Dallas Bldg 2J.pdf
PDF 41 MB Posted
- Attached to
- J041--NTX Duct Cleaning Services Federal contract opportunity
- Solicitation number
- 36C25725Q0050
About this file
This appears to be an image file showing a building labeled as "Dallas Bldg 2J" which likely corresponds to a VA medical facility where the duct cleaning services mentioned in the contract opportunity will take place. The image file alone does not contain detailed specifications or requirements for the duct cleaning services described in the associated contract opportunity for the North Texas Veterans Health Care System (Solicitation #36C25725Q0050).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Dallas Bldg 1 Additional Drawings.pdf | ||
| Amendment 36C25725Q0050 0005.pdf | ||
| Bonham.pdf | ||
| Fisher House.pdf | ||
| Dallas Bldg 60.pdf | ||
| Garland.pdf | ||
| Dallas Bldg 74.pdf | ||
| Dallas Bldg 2.pdf | ||
| Dallas Bldg 43.pdf | ||
| Dallas Bldg 1.pdf | ||
| Amendment 36C25725Q0050 0004.pdf | ||
| Amendment 36C25725Q0050 0003.pdf | ||
| Amendment 36C25725Q0050 0002.pdf | ||
| Amendment 36C25725Q0050 0001.pdf | ||
| P07 WD 2015-5227 rv.23 dated 07-22-2024 Dallas County.pdf | ||
| RFQ 36C25725Q0050 NTX Duct Cleaning Services.pdf | ||
| P07 WD 2015-5273 rv.27 dated 07-22-2024 Fannin County.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VETERANS ADMINISTRATION
NORTH TEXAS HEALTH CARE SYSTEM
4500 S. LANCASTER ROAD, DALLAS, TEXAS 75216
SHEET NO. - G001
VA Project Number: 549-11-1403 VA Contract Number: VA257-P-0305
FEI Project Number: 14035
Issue Date: 10/31/14
VA
D
A
LL
A S
S U
R G
IC
A
L S
U
IT
E H
VA
C
U P
G R
A D
E
2201 N Collins, Suite 295 Arlington, Texas 76011-2698
(817) 461-2337 Fax: (817) 461-1025 F-1166
MECHANICAL ELECTRICAL PLUMBING
FEI Project Number #14035
F
60977
MARK S. FRATTO
OE
TS
TA
TE
AS
X
10/31/2014
06/29/2017 AS BUILT
1. PROVIDE A PIR/ULTRASONIC DETECTION OCCUPANCY SENSOR AT
THE GENERAL LOCATION SHOWN AND CONNECT TO EXISTING HVAC
CONTROL SYSTEM. THE OCCUPANCY SENSOR SHALL SWITCH THE
CONTROL OF THE LOCAL HVAC TERMINAL UNIT TO OCCUPIED MODE
WHEN ROOM BECOMES OCCUPIED DURING NIGHT SETBACK.
COORDINATE EXACT SEQUENCE AND SETUP WITH OTHER TRADES
PRIOR TO ROUGH-IN.
1. REFER TO M001 FOR LEGENDS AND OTHER GENERAL NOTES.
2. REFER TO M101 FOR DEMOLITION WORK.
3. AS PART OF THIS PROJECT ALL NEW DIRECT DIGITAL CONTROLS
INCLUDING VALVES, DAMPERS, ACTUATORS, SENSORS, WIRING,
ETC. SHALL BE INSTALLED FOR THE SYSTEMS SERVING THE
OPERATING ROOM SUITE AND CONNECTED TO THE EXISTING BMS.
4. PROVIDE NEW CONTROL VALVES, ACTUATORS, SENSORS, ETC. FOR
THE DUCT MOUNTED HUMIDIFIER AT EACH OPERATING ROOM.
(817) 461-2337 Fax: (817) 461-1025 F-1166
MECHANICAL ELECTRICAL PLUMBING
FEI Project Number #14035
FOE
TS
TA
TE
AS
X
06/29/2017 AS BUILT
THIS DOCUMENT IS RELEASED
FOR THE PURPOSE OF INTERIM
PRICING AND REVIEW UNDER THE
AUTHORITY OF MARK S. FRATTO,
60977 ON JULY 14, 2014. IT IS NOT
TO BE USED FOR BIDDING OR
CONSTRUCTION.
(817) 461-2337 Fax: (817) 461-1025 F-1166
MECHANICAL ELECTRICAL PLUMBING
FEI Project Number #14035
FOE
TS
TA
TE
AS
X
06/29/2017 AS BUILT
THIS DOCUMENT IS RELEASED
FOR THE PURPOSE OF INTERIM
PRICING AND REVIEW UNDER THE
AUTHORITY OF MARK S. FRATTO,
60977 ON JULY 14, 2014. IT IS NOT
TO BE USED FOR BIDDING OR
CONSTRUCTION.
NOTES
GENERAL DUCTWORK
PIPING
CONTROLS
HVAC GENERAL DEMOLITION NOTES
PRESSURE REGULATOR
TWO-WAY CONTROL VALVE
REFRIGERANT LIQUID
REFRIGERANT SUCTION
CONDENSER WATER RETURN
SAFETY VALVE OR PRESSURE RELIEF
CONDENSER WATER SUPPLY
CHILLED WATER SUPPLY
CHILLED WATER RETURN
LOW PRESSURE STEAM CONDENSATE
LOW PRESSURE STEAM FLEXIBLE PIPE CONNECTION
PRESSURE / TEMPERATURE PLUG
COMBINATION BALANCE & STOP VALVE
CHECK VALVE
BUTTERFLY VALVE
GLOBE VALVE
BALL VALVE
GATE VALVE
PRESSURE GAUGE
EXISTING PIPING
THERMOMETER
STRAINER
UNION
D
CHR
CHS
LCR
MAKE-UP WATER
DRAIN LINE
RS
LPS
RL
CWR
CWS
MANUAL AIR VENT
FLOW MEASURING DEVICE
PIPE FLANGE
PIPING LEGEND
PIPE FLOW
PIPE SLOPE
T
H
S
FLEXIBLE DUCT
MANUAL VOLUME DAMPER
SIDEWALL GRILLE/REGISTER
INTAKE AIR FLOW
DISCHARGE AIR FLOW
RECTANGULAR ELBOW
FIRE DAMPER
EXHAUST AIR GRILLE
SUPPLY DIFFUSER
FIRE/SMOKE DAMPER
RETURN AIR DEVICE
THERMOSTAT
HVAC LEGEND
ROUND DUCTWORK DN
RECTANGULAR DUCTWORK
SUPPLY DUCT DN
ROUND DUCTWORK
MOTORIZED DAMPER
SMOKE DETECTOR
HUMIDISTAT OR HUMIDITY SENSOR
FLEXIBLE DUCT CONNECTION
POINT OF CONNECTION TO
EXISTING
EXISTING TO BE DEMOLISHED OR
EXISTING TO REMAIN
STATIC PRESSURE SENSORSP
BAROMETRIC DAMPER
HIGH PRESSURE STEAM HPS
SLOT DIFFUSER
THREE-WAY CONTROL VALVE
HCR HIGH PRESSURE STEAM CONDENSATE
PCR PUMPED CONDENSATE RETURN
SMOKE DAMPER
NEW EQUIPMENT
EXISTING EQUIPMENT
H HUMIDITY INDICATING DEVICEID
RETURN DUCT DN
EXHAUST DUCT DN
SUPPLY DUCT UP
RETURN DUCT UP
EXHAUST DUCT UP
ROUND, LONG RADIUS ELBOW
ROUND DUCTWORK UP
NOTE: ALL SYMBOLS SHOWN MAY NOT APPEAR IN ALL DRAWINGS SYMBOLS ARE SHOWN
SCHEMATIC AND MAY NOT BE TO SCALE
NOTE: ALL SYMBOLS SHOWN MAY NOT APPEAR IN ALL DRAWINGS SYMBOLS ARE SHOWN
SCHEMATIC AND MAY NOT BE TO SCALE
THERMOMETER WELL
F & T STEAM TRAP
STEAM BUCKET TRAP
SOLENOID VALVE
PLUG VALVE/BALANCING COCK VALVE IN VERTICAL
CIRCUIT BALANCING VALVE
CLEANOUT OR WALL CLEANOUT
PETE'S PLUG
GAUGE COCK
EXPANSION LOOP
MANUAL VOLUME DAMPER
CONICAL TAP WITH VOLUME DAMPER
WITH TURNING VANES
RELOCATED
MECHANICAL ABBREVIATIONS
AFF
APD
BTUH
BHP
CLG
CFM
°F
DTL
DDC
DN
DB
EDB
EAT
EWB
EWT
EA
(E)
ESP
FT
FLR
GPM
HZ
HP
IN
KW
LAT
LDB
LWB
LWT
MVD
MBH
MCA
MOCP
NPSH
NC
OUTSIDE AIR
PHASE
POUNDS
RETURN AIR
SUPPLY AIR
TYPICAL
VARIABLE AIR VOLUME
VARIABLE FREQUENCY DRIVE
VOLTS
WATER GAUGE
WATER PRESSURE DROP
WATTS
WET BULB (TEMPERATURE)
B/G
PIPE DN
PIPE UP
TEMPERATURE SENSOR S
RECTANGULAR DUCT DIMENSIONSX/X WIDTH (INCHES) x DEPTH (INCHES)
ROUND DUCT DIAMETER (INCHES)X" Ø
ROUND PIPE DIAMETER (INCHES)X" Ø
RETURN
RETURN
1. COMPLETED INSTALLATIONS SHALL CONFORM TO ALL APPLICABLE
FEDERAL CODES, STATE AND LOCAL ORDINANCES AND THE
SPECIFICATIONS. IF ANY CONFLICTS OCCUR, THE MOST STRINGENT
SHALL APPLY.
2. PIPING AND DUCT LAYOUT IS ONLY SCHEMATIC, EXACT LOCATION
OF PIPES AND DUCTS SHALL BE COORDINATED WITH BUILDING
STRUCTURE, AND WORK OF OTHER CONTRACTORS PRIOR TO
START OF ANY CONSTRUCTION OR DEMOLITION.
3. EXISTING WORK SHOWN ON PLANS IS FROM PREVIOUS
ENGINEERING DOCUMENTS AND FIELD OBSERVATION. ACTUAL
CONDITIONS MAY VARY, AND CONTRACTOR MUST FIELD VERIFY
EXISTING WORK. MAKE MINOR ADJUSTMENTS NECESSARY TO
COMPLETE WORK. IF EXISTING CONDITIONS PROHIBIT WORK,
NOTIFY THE ARCHITECT FOR REDIRECTION AS REQUIRED.
4. THE CONTRACTOR IS RESPONSIBLE FOR ALL WARRANTIES ON THE
EQUIPMENT INSTALLED.
5. INSURE THE EXECUTION OF ALL WARRANTIES FOR EQUIPMENT AND
INSTALLATION AS PRESCRIBED BY THE OWNER.
6. ALL DUCTS AND PIPES ARE ABOVE CEILING AND TIGHT TO BOTTOM
OF STRUCTURE UNLESS OTHERWISE NOTED.
7. ELEVATIONS, WHERE SHOWN, ARE CENTER OF PIPE AND BOTTOM
OF DUCT UNLESS OTHERWISE NOTED.
8. COORDINATE SIZE AND LOCATION OF ALL RECESSES AND
OPENINGS REQUIRED FOR HVAC WORK.
9. LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING
DEVICES IN ACCESSIBLE LOCATIONS WITH STRAIGHT SECTION OF
PIPE OR DUCT UP OR DOWNSTREAM AS RECOMMENDED BY THE
MANUFACTURER FOR ACCURACY.
10. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED
ACCESS TO UNIT ACCESS PANELS, CONTROLS AND VALVING.
11. LOCATE TEMPERATURE AND PRESSURE GAUGES INSTALLED IN
MECHANICAL ROOMS FOR UNOBSTRUCTED ACCESS TO VIEWING.
12. LOCATE ROOM THERMOSTATS, HUMIDISTAT, AND TEMPERATURE
AND HUMIDITY SENSORS 4'-0" (CENTERLINE) ABOVE FINISHED
FLOOR. NOTIFY ARCHITECT WHERE DIMENSION CANNOT BE
MAINTAINED OR WHERE THERE IS A QUESTION ON LOCATION.
13. VERIFY CONDITION OF ALL EXISTING LIFE SAFETY DEVICES (FIRE
DAMPERS, DUCT DETECTORS, ETC.) WITHIN LIMITS OF
CONSTRUCTION. REPAIR OR REPLACE IF FOUND TO BE DAMAGED
OR NON-FUNCTIONAL.
14. PROVIDE ALL DUCTWORK TRANSITIONS TO ACCOMMODATE ALL
FIRE, FIRE / SMOKE DAMPERS, HUMIDIFIERS, FANS, AIR HANDLING
UNITS & TERMINAL BOXES. REFER TO MANUFACTURER'S DATA FOR
EQUIPMENT CONNECTION SIZES.
15. LOCATIONS OF FIRE AND FIRE/SMOKE DAMPERS ARE PROVIDED AS
REQUIRED FOR DUCTWORK LAYOUT SHOWN. PROVIDE ADDITIONAL
DAMPERS AS REQUIRED BY GOVERNING AUTHORITY AND AS
REQUIRED SHOULD DUCTWORK LAYOUT CHANGE AS A RESULT OF
ACTUAL FIELD CONDITIONS.
16. WHEN ALL CONSTRUCTION IS COMPLETE, INSTALL NEW, CLEAN PRE-
AND POST- FILTERS IN AIR HANDLING UNITS SERVING THE
RENOVATED AREAS. VERIFY CONDITION OF UNIT FILTER GAUGES.
REPAIR OR REPLACE IF FOUND TO BE DAMAGED OR
NON-FUNCTIONAL.
17. PRIOR TO ROUGH IN, COORDINATE THE INSTALLATION OF
EQUIPMENT WITH THE MANUFACTURER'S INSTALLATION AND
MAINTENANCE REQUIREMENTS.
DESCRIPTIONSYMBOL SYMBOL DESCRIPTION
NOTE: ALL SYMBOLS ARE NOT NECESSARILY USED ON THESE DRAWINGS. REFER TO THE ARCHITECTS DRAWINGS FOR
ADDITIONAL SYMBOLS.
MECHANICAL CONVENTIONS LIST
DESCRIPTIONSYMBOL SYMBOL DESCRIPTION
SECTION DESIGNATION - LETTER/NUMBER
DENOTES SECTION IDENTIFICATION
INDICATES DRAWING NUMBER WHERE
SECTION IS DRAWN
DETAIL DESIGNATION - LETTER/NUMBER
DENOTES DETAIL IDENTIFICATION
INDICATES DRAWING NUMBER WHERE
DETAIL IS DRAWN DRAWING NOTE
1. DEMOLITION SHALL EXTEND TO POINTS OF CONNECTION WITH LIVE SERVICES, PANELBOARDS, OR OTHER APPLICABLE TERMINATION POINTS.
DEMOLITION SHALL NOT PERMIT ABANDONMENT OF ANY SYSTEM OR A COMPONENT OF ANY SYSTEM, UNLESS SPECIFICALLY NOTED AS "ABANDON" OR
"TO REMAIN".
2. DEMOLITION OF SYSTEMS SHALL INCLUDE UNITS, SUPPORT SYSTEMS, SYSTEM ACCESSORIES, SYSTEM CONTROLS, WIRING AND CONDUIT FOR POWER AND CONTROLS, ASSOCIATED PIPING, DUCTWORK, SUPPORTS, ETC. IN THEIR ENTIRETY, UNLESS SPECIFICALLY OTHERWISE NOTED.
3. ALL REMOVED EQUIPMENT SHALL BE MAINTAINED IN GOOD CONDITION. REMOVED EQUIPMENT NOT INDICATED FOR REUSE SHALL REMAIN THE PROPERTY OF THE OWNER. SHOULD THE OWNER DECLINE POSSESSION OF ANY EQUIPMENT, SAID EQUIPMENT SHALL BECOME THE PROPERTY OF THE CONTRACTOR. THE CONTRACTOR SHALL DELIVER ALL REMOVED EQUIPMENT TO THE OWNER. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE ALL
CONTRACTOR PROPERTY FROM THE SITE.
4. DEMOLITION AND/OR RELOCATION OF CONTROLS FOR UNITS TO REMAIN SHALL INCLUDE, BUT NOT LIMITED TO:
ALL PNEUMATIC CONTROLS, COMPRESSORS, AND PNEUMATIC DISTRIBUTION SYSTEM;
SPACE & DUCT THERMOSTATS;
SPACE & DUCT TEMPERATURE SENSORS;
SMOKE DETECTORS, FIRESTATS, FREEZESTATS, AND OTHER SAFETIES OR LIMIT DEVICES;
CONTROL VALVES AND DAMPERS - PROVIDE NEW DDC ACTUATORS AS REQUIRED;
ALL HVAC CONTROL PANELS.
NEW CONTROL SYSTEM SHOP DRAWINGS SHALL INCLUDE ALL EXISTING DEVICES, DAMPERS, CONTROL VALVES, ETC.
REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
5. EXISTING INFORMATION SHOWN ON THE PLANS IS DERIVED FROM ORIGINAL DESIGN AND MODIFICATION PLANS FOR THE SITE MADE AVAILABLE TO THE ENGINEER. ADDITIONAL UNDOCUMENTED MODIFICATIONS HAVE BEEN MADE AT THE SITE. CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION, ROUTING, AND SIZES OF EXISTING DUCTWORK AND PIPING TO REMAIN OR BE MODIFIED PRIOR TO BEGINNING ANY WORK. CONTRACTOR SHALL REPORT ANY MAJOR
DISCREPANCIES TO THE ARCHITECT FOR RECOMMENDED ACTION.
ABOVE FINISHED FLOOR
AIR PRESSURE DROP
BRITISH THERMAL UNITS PER HOUR
BRAKE HORSEPOWER
CEILING/COOLING
CUBIC FEET PER MINUTE
DEGREES FAHRENHEIT
DETAIL
DIRECT DIGITAL CONTROL
DOWN
DRY BULB (TEMPERATURE)
ENTERING AIR DRY BULB TEMPERATURE
ENTERING AIR TEMPERATURE
ENTERING AIR WET BULB TEMPERATURE
ENTERING WATER TEMPERATURE
EXHAUST AIR
EXISTING
EXTERNAL STATIC PRESSURE
FEET/FOOT
FLOOR
GALLONS PER MINUTE
HERTZ
HORSEPOWER
INCHES/INCH
KILOWATT
LEAVING AIR TEMPERATURE
LEAVING AIR DRY BULB TEMPERATURE
LEAVING AIR WET BULB TEMPERATURE
LEAVING WATER TEMPERATURE
MANUALLY ADJUSTED VOLUME DAMPER
1,000 BTUH
MINIMUM CIRCUIT AMPS
MAXIMUM OVER CURRENT PROTECTION
NET POSITIVE SUCTION HEAD
NOISE CRITERIA
BELOW GRADE
OA
PH
LBS
RA
SA
TYP
VAV
VFD
V
WG
WPD
W
WB
1. RUN ALL DUCTS LEVEL UNLESS OTHERWISE NOTED.
2. DUCT SIZES SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS.
INSTALLED DIMENSIONS SHALL NOT BE SMALLER. INTERNAL LINER,
WHERE ALLOWED, SHALL NOT BE INSTALLED DOWNSTREAM OF
FINAL FILTERS.
3. RUN OUT DUCT TO AIR DEVICES SHALL BE THE SAME SIZE AS THE
AIR DEVICE NECK, UNLESS OTHERWISE NOTED. BALANCING
DAMPERS ARE REQUIRED FOR ALL INDIVIDUAL DEVICE
CONNECTIONS. BALANCE DAMPERS SHALL BE LOCATED AT THE
ORIGIN OF THE INDIVIDUAL BRANCH CONNECTION.
4. FLEXIBLE RUNOUTS TO DIFFUSERS AND GRILLES TO BE MAXIMUM
OF 5 FEET IN LENGTH. FLEX SHALL BE STRETCHED STRAIGHT
WITHOUT SAGS. PROVIDE HANGER AT MID POINT. USE NYLON STRAP
TO FASTEN INNER SLEEVE TO TAKE-OFF. DUCT TAPE IS NOT
ACCEPTABLE.
5. DUCT TAPE IS NOT ACCEPTABLE FOR VAPOR BARRIER SEAMS.
6. OFFSET DUCTS INTO JOIST SPACE FOR CLEARANCE WHERE SPACE
ABOVE CEILING IS NOT SUFFICIENT FOR DUCTS TO CROSS OTHER
DUCTS OR WORK OF OTHER CONTRACTORS.
7. INSTALL BALANCING DAMPERS AS SHOWN AND AS REQUIRED FOR
PROPER BALANCING OF AIR HANDLING SYSTEMS.
8. PROVIDE AIRTIGHT A.D. IN DUCTS ADJACENT TO ALL AUTOMATIC
DAMPERS, TEMPERATURE CONTROL DEVICES, FIRE DAMPERS AND
SMOKE DAMPERS.
9. MAINTAIN MINIMUM 25'-0" BETWEEN OUTDOOR AIR INTAKES,
EXHAUST OUTLETS AND PLUMBING VENTS
1. SUPPORT ALL STEEL PIPE AT INTERVALS OF NOT MORE THAN 8'-0",
COPPER PIPE AT INTERVALS OF NOT MORE THAN 6'-0".
2. PIPING RUNOUTS TO TERMINAL UNITS ARE 3/4" UNLESS OTHERWISE
NOTED ON PIPING PLAN.
3. PROVIDE DEEP SEAL P-TRAP AT THE CONDENSATE DRAIN OF
COOLING COILS. MINIMUM REQUIREMENTS FOR THE CONDENSATE
DRAIN TYPE "M" COPPER. SIZE SHALL BE SAME SIZE AS EQUIPMENT
DRAIN CONNECTION, BUT NOT LESS THAN 3/4". ROUTE INDIVIDUALLY
OR COLLECT INTO COMMON PIPE FOR DISCHARGE TO THE NEAREST
FLOOR DRAIN, MOP SINK OR OTHER APPROVED LOCATION. MAY BE
ROUTED ABOVE CEILING WITH SPECIFIED INSULATION.
1. INSTALL CONTROL DEVICES AS REQUIRED ON ALL UNITS. VERIFY
ALL EQUIPMENT IS FUNCTIONAL AND PROPER BALANCE IS
ACHIEVED BEFORE COMPLETION. COORDINATE WITH OWNER'S
REPRESENTATIVE ON EXISTING EQUIPMENT.
2. PROVIDE ALL CONTROLS AND CONTROLLERS, INCLUDING
STARTERS AND CONTACTORS, NECESSARY FOR A COMPLETE AND
OPERATIONAL HVAC SYSTEM. INCLUDE ALL ELECTRICAL WORK
NECESSARY TO COMPLY WITH THIS REQUIREMENT. COORDINATE
POWER SOURCE CONNECTIONS PRIOR TO ORDERING EQUIPMENT
OR BEGINNING WORK.
3. COORDINATE THE VOLTAGE AND PHASE OF EACH PIECE OF
EQUIPMENT WITH ALL TRADES BEFORE ORDERING.
LETTER DENOTES DIFFUSER TYPE (REFER
TO MECHANICAL SCHEDULE)
NUMBER DENOTES CFM
M
B
CONICAL TAP WITHOUT VOLUME DAMPER
M-3
M-3
HOT WATER HEATING SUPPLY
HOT WATER HEATING RETURNHWR
HWS
PIPE CAP
DUCT CAP
A
PROJECT WORK SCHEDULE
THE SURGICAL SUITE MUST STAY FUNCTIONAL DURING
NORMAL OPERATING HOURS. ALL WORK SHALL OCCUR OVER
THE WEEKEND BETWEEN FRIDAY AT 8 PM AND MONDAY AT 5
AM. ALL OPERATING ROOMS MUST BE READY FOR USE BY 6
AM MONDAY MORNING.
EXHAUST LOUVER
EXHAUST PLENUM
OUTDOOR AIR INTAKE LOUVER
EXHAUST LOUVER
OUTDOOR AIR INTAKE LOUVER
EXHAUST PLENUM
1. REFER TO M001 FOR OTHER GENERAL NOTES AND LEGENDS.
2. REFER TO M201 FOR NEW WORK.
3. AS PART OF THIS PROJECT ALL PNEUMATIC CONTROLS INCLUDING
VALVES, DAMPERS, ACTUATORS, SENSORS, TUBING, ETC. THAT ARE
PART OF THE SYSTEMS SERVING THE OPERATING ROOM SUITE
SHALL BE DEMOLISHED.
4. DEMOLISH ACTUATOR AND CONTROLS AT DUCT MOUNTED STEAM
HUMIDIFIER FOR EACH OPERATING ROOM. DEMOLISH CONTROL
VALVES IF REPLACEMENT IS NECESSARY.
1. DEMOLISH EXHAUST DUCT FROM FAN TO EXHAUST PLENUM.
2. DEMOLISH GLYCOL HEAT RECOVERY SYSTEM, INCLUDING COILS,
PUMP, PIPING, VALVES, CONTROLS, ETC.
3. DEMOLISH EXISTING OUTSIDE AIR DAMPER.
4. DEMOLISH FACE AND BYPASS STEAM COIL WITHOUT DAMAGING THE
AIR HANDLER. REMOVE VALVES, CONTROLS, PIPING, ETC. AS
SHOWN.
(817) 461-2337 Fax: (817) 461-1025 F-1166
MECHANICAL ELECTRICAL PLUMBING
FEI Project Number #14035
FOE
TS
TA
TE
AS
X
06/29/2017 AS BUILT
THIS DOCUMENT IS RELEASED
FOR THE PURPOSE OF INTERIM
PRICING AND REVIEW UNDER THE
AUTHORITY OF MARK S. FRATTO,
60977 ON JULY 14, 2014. IT IS NOT
TO BE USED FOR BIDDING OR
CONSTRUCTION.
EXHAUST LOUVER
EXHAUST PLENUM
OUTDOOR AIR INTAKE LOUVER
3 1
M
M
M M
75"X31" CONTROL DAMPERS
STACKED ON TOP OF EACH OTHER.
74"X24"
CONTROL DAMPER
64"X36" MAX
OA DAMPER
20"X36" MIN
OA DAMPER
EXHAUST LOUVER
OUTDOOR AIR INTAKE LOUVER
EXHAUST PLENUM
M
M
M M
75"X32" CONTROL DAMPERS
STACKED ON TOP OF EACH OTHER.
64"X36" MAX
OA DAMPER
20"X36" MIN
OA DAMPER
74"X24"
CONTROL DAMPER
1. PROVIDE NEW AIR BLENDING/MIXING STATION IN AIR HANDLER.
2. PROVIDE NEW 4" FILTER RACK WITH MERV 13 FILTERS IN AIR
HANDLER DOWNSTREAM OF EXISTING FILTERS. FILTERS/RACK
SHALL BE GASKETED TO PROVIDE AIR-TIGHT SEAL.
3. PROVIDE NEW FULL SIZE STEAM COIL IN THE AIR HANDLER. REFER
TO SCHEDULE.
4. PROVIDE NEW AIRFLOW MEASURING STATION IN OUTSIDE AIR DUCT.
5. PROVIDE NEW MOTORIZED MINIMUM AND MAXIMUM CONTROL
DAMPERS IN OUTSIDE AIR DUCT.
6. NEW RETURN DUCT BETWEEN THE EXHAUST AND OUTSIDE AIR
DUCTS, PROVIDE WITH MOTORIZED CONTROL DAMPER.
7. PROVIDE NEW MOTORIZED CONTROL DAMPER IN EXHAUST
DUCT/PLENUM.
8. NEW EXHAUST DUCT TO EXHAUST PLENUM.
9. PROVIDE NEW UV-C GERMICIDAL LAMPS AT THE COOLING COIL, RLM
XTREAM BY UV RESOURCES OR APPROVED EQUAL WITH
NON-PROPRIETARY LAMPS. PROVIDE COMPLETE COVERAGE OF
THE DOWNSTREAM FACE OF THE COIL AND THE DRAIN PAN.
PROVIDE DOOR SWITCHES TO DE-ENERGIZE THE UV LIGHTS WHEN
ANY UNIT ACCESS DOOR IS OPEN. UV LAMPS SHALL BE
CONNECTED TO NEAREST 120V CRITICAL BRANCH CIRCUIT.
CONTRACTOR SHALL AMP THE EXISTING CIRCUIT TO VERIFY THE
ADDED CURRENT DOES NOT EXCEED CIRCUIT CAPACITY.
1. REFER TO M001 FOR LEGENDS AND OTHER GENERAL NOTES.
2. REFER TO M101 FOR DEMOLITION WORK.
3. AS PART OF THIS PROJECT ALL NEW DIRECT DIGITAL CONTROLS
INCLUDING VALVES, DAMPERS, ACTUATORS, SENSORS, WIRING,
ETC. SHALL BE INSTALLED FOR THE SYSTEMS SERVING THE
OPERATING ROOM SUITE AND CONNECTED TO THE EXISTING BMS.
4. PROVIDE NEW CONTROL VALVES, ACTUATORS, SENSORS, ETC. FOR
THE DUCT MOUNTED HUMIDIFIER AT EACH OPERATING ROOM.
5. THE REDUCTION OF OUTDOOR AIR HAS POTENTIAL TO ALTER THE
PRESSURE RELATIONSHIPS BETWEEN THE VARIOUS SPACES IN THE
SURGERY SUITE. BALANCING TECHNICIAN SHALL ENSURE THAT
THE CODE REQUIRED PRESSURES DIFFERENCES ARE MAINTAINED,
EVEN DURING UNOCCUPIED MODE.
(817) 461-2337 Fax: (817) 461-1025 F-1166
MECHANICAL ELECTRICAL PLUMBING
FEI Project Number #14035
FOE
TS
TA
TE
AS
X
06/29/2017 AS BUILT
THIS DOCUMENT IS RELEASED
FOR THE PURPOSE OF INTERIM
PRICING AND REVIEW UNDER THE
AUTHORITY OF MARK S. FRATTO,
60977 ON JULY 14, 2014. IT IS NOT
(817) 461-2337 Fax: (817) 461-1025 F-1166
MECHANICAL ELECTRICAL PLUMBING
FEI Project Number #14035
FOE
TS
TA
TE
AS
X
06/29/2017 AS BUILT
THIS DOCUMENT IS RELEASED
FOR THE PURPOSE OF INTERIM
PRICING AND REVIEW UNDER THE
AUTHORITY OF MARK S. FRATTO,
60977 ON JULY 14, 2014. IT IS NOT
(817) 461-2337 Fax: (817) 461-1025 F-1166
MECHANICAL ELECTRICAL PLUMBING
FEI Project Number #14035
FOE
TS
TA
TE
AS
X
06/29/2017 AS BUILT
THIS DOCUMENT IS RELEASED
FOR THE PURPOSE OF INTERIM
PRICING AND REVIEW UNDER THE
AUTHORITY OF MARK S. FRATTO,
60977 ON JULY 14, 2014. IT IS NOT
TO BE USED FOR BIDDING OR
CONSTRUCTION.
NOTES:
APPLICATIONSYSTEM
MAXIMUM
DESIGN
AIRFLOW
(CFM)
CAPACITY
(MBH)
MAXIMUM
FACE
VELOCITY
(FPM)
ENTERING
AIR
TEMP.
°F
DESIGN
STEAM
PRESSURE
(PSIG)
MAX AIR
P.D. ("WG)
TRAP
(LBS/HR) NOTES
PREHEAT2-AH26 23,330 25 1, 2, 3
2-AH28 37,300
NOTES:
1. x
2. x
SYSTEM
DESIGN
STEAM
FLOW
(LB/HR)
NOTES
MAX
PRESSURE
DROP
(PSI)
2-AH26 370 5
CLOSED
2-AH28 5
TU 26-1 5
16.1
TU 26-4 516.1
TU 26-7 516.1
TU 26-9 516.1
TU 26-10 516.1
TU 28-3 516.1
TU 28-4 516.1
TU 28-6 516.1
TU 28-8 516.1
TU 28-11 516.1
TU 28-14 516.1
TU 28-16 516.1
TU 28-17 516.1
1,030
1,640
0.25
0.25
1,100
1,760
50 25
1,170
2-AH26
2-AH28
STEAM
PRESSURE
MAX/MIN
(PSIG)
30/15
30/15
30/15
30/15
30/15
30/15
30/15
30/15
30/15
30/15
30/15
30/15
30/15
30/15
30/15
30/15
30/15
LEAVING
AIR
TEMP.
°F
MAX
PRESSURE
DROP
(PSI)
5PREHEAT
1. PROVIDE NEW FULL-HEIGHT COIL IN EXISTING AIR HANDLER.
2. 1-ROW, MAXIMUM 8 FINS PER INCH.
3. COIL SHALL BE PITCHED TOWARD CONDENSATE CONNECTION, MINIMUM 1/8" PER FT.
SERVICE
STEAM HEAT - 1/3 CAP.
STEAM HEAT - 1/3 CAP.
STEAM HUMIDIFIER
STEAM HUMIDIFIER
STEAM HUMIDIFIER
STEAM HUMIDIFIER
STEAM HUMIDIFIER
STEAM HUMIDIFIER
STEAM HUMIDIFIER
STEAM HUMIDIFIER
STEAM HUMIDIFIER
STEAM HUMIDIFIER
STEAM HUMIDIFIER
STEAM HUMIDIFIER
STEAM HUMIDIFIER
STEAM HEAT - 2/3 CAP.
STEAM HEAT - 2/3 CAP.
DESIGN
WATER
FLOW
(GPM)
2-AH26
2-AH28
CHILLED WATER
CHILLED WATER
458 - -
1, 2, 3
FAIL
POSITION
CLOSED
OPEN
OPEN
OPEN
OPEN
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
CLOSED
| Core ER OR Phar |
| Core Lab |
| E101 Floor Plan First Floor Core Lab Bldg 2J |
| E102 Floor Plan Basement Bldg 2 |
| E103 Sub Basement Floor Plan Bldg 2 HVAC |
| G001 Cover Sheet HVAC Upgrades Bldg 2J First Floor Core Lab Building 2 Sub Basement |
| H001 HVAC Legend & General Notes |
| H100 Funcational First Floor Plan HVAC |
| H101 HVAC Service Level Plan HVAC |
| H102 Sub Basement Floor Plan Bldg 2 HVAC |
| H401 Enlarged Partial Plans Bldg 2 HVAC |
| H501 HVAC Schedules And Details |
| ER |
| OR |
| Pharma |
| M001 HVAC Legend Abbreviations and General Notes |
| M101 Demolition Plan-HVAC |
| M102 Floor Plan - HVAC |
| M401 Service Bay & Partial Roof Plan HVAC |
| M501 HVAC Details |
| M502 HVAC Details |
| M601 HVAC Equipment Schedules |
| M701 HVAC Equipment Control Diagrams |
| Bldg 2J misc combo |
| 2-H89R Level Three Plan Functional Area A.3 HVAC |
| 2-H90R Level Three Plan Service Zone Area A.3 HVAC |
| 2-H101R Level Five Plan Functional Area A.1 |
| 2-H102R Level Five Plan Service Zone Area A.1 |
| 2-H103R Level Five Functinal Area A.2 |
| 2-H104R Level Five Plan Service Zone Area A.2 |
| 2-H105 Level Five Plan Functional Area A.3 |
| 2-H106R Level Five Plan Service Zone Area A.3 |
| 2-H107R Level Five Plan Functional Area B.1 |
| 2-H108R Level Five Plan Service Zone Area B.1 |
| 2-H113R Level Five Plan Functional Area B.4 |
| 2-H114R Level Five Plan Service Zone Area B.4 |
| 2-H142R Service Bay 3-1 Plan & Sections HVAC |
| 2-H149R Service Bay 5-1 Plan & Sections |
| 2-H150R Service Bay 5-2 Plan & Section |
| 2-H151R Service Bay 5-3 Plan & Section |
| 2-H155R Service Bay 5-7 Plan & Section |
| X2R Index of Drawings |
File details come from the government source that posted it. Updated .