RFIsto RFQ36C25724Q0421.docx
DOCX document 14 KB Posted
- Solicitation number
- 36C25724Q0421
About this file
This document is a Request for Information (RFI) for solicitation 36C25724Q0421 to repair the perimeter fence at the Amarillo VA Medical Center. The RFI poses several questions to potential contractors, including whether the Statement of Work (SOW) requires just one column, if the VA will allow replacing only the damaged portion of the mow strip instead of the full 41 feet, if contractors can park and set up in the grass between the fence and road, if temporary fencing is required, and if the VA will provide specifications for a pier beneath the stone column. The related federal contract opportunity is for the actual repair of the perimeter fence, with an agency of the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 17.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25724Q0421 0002.docx | DOCX document | |
| AnswersToRFIsto RFQ36C25724Q0421.docx | DOCX document | |
| 36C25724Q0421 0001.docx | DOCX document | |
| perimeter fence pre bid sign in sheet.pdf | ||
| ColumnSupport-PerimeterFenceRepair 02.jpg | JPG image | |
| POST 3-perimeterfence repair.jpg | JPG image | |
| MowStrip1-Perimeter Fence Repairs.jpg | JPG image | |
| ColumnSupport-PerimeterFenceRepair.jpg | JPG image | |
| MowStrip2-Perimeter Fence Repair 02.jpg | JPG image | |
| Post2 PerimeterFenceRepairs.jpg | JPG image | |
| Post1-Perimeter Fence Repair.jpg | JPG image | |
| 36C25724Q0421.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ # 36C25724Q0421 – CONST. REPAIR PERIMETER FENCING – Amarillo vamc
RFI’S
1. Is the SOW requiring just one column?
2. The statement of work requires 41' of mow strip to be demoed and replaced. However, only a portion of the mow strip has been damaged. There will be significant savings to the VA if you will allow only the portion that is damaged to be cut out and replaced. Will the VA allow this and if so, how many linear feet should contractors bid for replacement?
3. Are we allowed to park and set up our work area in the grass between the fence and the road?
4. Is temporary construction fencing required during the project?
5. For long-term stability, the stone column should have a pier set beneath it. Will the VA provide a pier detail or specifications for the column?