grade receptacles are required, and an ICRA (Infection Control Risk Assessment) Class II level will be maintained. The contractor will be responsible for cable pulls, splicing, and adhering to electrical codes, with the VA handling patching and painting. An escort will be provided on the first day for a site walkthrough, and while the site visit on 6/5/25 is not mandatory, it is recommended. COVID-related requirements and training have been removed from the original SOW. The project involves cabling and electrical work in multiple buildings and floors, with detailed power plans and floor layouts provided as attachments.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25725Q0602 0002.pdf | ||
| Bonham Cabling Rooms.xlsx | XLSX spreadsheet | |
| 24-E18 Power Plan First Floor Bldg B.pdf | ||
| Bonham Bldg 24 1ST FL C Wing.pdf | ||
| Statement of Work SOW_Cabling Rev.1.pdf | ||
| Bonham Bldg 24 2nd FL C Wing.pdf | ||
| 24-E16 Power Plan First Floor Bldg A1.pdf | ||
| 24-E19 Power Plan First Floor Bldg C.pdf | ||
| 24-E22 Power Plan Second Floor Bldg B.pdf | ||
| 24-E17 Power Plan First Floor Bldg A2.pdf | ||
| 24-E26 Power Plan Crawl Space.pdf | ||
| 24-E25 Power Plan Third Floor Bldg C.pdf | ||
| Bonham Bldg 24 2nd FL B Wing.pdf | ||
| 24-E23 Power Plan Second Floor Bldg C.pdf | ||
| 24-E21 Power Plan Second Floor Bldg A1.pdf | ||
| 24-E24 Power Plan Third Floor Bldg B.pdf | ||
| 24-E20 Power Plan First Floor Bldg D.pdf | ||
| Bonham Bldg 24 1ST FL B Wing.pdf | ||
| 36C25725Q0602.pdf | ||
| Service Contract Act WD 2015-5273.pdf | ||
| BONHAM CAMPUS Parking.pdf | ||
| 36C25725Q0602_1.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 6
0001 06-12-2025
36C257
Department Of Veterans Affairs Network Contracting Office 17
1901 Veterans Memorial Dr. Bldg. 171 Temple TX 76504
To all Offerors/Bidders
36C25725Q0602
05-28-2025
X
X X
X 1
The purpose of this amendment is to provide the following:
1. Floor plans
2. Revised SOW
3. Responses to questions
All changes and clarifications included in this amendment are hereby incorporated into the solicitation.
All other terms and conditions remain the same.
See continuation page.
36C25725Q0602 0001
CONTINUATION PAGE
1. Can plans be provided showing the lay-out of each floor?
Government Response: Yes, see attachments.
2. Can the plans show where the main distribution room would be located?
Government Response: MDF closets will not need to be accessed. Scope of work may only be from the IDF, which are included in the provided plans, to the patient room.
3. Is Hospital Grade MC Cable acceptable?
Government Response: Yes, please use 10 AWG.
4. Can the existing Duplex Receptacle and Coax Cable be left as is or do they need to be removed?
Government Response: Any extra cables will need to be removed for a clean install. The empty electrical junction box may be covered with a blank outlet cover.
5. Does the new RG-6 Cable need to be run in conduit inside the wall? If so, can we use flexible metal conduit and what would be the minimum size?
Government Response: The new cable does need to be run inside conduit and flexible metal conduit can be used, as long as it follows code compliance.
6. Who is responsible for sealing new penetrations on Fire Rated Walls?
Government Response: The responsibility would be with the contractor.
7. If any existing conduit is in the way of new receptacles location, can we relocate to where it is accessible?
Government Response: Yes.
8. Who is responsible for patching and painting, is the paint code available?
Government Response: Patching and painting will be the responsibility of the VA.
9. Are rooms going to be empty when working or are we going to be working around patients?
Government Response: Patient rooms will be empty. Patients will be temporarily relocated as you move through the building.
10. Is NTX Cabling Service the vendor you require or is this just a solicitation title?
Government Response: NTX Cabling Service is just a solicitation title. We are seeking a service provider to perform all cable and electrical installation tasks and functions in patient rooms.
Please note that this is a service contract, not a construction contract.
11. Is the site visit on 6/5/25 mandatory in order to submit bids or just advantageous to be there?
Government Response: The site visit on 6/5/25 is not mandatory in order to submit quotes, but it is advantageous to attend.
12. Is the training on p12 of the SOW required for this job?
Government Response: No, the training is not required for this job. It was removed from the
SOW.
13. Is the COVID section on p12 of the SOW still required?
Government Response: No, it is not required. It was removed from the SOW.
14. Could you provide a set of prints that includes: electrical, structural ceiling and ICRA classification of rooms and areas?
Government Response: Yes, please see the attached electrical plans for the building.
15. What are approved raceway methods and materials. EMT, Aluminum Flex or Mc Cable?
Government Response: MC cable is approved.
16. Are RG6 drops and areas that need physical protection approved to be installed in one of the above-mentioned raceways?
Government Response: Yes.
17. What is the color of devices and cover plates?
Government Response: White.
18. Are the ceilings open or tiled?
Government Response: Tiled.
19. What are ICRA responsibilities and requirements?
Government Response: Air circulator with HEPA filters for work performed in patient rooms.
20. What are the project times of operation?
Government Response: 8:00 AM – 5:00 PM CT.
21. Will there be any required Security or escort?
Government Response: An escort will be provided on the first day for a walkthrough of the area and to answer any questions. Secured areas will be opened by onsite staff when needed.
22. Surface or Flush installations?
Government Response: Surface.
23. Will the rooms be Occupied?
Government Response: The rooms will not be occupied. Patients will be temporarily moved to a different room as work is being done.
24. Can only general purpose receptacles be used for TV power?
Government Response: Hospital grade receptables are required.
25. Are there Lock Out Tag Out requirements?
Government Response: Yes, we will disable electricity using a LOTO method.
26. Are all existing receptacles labelled with circuit number and panel?
Government Response: The information is currently not available at this time.
27. Are there any Arc Flash or Safety requirements and procedures when tapping power?
Government Response: No, power to the rooms will be cut off using a LOTO method.
28. Confirm that quote/job is based on a maximum of 100 Cable pulls?
Government Response: Pulling new cable may not be necessary in certain locations depending on the direction the existing cable is traveling. If the coaxial cable runs from the ceiling to the existing outlet or junction box, it can be spliced and reused for a new installation because the new outlet box will be within its reach. However, if the cable runs from the floor and is too short, a new coaxial cable will need to be installed.
29. There does not seem to be any “Design or Engineering” required so can the requirement for a RCDD BICSI Consultant be removed from the Spec?
Government Response: Removed.
30. Confirm that each and every cable pull will be a homerun from faceplate to designated IDF closet?
Government Response: No, the coax cables may connect to splitters as it travels back to the IDF closet.
31. Confirm that ALL CATV cable locations shall be new cable (no reused cable)?
Government Response: Cables can be reused depending on the direction the existing cable is traveling. If the coaxial cable runs from the ceiling to the existing outlet or junction box, it can be spliced and reused for a new installation because the new outlet box will be within its reach.
However, if the cable runs from the floor and is too short, a new coaxial cable will need to be installed.
32. Confirm the VA will provide Plans designating Height for Outlet & IDF Room wall to locate wire?
Government Response: The VA will provide plans designating the height for the outlet and IDF room and wire locations. This can be show during the walkthrough at the beginning of the project.
33. Confirm that existing 120v wire can be reused?
Government Response: Yes, 120V wire can be reused by splicing to make it longer, but it is crucial to follow safety protocols and adhere to electrical codes.
34. Can we install individual outlets in the rooms? One for CATV and One for 120vac?
Government Response: The Government prefer one faceplate with electrical outlets and coax.
35. Confirm that CATV outlets in rooms will be Single Cable connections (not like existing dual)?
Government Response: Confirmed. This will be a single cable connection.
36. Remove COVID Requirements on pages 12-13?
Government Response: Removed.
37. No Head End termination, just label the cables?
Government Response: Yes, unless there are issues that will result in needing to replace the cable to the headend.
38. Are we to dispose/abate of any asbestos, lead, mold, or other hazardous material as part of this project? If so, provide appropriate hazardous material site survey report.
Government Response: Disposal or abatement of asbestos, lead, mold, or other hazardous materials is prohibited.
39. What will the ICRA level be for this project?
Government Response: Class II.
40. Are there any required/proprietary subcontractors the general contractor is to hire associated with this project?
Government Response: No.
41. Will all work be performed during regular working hours?
Government Response: Yes, 8:00 AM – 5:00 PM CT.
ATTACHMENTS
See attached document: Statement of Work SOW_Cabling Rev.1.
See attached document: Bonham Bldg 24 1ST FL B Wing.
See attached document: Bonham Bldg 24 1ST FL C Wing.
See attached document: Bonham Bldg 24 2nd FL B Wing.
See attached document: Bonham Bldg 24 2nd FL C Wing.
See attached document: 24-E16 Power Plan First Floor Bldg A1.
See attached document: 24-E17 Power Plan First Floor Bldg A2.
See attached document: 24-E18 Power Plan First Floor Bldg B.
See attached document: 24-E19 Power Plan First Floor Bldg C.
See attached document: 24-E20 Power Plan First Floor Bldg D.
See attached document: 24-E21 Power Plan Second Floor Bldg A1.
See attached document: 24-E22 Power Plan Second Floor Bldg B.
See attached document: 24-E23 Power Plan Second Floor Bldg C.
See attached document: 24-E24 Power Plan Third Floor Bldg B.
See attached document: 24-E25 Power Plan Third Floor Bldg C.
See attached document: 24-E26 Power Plan Crawl Space.