Technical Questions-Cooling Towers.docx
DOCX document 22 KB Posted
- Attached to
- J041--Cooling Towers Structural Repairs Federal contract opportunity
- Solicitation number
- 36C25724Q0534
About this file
This document contains technical questions related to a federal contract opportunity for the repair and maintenance of cooling towers at the VA Medical Center in Garland, Texas. The solicitation number is 36C25724Q0534, and the contract is for structural repairs to three cooling towers that support the facility's York centrifugal chillers. The scope of work includes replacing various tower components, such as fill, louvers, supports, and brackets, as well as making any necessary structural repairs. The contract also requires a 6-month rental of a 900-ton cooling tower to be integrated into the system during the repairs. The project duration is 180 days after award. The document provides details on the existing tower configurations, operating parameters, and other technical information relevant to the contract requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30 36C25724Q0534 0002.docx | DOCX document | |
| 36C25724Q0534 0002_1.docx | DOCX document | |
| SF30 36C25724Q0534 0001.docx | DOCX document | |
| 36C25724Q0534 0001_1.docx | DOCX document | |
| 36C25724Q0534_2.docx | DOCX document | |
| Service Contract Act WD_2015-5227_rv21_12-23-2023.pdf | ||
| S02 RFQ 36C25724Q0534.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Questions 36C25724Q0534
1. Is this a brand new contract OR if there is (was) an incumbent performing these services?
Answer: Brand New
2. If not brand new, could you please provide the current / previous contract number?
Answer: N/A
3. How many centrifugal chillers do the towers support and what is the total tonnage?
Answer: 3 @ 2700 Tons
4. How many Absorption chillers do the towers support and what is the total tonnage?
Answer: 0
5. How many months are they used annually?
Answer: 12
6. What is the weekly runtime?
Answer: Chillers are rotated once a week and operated 24/7 (168 hrs. per wk.)
7. What is the max tonnage needed?
Answer: 900
8. What is the average tonnage used?
Answer: Chillers average about 60%-80% load (500-750 tons)
9. What is the condenser PSI?
Answer: Water-Approx. 40 psi
10. What is the evaporator PSI?
Answer: Water-Approx. 80 psi
11. Is there any future expansion planned for the chiller plant?
Answer: No
12. Who is the current control system manufacturer?
Answer: Siemens
13. What is the annual make-up gallons?
Answer: Unknown
14. Is a meter being used to record make-up?
Answer: No
15. What is your electric cost per kwh?
Answer: Unknown
16. What is your current water cost per 1000 gallons?
Answer: Unknown
17. What are the 7 cooling tower serial numbers?
Answer: Evapco Model: USS-212-724 Serial # Range 4-101950 Marley Model NC Series Serial # 116726-002 NC6211GM-97
18. Due to the degradation of the electrical conduit and the condenser water lines, is the replacement of them part of this scope?
Answer: No
19. Are the "Repair or Replacement of the Structural Components of load bearing nature associated with Cooling Towers" referring to the inside or outside of the towers?
Answer: Yes. The Inside If during the service a member is found to have deteriorated and need to be reinforced or replaced, then it may be treated as unforeseen conditions as determined by the customer and contracting Officer
20. Is there any insulation or heat trace included in this project?
Answer: No
21. Will there be an outage allowed for connecting the rental towers? If so, how long, and what days are allowed?
Answer: Should be able to do this on a weekend to minimize system down time
22. When it states, "Contractor will coat each mechanical support containing rust resistant high-performance epoxy with paint like consistency", does that include the steel structure under the towers?
Answer: Yes
23. What is the GPM of the towers?
Answer: Approx. 3000
24. Is there sweeper piping in all existing towers? If so, is that to remain or does it need to be replaced?
Answer: This will be under a separate Contract.
25. Do you have the Basin Dimensions of the cooling tower with their tower numbers?
Answer: Evapco Basins approx. 12’ W x 12’ L x 10” deep per cell. Marley Tower approx. 12’ W x 24’ L x 10” deep
26. Can we request another site visit to obtain information that might have been missed or not thought about?
Answer: No additional site visits will be held
27. Is this project tax exempt?
Answer: No
28. Can all cooling towers be offline for repairs? Or will they need to be done individually?
Answer: Individually.
29. Are there controls needed in the SOW? If so, who has them?
Answer: No.
30. Will any of the piping or conduit be changed out in the SOW?
Answer: No.
31. Will any drawings or specifications be provided?
Answer: No.
32. Are there any asbestos materials on the condensing water piping?
Answer: Not to the customers knowledge, however if during the service asbestos is suspected, the government will seek to remedy this issue
33. Will the contractor need to provide water treatment to the condensing water system?
Answer: No