  1. The Statement of Work (SOW) requires one column to be replaced. 2) The SOW requires 41 feet of mow strip to be demolished and replaced, but the contractor requests to only replace the damaged portion, which is estimated to be around 20 feet, to achieve cost savings. The VA has indicated they will allow this. 3) The contractor is allowed to park and set up the work area in the grass between the fence and the road. 4) Temporary construction fencing is not required during the project. 5) For long-term stability, the VA has specified that the stone column should have a pier set beneath it, using concrete, rebar, and a rebar cage.

View the file

Other files

File Type Posted
36C25724Q0421 0002.docx DOCX document
36C25724Q0421 0001.docx DOCX document
perimeter fence pre bid sign in sheet.pdf PDF
RFIsto RFQ36C25724Q0421.docx DOCX document
ColumnSupport-PerimeterFenceRepair 02.jpg JPG image
POST 3-perimeterfence repair.jpg JPG image
MowStrip1-Perimeter Fence Repairs.jpg JPG image
ColumnSupport-PerimeterFenceRepair.jpg JPG image
MowStrip2-Perimeter Fence Repair 02.jpg JPG image
Post2 PerimeterFenceRepairs.jpg JPG image
Post1-Perimeter Fence Repair.jpg JPG image
36C25724Q0421.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ # 36C25724Q0421 – CONST. REPAIR PERIMETER FENCING – Amarillo vamc

RFI’S

1. Is the SOW requiring just one column? Yes

2. The statement of work requires 41' of mow strip to be demoed and replaced. However, only a portion of the mow strip has been damaged. There will be significant savings to the VA if you will allow only the portion that is damaged to be cut out and replaced. Will the VA allow this and if so, how many linear feet should contractors bid for replacement? ~20

3. Are we allowed to park and set up our work area in the grass between the fence and the road? Yes

4. Is temporary construction fencing required during the project? No

5. For long-term stability, the stone column should have a pier set beneath it. Will the VA provide a pier detail or specifications for the column? Install a pier using concrete and a rebar cage using 5 pieces of rebar, 4 on each corner and one in the center