Revised - PRICE -COST SCHEDULE.pdf
PDF 94 KB Posted
- Solicitation number
- 36C25725Q0519
About this file
This Price/Cost Schedule details a contract opportunity for maintenance and repair services for Reverse Osmosis (RO) systems at the West Texas VA Health Care System's Boiler Plant. The document outlines a base contract period from 07-01-2025 to 06-30-2026 and four additional one-year option periods extending through 06-30-2030. Key service requirements include monthly site visits to check RO systems, quarterly inlet filter replacements, unforeseen repairs, and specific equipment interventions such as rebedding three water softeners and carbon tanks, and replacing three water softener controllers.
The pricing schedule includes specific line items for installation of two Culligan G2 RO Systems (or equivalent), with quantities and units specified for each service. The contract structure allows for potential government-determined not-to-exceed amounts for unforeseen repairs, which will be entered upon award. The comprehensive service plan covers ongoing maintenance, preventative services, and equipment replacement/installation across multiple contract periods, providing the VA Health Care System with a structured approach to maintaining critical water treatment infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25725Q0519 0002_1.docx | DOCX document | |
| Revision 2 - PRICE - COST SCHEDULE.docx | DOCX document | |
| Revised - SOW - 36C25725Q0519 - 0001.pdf | ||
| 36C25725Q0519 0001_1.docx | DOCX document | |
| 36C25725Q0519_1.docx | DOCX document | |
| RFQ 36C25725Q0519.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
12.00 MO _______________ _______________
Contractor will perform site visits monthly to ensure proper operational checks of the RO systems.
Contract Period: Base POP Begin: 07-01-2025 POP End: 06-30-2026
4.00 QT _______________ _______________
The contractor will replace inlet Filters quarterly IAW the SOW.
Contract Period: Base
1.00 YR _______________ _______________
Unforeseen Repairs as needed
Not-to-exceed amount to be entered by the government upon award
Contract Period: Base
3.00 EA _______________ _______________
Rebed three (3) Water Softeners for the Boiler Plant
Rebed three (3) carbon tanks for the Boiler Plant
Replace three (3) Controllers on the water softeners at the Boiler Plant
2.00 EA _______________ _______________
Installation of two (2) Culligan G2 RO Systems or equivalent for the Boiler Plant
Contract Period: Base operational checks of the RO systems.
Contract Period: Option 1 POP Begin: 07-01-2026 POP End: 06-30-2027
Contract Period: Option 1
Contract Period: Option 1 operational checks of the RO systems.
Contract Period: Option 2 POP Begin: 07-01-2027 POP End: 06-30-2028
Contract Period: Option 2
Contract Period: Option 2 operational checks of the RO systems.
Contract Period: Option 3 POP Begin: 07-01-2028 POP End: 06-30-2029
4.00 QT _______________ _____________
Contract Period: Option 3
Contract Period: Option 3 operational checks of the RO systems.
Contract Period: Option 4 POP Begin: 07-01-2029 POP End: 06-30-2030
Contract Period: Option 4
Contract Period: Option 4
GRAND TOTAL _______________