This is Amendment/Modification 0003 to solicitation 36C25725Q0601 for comprehensive electrical maintenance services for the North Texas Veterans Affairs facilities. The amendment extends the offer due date to August 14, 2025, at 4PM CDT and provides answers to technical questions 23-35 regarding the electrical maintenance requirements. The contract is set aside 100% for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and involves maintenance of electrical distribution systems operating at 13,500V across four VA facilities including Dallas, Garland, Bonham, and Grand Prairie locations.

The solicitation requires comprehensive electrical maintenance services including annual preventive maintenance, emergency response within one hour of notification, and testing of equipment over 250 amps. Key requirements include NETA and ANSI compliance, five years of technician experience, current safety certifications (OSHA, NFPA 70E), and annual Schneider Electric PowerLogic Priority support. The incumbent contractor is Shermco Industries, Inc. under previous contract 36C25720C0109. The amendment clarifies that emailed reports are acceptable instead of CD-ROM submissions, confirms that generators at Dallas, Garland, and Bonham are under separate contracts, and notes that a spinal cord injury building has newly installed power awaiting completion. Emergency response may be extended to 2-4 hours for on-site presence at the Contracting Officer's Representative discretion.

View the file

Other files for this federal contract opportunity

Other files attached to J061--NEW (B+4) | NTX Comprehensive Electrical Maintenance, newest first.
File Type Posted
Attachment B - Electrical Maintenance Drawings.pdf PDF
Attachment A - Appendix A.xls XLS spreadsheet
36C25725Q0601 0003_1.docx DOCX document
36C25725Q0601 0002_1.docx DOCX document
SF30 36C25725Q0601 0002.docx DOCX document
Electrical Maintenance Drawings.zip ZIP file
36C25725Q0601 0001_1.docx DOCX document
Service Contract Act WD_2015-5227_Dallas.pdf PDF
S02 36C25725Q0601.docx DOCX document
Service Contract Act WD_2015-5273_Fannin.pdf PDF
36C25725Q0601_1.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25725Q0601 0003

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

08-07-2025

549-25-4-5096-0416

36C257 Department Of Veterans Affairs Network Contracting Office 17 5441 Babcock Road Ste. 302 San Antonio, TX 78240

To all Offerors/Bidders

36C25725Q0601 05-30-2025

X

X X

** HOUR & DATE for Receipt of Offers is EXTENDED to: 08-14-2025 4PM CDT

The purpose of this amendment is to:

1. Extend the offeror due date to 8/14/2025, 4PM CST.

2. Provide the answers to the additional technical questions (23-35) asked timely.

3. Updated VAAR Clause 852.219-75 from "Services" to "Specialty Trade".

4. Confirm the requirement is set-aside for 100% SDVOSB vendors.

5. Add Attachment A and reattach Electrical Maintenance Drawings.

Technical Questions NTX Comprehensive Electrical Maintenance 36C25725Q0601 0003

1. We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services.

Answer: Incumbent - Shermco Industries, Inc.

2. If not brand new, could you please provide the current / previous contract number?

Answer: Contract # 36C25720C0109

3. Are you able to provide the current single line drawings and Arc Flash Study?

Answer: Yes, via shared drive

4. Confirm the medium voltage level of the electrical distribution system—specifically, whether it operates at 4160V or another voltage?

Answer: Operating at 13,500V

5. I am requesting to see previous reports, records, logs for repairs, replacement breakers/gear, and any changes or additions made that should have been recorded with the VA.

Answer: The VA is unable to locate previous reports.

6. I would like to see current list of Out Of Order and non-functional power/distribution gear to create a replacement bid along with the testing and maintenance. We also want to understand if those will still be addressed on a separate work agreement with the current service provider for each hospital.

Answer: All are in operation.

7. If there are any additions, renovations, future power/distribution gear currently installed only but not functional, and what the timeline is for each to be finished.

Answer: Spinal cord injury building power is newly installed awaiting completion in the jobsite before racking in/ closing feeder from bldg. 87.

8. Need another tour of the Grand Prairie, TX clinic since no one from the clinic was there to provide the walk-through tour.

Answer: Tuesday July 22, 2025 at 1:00 pm

9. Would like to know if any of the emergency power generators are currently under contract that is separate from this power/distribution bid.

Answer: Generators, for load bank reports for Dallas, Garland, Bonham

10. What other specific standard besides NETA and ANSI is acceptable, “or a similar published standard establishing minimum requirements for Certified Technicians.” ?

Answer: Employees shall have not less than five years of experience on current equipment and replacements, including experience with the materials in the kits.

•Furnish satisfactory proof of such experience for each employee that will install, test equipment, labor and technical personnel shall be provided as necessary to perform the electrical acceptance tests. Arranges shall be made to have tests witnessed by the COR.

•Current on all required safety certifications (OSHA, NFPA 70E, etc.)

•Familiarity with UL, NEC, and other relevant standards.

11. We want to understand what is meant by Number 8, item ii in the SOW-

a. “ii. Provide annual Schneider Electric PowerLogic Priority support agreement.”? Is this an agreement within an agreement?

Answer: Intent is to bring PowerLogic back to life and maintain it.

b. Is this Schneider Electric PowerLogic currently under a separate contract from the power/distribution maintenance agreement? We do not want to include costs that may be duplicated and make our bid higher.

Answer: Currently not under contract

12. Will we be allowed to attend more visits before the bids are due?

Answer: No.

13. Would like to confirm with client that this is a legitimate requirement. This is non-standard for us and may be difficult to implement into standard procedures, however we can definitely comply if absolutely necessary. We typically email all reports to a designated client contact via pdf.

a. Submit one (1) CD-ROM of the electronic version of the verified report in Adobe Portable Document File format to the COR within forty-five (45) calendar days of the visit.

Answer: Emailed copies are acceptable.

14. Are drawings of the facilities available?

Answer: Attached.

15. We need drawings of everything, or specific equipment lists w/quantities to price this. Client lists all the types of equipment, but not quantities.

Answer: Attached.

16. Also, the pricing requested is somewhat unclear. For example, “equipment repairs as needed” for a year at all (4) sites as a “Not-to-exceed” number may be extremely difficult to estimate. Especially without knowing the condition of the equipment. Is there basis we are supposed to work off? We can certainly provide lump sum values for each site for annual PMs.

Answer: The government enters this amount upon award based on historical records. The contractor will only invoice for services approved and performed.

17. Are site visits required? We plan on attending, but the dates are coming up fast and we may miss the one tomorrow.

Answer: Site visits are not mandatory, however, highly recommended for an accurate quote.

18. Would like to confirm the requirement of 1-hour from notification to boots otg. We are certainly capable of responding within an hour, but I can see situations where having someone on site within an hour may be impossible/impractical depending on the type of the issue. Could this be extended to (1) hour to respond and confirm + (~2-4) hours to have someone on site?

Answer: Yes, at COR discretion and approval.

19. A 24-hour contact shall be provided that can dispatch trained and certified personnel as defined in Section 2 of this Scope of Work within one (1) hour of notification of the emergency.

Answer: Yes.

20. Is there an amperage cutoff to which breaker testing is to be applied? Some VA select a threshold of >250A require testing, and anything below just needs to be operated. Please confirm the scope.

Answer: Equipment > 250 Amps.

21. Is primary injection required on any of the breakers? If yes, what dictates that?

Answer: <250 Amps

22. To ensure an accurate assessment of the scope of work, could you kindly provide a one-line diagram for the facility?

Answer: Attached.

ADDITIONAL QUESTIONS

23. Can you provide the latest test report as a reference?

Answer: Not currently.

24. Can you provide the one-line diagram?

Answer: Attached in Amendment 0001 zip folder and here again as “Electrical Maintenance Drawings”.

25. The specifications say that 250A or larger breakers must be tested by secondary injection. Do all breakers accept this type of test? (i.e. none are thermal-magnetic) Answer: Yes.

26. If there are 250A or larger thermomagnetic circuit breakers (they do not accept secondary injection), should they be tested by primary injection or just by contact resistance and insulation?

Answer: Yes, primary as well.

27. If some primary injection is required in circuit breaker testing, what percentage of CBs larger than 250A are thermal-magnetic?

Answer: Primary injection can be done on thermal-magnetic.

28. Could you please explain better what the contractor must do in section 8. ANNUAL ENERGY MANAGEMENT AND POWER QUALITY MONITORING REQUIREMENT of the SOW?

Answer: All equipment tested shall have color-coded inspection stickers affixed to the equipment showing the testing provider, date of tests, next due date, and technician.

a. White- Within Specification

b. Yellow- Limited service and reason

c. Red- Out of Specification and reason

Provide a complete written report of the testing. Information contained in the report shall include, but is not limited to:

a. Company’s name, address, telephone & FAX numbers, and certification. | b. Name of technician who performs the maintenance and testing, and the level of certification. | c. VA Work Contract Number, name, and number of VA Contracting Officer Representative (COR) | d. Date and Time of work. | e. Descriptions and model numbers of specialized tools and equipment used, and the last calibration date. | f. Location, Type, Name, and nameplate information of electrical equipment to be maintained and tested. | g. Test data is to include measurements as found | h. Reference materials, such as equipment manufacturers' specifications and coordination studies, etc. | i. Remarks on conditions of equipment. List all deficiencies, if any. | j. Recommended corrective actions, if any are found. | k. Submit copies of the original signed data sheet of all electrical test data sheets or electronic storage device documenting work performed to COR on the day work is performed. VA will supply access to a copier for this purpose. | l. Submit one (1) CD-ROM of the electronic version of the verified report in Adobe Portable Document File format to the COR within forty-five (45) calendar days of the visit.

29. Still on section 8 of the SOW referred to in the previous question:

a. Should the contractor provide 4 trips per year to the site?

Answer: Yes.

b. How many working hours should we consider for each mobilization for the work described in section 8?

Answer: Up to 10 hours.

30. According to the specifications the contractor must provide IR Scan only for MV Transformers. Is this correct?

Answer: Yes.

31. The specifications are not clear regarding generator maintenance. What kind of testing should be provided to the generators? Will a load bank be necessary?

Answer: ANNUAL MISSION CRITICAL ELECTRICAL STANDBY POWER DIESEL ENGINE DRIVEN GENERATOR (DEDG), SYSTEMS REQUIREMENT:

Provide preliminary baseline condition assessment of all DEDG and systems under this contract. Note any critical conditions and low-priority repairs. Provide line item pricing for corrections in addition to the contract proposal.

General maintenance, weekly testing, and load banking is done in-house via our Electric shop and Motor-pool.

32. About PRICE/COST SCHEDULE: Please confirm whether the price of items 0002, 0003, 1002, 1003, 2002, 2003, 3002, 3003, 4002, and 4003 will be filled in by the government.

Answer: Yes.

33. In subsection "f." on page 7 the specifications mention that we should test the devices listed in appendix A, but this was not found. Please provide appendix A, inventory or list of devices to be tested.

Answer: Appendix A attached.

34. Since no device list was provided in the initial request, additional questions may arise. Will we have any additional window for questions after the inventory is provided?

Answer: The awardee may have a meeting with the COR prior to the start of the contract if there are clarifications that need to be made.

35. Regarding tests on medium voltage transformers, the specifications mention oil sampling and IR Scan. Are oil sampling, inspection and IR Scan sufficient?

Answer: Also, mechanical, safety, visual, and operational verifications of proper voltages.

A.1 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)

(a) Pursuant to 38 U.S.C. 8127(l)(2), the offeror certifies that—

(1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows:

(i) [] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219–73 or certified VOSBs listed in the SBA certification database as set forth in 852.219–74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6.

(ii) [] General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219–73 or certified VOSBs listed in the SBA certification database as set forth in 852.219–74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(iii) [X] Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219–73 or certified VOSBs listed in the SBA certification database as set forth in 852.219–74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution.

(3) If VA determines that an SDVOSB/ VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following:

(i) Referral to the VA Suspension and Debarment Committee;

(ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and

(iii) Prosecution for violating 18 U.S.C. 1001.

(b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. Contracting officers may, at their discretion, require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the contracting officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed.

(c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate.

(d) Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror’s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.

Certification I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror].

Printed Name of Signee: ___________ Printed Title of Signee: _____________ Signature: ____________ Date: ______________ Company Name and Address: _______________ (End of Clause)

See attached document: Attachment A - Appendix A.

See attached document: Attachment B - Electrical Maintenance Drawings.

File details come from the government source that posted it. Updated .