Attachment 2 Drawings.pdf

PDF 25 MB Posted

Attached to
Z2DA--549-22-227 NRM Renovate 2D-200/300 MH Restrooms
Solicitation number
36C25724B0011
Issued by

About this file

This document provides details for a federal contract opportunity with the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17. The solicitation number is 36C25724B0011 and seeks to renovate restrooms at the Z2DA--549-22-227 NRM facility. An attachment with drawings related to the project is included as a 25MB PDF file. The opportunity type is a solicitation to renovate two sets of men's and women's restrooms at the 200/300 barracks to current accessibility standards. The estimated period of performance and response date are not specified.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING CODE ANALYSIS

A. PROJECT DESIGN IN ACCORDANCE WITH:

B. BASIC REVIEW INFORMATION

4. Type of Construction

5. Building Floor Area

a. Gross Floor Area: 31,577 S.F.

8. Exit Requirements:

1. Site Development -Not Applicable-

2. Location on Property -Not Applicable-

6. Building Height -Not Applicable-

7. Uniform Federal Accessibility Standards (UFAS)

Separation Required: No

(6) Roof Construction

(8) Interior non-bearing walls

Automatic Sprinkler System Modifications will be designed in accordance with the 1999 edition of NFPA 13.

3. Occupancy

4. National Electrical Code (NEC)

5. Uniform Building Code (UBC) 2021 for other Building Elements

6. National Standard Plumbing Code (NSPC)

8. Building Code Requirements for Reinforced Concrete (ACI 318)

3. Fire Protection Design Manual Department of Veteran Affairs 2021 (FPDM)

NFPA 220 Standard on Types of Building Construction, 2019 Edition

2. NFPA 101 Life Safety Code, 2018 Edition (LSC)

1. Uniform Building Code, 2021 Edition (UBC)

NFPA 13 Standard for the Installation of Sprinkler Systems, 2019 Edition

NFPA 72 National Fire Alarm Code, 2019 Edition

NFPA 14 Standard for the installation of Standpipe, Private Hydrants, and Hose Systems, 2019 Edition

NFPA 80A Recommended Practice for the Protection of Buildings from Exterior Fire Exposure, 2019 Edition NFPA 90A Standard for the Installation of Air Conditioning and Ventilating Systems, 2019 Edition

NFPA 70, National Electric Code, 2019 Edition

9. ASHRAE Standard 62, 2019 Edition

10. ASHRAE Standard 15, 2019 Edition

5. IBC 2021 for Structural Systems

NFPA 5000 Building Construction and Safety Code, 2019 Edition

Healthcare mixed-use occupancy

Major Occupancy Patient Areas - Healthcare occupancy (LSC:3.3.152.7)

Other Occupancies Conference rooms, training rooms, etc. - Assembly occupancy (LSC: 3.3.152.2) Storage areas - Storage occupancy (LSC 3.3.152.15) Office areas - Business occupancy (LSC:3.3.152.3)

A. The type of construction shall comply with the requirements of NFPA 101 for the most restrictive occupancy in the building. For occupancies with no construction requirements in NFPA 101, type of construction and height/area restrictions shall comply with UBC (VA FPDM 2.1)

B. Construction type: Type II (222) (LSC:18.1.6.4)

7. Structural Fire Resistance Requirements - NFPA 220: Table 4.1.1

(1) Beams, girders, trusses & arches

(2) Columns

(3) Interior bearing walls

(4) Exterior bearing walls

(5) Floor Construction

(7) Exterior non-bearing walls

(10) Vertical Shaft Enclosures (LSC: 8.6.5)

(9) Stairway Construction (LSC: 7.1.3.2.1)

Required

NR/NC

NR/NC

Provided

NR/NC

NR/NC

A. Total floor occupant load: 383 occupants

B. Egress capacity:

Level components and ramps 0.2" per occupant (LSC: Table 7.3.3.1) Stairways 0.3" per occupant (LSC: Table 7.3.3.1)

The travel distance between any room door required as an exit and an exit shall not exceed 150 ft.

The travel distance between any point in a room and an exit shall not exceed 200 ft.

The travel distance between any point in a healthcare sleeping room and an exit access door in that room may not exceed 50 ft.

C. Maximum allowable travel distance

D. Maximum dead end corridor: 30 ft. (LSC: 18.2.5.10)

9. Minimum number of exits:

At least two exits located remotely from each other must be provided for each floor.

At least two exits must be provided and must be accessible from each smoke compartment

Every habitable room must have an exit access door leading directly to an exit corridor, unless otherwise permitted.

10. Egress components:

A. Corridor, aisles and ramps:

Minimum clear width for exit access of psychiatric care area of hospital: 72" (LSC: 18.2.3.5) Minimum clear width for areas adjacent to hospital psychiatric areas with patient care or sleeping: 32" [LSC: 18.2.3.5(1)]

B. Stairs Minimum width: 44" [LSC: Table 7.2.2.2.1(a)]

C. Doors Minimum clear width: 32" (LSC: 7.2.1.2.4)

11. Plumbing Fixture Calculations

A. Hospital Waiting Rooms Required

Provided

WC

Lavatories

UBC: Appendix Chapter 29 - Minimum Plumbing Fixtures (Group I occupancy)

Required

Provided

C. Patient rooms

WC (one per room) Lavatories (one per room)

Required

Provided

WC

Lavatories

B. Hospital General Use Areas

* NOTE: Additional Public/Staff plumbing fixtures are available to serve this occupant load within Building 2 and the Clinical Addition.

VETERANS DRIVE

VETERANS DRIVE

DRIVE

AR

BO

R

AN

N

ANN ARBOR

ENTRANCE

EASTER AVE.

AN

N

A R

BO

R

D R

IV

E

GLADEW

ATER

SOFTBALL &

RECREATION

AREA

SCI

ENTRANCE

SPINAL CORD

INJURY CENTER EAST

ENTRANCE74

RADIATION

ONCOLOGY

BUILDING

CLINICAL ADDITION

SOUTH

ENTRANCE

MAIN

ENTRANCE

MAIN

MEDICAL CENTER

ENTRANCE

SOUTH

ENTRANCE

LANCASTER ROADLANCASTER ROAD

TRANSITIONAL

CARE UNIT

STAFF

GARAGE

(BELOW)

MENTAL HEALTH

RENOVATION

DALLAS VA MEDICAL CENTER

CLINICAL ADDITION

SOUTH

ENTRANCE

MAIN

ENTRANCE

MAIN

MEDICAL CENTER

ENTRANCE

SOUTH

ENTRANCE

LANCASTER ROADLANCASTER ROAD

SHEET INDEX

DWG. NO. SHEET TITLE

TITLE SHEET2-G-001 ELECTRICAL FRONT SHEET2-E-001

ELECTRICAL SYMBOLS, LEGENDS, AND ABBREVIATIONS2-E-002

ELECTRICAL PARTIAL SINGLE LINE DIAGRAM2-E-003

DWG. NO. SHEET TITLE

ARCHITECTURAL DEMOLITION FLOOR PLAN2-AD-101

ARCHITECTURAL FLOOR PLAN2-A-101

2-E-004

ELECTRICAL DEMOLITION SECOND FLOOR POWER PLAN2-ED-200

ELECTRICAL DEMOLITION SECOND FLOOR LIGHTING PLAN2-ED-201

PLUMBING FRONT SHEET2-P-001

2-PD-100 PLUMBING DEMOLITION SECOND FLOOR PLANS

2-PD-101

PLUMBING DEMOLITION SECOND FLOOR ENLARGED PLAN

PLUMBING SECOND FLOOR PLAN

MECHANICAL FRONT SHEET2-M-001

MECHANICAL EQUIPMENT SCHEDULES2-M-002

MECHANICAL EQUIPMENT SCHEDULES2-M-003

MECHANICAL SECOND FLOOR DEMOLITION PLAN2-MD-200

MECHANICAL SECOND FLOOR PLAN2-MH-200

2-MH-201

ARCHITECTURAL FLOOR PLAN - PHASING PLAN2-A-102

ARCHITECTURAL INTERIOR ELEVATIONS, PLUMBING FIXTURE LEGEND2-A-251

ARCHITECTURAL ENLARGED PLANS2-A-401

GENERAL NOTES

SYMBOL AND ABBREVIATION LISTS ARE COMPOSITE. ALL SYMBOLS AND ABBREVIATIONS MIGHT NOT BE USED ON THIS PROJECT.

MAINTAIN CLEAR ACCESS TO SERVICE EQUIPMENT AND OTHER ACCESSORIES REQUIRING SERVICE, VISUAL INSPECTION OR HAND OPERATION. WHERE INDICATED OR REQUIRED, PROVIDE ACCESS PANELS OF THE TYPE SELECTED TO SUIT MATERIALS IN WHICH

INSTALLED.

ALL WORK SHALL BE DONE IN ACCORDANCE WITH LATEST APPLICABLE CODES AND REGULATIONS PER ALL FEDERAL AND STATE

REGULATIONS.

THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND SHOULD NOT BE SCALED TO ESTABLISH LOCATION OF WORK. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND MAKE ADJUSTMENTS TO DIMENSIONS AS NECESSARY TO COMPLETE THE WORK.

CONTRACTOR SHALL THOROUGHLY EXAMINE PREMISES AND OBSERVE ALL CONDITIONS AND CIRCUMSTANCES UNDER WHICH THE WORK SHALL BE PERFORMED. NO ALLOWANCES WILL BE MADE FOR ERRORS OR NEGLIGENCE IN THIS RESPECT.

THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE IMPORTANCE OF PROPER SCHEDULING AND PHASING OF THE WORK SO AS TO CAUSE MINIMUM DISTURBANCE TO THE ACTIVITIES IN THE OTHER AREAS OF THE BUILDING WHICH REMAIN OCCUPIED. THE

CONTRACTOR'S WORK SCHEDULE SHALL BE SUBMITTED TO AND APPROVED BY THE GOVERNMENT.

CONTRACTOR SHALL PERFORM WORK ONLY AFTER THE GATHERING OF EXACT FIELD DIMENSIONS OF THE BUILDING STRUCTURE AND

CEILINGS, ETC. WHICH MAY AFFECT THE INSTALLATION OF THE NEW SYSTEMS.

THE CONTRACTOR SHALL FULLY COORDINATE ALL WORK WITH OTHER TRADES TO ASSURE ALL WORK CAN BE PROPERLY INSTALLED

WITHOUT INTERFERENCE OR DELAY.

CLEAN UP ALL WASTE AND DEBRIS AT THE END OF EACH WORKING DAY AND AT THE COMPLETION OF THE JOB.

ALL SPECIFIED EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.

PROVIDE ONE YEAR WARRANTY FOR ALL WORKMANSHIP AND MATERIALS AFTER THE DATE OF FINAL ACCEPTANCE.

PRIOR TO STARTING WORK, SUBMIT SHOP DRAWINGS FOR ALL MECHANICAL EQUIPMENT & DUCTWORK PER SPECIFICATIONS.

CONTRACTOR SHALL FURNISH AND INSTALL DUCT AND PIPE SUPPORTS AND BRACING PER SMACNA REQUIREMENTS.

ANY EQUIPMENT OR PIPING INSTALLED MORE THAN 1 FT FROM THE LOCATION SHOWN ON THE DRAWINGS SHALL BE CLEARLY DOCUMENTED IN THE FIELD. CONTRACTOR SHALL PROVIDE AS-BUILT DRAWINGS TO CLEARLY SHOW THE LOCATION OF THE EQUIPMENT BEFORE COMPLETION OF THE PROJECT. ALL EXPENSE RELATING TO VERIFY THE AS-BUILT DRAWINGS BY THE CLIENT OR ITS REPRESENTATIVE(S) DUE TO INACCURATE OR INCOMPLETE RECORDS SHALL BE BORN BY THE CONTRACTOR.

ALL MECHANICAL EQUIPMENT SHALL BE BRACED OR ANCHORED TO RESIST A HORIZONTAL FORCE ACTING IN ANY DIRECTION USING

LATEST IBC AND ASCE 7-05 CHAPTER 13.

ALL PIPES SHALL BE SUPPORTED AND BRACED PER SMACNA GUIDELINES AND IMC.

EQUIPMENT SPECIFIED ON THESE DRAWINGS ARE BASIS OF DESIGN ITEMS. CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ALL ADDITIONAL DESIGN AND CONSTRUCTION COSTS INCURRED BY THE USE OF ANY PRODUCT OTHER THAN THE BASIS OF DESIGN.

MEDICAL CENTER, DALLAS, TX

DEPARTMENT OF VETERANS AFFAIRS

V.A. HOSPITAL DALLAS, TX

VA PROJECT #549-22-227

PATIENT BATHROOM REMODELING

1.

2.

3.

4.

5.

6.

7.

15.

10.

11.

12.

13.

14.

9.

16.

17.

8.

ARCHITECTURAL WINDOW & DOOR ELEVATIONS AND DETAILS2-A-621

MECHANICAL PIPING SECOND FLOOR DEMOLITION PLAN

ELECTRICAL LIGHTING FIXTURES SCHEDULE & PANEL SCHEDULES

PLUMBING SITE PLAN

PLUMBING DEMOLITION SECOND FLOOR ENLARGED PLAN

2-PD-102

2-MH-600 MECHANICAL DETAILS

2-MH-700 MECHANICAL CONTROLS

2-E-400

ELECTRICAL ENLARGE VIEW FOR PATIENT BATHROOM SECOND FLOOR POWER PLAN2-EP-400

ELECTRICAL ENLARGE VIEW FOR PATIENT BATHROOM SECOND FLOOR POWER PLAN2-EP-401

ELECTRICAL ENLARGE VIEW FOR PATIENT BATHROOM SECOND FLOOR LIGHTING PLAN2-EP-402

2-EL-300

2-EP-301

2-EP-302

ELECTRICAL SECOND FLOOR LIGHTING PLAN

ELECTRICAL SECOND FLOOR POWER PLAN

ELECTRICAL SECOND FLOOR COMMUNICATION PLAN

ELECTRICAL LIGHTING PHOTOMETRIC

PLUMBING SECOND FLOOR ENLARGED PLAN

2-PP-200

2-PP-201

PLUMBING DETAILS

2-PP-202

2-PP-400

PLUMBING SECOND FLOOR ENLARGED PLAN

2-PS-100

ELECTRICAL ENLARGE VIEW FOR PATIENT BATHROOM SECOND FLOOR LIGHTING PLAN2-EP-403

ELECTRICAL DETAILS SHEET2-E-500

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

VA DALLAS PATIENT BATHROOM

RENOVATION

4500 S. Lancaster Rd. Dallas, Texas 75216

549-22-227

Building 2 Project Director

Revisions: Date:

STAMP35% SCHEMATIC DESIGN

65% DESIGN DEVELOPMENT 10/5/2022

9/9/2022

95% CONSTRUCTION DOCUMENTS 11/4/2022

8/28/2023

100% CONSTRUCTION DOCUMENTS 12/2/2022

BID SET 8/28/2023

2-G-001

HKCR

TITLE SHEET

THE SECOND FLOOR OF THE MENTAL HEALTH BUILDING 2 ALSO NAMED WARD 2D200-300 HAS 20 PATIENT ROOMS, EACH WITH THEIR OWN BATHROOM THAT WILL GO UNDER RENOVATION. 18 OF THESE PATIENT BATHROOMS INCLUDE A TOILET, LAVATORY, AND SHOWER WHILE THE OTHER 2 BATHROOMS THAT SERVE ISOLATION ROOMS INCLUDE A TOILET AND LAVATORY ONLY. THIS PROJECT WILL REDESIGN THE BATHROOMS TO BRING UP TO CURRENT SPECIFICATIONS AND COMPLIANCE, ELIMINATE ANY POTENTIAL HAZARD CONCERNS AND IMPROVE PATIENT SAFETY WHILE ADDRESSING PROPER LIGHTING, HVAC, VENTILATION, AND PLUMBING SYSTEMS. ALSO INCLUDED IN THIS PROJECT, THE EXISTING PATIENT ROOM DOORS WILL BE REPLACED WITH NEW DOORS AND BEHAVIORAL HEALTH HARDWARE. THE EXISTING EXTERIOR ALUMINUM WINDOW SYSTEM WILL BE REPLACED WITH HIGH PERFORMANCE WINDOW SYSTEM AND MOTORIZED BLINDS.

ARCHITECTURAL

GENERAL ELECTRICAL MECHANICAL

PLUMBING

SITE PLAN

PROJECT SCOPE

PLUMBING SCHEDULES2-PP-500

MECHANICAL EQUIPMENT SCHEDULES2-M-004

MECHANICAL

.0 .0

.9 \D at aF ile s\

Pr oj ec ts

\2

2\ S6

.0

- V A

D al la s P at ie nt B at hr oo m

R en ov at io n\

Ar ch

\2 -G

-0

.d w g, /6 /2

2:

:0

PM

, T yl er

MECHANICAL SYMBOLS

10x8ø

10x8

FLAT OVAL DUCTWORK

NK=

R/D

NK=

AND VOLUME DAMPER

TRANSITION ON CENTER

FLEXIBLE CONNECTOR

VOLUME DAMPER

SQUARE-THROATED TEE

VOLUME DAMPER

RADIUS ELBOW

RADIUS TEE

8"ø

RECTANGULAR-TO-ROUND TRANSITION

TAKE-OFF TAP TO RECTANGULAR DUCT

COMBINATION FIRE SMOKE DAMPER (CFSD)

CONICAL TAP TO RECTANGULAR DUCT AND

TRANSITION WITH FLAT SIDE

CHANGE IN ELEVATION WITH RELATION TO AIR FLOW

SQUARE-THROATED ELBOW W/TURNING VANES

RECTANGULAR DUCTWORK (WIDTH X DEPTH)

RECTANGULAR DUCTWORK (WIDTH X DEPTH)

ROUND DUCTWORK (SIZE, DIAMETER)

ACOUSTICALLY LINED DUCTWORK

DEMOLITION SYMBOL FOR

DEMOLITION OF EXISTING DUCTWORK.

EXISTING EQUIPMENT, PIPING, AND DUCTWORK.

BACKDRAFT DAMPER

BDD

FIRE DAMPER (FD)

EXHAUST DUCT RISER

RETURN DUCT RISER IN PLAN

SUPPLY DUCT RISER IN PLAN

ACCESS REQUIRED FOR EQUIPMENT SERVICE

1-1/2 HOUR RATED UNLESS OTHERWISE NOTED

1-1/2 HOUR RATED UNLESS OTHERWISE NOTED

POINT OF DISCONNECT

POINT OF CONNECTION BETWEEN NEW AND EXISTING

ABBREVIATIONS

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AAV AUTOMATIC AIR VENT

ACC AIR COOLED CONDENSER

ACCH AIR COOLED CHILLER

ACCU AIR COOLED CONDENSING UNIT

ACD AUTOMATIC CONTROL DAMPER,

MODULATING

ACU AIR CONDITIONING UNIT

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AHU AIR-HANDLING UNIT

AMP AMPERE

AP ACCESS PANEL

APD AIR PRESSURE DROP

AS AIR SEPARATOR

ASHRAE AMERICAN SOCIETY OF HEATING

REFRIGERATION AIR

CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C CENTIGRADE (CELSIUS)

CAV CONSTANT AIR VOLUME

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD CEILING DIFFUSER

CENT CENTRIFICAL

CFM CUBIC FEET PER MINUTE

CG CEILING GRILLE

CH CHILLER

CHP CHILLED WATER PUMP

CHW CHILLER WATER

CHR CHILLED WATER RETURN

CHS CHILLED WATER SUPPLY

CO2 CARBON DIOXODE

CP CONDENSATE PUMP

CR CEILING REGISTER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CWCC CHILLED WATER COOLING COIL

D DAMPER - AUTOMATIC

Db DRY-BULB TEMPERATURE

DB DECIBELS

DCW DOMESTIC COLD WATER

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DIA DIAMETER

DP DEW POINT TEMPERATURE

DPA DIFFERENTIAL PRESSURE ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

ECC ENGINEERING CONTROL CENTER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EH EXHAUST HOOD

ENT ENTERING

ER EXHAUST REGISTER

ERC ELECTRIC REHEAT COIL

ESP EXTERNAL STATIC PRESSURE

EUH ELECTRIC UNIT HEATER

EWT ENTERING WATER TEMPERATURE

(E) EXISTING

F FAHRENHEIT

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FCU FAN COIL UNIT (4 PIPE)

FCUC FAN COIL UNIT COOLING ONLY

FCUH FAN COIL UNIT HEATING ONLY

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FM FLOW METER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FPTU FAN POWERED TERMINAL UNIT

FR FLOOR REGISTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT WC FEET OF WATER COLUMN

FT-LB FOOT-POUND

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GPR GAS PRESSURE REGULATOR

GS GALVANIZED STEEL

H HUMIDIFER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HSTAT HUMIDISTAT

HTM HUMIDIFIER TERMINAL

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWHC HOT WATER HEATING COIL

HWP HEATING HOT WATER PUMP

HWR HEATING HOT WATER RETURN

HWS HEATING HOT WATER SUPPLY

HZ HERTZ

I/O INPUT/OUTPUT

ICF IN-LINE CENTRIFUGAL FAN

ID INSIDE DIAMETER

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

KG KILOGRAM

KG/HR KILOGRAM PER HOUR

KW KILOWATT

KWH KILOWATT HOUR

L LITER

L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND)

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LPS LOW PRESSURE STEAM

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/S METERS PER SECOND (OR

METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAX MAXIMUM

MB MIXING BOX

MBH 1,000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING VALUE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MPS MEDIUM PRESSURE STEAM

MVD MANUAL VOLUME DAMPER

MZ MULTI-ZONE

(N) NEW

N/A NOT APPLICABLE

NC NORMALLY CLOSED

NG NATURAL GAS

NGFM NATURAL GAS FLOWMETER

NO NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

OAD OUTDOOR AIR DAMPER

OAG OUTSIDE AIR GRILLE

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

P PUMP

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PF PRE-FILTER

PG PRESSURE GAGE

PHC PREHEAT COIL

PPM PARTS PER MILLION

PRS PRESSURE REGULATING (VALVE) STATION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

PTAC PACKAGED TERMINAL AIR CONDITIONER

R/E RETURN OR EXHAUST

RA RETURN AIR

RAD RETURN AIR DAMPER

RAT RETURN AIR TEMPERATURE

RCCH REMOTE CONDENSER CHILLER

RD REFRIGERANT DISCHARGE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RELAD RELIEF AIR DAMPER

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RO REVERSE OSMOSIS

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SPD SUPPLY PROCESS AND DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSHX STEAM TO STEAM HEAT EXCHANGER

ST STEAM TRAP

SUH STEAM UNIT HEATER

SV STEAM PRESSURE REDUCING VALVE

SVS STEAM VENT SILENCER

SWHX STEAM TO WATER HEAT EXCHANGER

TAB TESTING, ADJUSTING, BALANCE

TG TRANSFER GRILLE

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

TYP. TYPICAL

UC UNIT COOLER

UH UNIT HEATER

U UNDERWRITERS LABORATORY

URV UPBLAST UNIT VENTILATOR

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL OPPOSED

BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE) RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

W WATTS

Wb WET-BULB (TEMPERATURE)

WC WATER COOLED

WCCH WATER COOLED CHILLER

WCCU WATER COOLED CONDENSING UNIT

WCHP WATER COOLED HEAT PUMPS

WCPU WATER COOLED PACKAGED UNIT

WEF WALL EXHAUST FAN

WF WATER FILTER

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

GENERAL NOTES

1. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING.

2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.

3. ACCESS PANELS IN SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED

AND INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS.

4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, DIFFUSERS, FILTERS, COILS, ETC. LOSS FOR FILTERS SHALL BE FOR FILTERS AT 50%

LOADING.

5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS.

6. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.

7. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.

8. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.

9. STEAM HEADER SET PRESSURE: ___ kPa [PSIG] NORMAL ___ kPa [PSIG] LOW DEMAND PERIODS

10. ALTITUDE-BOILER ROOM FLOOR: ___ M [FT.] ABOVE SEA LEVEL

11. SEISMIC PROVISIONS // REQUIRED - SEE SPECS // NOT REQUIRED // ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED

12. ALL WORK AND WALL AND ROOF PENETRATIONS SHALL BE COORDINATED WITH STRUCTURAL JOISTS AND BEAMS. PROVIDE OFFSETS IN PIPES AND DUCTS TO AVOID

CUTTING OF BEAMS AND JOISTS.

13. SYMBOL AND ABBREVIATION LISTS ARE COMPOSITE. ALL SYMBOLS AND ABBREVIATIONS MIGHT NOT BE USED ON THIS PROJECT.

14. MAINTAIN CLEAR ACCESS TO SERVICE EQUIPMENT AND OTHER ACCESSORIES REQUIRING SERVICE, VISUAL INSPECTION OR HAND OPERATION. WHERE INDICATED OR REQUIRED, PROVIDE ACCESS PANELS OF THE TYPE SELECTED TO SUIT MATERIALS IN WHICH INSTALLED.

15. THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND SHOULD NOT BE SCALED TO ESTABLISH LOCATION OF WORK. THE CONTRACTOR SHALL VERIFY ALL

CONDITIONS AND MAKE ADJUSTMENTS TO DIMENSIONS AS NECESSARY TO COMPLETE THE WORK.

16. CONTRACTOR SHALL THOROUGHLY EXAMINE PREMISES AND OBSERVE ALL CONDITIONS AND CIRCUMSTANCES UNDER WHICH THE WORK SHALL BE PERFORMED. NO

ALLOWANCES WILL BE MADE FOR ERRORS OR NEGLIGENCE IN THIS RESPECT.

17. THE CONTRACTOR SHALL FULLY COORDINATE ALL WORK WITH OTHER TRADES TO ASSURE ALL WORK CAN BE PROPERLY INSTALLED WITHOUT INTERFERENCE OR

DELAY.

18. CLEAN UP ALL WASTE AND DEBRIS AT THE END OF EACH WORKING DAY AND AT THE COMPLETION OF THE JOB.

19. ALL SPECIFIED EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.

20. EXACT LOCATIONS OF ALL EQUIPMENT AND AIR DISTRIBUTION SHALL BE COORDINATED WITH LIGHTING AND OTHER WORK.

21. CONTRACTOR SHALL FURNISH AND INSTALL DUCT AND PIPE SUPPORT PER SMACNA REQUIREMENT.

22. ANY EQUIPMENT, DUCTWORK, OR PIPING INSTALLED MORE THAN 1 FT FROM THE LOCATION SHOWN ON THE DRAWINGS SHALL BE CLEARLY DOCUMENTED IN THE FIELD. CONTRACTOR SHALL PROVIDE RECORD DRAWINGS IN AUTOCAD FORMAT TO CLEARLY SHOW THE LOCATION OF THE EQUIPMENT BEFORE COMPLETION OF THE PROJECT. ALL EXPENSES RELATING TO VERIFY THE RECORD DRAWINGS BY THE CLIENT OR ITS REPRESENTATIVE(S) DUE TO INACCURATE OR INCOMPLETE RECORDS

SHALL BE BORN BY THE CONTRACTOR.

23. NOTE THE CRITICAL SPACE AVAILABLE ABOVE CEILINGS. PROVIDE TRANSITION PIECES AT CROSSOVERS, UNDER BEAMS, OVER/UNDER PIPES AS REQUIRED TO ACCOMMODATE DUCTS WITHIN SPACE AVAILABLE, PROVIDING EQUIVALENT DUCT SIZE TO THE DIMENSION SHOWN. COORDINATE CLOSELY WITH OTHER SECTIONS TO MINIMIZE NECESSITY OF TRANSITIONS. NO ADDITIONAL COSTS WILL BE PAID FOR ANY REQUIRED TRANSITIONS OR OTHER SPECIAL CHANGE SHAPE PIECES.

24. CUTTING, BORING, SAWCUTTING OR DRILLING THROUGH THE STRUCTURAL ELEMENTS TO BE DONE ONLY WHEN SO DETAILED IN THE DRAWINGS OR ACCEPTED BY THE USER AND APPROVED BY ENGINEER OF RECORD. OBTAIN FACILITY APPROVAL BEFORE COMMENCING ANY WORK.

2-M-001 MECHANICAL FRONT SHEET

2-M-002 MECHANICAL EQUIPMENT SCHEDULES

2-M-003 MECHANICAL EQUIPMENT SCHEDULES

2-M-004 MECHANICAL EQUIPMENT SCHEDULES

2-MD-200 MECHANICAL SECOND FLOOR DEMOLITION PLAN

2-MH-200 MECHANICAL SECOND FLOOR PLAN

2-MH-201 MECHANICAL PIPING SECOND FLOOR PLAN

2-MH-600 MECHANICAL DETAILS

2-MH-700 MECHANICAL CONTROLS

MECHANICAL SHEET INDEX

NUMBER SHEET TITLE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

VA DALLAS PATIENT BATHROOM

RENOVATION

4500 S. Lancaster Rd. Dallas, Texas 75216

549-22-227

Building 2 Project Director

Revisions: Date:

STAMP35% SCHEMATIC DESIGN

65% DESIGN DEVELOPMENT 10/5/2022

9/9/2022

95% CONSTRUCTION DOCUMENTS 11/4/2022

8/28/2023

100% CONSTRUCTION DOCUMENTS 12/2/2022

BID SET 8/28/2023

2-M-001

RDSH

MECHANICAL FRONT SHEET

.0 .0

.9 \D at aF ile s\

Pr oj ec ts

\2

2\ S6

.0

- V A

D al la s P at ie nt B at hr oo m

R en ov at io n\

M \M

-0

-M

EC

H

AN

IC

AL

F

RO

N T

SH

EE

T.

dw g, /6 /2

1:

:5

PM

, T yl er

AutoCAD SHX Text

EXP. 06-30-25

AutoCAD SHX Text E

AutoCAD SHX Text No. 29448

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text H

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text M

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

VA DALLAS PATIENT BATHROOM

RENOVATION

4500 S. Lancaster Rd. Dallas, Texas 75216

549-22-227

Building 2 Project Director

Revisions: Date:

STAMP35% SCHEMATIC DESIGN

65% DESIGN DEVELOPMENT 10/5/2022

9/9/2022

95% CONSTRUCTION DOCUMENTS 11/4/2022

8/28/2023

100% CONSTRUCTION DOCUMENTS 12/2/2022

BID SET 8/28/2023

CD-2

EG-1

TYPE OVERALL DIMENSIONS (IN) NECK SIZE (IN)

DIFFUSERS/GRILLES SCHEDULE

MARK

NO.

101 - 200

CFM RANGE

MAX.

NC

0.1

MAX. S.P.

(IN WC) REMARKS

CD-1 SECURITY CEILING

DEFFUSER

6" x 6" 0 - 100 20 0.16.5" X 6.5 TITUS SPD3 SECURITY DIFFUSER

9" x 9"

SECURITY CEILING

GRILLE

9.5" x 9.5" TITUS SPD3 SECURITY DIFFUSERSECURITY CEILING

DEFFUSER

TITUS SDPCR SECURITY GRILLE6" x 6" 0 - 100 20 0.16.5" X 6.5

EG-2 SECURITY CEILING

GRILLE

101 - 200 19 0.19" x 9"9.5" x 9.5" TITUS SDPCR SECURITY GRILLE

2-M-002

RDSH

MECHANICAL EQUIPMENT

SCHEDULES

.0 .0

.9 \D at aF ile s\

Pr oj ec ts

\2

2\ S6

.0

- V A

D al la s P at ie nt B at hr oo m

R en ov at io n\

M \M

-0

-M

EC

H

AN

IC

AL

E Q

UI

PM

EN

T

SC

H

ED

UL

ES

.d w g, /1

/2

3:

:5

PM

, t yl er

AutoCAD SHX Text

EXP. 06-30-25

AutoCAD SHX Text E

AutoCAD SHX Text No. 29448

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text H

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text M

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text O

CONSTANT AIR VOLUME BOX SCHEDULE

TAG MANUFACTURER

AND MODEL NO. DESIGN

AIR FLOW (CFM)

INLET SIZE

(INCHES)

MAX.

PRESSURE

DROP (IN WC) BTU GPM

REHEAT COIL

ROWS

MTG DETAIL REMARKS

CAV/2-1 KRUEGER LMHS

CAV/2-2 REBALANCE

REBALANCE

REBALANCE

REBALANCE

REBALANCE

REBALANCE

REBALANCE

REBALANCE

REBALANCE

REBALANCE

REBALANCE

REBALANCE

REBALANCE

REBALANCE

REBALANCE

REBALANCE

REBALANCE

REBALANCE

CAV/2-3

CAV/2-4

CAV/2-5

CAV/2-6

CAV/2-7

CAV/2-8

CAV/2-9

CAV/2-10

CAV/2-11

CAV/2-12

CAV/2-13

CAV/2-14

CAV/2-15

CAV/2-16

CAV/2-17

CAV/2-18

CAV/2-19

5 80 0.1 REBALANCE

0.1

0.1

104 0.1

65 0.1

95 0.1

55 0.1

65 0.1

40 0.1

0.1

80 0.1

80 0.1

95 0.1

95 0.1

80 0.1

80 0.1

80 0.1

80 0.1

80 0.1

SERVICES

(ROOM N0.)

KRUEGER LMHS

KRUEGER LMHS

KRUEGER LMHS

KRUEGER LMHS

KRUEGER LMHS

KRUEGER LMHS

KRUEGER LMHS

KRUEGER LMHS

KRUEGER LMHS

KRUEGER LMHS

KRUEGER LMHS

KRUEGER LMHS

KRUEGER LMHS

KRUEGER LMHS

KRUEGER LMHS

KRUEGER LMHS

KRUEGER LMHS

KRUEGER LMHS

3456 0.34 0.1

3240 0.32 0.1

3240 0.32 0.1

4492 0.44 0.1

2808 0.28 0.1

4104 0.41 0.1

3240 0.32

0.1

0.1

1728 0.17 0.1

0.1

3456 0.34 0.1

3456 0.34 0.1

4104 0.41 0.1

4104 0.41 0.1

3456 0.34 0.1

3456 0.34 0.1

3456 0.34 0.1

3456 0.34 0.1

3456 0.34 0.1

TOILET 2D-203A

TOILET 2D-204A

TOILET 2D-205A

TOILET 2D-209A

TOILET 2D-210A

TOILET 2D-212A

TOILET 2D-215A

TOILET 2D-216A

TOILET 2D-333A

TOILET 2D-329A

TOILET 2D-326A

TOILET 2D-322A

TOILET 2D-317A

TOILET 2D-315A

TOILET 2D-312A

TOILET 2D-314A

TOILET 2D-309A

TOILET 2D-306A

TOILET 2D-304A

REBALANCECAV/2-20 80 0.1KRUEGER LMHS 3456 0.34 0.1 TOILET 2D-316B

3240 0.32

40 1728 0.17

CAV/2-1

CAV/2-2

CAV/2-3

CAV/2-4

CAV/2-5

CAV/2-6

CAV/2-7

CAV/2-8

CAV/2-9

CAV/2-10

CAV/2-11

CAV/2-12

CAV/2-13

CAV/2-14

CAV/2-15

CAV/2-16

CAV/2-17

CAV/2-18

CAV/2-19

CAV/2-20

MANUFACTURER

AND MODEL NO.SYMBOL

SERVICE

CFM RPM" W.G.

SP

ELECTRICAL

PHASE

EXHAUST FAN SCHEDULE

WEIGHT

(LB)

DUTY

REMARKS

VOLTS

X

EF

LOCATION

TYPE

DRIVE

HP

MOTOR

EF-6 COOK 150 SQNB 2600 1.4 1725 480 3 1101.27TOILET WAITING ROOO BELT SEE NOTES

1. INTERLOCK (OUTSIDE AIR MOTORIZED DAMPERS) .

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

VA DALLAS PATIENT BATHROOM

RENOVATION

4500 S. Lancaster Rd. Dallas, Texas 75216

549-22-227

Building 2 Project Director

Revisions: Date:

STAMP35% SCHEMATIC DESIGN

65% DESIGN DEVELOPMENT 10/5/2022

9/9/2022

95% CONSTRUCTION DOCUMENTS 11/4/2022

8/28/2023

100% CONSTRUCTION DOCUMENTS 12/2/2022

BID SET 8/28/2023

2-M-003

MECHANICAL EQUIPMENT

SCHEDULES

RDSH

.0 .0

.9 \D at aF ile s\

Pr oj ec ts

\2

2\ S6

.0

- V A

D al la s P at ie nt B at hr oo m

R en ov at io n\

M \M

-0

-M

EC

H

AN

IC

AL

E Q

UI

PM

EN

T

SC

H

ED

UL

ES

.d w g, /1

/2

3:

:0

PM

, t yl er

AutoCAD SHX Text

EXP. 06-30-25

AutoCAD SHX Text E

AutoCAD SHX Text No. 29448

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text H

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text M

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text O

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

VA DALLAS PATIENT BATHROOM

RENOVATION

4500 S. Lancaster Rd. Dallas, Texas 75216

549-22-227

Building 2 Project Director

Revisions: Date:

STAMP35% SCHEMATIC DESIGN

65% DESIGN DEVELOPMENT 10/5/2022

9/9/2022

95% CONSTRUCTION DOCUMENTS 11/4/2022

8/28/2023

100% CONSTRUCTION DOCUMENTS 12/2/2022

BID SET 8/28/2023

2-M-004

MECHANICAL EQUIPMENT

SCHEDULES

RDSH

.0 .0

.9 \D at aF ile s\

Pr oj ec ts

\2

2\ S6

.0

- V A

D al la s P at ie nt B at hr oo m

R en ov at io n\

M \M

-0

-M

EC

H

AN

IC

AL

E Q

UI

PM

EN

T

SC

H

ED

UL

ES

.d w g, /1

/2

3:

:1

PM

, t yl er

AutoCAD SHX Text

EXP. 06-30-25

AutoCAD SHX Text E

AutoCAD SHX Text No. 29448

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text H

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text M

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text O

BUILDING 2

2'-2"24'-0"

'-7

FI

EL

D V

ER

IF

Y

3'- 2"

4'-

6'-

1'-

5"

8'- 3"

7'-

2'-10"

2"

3'-0" 20'-0" 8'-7" 1'-5" 22'-4"1'-5" 1'-5"

167'-4" 23'-9"

3'-5"

1'- 5"

6'-

0"

'-41 2"

7'- 8"

14'-6" 5'-6"

1'-1 12"

14'-11 14" 814" 1'-0" 6'-6"

7'-912" 16'-2 12" 5'-1 34" 2'-3" 15'-6"

1'-114"

4'-7"

4'-11" 14'-6"

14'-5"

12'-9"

1'-6"

8'-0" 8'-712"10'-10"10'-3 1/4"

1'-1 12"

8'-0" 13'-0"

1'-234"

8'-0"

1'-114"

13'-1 1 4" 8'-2"

8'-0"

13'-2 3/4" 1'-8"

11'-4" 13'-3"

8'-014"

11'-6"

2'-834"

22'-1012"

17'-514" 2'-5" 8'-0" 9'-9" 12'-3"

7'-7"

8'-0"

1'-8"

8'-5" 20'-3" 8'-0"

32'-4" 1'-4"

4'-5"

11'-3 3 8" 8'-0" 1'-112"

5'-114"

8'-0"

9'-23 4"

8'-0" 8'-0"

1'-23 4" 5'-5"

1'-1 14"

2'- 2"

3'- 8"

8" 6"

21 2"

'-83

4" 7'-

5" 6'-

1" 6'-

11 4"

7'- 61 4"

'-1

1"

'-5 1/

2"

2'-

7'- 1"

'-1

03 4"

2'- 4"

8'- 0"

3'-

'-2 1 4"

4'- 1"

3'- 8"

'-2

6'- 7"

6'- 7"

1'-1

4" 7'-7"

2'- 43 4"

'-51 4"

7'- 5"

3'- 51 4"

'-5

'-71 2"

17'-714" 1'-33 4"

11'-9"

1'-1 12"

5'- 31 8"

11'-1112"

8'- 0"

8'- 81 2"

8'- 0"

3'- 5"

1 2"

5'- 41 2"

2'- 81 2"

3'- 7"

6'- 111 2"

2'- 4"

5'- 0"

9'- 1"

9"

6'- 61 2"

3'- 4"

2'-0"

2'- 2"

4'-6" CLR.

5'- 9"

7'-0"

'-0

'-1

01 2"

2'- 11 2"

1'- 0"

TY

P.

3'- 2"

CL

R.

7'-10"

7'- 8"

'-13 4"

5"

9'- 1"

1'-5"

2'-7 5/8"

EQ. EQ. 1'-5"

2'-7 5/8"2'-7 5/8"

EQ.

2'-7 5/8"

EQ. EQ.

2'-7 5/8"

EQ. 1'-5"

2'-7 5/8"

1'-5"

2'-7 5/8"

1'- 5"

DAYROOM

DAYROOM

MECHANICAL

ROOM

NURSE STATION

MEDICATION

NOURISH.

NURSE STATION

CONFERENCE/

REPORT ROOM

NURSE

WORKROOM

NURSE

WORKROOM

MEDICATION

NURSING

SUPERVISOR

DEMONSTRAT.

CLASSROOM

BLDG. MGMT.

EQUIP. ROOM

DIETICIAN'S

OFFICE

CLEAN

LINEN

CLEAN

LINEN

REHAB.

THERAPIST

REHAB.

TECHNICIAN

QUIET

ROOM

SOCIAL

WORKER

MULTIPURPOSE

OFFICE

PSYCHOLOGIST

OFFICE

MECHANICAL

ANTE

ROOM

INTERVIEW/

CONSULTATION

INTERVIEW/

CONSULTATION

DATA

ROOM

HAC

HAC

SECL.

ROOM

ANTE

ROOM

SECL.

ROOMPATIENT

ROOM (1)

PATIENT

ROOM (2)

PATIENT

ROOM (1)

PATIENT

ROOM (1)

PATIENT

ROOM (1)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

DATA

ROOM

FAMILY VIST

ROOM

FAMILY VIST

ROOM

PSYCHIATRIST

OFFICE

BATHING

FACILITIES

PHYSICIAN

ASSIST.

ROUNDING

ROOM

CONF./

REPORT RM.

PATIENT

LAUNDRY

NOURISH.

PATIENT

PROPERTY

STORAGE

EQUIPMENT

STORAGE

WARD

CLERKSTAFF

OFFICE

CLEAN

UTILITY

CLEAN

UTILITY

SOILED

UTILITY

SOILED

LINEN

WARD

CLERK

INTERVIEW/

CONSULTATION

INTERVIEW/

CONSULTATION

STUDENT

WORKROOM

PATIENT

ROOM (2)PATIENT

ROOM (1)

FUTURE

ELEVATORS

FUTURE

ELEVATORS

DINING

ROUNDING

ROOM

PATIENT

ROOM (1)

PATIENT

ROOM (1)

FOOD

CARTS

DINING

PATIENT

ROOM (1)

STAFF

OFFICE

STAFF

OFFICE

STAFF

OFFICE

ELECTRICAL

HEAD NURSE

OFFICE

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

VESTIB.

VESTIB.

VESTIB.

STAFF

LOUNGE/

LOCKERS

WOMEN

STAFF TLT.

MEN

STAFF TLT.

QUIET

ROOM

QUIET

ROOM

QUIET

ROOM

ELECTRICALLOBBY

CORRIDOR CORRIDOR

TOILETCORRIDOR

CORRIDOR

STAIR

NO. 10

CORRIDORCORRIDOR

CORRIDOR

PSYCHIATRIST

OFFICE

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

TOILET

CORRIDOR

STAIR

NO. 9

CORRIDOR

CORRIDOR

VESTIB.

TOILET TOILET

WAITING

FUTURE

STAIR

STAIR

NO. 5

SOILED

LINEN

SOILED

UTILITY

NON-FOOD

STORAGE

CORRIDOR

FOOD

CARTS

NON

FOOD

STORAGE

DW

DW

STAIR

NO. 11

DW

EXAM ROOM

EXAM ROOM

EXAM ROOM

EXAM ROOM

LINEN

CHUTE

STRETCHER/

WHEELCHAIR

STORAGE ALCOVE

CRASH

CARTS

STRETCHER/

WHEELCHAIR

STORAGE ALCOVE

24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 18'-11"24'-0"20'-0"12'-2"

'-8

'-8

'-8

'-7

'-0

4'-

0"

'-1 0"

4'- 0"

'-0

4'-

0"

4'-0" 20'-0" 4'-0" 20'-0" 4'-0" 20'-0" 4'-0" 12'-0"8'-0" 23'-4" 12'-0"

6'-8"

7'- 4"

7'-3" 7'-7" 11'-034" 10'-112"

5'-11" 7'-0"

13'-914" 10'-4 78" 8'-0" 3'-0" 12'-012" 13'-4" 6'-712" 3'-2" 8'-0" 3'-0" 11'-8 1/2" 8'-0"

19'-3" 7'-3" 8'-6 14" 2'-9"

3'-9" 3'-0" 9'-714" 8'-0"6'-11"

13'-2 3/4" 10'-11 3/8" 3'-0" 10'-012" 8'-814" 8'-0" 11'-718"

10'-512" 16'-0" 9'-4 14" 9'-11" 3'-6"

6'-53 4"

8'- 9"

'-5

'-5

'-5

7'-

01 2" 5'-

6"

'-5

1/ 2"

8'- 5"

6'-

9'- 7"

'-9

3/ 4"

'-9

6'-

5"

'-33 4"

'-33 4"

'-33 4"

'-5

'-5

8'-

101 2"

'-5

13'-212"

8'- 5"

'-1

'-1

'-1

6'-

31 2" 9'-

51 2"

7'- 2"

8'- 5"

'-9

7'-

7"

'-3

4'-

0"

'-8

5'- 0"

5'- 6"

4'- 2"

4'-

4'-

6"

8'-4"11'-3"

A.

10 8 7 6 5 4 3 2 116 15 14 13 1217

N M

J

A C

D E

F G

H K

B

1 1

1 1

1 1

POINT OF DISCONNECTION

( TYP)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

VA DALLAS PATIENT BATHROOM

RENOVATION

4500 S. Lancaster Rd. Dallas, Texas 75216

549-22-227

Building 2 Project Director

Revisions: Date:

STAMP35% SCHEMATIC DESIGN

65% DESIGN DEVELOPMENT 10/5/2022

9/9/2022

95% CONSTRUCTION DOCUMENTS 11/4/2022

8/28/2023

100% CONSTRUCTION DOCUMENTS 12/2/2022

BID SET 8/28/2023

NORTH

MECHANICAL DEMOLITION SECOND FLOOR PLAN

ED

SCALE: 1/8" = 1'-0"

2-MD-200

MECHANICAL DEMOLITION SECOND

FLOOR PLAN

RDSH

GENERAL NOTE

1. CONTRACTOR TO CAP AND SEAL AIR TIGHT FOR EXISTING DUCT

DEMOLITION KEY NOTE

1 DEMO EXISTING GRILLES AND DIFFUSERS (TYP.)

2 DEMO PORTION OF EXISTING DUCTWORK INCLUDING

EXISTING VOLUME DAMPER AND CAP DUCT AIR TIGHT.

THAT HAS BEEN DEMO.

3 DEMO PORTION OF EXISTING DUCTWORK INCLUDING

EXISTING VOLUME DAMPER AND CAP DUCT AIR TIGHT.

4 DEMO EXISTING EF-6 AND ASSOCIATED DUCTWORK AND

LOUVERS

.0 .0

.9 \D at aF ile s\

Pr oj ec ts

\2

2\ S6

.0

- V A

D al la s P at ie nt B at hr oo m

R en ov at io n\

M \M

D -2

-M

EC

H

AN

IC

AL

D

EM

O

LI

TI

O N

S

EC

O N

D F

LO

O

R

PL

AN

.d w g, /1

/2

3:

:3

PM

, t yl er

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

EXP. 06-30-25

AutoCAD SHX Text E

AutoCAD SHX Text No. 29448

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text H

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text M

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CURTAIN

TRACKS

BUILDING

EXPANSION JOINT

BUILDING

EXPANSION JOINT

BUILDING

EXPANSION JOINT

D 1/

2- A5

D 1/

2- A5

D 1/

2- A5

D 1/

2- A5

R4'-0"

90°

8"

CURTAIN

TRACK

R4'-0

90°

8"

CURTAIN

TRACK

R4'-0"

90°

8"

R4'-0

90°

8"

CURTAIN

TRACK

CURTAIN

TRACK

R1'-1 1"

R1'-11"

AL

IG

N

4'-8"

6'- 9"

5'-

TY

P.

E4 /2

-A

TY

P.

F4 /2

-A

TY

P.

F4 /2

-A

EQ

EQ

C4/A520

C 4/

A5

C4/A520

EQ

EQ

EQ

EQ

11'-0" 11'-0"

11'-0" 11'-0"

10'-0"

10'-0"

8'-0" 8'-0"

8'-0"

9'-6"

9'-6" 9'-6"

9'-6"

C D

E F

G

2 3 4 5 6 101213 17 8

K

141617

STAIR

NO. 5

B A

DW

DW

DW

O A V

O A V

O A V

A V

O

H

N M

J A.

MECHANICAL

ROOM

CONFERENCE/

REPORT ROOM

NURSE

WORKROOM

NURSE

WORKROOM

NURSING

SUPERVISOR

DEMONSTRAT.

CLASSROOM

BLDG. MGMT.

EQUIP. ROOM

DIETICIAN'S

OFFICE

CLEAN

LINEN

CLEAN

LINEN

REHAB.

THERAPIST

REHAB.

TECHNICIAN

QUIET

ROOM

SOCIAL

WORKER

MULTIPURPOSE

OFFICE

PSYCHOLOGIST

OFFICE

ANTE

ROOM

INTERVIEW/

CONSULTATION

INTERVIEW/

CONSULTATION

DATA

ROOM

SECL.

ROOM

ANTE

ROOM

SECL.

ROOMPATIENT

ROOM (1)

PATIENT

ROOM (2)

PATIENT

ROOM (1)

PATIENT

ROOM (1)

PATIENT

ROOM (1)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

DATA

ROOM

FAMILY VIST

ROOM

FAMILY VIST

ROOM

PSYCHIATRIST

OFFICE

BATHING

FACILITIES

PHYSICIAN

ASSIST.

ROUNDING

ROOM

CONF./

REPORT RM.

PATIENT

LAUNDRY

PATIENT

PROPERTY

STORAGE

EQUIPMENT

STORAGE

WARD

CLERKSTAFF

OFFICE

CLEAN

UTILITY

CLEAN

UTILITY

SOILED

UTILITY

SOILED

LINEN

WARD

CLERK

INTERVIEW/

CONSULTATION

INTERVIEW/

CONSULTATION

STUDENT

WORKROOM

PATIENT

ROOM (2)PATIENT

ROOM (1)

FUTURE

ELEVATORS

FUTURE

ELEVATORS

ROUNDING

ROOM

PATIENT

ROOM (1)

PATIENT

ROOM (1)

FOOD

CARTS

PATIENT

ROOM (1)

STAFF

OFFICE

STAFF

OFFICE

STAFF

OFFICE

HEAD NURSE

OFFICE

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

VESTIB.

VESTIB.

VESTIB.

STAFF

LOUNGE/

LOCKERS

WOMEN

STAFF TLT.

MEN

STAFF TLT.

QUIET

ROOM

QUIET

ROOM

QUIET

ROOM

2D-101

LOBBY

2D-100

2D-105

2D-102

2D-200

2D-201

2D-202

2D-203

2D-203A 2D-204 2D-204A

2D-205

2D-205A

2D-200

2D-207A

2D-206

2D-207

2D-207B

2D-208

2D-208A

2D-207A

2D-208B

2D-209A 2D-209 2D-210

2D-210A

2D-211

2D-213

2D-212

2D-213A

TOILET

2D-212A

2D-214 2D-215

2D-216A

2D-2162D-216B 2D-217

2D-200

2D-300

2D-301

2D-302 2D-301A

2D-303A

2D-303

2D-305

2D-304 2D-305A

2D-306

STAIR

NO. 10

2D-307

2D-308

2D-309

2D-310

2D-311

2D-312

2D-4002D-400

2D-401

2D-403B 2D-403A

2D-402

2D-403

2D-401A

2D-404

2D-405

2D-406A

2D-406 2D-406B

2D-407A

2D-4072D-408

2D-408A

2D-409A

2D-409

2D-410

2D-411

2D-412 2D-604

2D-703

2D-216C

2D-414C

2D-414B

2D-414

2D-414A

2D-500

2D-501

2D-502

2D-503

2D-504

2D-505

2D-506

PSYCHIATRIST

OFFICE

2D-507

2D-508A 2D-507A

2D-508

2D-509

2D-509A

2D-510

2D-511

2D-600

2D-603

2D-602

2D-601 2D-607

2D-606

2D-605

2D-608

2D-609

2D-700

2D-800

2D-800

2D-704

2D-705

2D-706

2D-707 2D-701

2D-708

2D-702

2D-708A

TOILET

2D-806

2D-805

2D-803

2D-804

2D-807

2D-8012D-801

2D-900

2D-909

2D-908

2D-901

2D-902

2D-903

2D-904

2D-905

2D-906

2D-907

STAIR

NO. 9

2D-700

2D-900

VESTIB.

2D-104 2D-103

2D-101A

2D-106

2D-101B

FUTURE

STAIR

STAIR

NO. 5

SOILED

LINEN

SOILED

UTILITY

NON-FOOD

STORAGE

2D-800

FOOD

CARTS

NON

FOOD

STORAGE

STAIR

NO. 11

EXAM ROOM

EXAM ROOM

EXAM ROOM

EXAM ROOM

LINEN

CHUTE

2D-800B

CRASH

CARTS

DAYROOM

DAYROOM

NURSE STATION

MEDICATION

NOURISH.

NURSE STATION

MEDICATION

MECHANICAL

HAC

HAC

NOURISH.

DINING

DINING

ELECTRICAL

ELECTRICAL

CORRIDOR CORRIDOR

CORRIDOR

CORRIDOR

CORRIDORCORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

TOILET TOILET

WAITING

CORRIDOR

GENERAL NOTE

1. PROVIDE ACCESS PANEL FOR ALL NEW INSTALLED CAV

BOXES

CONSTRUCTION KEY NOTE

1 CAP EXISTIMG DUCT AIR TIEGHT

CAV

2-19

CAV

2-1

CAV

2-3

CAV

2-4

CAV

2-5

CAV

2-6

CAV

2-7

CAV

2-8

CAV

2-10

CAV

2-9

CAV

2-11

CAV

2-12

CAV

2-13CAV

2-14

CAV

2-15

CAV

2-16

CAV

2-17

CAV

2-18

105 CFM (EA)

80 CFM (SA)

CAV

2-2

2D-203A

A

BUILDING 2

BUILDING 2

CONNECTION

TO BLDG. 2

ROOF

BUILDING 4

ROOF

PLANTER

FENCE FENCE

GATE

PATIO

PATIO

E9 2-A401

D8 2-A401

D9 2-A401

F1 2-A401

E3 2-A401

F3 2-A401

E5 2-A401

F5 2-A401

F8 2-A401

F6 2-A401

B1 2-A401

B3 2-A401

D6 2-A401

MB1

REF.

(VC)

REF.

(VC)

MB1

MB2

MB2

TB1

DAYROOM

DAYROOM

MECHANICAL

ROOM

NURSE STATION

MEDICATION

NOURISH.

NURSE STATION

CONFERENCE/

REPORT ROOM

NURSE

WORKROOM

NURSE

WORKROOM

MEDICATION

NURSING

SUPERVISOR

DEMONSTRAT.

CLASSROOM

BLDG. MGMT.

EQUIP. ROOM

DIETICIAN'S

OFFICE

CLEAN

LINEN

CLEAN

LINEN

REHAB.

THERAPIST

REHAB.

TECHNICIAN

QUIET

ROOM

SOCIAL

WORKER

MULTIPURPOSE

OFFICE

PSYCHOLOGIST

OFFICE

MECHANICAL

ANTE

ROOM

INTERVIEW/

CONSULTATION

INTERVIEW/

CONSULTATION

DATA

ROOM

HAC

HAC

C D

E F

G

2 3 4 5 6 101213

SECL.

ROOM

ANTE

ROOM

SECL.

ROOMPATIENT

ROOM (1)

PATIENT

ROOM (2)

PATIENT

ROOM (1)

PATIENT

ROOM (1)

PATIENT

ROOM (1)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

PATIENT

ROOM (2)

DATA

ROOM

FAMILY VIST

ROOM

FAMILY VIST

ROOM

PSYCHIATRIST

OFFICE

BATHING

FACILITIES

PHYSICIAN

ASSIST.

ROUNDING

ROOM

CONF./

REPORT RM.

PATIENT

LAUNDRY

NOURISH.

PATIENT

PROPERTY

STORAGE

EQUIPMENT

STORAGE

WARD

CLERKSTAFF

OFFICE

CLEAN

UTILITY

CLEAN

UTILITY

SOILED

UTILITY

SOILED

LINEN

WARD

CLERK

INTERVIEW/

CONSULTATION

INTERVIEW/

CONSULTATION

STUDENT

WORKROOM

PATIENT

ROOM (2)

PATIENT

ROOM (1)

FUTURE

ELEVATORS

FUTURE

ELEVATORS

DINING

ROUNDING

ROOM

PATIENT

ROOM (1)

PATIENT

ROOM (1)

FOOD

CARTS

DINING

PATIENT

ROOM (1)

STAFF

OFFICE

STAFF

OFFICE

STAFF

OFFICE

ELECTRICAL

HEAD NURSE

OFFICE

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

TOILET

VESTIB.

VESTIB.

VESTIB.

STAFF

LOUNGE/

LOCKERS

WOMEN

STAFF TLT.

MEN

STAFF TLT.

QUIET

ROOM

QUIET

ROOM

QUIET

ROOM

ELECTRICAL

7 8

LOBBY

CORRIDOR CORRIDOR

TOILETCORRIDOR

CORRIDOR

STAIR

NO. 10

CORRIDORCORRIDOR

2D-317A

CORRIDOR

PSYCHIATRIST

OFFICE

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

TOILET

CORRIDOR

STAIR

NO. 9

CORRIDOR

CORRIDOR

K

141617

VESTIB.

TOILET TOILET

WAITING

FUTURE

STAIR

STAIR

NO. 5

SOILED

LINEN

SOILED

UTILITY

NON-FOOD

STORAGE

CORRIDOR

B A

FOOD

CARTS

NON

FOOD

STORAGE

DW

DW

STAIR

NO. 11

DW

EXAM ROOM

EXAM ROOM

EXAM ROOM

EXAM ROOM

LINEN

CHUTE

STRETCHER/

WHEELCHAIR

STORAGE ALCOVE

2D-800A

CRASH

CARTS

STRETCHER/

WHEELCHAIR

STORAGE ALCOVE

2D-800A

O A V

O A V

O A V

A V

O

H

N M

J A.

2D-101

2D-100

2D-105

2D-102

2D-200

2D-201

2D-202

2D-203

2D-203A 2D-204 2D-204A

2D-205

2D-205A

2D-200

2D-207A

2D-206

2D-207

2D-207B

2D-209

2D-209A

2D-207A

2D-209B

2D-210A 2D-210 2D-212

2D-212A

2D-211

2D-216

2D-215

2D-216A 2D-215A

2D-214 2D-215

2D-216A

2D-2162D-216B 2D-217

2D-200

2D-300

2D-333

2D-302 2D-333A

2D-329A

2D-329

2D-326

2D-304 2D-326A

2D-306

2D-307

2D-308

2D-309

2D-310

2D-311

2D-312

2D-4002D-400

2D-322

2D-403B 2D-403A

2D-402

2D-403

2D-322A

2D-404

2D-317

2D-316A

2D-316 2D-316B

2D-315A

2D-3152D-314

2D-314A

2D-312A

2D-312

2D-410

2D-411

2D-412 2D-604

2D-703

2D-216C

2D-414C

2D-414B

2D-414

2D-414A

2D-500

2D-501

2D-502

2D-503

2D-504

2D-505

2D-506 2D-309

2D-306A 2D-309A

2D-306

2D-304

2D-304A

2D-510

2D-511

2D-600

2D-603

2D-602

2D-601 2D-607

2D-606

2D-605

2D-608

2D-609

2D-700

2D-800

2D-800

2D-704

2D-705

2D-706

2D-707 2D-701

2D-708

2D-702

2D-708A

2D-806

2D-805

2D-803

2D-804

2D-807

2D-8012D-801

2D-900

2D-909

2D-908

2D-901

2D-902

2D-903

2D-904

2D-905

2D-906

2D-907 2D-700

2D-900 2D-104 2D-103

2D-101A

2D-106

2D-101B

2D-800

2D-800B

90 CFM (EA)

75 CFM (SA )

90 CFM (EA)

75 CFM (SA)

130 CFM (EA)

90 CFM (SA)

120 CFM (EA)

80 CFM (SA)

80 CFM (EA)

65 CFM (SA)

80 CFM (EA)

65 CFM (SA)

60 CFM (EA)

40 CFM (SA)

40 CFM (SA)

60 CFM (EA)

80 CFM (SA)

100 CFM (EA)

100 CFM (EA)

75 CFM (SA)

120 CFM (EA)

80 CFM (SA)

120 CFM (EA)

60 CFM (SA)

70 CFM (EA) 80 CFM (SA)100 CFM (EA)

80 CFM (SA)

80 CFM (SA)

100 CFM (EA)

100 CFM (EA)

100 CFM (EA)

80 CFM (SA)

80 CFM (SA)

100 CFM (EA)

80 CFM (SA)

CAV

2-20

2 VOLUME DAMPER

22222

2 2 2

2 2

80 CFM (EA)

65 CFM (EA)

RELIEF LOUVER

32X10

X1

X1

8X8

NEW

ALTERN ATE :

1. RELPACE EXISTING EF-6 WITH NEW

2. PROVIDE NEW DUCTWORK AND MOTORIZED

OSA DAMPER INTERLOCK WITH EF-6

3. LOCATE EF-6 IN WAITING 2D-102 , PROVIDE

4. ACCESS PANEL FOR FAN SERVICE

REMOVE

8X8 EA DUCT

AND CAP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

BID SET

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

VA DALLAS PATIENT BATHROOM

RENOVATION

4500 S. Lancaster Rd. Dallas, Texas 75216

549-22-227

Building 2 Project Director

Revisions: Date:

STAMP35% SCHEMATIC DESIGN

65% DESIGN DEVELOPMENT 10/5/2022

9/9/2022

95% CONSTRUCTION DOCUMENTS 11/4/2022

8/28/2023

100% CONSTRUCTION DOCUMENTS 12/2/2022

BID SET 8/28/2023

NORTH

MECHANICAL SECOND FLOOR PLAN

MH

SCALE: 1/8" = 1'-0"

2-MH-200

MECHANICAL SECOND FLOOR PLAN

RDSH

.0 .0

.9 \D at aF ile s\

Pr oj ec ts

\2

2\ S6

.0

- V A

D al la s P at ie nt B at hr oo m

R en ov at io n\

M \M

H -2

-M

EC

H

AN

IC

AL

S

EC

O

N D

F

LO

O R

P

LA

N .d w g, /1

/2

3:

:4

PM

, t yl er

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text

EF

AutoCAD SHX Text

AutoCAD SHX Text

EXP. 06-30-25

AutoCAD SHX Text E

AutoCAD SHX Text No. 29448

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text H

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text M

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text L

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SPECIFIC NOTE

1. HOT TAP CAV BOX PIPING TO (E) HWS/R MAIN LOOP

GENERAL NOTE

1. CONTRACTOR TO BALANCE GPM FLOW(SEE SCHEDULE

2M-003) FOR EACH NEW VAVBOX

CAV

2-19

CAV

2-1

CAV

2-3

CAV

2-4

CAV

2-5

CAV

2-6

CAV

2-7

CAV

2-8

CAV

2-10

CAV

2-9

CAV

2-11

CAV

2-12

CAV

2-13

CAV

2-14

CAV

2-15

CAV

2…