ATTACHMENT 1 PAST PERFORMANCE QUESTIONNAIRE.pdf
PDF 167 KB Posted
- Solicitation number
- 36C25725Q0243
About this file
This document is a Past and Present Performance Questionnaire attachment for a VA construction contract solicitation. The questionnaire is designed to evaluate contractors' previous performance through ratings from previous clients or contract representatives. It contains 20 evaluation criteria rated on a scale of Exceptional (E), Satisfactory (S), Marginal (M), Unsatisfactory (U), or Neutral (N).
The evaluation areas include project management capabilities, compliance with laws and regulations, quality control, problem resolution, schedule management, cost control, and overall performance. The form requires detailed information about both the contractor being evaluated and the respondent providing the evaluation. Completed questionnaires must be submitted to cassandra.king@va.gov by the date specified in the solicitation. The form also includes sections for indicating whether any cure notices were issued and if the evaluator would award another contract to the contractor, along with space for explanatory remarks.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25725Q0243 0004.docx | DOCX document | |
| STATEMENT OF WORK_rev2.pdf | ||
| 36C25725Q0243 0003.docx | DOCX document | |
| Bldg 8 Site Visit_Sign-In Sheet.pdf | ||
| A.3 - STATEMENT OF WORK.pdf | ||
| 36C25725Q0243 0002.docx | DOCX document | |
| 36C25725Q0243 0001.docx | DOCX document | |
| 36C25725Q0243_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
PAST AND PRESENT PERFORMANCE QUESTIONNAIRE
SUBJECT: Request for Past and Present Performance Evaluation
TO: ________________________________________________ (to be completed by the Offeror)
You have been identified as a point of contact for a past and/or present performance evaluation of the firm listed on the questionnaire below. This firm is currently being considered for a construction contract with the
Department of Veterans Affairs, Network Contracting Office (NCO) 17.
Your prompt attention to this questionnaire will be greatly appreciated. Please submit completed questionnaire via e-mail to cassandra.king@va.gov NLT the date and time specified in the solicitation.
file:///C:/Users/vhactxDunlaW1/AppData/Local/Documents%20and%20Settings/vhapugsantim/Local%20Settings/Airfield%20IDIQ%202009/Pre%20Award/far/Far02.doc%23T2101 file:///C:/Users/vhactxDunlaW1/AppData/Local/Documents%20and%20Settings/vhapugsantim/Local%20Settings/Airfield%20IDIQ%202009/Pre%20Award/far/FAR03.DOC%23b3104 mailto:cassandra.king@va.gov VHACTXKingC Cross-Out
ATTACHMENT 2
PAST AND PRESENT PERFORMANCE QUESTIONNAIRE
A. GENERAL INFORMATION: (to be completed by the Offeror)
Contractor’s Name: Telephone Number:
Contract Number: Tel/Fax Number:
Point of Contact (POC):
Address:
POC e-mail address: _______________________
Project Title and Brief Description of Work:
Contract Number: Dollar Amount: $
Contract Performance Period:
Contractor performed as the: Prime Contractor Sub-Contractor
B. RESPONDENT INFORMATION:
Name of Respondent: Title:
Address:
Telephone Number:
Email Address:
C. E-MAIL COMPLETED SURVEY FORM TO: cassandra.king@va.gov.
D. PERFORMANCE INFORMATION: Choose the appropriate letter on the scale (E, S, M, U, and N) that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE A NARRATIVE
EXPLANATION FOR ANY RATINGS OF M or U.
E: Exceptional: Performance meets contractual requirements with many exceeded to the Government’s benefit.
The contractual performance of the element or sub-element being assessed was accomplished with no more than a few minor problems for which corrective actions taken by the contractor were highly effective.
S: Satisfactory: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor were satisfactory.
M: Marginal: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.
U: Unsatisfactory: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
N: Neutral: Performance was not observed or not applicable to the current effort being reported against.
Place an “X” in the appropriate rating letter using the definitions matrix above.
The Contractor:
1. Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.
E _____ S _____ M _____ U _____ N _____
2. Provided adequate project supervision.
E _____ S _____ M _____ U _____ N _____
3. Complied with all Federal and locals laws including OSHA, EPA, etc.
E _____ S _____ M _____ U _____ N _____
4. Provided effective inspection procedures which resulted in a quality finished project.
E _____ S _____ M _____ U _____ N _____
5. Corrected deficiencies in timely manner.
E _____ S _____ M _____ U _____ N _____
6. Provided timely resolution of contract discrepancies.
E _____ S _____ M _____ U _____ N _____
7. Identified problems as they occurred/ Suggested alternative approaches to problems.
E _____ S _____ M _____ U _____ N _____ mailto:cassandra.king@va.gov
8. Displayed initiative to solve problems.
E _____ S _____ M _____ U _____ N _____
9. Developed realistic progress schedules.
E _____ S _____ M _____ U _____ N _____
10. Was responsive to contract changes.
E _____ S _____ M _____ U _____ N _____
11. Provided accurate, and complete records E _____ S _____ M _____ U _____ N _____
12. Complied with standards of wood workmanship
E _____ S _____ M _____ U _____ N _____
13. Paid subcontractors/suppliers in a timely manner.
E _____ S _____ M _____ U _____ N _____
14. Communicated with Government personnel to keep the project on schedule or minimize delays
E _____ S _____ M _____ U _____ N _____
15. Was diligent in forecasting and controlling cost.
E _____ S _____ M _____ U _____ N _____
16. Provided timely and accurate billing.
E _____ S _____ M _____ U _____ N _____
17. Submitted reasonable priced change proposals.
E _____ S _____ M _____ U _____ N _____
18. How would you rate the contractor's overall performance?
E _____ S _____ M _____ U _____ N _____
19. Did you ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”
Yes _____ No _____
20. Would you award another contract to this contractor? If not, explain in “remarks
Yes _____ No _____
CONTRACTOR’S NAME: ______________________________________
CONTRACT NUMBER: ________________________________________
Remarks:
| E: |
| S: |
| M: |
| U: |
| N: |
| E_2: |
| S_2: |
| M_2: |
| U_2: |
| N_2: |
| E_3: |
| S_3: |
| M_3: |
| U_3: |
| N_3: |
| E_4: |
| S_4: |
| M_4: |
| U_4: |
| N_4: |
| E_5: |
| S_5: |
| M_5: |
| U_5: |
| N_5: |
| E_6: |
| S_6: |
| M_6: |
| U_6: |
| N_6: |
| E_7: |
| S_7: |
| M_7: |
| U_7: |
| N_7: |
| E_8: |
| S_8: |
| M_8: |
| U_8: |
| N_8: |
| E_9: |
| S_9: |
| M_9: |
| U_9: |
| N_9: |
| E_10: |
| S_10: |
| M_10: |
| U_10: |
| N_10: |
| E_11: |
| S_11: |
| M_11: |
| U_11: |
| N_11: |
| E_12: |
| S_12: |
| M_12: |
| U_12: |
| N_12: |
| E_13: |
| S_13: |
| M_13: |
| U_13: |
| N_13: |
| E_14: |
| S_14: |
| M_14: |
| U_14: |
| N_14: |
| E_15: |
| S_15: |
| M_15: |
| U_15: |
| N_15: |
| E_16: |
| S_16: |
| M_16: |
| U_16: |
| N_16: |
| E_17: |
| S_17: |
| M_17: |
| U_17: |
| N_17: |
| E_18: |
| S_18: |
| M_18: |
| U_18: |
| N_18: |
| Yes: |
| No: |
| Yes_2: |
| No_2: |
| CONTRACTORS NAME: |
| CONTRACT NUMBER: |
| Text1: |
| Text3: |
| Text4: |
| Text5: |
| Text6: |
| Text7: |
| Text8: |
| Text9: |
| Text10: |
| Text11: |
| Text12: |
| Text13: |
| Text14: |
| Text15: |
| Text16: |
| Text17: |
| Text18: |
| Text19: |
| Check Box20: Off |
| Check Box21: Off |
| Text22: |
| Text23: |
| Text24: |
| Text25: |
| Text26: |
| Text27: |
| Text28: |
| Text29: |
| Text30: |
File details come from the government source that posted it. Updated .