Attachment 2 Drawings.pdf
PDF 25 MB Posted
- Solicitation number
- 36C25724B0011
About this file
This document provides details for a federal contract opportunity with the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17. The solicitation number is 36C25724B0011 and seeks to renovate restrooms at the Z2DA--549-22-227 NRM facility. An attachment with drawings related to the project is included as a 25MB PDF file. The opportunity type is a solicitation to renovate two sets of men's and women's restrooms at the 200/300 barracks to current accessibility standards. The estimated period of performance and response date are not specified.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING CODE ANALYSIS
A. PROJECT DESIGN IN ACCORDANCE WITH:
B. BASIC REVIEW INFORMATION
4. Type of Construction
5. Building Floor Area
a. Gross Floor Area: 31,577 S.F.
8. Exit Requirements:
1. Site Development -Not Applicable-
2. Location on Property -Not Applicable-
6. Building Height -Not Applicable-
7. Uniform Federal Accessibility Standards (UFAS)
Separation Required: No
(6) Roof Construction
(8) Interior non-bearing walls
Automatic Sprinkler System Modifications will be designed in accordance with the 1999 edition of NFPA 13.
3. Occupancy
4. National Electrical Code (NEC)
5. Uniform Building Code (UBC) 2021 for other Building Elements
6. National Standard Plumbing Code (NSPC)
8. Building Code Requirements for Reinforced Concrete (ACI 318)
3. Fire Protection Design Manual Department of Veteran Affairs 2021 (FPDM)
NFPA 220 Standard on Types of Building Construction, 2019 Edition
2. NFPA 101 Life Safety Code, 2018 Edition (LSC)
1. Uniform Building Code, 2021 Edition (UBC)
NFPA 13 Standard for the Installation of Sprinkler Systems, 2019 Edition
NFPA 72 National Fire Alarm Code, 2019 Edition
NFPA 14 Standard for the installation of Standpipe, Private Hydrants, and Hose Systems, 2019 Edition
NFPA 80A Recommended Practice for the Protection of Buildings from Exterior Fire Exposure, 2019 Edition NFPA 90A Standard for the Installation of Air Conditioning and Ventilating Systems, 2019 Edition
NFPA 70, National Electric Code, 2019 Edition
9. ASHRAE Standard 62, 2019 Edition
10. ASHRAE Standard 15, 2019 Edition
5. IBC 2021 for Structural Systems
NFPA 5000 Building Construction and Safety Code, 2019 Edition
Healthcare mixed-use occupancy
Major Occupancy Patient Areas - Healthcare occupancy (LSC:3.3.152.7)
Other Occupancies Conference rooms, training rooms, etc. - Assembly occupancy (LSC: 3.3.152.2) Storage areas - Storage occupancy (LSC 3.3.152.15) Office areas - Business occupancy (LSC:3.3.152.3)
A. The type of construction shall comply with the requirements of NFPA 101 for the most restrictive occupancy in the building. For occupancies with no construction requirements in NFPA 101, type of construction and height/area restrictions shall comply with UBC (VA FPDM 2.1)
B. Construction type: Type II (222) (LSC:18.1.6.4)
7. Structural Fire Resistance Requirements - NFPA 220: Table 4.1.1
(1) Beams, girders, trusses & arches
(2) Columns
(3) Interior bearing walls
(4) Exterior bearing walls
(5) Floor Construction
(7) Exterior non-bearing walls
(10) Vertical Shaft Enclosures (LSC: 8.6.5)
(9) Stairway Construction (LSC: 7.1.3.2.1)
Required
NR/NC
NR/NC
Provided
NR/NC
NR/NC
A. Total floor occupant load: 383 occupants
B. Egress capacity:
Level components and ramps 0.2" per occupant (LSC: Table 7.3.3.1) Stairways 0.3" per occupant (LSC: Table 7.3.3.1)
The travel distance between any room door required as an exit and an exit shall not exceed 150 ft.
The travel distance between any point in a room and an exit shall not exceed 200 ft.
The travel distance between any point in a healthcare sleeping room and an exit access door in that room may not exceed 50 ft.
C. Maximum allowable travel distance
D. Maximum dead end corridor: 30 ft. (LSC: 18.2.5.10)
9. Minimum number of exits:
At least two exits located remotely from each other must be provided for each floor.
At least two exits must be provided and must be accessible from each smoke compartment
Every habitable room must have an exit access door leading directly to an exit corridor, unless otherwise permitted.
10. Egress components:
A. Corridor, aisles and ramps:
Minimum clear width for exit access of psychiatric care area of hospital: 72" (LSC: 18.2.3.5) Minimum clear width for areas adjacent to hospital psychiatric areas with patient care or sleeping: 32" [LSC: 18.2.3.5(1)]
B. Stairs Minimum width: 44" [LSC: Table 7.2.2.2.1(a)]
C. Doors Minimum clear width: 32" (LSC: 7.2.1.2.4)
11. Plumbing Fixture Calculations
A. Hospital Waiting Rooms Required
Provided
WC
Lavatories
UBC: Appendix Chapter 29 - Minimum Plumbing Fixtures (Group I occupancy)
Required
Provided
C. Patient rooms
WC (one per room) Lavatories (one per room)
Required
Provided
WC
Lavatories
B. Hospital General Use Areas
* NOTE: Additional Public/Staff plumbing fixtures are available to serve this occupant load within Building 2 and the Clinical Addition.
VETERANS DRIVE
VETERANS DRIVE
DRIVE
AR
BO
R
AN
N
ANN ARBOR
ENTRANCE
EASTER AVE.
AN
N
A R
BO
R
D R
IV
E
GLADEW
ATER
SOFTBALL &
RECREATION
AREA
SCI
ENTRANCE
SPINAL CORD
INJURY CENTER EAST
ENTRANCE74
RADIATION
ONCOLOGY
BUILDING
CLINICAL ADDITION
SOUTH
ENTRANCE
MAIN
ENTRANCE
MAIN
MEDICAL CENTER
ENTRANCE
SOUTH
ENTRANCE
LANCASTER ROADLANCASTER ROAD
TRANSITIONAL
CARE UNIT
STAFF
GARAGE
(BELOW)
MENTAL HEALTH
RENOVATION
DALLAS VA MEDICAL CENTER
CLINICAL ADDITION
SOUTH
ENTRANCE
MAIN
ENTRANCE
MAIN
MEDICAL CENTER
ENTRANCE
SOUTH
ENTRANCE
LANCASTER ROADLANCASTER ROAD
SHEET INDEX
DWG. NO. SHEET TITLE
TITLE SHEET2-G-001 ELECTRICAL FRONT SHEET2-E-001
ELECTRICAL SYMBOLS, LEGENDS, AND ABBREVIATIONS2-E-002
ELECTRICAL PARTIAL SINGLE LINE DIAGRAM2-E-003
DWG. NO. SHEET TITLE
ARCHITECTURAL DEMOLITION FLOOR PLAN2-AD-101
ARCHITECTURAL FLOOR PLAN2-A-101
2-E-004
ELECTRICAL DEMOLITION SECOND FLOOR POWER PLAN2-ED-200
ELECTRICAL DEMOLITION SECOND FLOOR LIGHTING PLAN2-ED-201
PLUMBING FRONT SHEET2-P-001
2-PD-100 PLUMBING DEMOLITION SECOND FLOOR PLANS
2-PD-101
PLUMBING DEMOLITION SECOND FLOOR ENLARGED PLAN
PLUMBING SECOND FLOOR PLAN
MECHANICAL FRONT SHEET2-M-001
MECHANICAL EQUIPMENT SCHEDULES2-M-002
MECHANICAL EQUIPMENT SCHEDULES2-M-003
MECHANICAL SECOND FLOOR DEMOLITION PLAN2-MD-200
MECHANICAL SECOND FLOOR PLAN2-MH-200
2-MH-201
ARCHITECTURAL FLOOR PLAN - PHASING PLAN2-A-102
ARCHITECTURAL INTERIOR ELEVATIONS, PLUMBING FIXTURE LEGEND2-A-251
ARCHITECTURAL ENLARGED PLANS2-A-401
GENERAL NOTES
SYMBOL AND ABBREVIATION LISTS ARE COMPOSITE. ALL SYMBOLS AND ABBREVIATIONS MIGHT NOT BE USED ON THIS PROJECT.
MAINTAIN CLEAR ACCESS TO SERVICE EQUIPMENT AND OTHER ACCESSORIES REQUIRING SERVICE, VISUAL INSPECTION OR HAND OPERATION. WHERE INDICATED OR REQUIRED, PROVIDE ACCESS PANELS OF THE TYPE SELECTED TO SUIT MATERIALS IN WHICH
INSTALLED.
ALL WORK SHALL BE DONE IN ACCORDANCE WITH LATEST APPLICABLE CODES AND REGULATIONS PER ALL FEDERAL AND STATE
REGULATIONS.
THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND SHOULD NOT BE SCALED TO ESTABLISH LOCATION OF WORK. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND MAKE ADJUSTMENTS TO DIMENSIONS AS NECESSARY TO COMPLETE THE WORK.
CONTRACTOR SHALL THOROUGHLY EXAMINE PREMISES AND OBSERVE ALL CONDITIONS AND CIRCUMSTANCES UNDER WHICH THE WORK SHALL BE PERFORMED. NO ALLOWANCES WILL BE MADE FOR ERRORS OR NEGLIGENCE IN THIS RESPECT.
THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE IMPORTANCE OF PROPER SCHEDULING AND PHASING OF THE WORK SO AS TO CAUSE MINIMUM DISTURBANCE TO THE ACTIVITIES IN THE OTHER AREAS OF THE BUILDING WHICH REMAIN OCCUPIED. THE
CONTRACTOR'S WORK SCHEDULE SHALL BE SUBMITTED TO AND APPROVED BY THE GOVERNMENT.
CONTRACTOR SHALL PERFORM WORK ONLY AFTER THE GATHERING OF EXACT FIELD DIMENSIONS OF THE BUILDING STRUCTURE AND
CEILINGS, ETC. WHICH MAY AFFECT THE INSTALLATION OF THE NEW SYSTEMS.
THE CONTRACTOR SHALL FULLY COORDINATE ALL WORK WITH OTHER TRADES TO ASSURE ALL WORK CAN BE PROPERLY INSTALLED
WITHOUT INTERFERENCE OR DELAY.
CLEAN UP ALL WASTE AND DEBRIS AT THE END OF EACH WORKING DAY AND AT THE COMPLETION OF THE JOB.
ALL SPECIFIED EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
PROVIDE ONE YEAR WARRANTY FOR ALL WORKMANSHIP AND MATERIALS AFTER THE DATE OF FINAL ACCEPTANCE.
PRIOR TO STARTING WORK, SUBMIT SHOP DRAWINGS FOR ALL MECHANICAL EQUIPMENT & DUCTWORK PER SPECIFICATIONS.
CONTRACTOR SHALL FURNISH AND INSTALL DUCT AND PIPE SUPPORTS AND BRACING PER SMACNA REQUIREMENTS.
ANY EQUIPMENT OR PIPING INSTALLED MORE THAN 1 FT FROM THE LOCATION SHOWN ON THE DRAWINGS SHALL BE CLEARLY DOCUMENTED IN THE FIELD. CONTRACTOR SHALL PROVIDE AS-BUILT DRAWINGS TO CLEARLY SHOW THE LOCATION OF THE EQUIPMENT BEFORE COMPLETION OF THE PROJECT. ALL EXPENSE RELATING TO VERIFY THE AS-BUILT DRAWINGS BY THE CLIENT OR ITS REPRESENTATIVE(S) DUE TO INACCURATE OR INCOMPLETE RECORDS SHALL BE BORN BY THE CONTRACTOR.
ALL MECHANICAL EQUIPMENT SHALL BE BRACED OR ANCHORED TO RESIST A HORIZONTAL FORCE ACTING IN ANY DIRECTION USING
LATEST IBC AND ASCE 7-05 CHAPTER 13.
ALL PIPES SHALL BE SUPPORTED AND BRACED PER SMACNA GUIDELINES AND IMC.
EQUIPMENT SPECIFIED ON THESE DRAWINGS ARE BASIS OF DESIGN ITEMS. CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ALL ADDITIONAL DESIGN AND CONSTRUCTION COSTS INCURRED BY THE USE OF ANY PRODUCT OTHER THAN THE BASIS OF DESIGN.
MEDICAL CENTER, DALLAS, TX
DEPARTMENT OF VETERANS AFFAIRS
V.A. HOSPITAL DALLAS, TX
VA PROJECT #549-22-227
PATIENT BATHROOM REMODELING
1.
2.
3.
4.
5.
6.
7.
15.
10.
11.
12.
13.
14.
9.
16.
17.
8.
ARCHITECTURAL WINDOW & DOOR ELEVATIONS AND DETAILS2-A-621
MECHANICAL PIPING SECOND FLOOR DEMOLITION PLAN
ELECTRICAL LIGHTING FIXTURES SCHEDULE & PANEL SCHEDULES
PLUMBING SITE PLAN
PLUMBING DEMOLITION SECOND FLOOR ENLARGED PLAN
2-PD-102
2-MH-600 MECHANICAL DETAILS
2-MH-700 MECHANICAL CONTROLS
2-E-400
ELECTRICAL ENLARGE VIEW FOR PATIENT BATHROOM SECOND FLOOR POWER PLAN2-EP-400
ELECTRICAL ENLARGE VIEW FOR PATIENT BATHROOM SECOND FLOOR POWER PLAN2-EP-401
ELECTRICAL ENLARGE VIEW FOR PATIENT BATHROOM SECOND FLOOR LIGHTING PLAN2-EP-402
2-EL-300
2-EP-301
2-EP-302
ELECTRICAL SECOND FLOOR LIGHTING PLAN
ELECTRICAL SECOND FLOOR POWER PLAN
ELECTRICAL SECOND FLOOR COMMUNICATION PLAN
ELECTRICAL LIGHTING PHOTOMETRIC
PLUMBING SECOND FLOOR ENLARGED PLAN
2-PP-200
2-PP-201
PLUMBING DETAILS
2-PP-202
2-PP-400
PLUMBING SECOND FLOOR ENLARGED PLAN
2-PS-100
ELECTRICAL ENLARGE VIEW FOR PATIENT BATHROOM SECOND FLOOR LIGHTING PLAN2-EP-403
ELECTRICAL DETAILS SHEET2-E-500
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
VA DALLAS PATIENT BATHROOM
RENOVATION
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-227
Building 2 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 10/5/2022
9/9/2022
95% CONSTRUCTION DOCUMENTS 11/4/2022
8/28/2023
100% CONSTRUCTION DOCUMENTS 12/2/2022
BID SET 8/28/2023
2-G-001
HKCR
TITLE SHEET
THE SECOND FLOOR OF THE MENTAL HEALTH BUILDING 2 ALSO NAMED WARD 2D200-300 HAS 20 PATIENT ROOMS, EACH WITH THEIR OWN BATHROOM THAT WILL GO UNDER RENOVATION. 18 OF THESE PATIENT BATHROOMS INCLUDE A TOILET, LAVATORY, AND SHOWER WHILE THE OTHER 2 BATHROOMS THAT SERVE ISOLATION ROOMS INCLUDE A TOILET AND LAVATORY ONLY. THIS PROJECT WILL REDESIGN THE BATHROOMS TO BRING UP TO CURRENT SPECIFICATIONS AND COMPLIANCE, ELIMINATE ANY POTENTIAL HAZARD CONCERNS AND IMPROVE PATIENT SAFETY WHILE ADDRESSING PROPER LIGHTING, HVAC, VENTILATION, AND PLUMBING SYSTEMS. ALSO INCLUDED IN THIS PROJECT, THE EXISTING PATIENT ROOM DOORS WILL BE REPLACED WITH NEW DOORS AND BEHAVIORAL HEALTH HARDWARE. THE EXISTING EXTERIOR ALUMINUM WINDOW SYSTEM WILL BE REPLACED WITH HIGH PERFORMANCE WINDOW SYSTEM AND MOTORIZED BLINDS.
ARCHITECTURAL
GENERAL ELECTRICAL MECHANICAL
PLUMBING
SITE PLAN
PROJECT SCOPE
PLUMBING SCHEDULES2-PP-500
MECHANICAL EQUIPMENT SCHEDULES2-M-004
MECHANICAL
.0 .0
.9 \D at aF ile s\
Pr oj ec ts
\2
2\ S6
.0
- V A
D al la s P at ie nt B at hr oo m
R en ov at io n\
Ar ch
\2 -G
-0
.d w g, /6 /2
2:
:0
PM
, T yl er
MECHANICAL SYMBOLS
10x8ø
10x8
FLAT OVAL DUCTWORK
NK=
R/D
NK=
AND VOLUME DAMPER
TRANSITION ON CENTER
FLEXIBLE CONNECTOR
VOLUME DAMPER
SQUARE-THROATED TEE
VOLUME DAMPER
RADIUS ELBOW
RADIUS TEE
8"ø
RECTANGULAR-TO-ROUND TRANSITION
TAKE-OFF TAP TO RECTANGULAR DUCT
COMBINATION FIRE SMOKE DAMPER (CFSD)
CONICAL TAP TO RECTANGULAR DUCT AND
TRANSITION WITH FLAT SIDE
CHANGE IN ELEVATION WITH RELATION TO AIR FLOW
SQUARE-THROATED ELBOW W/TURNING VANES
RECTANGULAR DUCTWORK (WIDTH X DEPTH)
RECTANGULAR DUCTWORK (WIDTH X DEPTH)
ROUND DUCTWORK (SIZE, DIAMETER)
ACOUSTICALLY LINED DUCTWORK
DEMOLITION SYMBOL FOR
DEMOLITION OF EXISTING DUCTWORK.
EXISTING EQUIPMENT, PIPING, AND DUCTWORK.
BACKDRAFT DAMPER
BDD
FIRE DAMPER (FD)
EXHAUST DUCT RISER
RETURN DUCT RISER IN PLAN
SUPPLY DUCT RISER IN PLAN
ACCESS REQUIRED FOR EQUIPMENT SERVICE
1-1/2 HOUR RATED UNLESS OTHERWISE NOTED
1-1/2 HOUR RATED UNLESS OTHERWISE NOTED
POINT OF DISCONNECT
POINT OF CONNECTION BETWEEN NEW AND EXISTING
ABBREVIATIONS
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AAV AUTOMATIC AIR VENT
ACC AIR COOLED CONDENSER
ACCH AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACU AIR CONDITIONING UNIT
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AHU AIR-HANDLING UNIT
AMP AMPERE
AP ACCESS PANEL
APD AIR PRESSURE DROP
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING
REFRIGERATION AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CENT CENTRIFICAL
CFM CUBIC FEET PER MINUTE
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CO2 CARBON DIOXODE
CP CONDENSATE PUMP
CR CEILING REGISTER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
Db DRY-BULB TEMPERATURE
DB DECIBELS
DCW DOMESTIC COLD WATER
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
DP DEW POINT TEMPERATURE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EH EXHAUST HOOD
ENT ENTERING
ER EXHAUST REGISTER
ERC ELECTRIC REHEAT COIL
ESP EXTERNAL STATIC PRESSURE
EUH ELECTRIC UNIT HEATER
EWT ENTERING WATER TEMPERATURE
(E) EXISTING
F FAHRENHEIT
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FR FLOOR REGISTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
H HUMIDIFER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HZ HERTZ
I/O INPUT/OUTPUT
ICF IN-LINE CENTRIFUGAL FAN
ID INSIDE DIAMETER
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
KG KILOGRAM
KG/HR KILOGRAM PER HOUR
KW KILOWATT
KWH KILOWATT HOUR
L LITER
L/h LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LPS LOW PRESSURE STEAM
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/S METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAX MAXIMUM
MB MIXING BOX
MBH 1,000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MPS MEDIUM PRESSURE STEAM
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
(N) NEW
N/A NOT APPLICABLE
NC NORMALLY CLOSED
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
P PUMP
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD RETURN AIR DAMPER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RD REFRIGERANT DISCHARGE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RELAD RELIEF AIR DAMPER
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
SVS STEAM VENT SILENCER
SWHX STEAM TO WATER HEAT EXCHANGER
TAB TESTING, ADJUSTING, BALANCE
TG TRANSFER GRILLE
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TYP. TYPICAL
UC UNIT COOLER
UH UNIT HEATER
U UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED
BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WEF WALL EXHAUST FAN
WF WATER FILTER
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
GENERAL NOTES
1. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING.
2. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.
3. ACCESS PANELS IN SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED
AND INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS.
4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, DIFFUSERS, FILTERS, COILS, ETC. LOSS FOR FILTERS SHALL BE FOR FILTERS AT 50%
LOADING.
5. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS.
6. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.
7. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.
8. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.
9. STEAM HEADER SET PRESSURE: ___ kPa [PSIG] NORMAL ___ kPa [PSIG] LOW DEMAND PERIODS
10. ALTITUDE-BOILER ROOM FLOOR: ___ M [FT.] ABOVE SEA LEVEL
11. SEISMIC PROVISIONS // REQUIRED - SEE SPECS // NOT REQUIRED // ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED
12. ALL WORK AND WALL AND ROOF PENETRATIONS SHALL BE COORDINATED WITH STRUCTURAL JOISTS AND BEAMS. PROVIDE OFFSETS IN PIPES AND DUCTS TO AVOID
CUTTING OF BEAMS AND JOISTS.
13. SYMBOL AND ABBREVIATION LISTS ARE COMPOSITE. ALL SYMBOLS AND ABBREVIATIONS MIGHT NOT BE USED ON THIS PROJECT.
14. MAINTAIN CLEAR ACCESS TO SERVICE EQUIPMENT AND OTHER ACCESSORIES REQUIRING SERVICE, VISUAL INSPECTION OR HAND OPERATION. WHERE INDICATED OR REQUIRED, PROVIDE ACCESS PANELS OF THE TYPE SELECTED TO SUIT MATERIALS IN WHICH INSTALLED.
15. THE MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND SHOULD NOT BE SCALED TO ESTABLISH LOCATION OF WORK. THE CONTRACTOR SHALL VERIFY ALL
CONDITIONS AND MAKE ADJUSTMENTS TO DIMENSIONS AS NECESSARY TO COMPLETE THE WORK.
16. CONTRACTOR SHALL THOROUGHLY EXAMINE PREMISES AND OBSERVE ALL CONDITIONS AND CIRCUMSTANCES UNDER WHICH THE WORK SHALL BE PERFORMED. NO
ALLOWANCES WILL BE MADE FOR ERRORS OR NEGLIGENCE IN THIS RESPECT.
17. THE CONTRACTOR SHALL FULLY COORDINATE ALL WORK WITH OTHER TRADES TO ASSURE ALL WORK CAN BE PROPERLY INSTALLED WITHOUT INTERFERENCE OR
DELAY.
18. CLEAN UP ALL WASTE AND DEBRIS AT THE END OF EACH WORKING DAY AND AT THE COMPLETION OF THE JOB.
19. ALL SPECIFIED EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
20. EXACT LOCATIONS OF ALL EQUIPMENT AND AIR DISTRIBUTION SHALL BE COORDINATED WITH LIGHTING AND OTHER WORK.
21. CONTRACTOR SHALL FURNISH AND INSTALL DUCT AND PIPE SUPPORT PER SMACNA REQUIREMENT.
22. ANY EQUIPMENT, DUCTWORK, OR PIPING INSTALLED MORE THAN 1 FT FROM THE LOCATION SHOWN ON THE DRAWINGS SHALL BE CLEARLY DOCUMENTED IN THE FIELD. CONTRACTOR SHALL PROVIDE RECORD DRAWINGS IN AUTOCAD FORMAT TO CLEARLY SHOW THE LOCATION OF THE EQUIPMENT BEFORE COMPLETION OF THE PROJECT. ALL EXPENSES RELATING TO VERIFY THE RECORD DRAWINGS BY THE CLIENT OR ITS REPRESENTATIVE(S) DUE TO INACCURATE OR INCOMPLETE RECORDS
SHALL BE BORN BY THE CONTRACTOR.
23. NOTE THE CRITICAL SPACE AVAILABLE ABOVE CEILINGS. PROVIDE TRANSITION PIECES AT CROSSOVERS, UNDER BEAMS, OVER/UNDER PIPES AS REQUIRED TO ACCOMMODATE DUCTS WITHIN SPACE AVAILABLE, PROVIDING EQUIVALENT DUCT SIZE TO THE DIMENSION SHOWN. COORDINATE CLOSELY WITH OTHER SECTIONS TO MINIMIZE NECESSITY OF TRANSITIONS. NO ADDITIONAL COSTS WILL BE PAID FOR ANY REQUIRED TRANSITIONS OR OTHER SPECIAL CHANGE SHAPE PIECES.
24. CUTTING, BORING, SAWCUTTING OR DRILLING THROUGH THE STRUCTURAL ELEMENTS TO BE DONE ONLY WHEN SO DETAILED IN THE DRAWINGS OR ACCEPTED BY THE USER AND APPROVED BY ENGINEER OF RECORD. OBTAIN FACILITY APPROVAL BEFORE COMMENCING ANY WORK.
2-M-001 MECHANICAL FRONT SHEET
2-M-002 MECHANICAL EQUIPMENT SCHEDULES
2-M-003 MECHANICAL EQUIPMENT SCHEDULES
2-M-004 MECHANICAL EQUIPMENT SCHEDULES
2-MD-200 MECHANICAL SECOND FLOOR DEMOLITION PLAN
2-MH-200 MECHANICAL SECOND FLOOR PLAN
2-MH-201 MECHANICAL PIPING SECOND FLOOR PLAN
2-MH-600 MECHANICAL DETAILS
2-MH-700 MECHANICAL CONTROLS
MECHANICAL SHEET INDEX
NUMBER SHEET TITLE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
VA DALLAS PATIENT BATHROOM
RENOVATION
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-227
Building 2 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 10/5/2022
9/9/2022
95% CONSTRUCTION DOCUMENTS 11/4/2022
8/28/2023
100% CONSTRUCTION DOCUMENTS 12/2/2022
BID SET 8/28/2023
2-M-001
RDSH
MECHANICAL FRONT SHEET
.0 .0
.9 \D at aF ile s\
Pr oj ec ts
\2
2\ S6
.0
- V A
D al la s P at ie nt B at hr oo m
R en ov at io n\
M \M
-0
-M
EC
H
AN
IC
AL
F
RO
N T
SH
EE
T.
dw g, /6 /2
1:
:5
PM
, T yl er
AutoCAD SHX Text
EXP. 06-30-25
AutoCAD SHX Text E
AutoCAD SHX Text No. 29448
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
VA DALLAS PATIENT BATHROOM
RENOVATION
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-227
Building 2 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 10/5/2022
9/9/2022
95% CONSTRUCTION DOCUMENTS 11/4/2022
8/28/2023
100% CONSTRUCTION DOCUMENTS 12/2/2022
BID SET 8/28/2023
CD-2
EG-1
TYPE OVERALL DIMENSIONS (IN) NECK SIZE (IN)
DIFFUSERS/GRILLES SCHEDULE
MARK
NO.
101 - 200
CFM RANGE
MAX.
NC
0.1
MAX. S.P.
(IN WC) REMARKS
CD-1 SECURITY CEILING
DEFFUSER
6" x 6" 0 - 100 20 0.16.5" X 6.5 TITUS SPD3 SECURITY DIFFUSER
9" x 9"
SECURITY CEILING
GRILLE
9.5" x 9.5" TITUS SPD3 SECURITY DIFFUSERSECURITY CEILING
DEFFUSER
TITUS SDPCR SECURITY GRILLE6" x 6" 0 - 100 20 0.16.5" X 6.5
EG-2 SECURITY CEILING
GRILLE
101 - 200 19 0.19" x 9"9.5" x 9.5" TITUS SDPCR SECURITY GRILLE
2-M-002
RDSH
MECHANICAL EQUIPMENT
SCHEDULES
.0 .0
.9 \D at aF ile s\
Pr oj ec ts
\2
2\ S6
.0
- V A
D al la s P at ie nt B at hr oo m
R en ov at io n\
M \M
-0
-M
EC
H
AN
IC
AL
E Q
UI
PM
EN
T
SC
H
ED
UL
ES
.d w g, /1
/2
3:
:5
PM
, t yl er
AutoCAD SHX Text
EXP. 06-30-25
AutoCAD SHX Text E
AutoCAD SHX Text No. 29448
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text O
CONSTANT AIR VOLUME BOX SCHEDULE
TAG MANUFACTURER
AND MODEL NO. DESIGN
AIR FLOW (CFM)
INLET SIZE
(INCHES)
MAX.
PRESSURE
DROP (IN WC) BTU GPM
REHEAT COIL
ROWS
MTG DETAIL REMARKS
CAV/2-1 KRUEGER LMHS
CAV/2-2 REBALANCE
REBALANCE
REBALANCE
REBALANCE
REBALANCE
REBALANCE
REBALANCE
REBALANCE
REBALANCE
REBALANCE
REBALANCE
REBALANCE
REBALANCE
REBALANCE
REBALANCE
REBALANCE
REBALANCE
REBALANCE
CAV/2-3
CAV/2-4
CAV/2-5
CAV/2-6
CAV/2-7
CAV/2-8
CAV/2-9
CAV/2-10
CAV/2-11
CAV/2-12
CAV/2-13
CAV/2-14
CAV/2-15
CAV/2-16
CAV/2-17
CAV/2-18
CAV/2-19
5 80 0.1 REBALANCE
0.1
0.1
104 0.1
65 0.1
95 0.1
55 0.1
65 0.1
40 0.1
0.1
80 0.1
80 0.1
95 0.1
95 0.1
80 0.1
80 0.1
80 0.1
80 0.1
80 0.1
SERVICES
(ROOM N0.)
KRUEGER LMHS
KRUEGER LMHS
KRUEGER LMHS
KRUEGER LMHS
KRUEGER LMHS
KRUEGER LMHS
KRUEGER LMHS
KRUEGER LMHS
KRUEGER LMHS
KRUEGER LMHS
KRUEGER LMHS
KRUEGER LMHS
KRUEGER LMHS
KRUEGER LMHS
KRUEGER LMHS
KRUEGER LMHS
KRUEGER LMHS
KRUEGER LMHS
3456 0.34 0.1
3240 0.32 0.1
3240 0.32 0.1
4492 0.44 0.1
2808 0.28 0.1
4104 0.41 0.1
3240 0.32
0.1
0.1
1728 0.17 0.1
0.1
3456 0.34 0.1
3456 0.34 0.1
4104 0.41 0.1
4104 0.41 0.1
3456 0.34 0.1
3456 0.34 0.1
3456 0.34 0.1
3456 0.34 0.1
3456 0.34 0.1
TOILET 2D-203A
TOILET 2D-204A
TOILET 2D-205A
TOILET 2D-209A
TOILET 2D-210A
TOILET 2D-212A
TOILET 2D-215A
TOILET 2D-216A
TOILET 2D-333A
TOILET 2D-329A
TOILET 2D-326A
TOILET 2D-322A
TOILET 2D-317A
TOILET 2D-315A
TOILET 2D-312A
TOILET 2D-314A
TOILET 2D-309A
TOILET 2D-306A
TOILET 2D-304A
REBALANCECAV/2-20 80 0.1KRUEGER LMHS 3456 0.34 0.1 TOILET 2D-316B
3240 0.32
40 1728 0.17
CAV/2-1
CAV/2-2
CAV/2-3
CAV/2-4
CAV/2-5
CAV/2-6
CAV/2-7
CAV/2-8
CAV/2-9
CAV/2-10
CAV/2-11
CAV/2-12
CAV/2-13
CAV/2-14
CAV/2-15
CAV/2-16
CAV/2-17
CAV/2-18
CAV/2-19
CAV/2-20
MANUFACTURER
AND MODEL NO.SYMBOL
SERVICE
CFM RPM" W.G.
SP
ELECTRICAL
PHASE
EXHAUST FAN SCHEDULE
WEIGHT
(LB)
DUTY
REMARKS
VOLTS
X
EF
LOCATION
TYPE
DRIVE
HP
MOTOR
EF-6 COOK 150 SQNB 2600 1.4 1725 480 3 1101.27TOILET WAITING ROOO BELT SEE NOTES
1. INTERLOCK (OUTSIDE AIR MOTORIZED DAMPERS) .
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
VA DALLAS PATIENT BATHROOM
RENOVATION
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-227
Building 2 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 10/5/2022
9/9/2022
95% CONSTRUCTION DOCUMENTS 11/4/2022
8/28/2023
100% CONSTRUCTION DOCUMENTS 12/2/2022
BID SET 8/28/2023
2-M-003
MECHANICAL EQUIPMENT
SCHEDULES
RDSH
.0 .0
.9 \D at aF ile s\
Pr oj ec ts
\2
2\ S6
.0
- V A
D al la s P at ie nt B at hr oo m
R en ov at io n\
M \M
-0
-M
EC
H
AN
IC
AL
E Q
UI
PM
EN
T
SC
H
ED
UL
ES
.d w g, /1
/2
3:
:0
PM
, t yl er
AutoCAD SHX Text
EXP. 06-30-25
AutoCAD SHX Text E
AutoCAD SHX Text No. 29448
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text O
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
VA DALLAS PATIENT BATHROOM
RENOVATION
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-227
Building 2 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 10/5/2022
9/9/2022
95% CONSTRUCTION DOCUMENTS 11/4/2022
8/28/2023
100% CONSTRUCTION DOCUMENTS 12/2/2022
BID SET 8/28/2023
2-M-004
MECHANICAL EQUIPMENT
SCHEDULES
RDSH
.0 .0
.9 \D at aF ile s\
Pr oj ec ts
\2
2\ S6
.0
- V A
D al la s P at ie nt B at hr oo m
R en ov at io n\
M \M
-0
-M
EC
H
AN
IC
AL
E Q
UI
PM
EN
T
SC
H
ED
UL
ES
.d w g, /1
/2
3:
:1
PM
, t yl er
AutoCAD SHX Text
EXP. 06-30-25
AutoCAD SHX Text E
AutoCAD SHX Text No. 29448
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text O
BUILDING 2
2'-2"24'-0"
'-7
FI
EL
D V
ER
IF
Y
3'- 2"
4'-
6'-
1'-
5"
8'- 3"
7'-
2'-10"
2"
3'-0" 20'-0" 8'-7" 1'-5" 22'-4"1'-5" 1'-5"
167'-4" 23'-9"
3'-5"
1'- 5"
6'-
0"
'-41 2"
7'- 8"
14'-6" 5'-6"
1'-1 12"
14'-11 14" 814" 1'-0" 6'-6"
7'-912" 16'-2 12" 5'-1 34" 2'-3" 15'-6"
1'-114"
4'-7"
4'-11" 14'-6"
14'-5"
12'-9"
1'-6"
8'-0" 8'-712"10'-10"10'-3 1/4"
1'-1 12"
8'-0" 13'-0"
1'-234"
8'-0"
1'-114"
13'-1 1 4" 8'-2"
8'-0"
13'-2 3/4" 1'-8"
11'-4" 13'-3"
8'-014"
11'-6"
2'-834"
22'-1012"
17'-514" 2'-5" 8'-0" 9'-9" 12'-3"
7'-7"
8'-0"
1'-8"
8'-5" 20'-3" 8'-0"
32'-4" 1'-4"
4'-5"
11'-3 3 8" 8'-0" 1'-112"
5'-114"
8'-0"
9'-23 4"
8'-0" 8'-0"
1'-23 4" 5'-5"
1'-1 14"
2'- 2"
3'- 8"
8" 6"
21 2"
'-83
4" 7'-
5" 6'-
1" 6'-
11 4"
7'- 61 4"
'-1
1"
'-5 1/
2"
2'-
7'- 1"
'-1
03 4"
2'- 4"
8'- 0"
3'-
'-2 1 4"
4'- 1"
3'- 8"
'-2
6'- 7"
6'- 7"
1'-1
4" 7'-7"
2'- 43 4"
'-51 4"
7'- 5"
3'- 51 4"
'-5
'-71 2"
17'-714" 1'-33 4"
11'-9"
1'-1 12"
5'- 31 8"
11'-1112"
8'- 0"
8'- 81 2"
8'- 0"
3'- 5"
1 2"
5'- 41 2"
2'- 81 2"
3'- 7"
6'- 111 2"
2'- 4"
5'- 0"
9'- 1"
9"
6'- 61 2"
3'- 4"
2'-0"
2'- 2"
4'-6" CLR.
5'- 9"
7'-0"
'-0
'-1
01 2"
2'- 11 2"
1'- 0"
TY
P.
3'- 2"
CL
R.
7'-10"
7'- 8"
'-13 4"
5"
9'- 1"
1'-5"
2'-7 5/8"
EQ. EQ. 1'-5"
2'-7 5/8"2'-7 5/8"
EQ.
2'-7 5/8"
EQ. EQ.
2'-7 5/8"
EQ. 1'-5"
2'-7 5/8"
1'-5"
2'-7 5/8"
1'- 5"
DAYROOM
DAYROOM
MECHANICAL
ROOM
NURSE STATION
MEDICATION
NOURISH.
NURSE STATION
CONFERENCE/
REPORT ROOM
NURSE
WORKROOM
NURSE
WORKROOM
MEDICATION
NURSING
SUPERVISOR
DEMONSTRAT.
CLASSROOM
BLDG. MGMT.
EQUIP. ROOM
DIETICIAN'S
OFFICE
CLEAN
LINEN
CLEAN
LINEN
REHAB.
THERAPIST
REHAB.
TECHNICIAN
QUIET
ROOM
SOCIAL
WORKER
MULTIPURPOSE
OFFICE
PSYCHOLOGIST
OFFICE
MECHANICAL
ANTE
ROOM
INTERVIEW/
CONSULTATION
INTERVIEW/
CONSULTATION
DATA
ROOM
HAC
HAC
SECL.
ROOM
ANTE
ROOM
SECL.
ROOMPATIENT
ROOM (1)
PATIENT
ROOM (2)
PATIENT
ROOM (1)
PATIENT
ROOM (1)
PATIENT
ROOM (1)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
DATA
ROOM
FAMILY VIST
ROOM
FAMILY VIST
ROOM
PSYCHIATRIST
OFFICE
BATHING
FACILITIES
PHYSICIAN
ASSIST.
ROUNDING
ROOM
CONF./
REPORT RM.
PATIENT
LAUNDRY
NOURISH.
PATIENT
PROPERTY
STORAGE
EQUIPMENT
STORAGE
WARD
CLERKSTAFF
OFFICE
CLEAN
UTILITY
CLEAN
UTILITY
SOILED
UTILITY
SOILED
LINEN
WARD
CLERK
INTERVIEW/
CONSULTATION
INTERVIEW/
CONSULTATION
STUDENT
WORKROOM
PATIENT
ROOM (2)PATIENT
ROOM (1)
FUTURE
ELEVATORS
FUTURE
ELEVATORS
DINING
ROUNDING
ROOM
PATIENT
ROOM (1)
PATIENT
ROOM (1)
FOOD
CARTS
DINING
PATIENT
ROOM (1)
STAFF
OFFICE
STAFF
OFFICE
STAFF
OFFICE
ELECTRICAL
HEAD NURSE
OFFICE
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
VESTIB.
VESTIB.
VESTIB.
STAFF
LOUNGE/
LOCKERS
WOMEN
STAFF TLT.
MEN
STAFF TLT.
QUIET
ROOM
QUIET
ROOM
QUIET
ROOM
ELECTRICALLOBBY
CORRIDOR CORRIDOR
TOILETCORRIDOR
CORRIDOR
STAIR
NO. 10
CORRIDORCORRIDOR
CORRIDOR
PSYCHIATRIST
OFFICE
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
TOILET
CORRIDOR
STAIR
NO. 9
CORRIDOR
CORRIDOR
VESTIB.
TOILET TOILET
WAITING
FUTURE
STAIR
STAIR
NO. 5
SOILED
LINEN
SOILED
UTILITY
NON-FOOD
STORAGE
CORRIDOR
FOOD
CARTS
NON
FOOD
STORAGE
DW
DW
STAIR
NO. 11
DW
EXAM ROOM
EXAM ROOM
EXAM ROOM
EXAM ROOM
LINEN
CHUTE
STRETCHER/
WHEELCHAIR
STORAGE ALCOVE
CRASH
CARTS
STRETCHER/
WHEELCHAIR
STORAGE ALCOVE
24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 18'-11"24'-0"20'-0"12'-2"
'-8
'-8
'-8
'-7
'-0
4'-
0"
'-1 0"
4'- 0"
'-0
4'-
0"
4'-0" 20'-0" 4'-0" 20'-0" 4'-0" 20'-0" 4'-0" 12'-0"8'-0" 23'-4" 12'-0"
6'-8"
7'- 4"
7'-3" 7'-7" 11'-034" 10'-112"
5'-11" 7'-0"
13'-914" 10'-4 78" 8'-0" 3'-0" 12'-012" 13'-4" 6'-712" 3'-2" 8'-0" 3'-0" 11'-8 1/2" 8'-0"
19'-3" 7'-3" 8'-6 14" 2'-9"
3'-9" 3'-0" 9'-714" 8'-0"6'-11"
13'-2 3/4" 10'-11 3/8" 3'-0" 10'-012" 8'-814" 8'-0" 11'-718"
10'-512" 16'-0" 9'-4 14" 9'-11" 3'-6"
6'-53 4"
8'- 9"
'-5
'-5
'-5
7'-
01 2" 5'-
6"
'-5
1/ 2"
8'- 5"
6'-
9'- 7"
'-9
3/ 4"
'-9
6'-
5"
'-33 4"
'-33 4"
'-33 4"
'-5
'-5
8'-
101 2"
'-5
13'-212"
8'- 5"
'-1
'-1
'-1
6'-
31 2" 9'-
51 2"
7'- 2"
8'- 5"
'-9
7'-
7"
'-3
4'-
0"
'-8
5'- 0"
5'- 6"
4'- 2"
4'-
4'-
6"
8'-4"11'-3"
A.
10 8 7 6 5 4 3 2 116 15 14 13 1217
N M
J
A C
D E
F G
H K
B
1 1
1 1
1 1
POINT OF DISCONNECTION
( TYP)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
VA DALLAS PATIENT BATHROOM
RENOVATION
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-227
Building 2 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 10/5/2022
9/9/2022
95% CONSTRUCTION DOCUMENTS 11/4/2022
8/28/2023
100% CONSTRUCTION DOCUMENTS 12/2/2022
BID SET 8/28/2023
NORTH
MECHANICAL DEMOLITION SECOND FLOOR PLAN
ED
SCALE: 1/8" = 1'-0"
2-MD-200
MECHANICAL DEMOLITION SECOND
FLOOR PLAN
RDSH
GENERAL NOTE
1. CONTRACTOR TO CAP AND SEAL AIR TIGHT FOR EXISTING DUCT
DEMOLITION KEY NOTE
1 DEMO EXISTING GRILLES AND DIFFUSERS (TYP.)
2 DEMO PORTION OF EXISTING DUCTWORK INCLUDING
EXISTING VOLUME DAMPER AND CAP DUCT AIR TIGHT.
THAT HAS BEEN DEMO.
3 DEMO PORTION OF EXISTING DUCTWORK INCLUDING
EXISTING VOLUME DAMPER AND CAP DUCT AIR TIGHT.
4 DEMO EXISTING EF-6 AND ASSOCIATED DUCTWORK AND
LOUVERS
.0 .0
.9 \D at aF ile s\
Pr oj ec ts
\2
2\ S6
.0
- V A
D al la s P at ie nt B at hr oo m
R en ov at io n\
M \M
D -2
-M
EC
H
AN
IC
AL
D
EM
O
LI
TI
O N
S
EC
O N
D F
LO
O
R
PL
AN
.d w g, /1
/2
3:
:3
PM
, t yl er
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
EXP. 06-30-25
AutoCAD SHX Text E
AutoCAD SHX Text No. 29448
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CURTAIN
TRACKS
BUILDING
EXPANSION JOINT
BUILDING
EXPANSION JOINT
BUILDING
EXPANSION JOINT
D 1/
2- A5
D 1/
2- A5
D 1/
2- A5
D 1/
2- A5
R4'-0"
90°
8"
CURTAIN
TRACK
R4'-0
90°
8"
CURTAIN
TRACK
R4'-0"
90°
8"
R4'-0
90°
8"
CURTAIN
TRACK
CURTAIN
TRACK
R1'-1 1"
R1'-11"
AL
IG
N
4'-8"
6'- 9"
5'-
TY
P.
E4 /2
-A
TY
P.
F4 /2
-A
TY
P.
F4 /2
-A
EQ
EQ
C4/A520
C 4/
A5
C4/A520
EQ
EQ
EQ
EQ
11'-0" 11'-0"
11'-0" 11'-0"
10'-0"
10'-0"
8'-0" 8'-0"
8'-0"
9'-6"
9'-6" 9'-6"
9'-6"
C D
E F
G
2 3 4 5 6 101213 17 8
K
141617
STAIR
NO. 5
B A
DW
DW
DW
O A V
O A V
O A V
A V
O
H
N M
J A.
MECHANICAL
ROOM
CONFERENCE/
REPORT ROOM
NURSE
WORKROOM
NURSE
WORKROOM
NURSING
SUPERVISOR
DEMONSTRAT.
CLASSROOM
BLDG. MGMT.
EQUIP. ROOM
DIETICIAN'S
OFFICE
CLEAN
LINEN
CLEAN
LINEN
REHAB.
THERAPIST
REHAB.
TECHNICIAN
QUIET
ROOM
SOCIAL
WORKER
MULTIPURPOSE
OFFICE
PSYCHOLOGIST
OFFICE
ANTE
ROOM
INTERVIEW/
CONSULTATION
INTERVIEW/
CONSULTATION
DATA
ROOM
SECL.
ROOM
ANTE
ROOM
SECL.
ROOMPATIENT
ROOM (1)
PATIENT
ROOM (2)
PATIENT
ROOM (1)
PATIENT
ROOM (1)
PATIENT
ROOM (1)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
DATA
ROOM
FAMILY VIST
ROOM
FAMILY VIST
ROOM
PSYCHIATRIST
OFFICE
BATHING
FACILITIES
PHYSICIAN
ASSIST.
ROUNDING
ROOM
CONF./
REPORT RM.
PATIENT
LAUNDRY
PATIENT
PROPERTY
STORAGE
EQUIPMENT
STORAGE
WARD
CLERKSTAFF
OFFICE
CLEAN
UTILITY
CLEAN
UTILITY
SOILED
UTILITY
SOILED
LINEN
WARD
CLERK
INTERVIEW/
CONSULTATION
INTERVIEW/
CONSULTATION
STUDENT
WORKROOM
PATIENT
ROOM (2)PATIENT
ROOM (1)
FUTURE
ELEVATORS
FUTURE
ELEVATORS
ROUNDING
ROOM
PATIENT
ROOM (1)
PATIENT
ROOM (1)
FOOD
CARTS
PATIENT
ROOM (1)
STAFF
OFFICE
STAFF
OFFICE
STAFF
OFFICE
HEAD NURSE
OFFICE
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
VESTIB.
VESTIB.
VESTIB.
STAFF
LOUNGE/
LOCKERS
WOMEN
STAFF TLT.
MEN
STAFF TLT.
QUIET
ROOM
QUIET
ROOM
QUIET
ROOM
2D-101
LOBBY
2D-100
2D-105
2D-102
2D-200
2D-201
2D-202
2D-203
2D-203A 2D-204 2D-204A
2D-205
2D-205A
2D-200
2D-207A
2D-206
2D-207
2D-207B
2D-208
2D-208A
2D-207A
2D-208B
2D-209A 2D-209 2D-210
2D-210A
2D-211
2D-213
2D-212
2D-213A
TOILET
2D-212A
2D-214 2D-215
2D-216A
2D-2162D-216B 2D-217
2D-200
2D-300
2D-301
2D-302 2D-301A
2D-303A
2D-303
2D-305
2D-304 2D-305A
2D-306
STAIR
NO. 10
2D-307
2D-308
2D-309
2D-310
2D-311
2D-312
2D-4002D-400
2D-401
2D-403B 2D-403A
2D-402
2D-403
2D-401A
2D-404
2D-405
2D-406A
2D-406 2D-406B
2D-407A
2D-4072D-408
2D-408A
2D-409A
2D-409
2D-410
2D-411
2D-412 2D-604
2D-703
2D-216C
2D-414C
2D-414B
2D-414
2D-414A
2D-500
2D-501
2D-502
2D-503
2D-504
2D-505
2D-506
PSYCHIATRIST
OFFICE
2D-507
2D-508A 2D-507A
2D-508
2D-509
2D-509A
2D-510
2D-511
2D-600
2D-603
2D-602
2D-601 2D-607
2D-606
2D-605
2D-608
2D-609
2D-700
2D-800
2D-800
2D-704
2D-705
2D-706
2D-707 2D-701
2D-708
2D-702
2D-708A
TOILET
2D-806
2D-805
2D-803
2D-804
2D-807
2D-8012D-801
2D-900
2D-909
2D-908
2D-901
2D-902
2D-903
2D-904
2D-905
2D-906
2D-907
STAIR
NO. 9
2D-700
2D-900
VESTIB.
2D-104 2D-103
2D-101A
2D-106
2D-101B
FUTURE
STAIR
STAIR
NO. 5
SOILED
LINEN
SOILED
UTILITY
NON-FOOD
STORAGE
2D-800
FOOD
CARTS
NON
FOOD
STORAGE
STAIR
NO. 11
EXAM ROOM
EXAM ROOM
EXAM ROOM
EXAM ROOM
LINEN
CHUTE
2D-800B
CRASH
CARTS
DAYROOM
DAYROOM
NURSE STATION
MEDICATION
NOURISH.
NURSE STATION
MEDICATION
MECHANICAL
HAC
HAC
NOURISH.
DINING
DINING
ELECTRICAL
ELECTRICAL
CORRIDOR CORRIDOR
CORRIDOR
CORRIDOR
CORRIDORCORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
TOILET TOILET
WAITING
CORRIDOR
GENERAL NOTE
1. PROVIDE ACCESS PANEL FOR ALL NEW INSTALLED CAV
BOXES
CONSTRUCTION KEY NOTE
1 CAP EXISTIMG DUCT AIR TIEGHT
CAV
2-19
CAV
2-1
CAV
2-3
CAV
2-4
CAV
2-5
CAV
2-6
CAV
2-7
CAV
2-8
CAV
2-10
CAV
2-9
CAV
2-11
CAV
2-12
CAV
2-13CAV
2-14
CAV
2-15
CAV
2-16
CAV
2-17
CAV
2-18
105 CFM (EA)
80 CFM (SA)
CAV
2-2
2D-203A
A
BUILDING 2
BUILDING 2
CONNECTION
TO BLDG. 2
ROOF
BUILDING 4
ROOF
PLANTER
FENCE FENCE
GATE
PATIO
PATIO
E9 2-A401
D8 2-A401
D9 2-A401
F1 2-A401
E3 2-A401
F3 2-A401
E5 2-A401
F5 2-A401
F8 2-A401
F6 2-A401
B1 2-A401
B3 2-A401
D6 2-A401
MB1
REF.
(VC)
REF.
(VC)
MB1
MB2
MB2
TB1
DAYROOM
DAYROOM
MECHANICAL
ROOM
NURSE STATION
MEDICATION
NOURISH.
NURSE STATION
CONFERENCE/
REPORT ROOM
NURSE
WORKROOM
NURSE
WORKROOM
MEDICATION
NURSING
SUPERVISOR
DEMONSTRAT.
CLASSROOM
BLDG. MGMT.
EQUIP. ROOM
DIETICIAN'S
OFFICE
CLEAN
LINEN
CLEAN
LINEN
REHAB.
THERAPIST
REHAB.
TECHNICIAN
QUIET
ROOM
SOCIAL
WORKER
MULTIPURPOSE
OFFICE
PSYCHOLOGIST
OFFICE
MECHANICAL
ANTE
ROOM
INTERVIEW/
CONSULTATION
INTERVIEW/
CONSULTATION
DATA
ROOM
HAC
HAC
C D
E F
G
2 3 4 5 6 101213
SECL.
ROOM
ANTE
ROOM
SECL.
ROOMPATIENT
ROOM (1)
PATIENT
ROOM (2)
PATIENT
ROOM (1)
PATIENT
ROOM (1)
PATIENT
ROOM (1)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
PATIENT
ROOM (2)
DATA
ROOM
FAMILY VIST
ROOM
FAMILY VIST
ROOM
PSYCHIATRIST
OFFICE
BATHING
FACILITIES
PHYSICIAN
ASSIST.
ROUNDING
ROOM
CONF./
REPORT RM.
PATIENT
LAUNDRY
NOURISH.
PATIENT
PROPERTY
STORAGE
EQUIPMENT
STORAGE
WARD
CLERKSTAFF
OFFICE
CLEAN
UTILITY
CLEAN
UTILITY
SOILED
UTILITY
SOILED
LINEN
WARD
CLERK
INTERVIEW/
CONSULTATION
INTERVIEW/
CONSULTATION
STUDENT
WORKROOM
PATIENT
ROOM (2)
PATIENT
ROOM (1)
FUTURE
ELEVATORS
FUTURE
ELEVATORS
DINING
ROUNDING
ROOM
PATIENT
ROOM (1)
PATIENT
ROOM (1)
FOOD
CARTS
DINING
PATIENT
ROOM (1)
STAFF
OFFICE
STAFF
OFFICE
STAFF
OFFICE
ELECTRICAL
HEAD NURSE
OFFICE
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
TOILET
VESTIB.
VESTIB.
VESTIB.
STAFF
LOUNGE/
LOCKERS
WOMEN
STAFF TLT.
MEN
STAFF TLT.
QUIET
ROOM
QUIET
ROOM
QUIET
ROOM
ELECTRICAL
7 8
LOBBY
CORRIDOR CORRIDOR
TOILETCORRIDOR
CORRIDOR
STAIR
NO. 10
CORRIDORCORRIDOR
2D-317A
CORRIDOR
PSYCHIATRIST
OFFICE
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
TOILET
CORRIDOR
STAIR
NO. 9
CORRIDOR
CORRIDOR
K
141617
VESTIB.
TOILET TOILET
WAITING
FUTURE
STAIR
STAIR
NO. 5
SOILED
LINEN
SOILED
UTILITY
NON-FOOD
STORAGE
CORRIDOR
B A
FOOD
CARTS
NON
FOOD
STORAGE
DW
DW
STAIR
NO. 11
DW
EXAM ROOM
EXAM ROOM
EXAM ROOM
EXAM ROOM
LINEN
CHUTE
STRETCHER/
WHEELCHAIR
STORAGE ALCOVE
2D-800A
CRASH
CARTS
STRETCHER/
WHEELCHAIR
STORAGE ALCOVE
2D-800A
O A V
O A V
O A V
A V
O
H
N M
J A.
2D-101
2D-100
2D-105
2D-102
2D-200
2D-201
2D-202
2D-203
2D-203A 2D-204 2D-204A
2D-205
2D-205A
2D-200
2D-207A
2D-206
2D-207
2D-207B
2D-209
2D-209A
2D-207A
2D-209B
2D-210A 2D-210 2D-212
2D-212A
2D-211
2D-216
2D-215
2D-216A 2D-215A
2D-214 2D-215
2D-216A
2D-2162D-216B 2D-217
2D-200
2D-300
2D-333
2D-302 2D-333A
2D-329A
2D-329
2D-326
2D-304 2D-326A
2D-306
2D-307
2D-308
2D-309
2D-310
2D-311
2D-312
2D-4002D-400
2D-322
2D-403B 2D-403A
2D-402
2D-403
2D-322A
2D-404
2D-317
2D-316A
2D-316 2D-316B
2D-315A
2D-3152D-314
2D-314A
2D-312A
2D-312
2D-410
2D-411
2D-412 2D-604
2D-703
2D-216C
2D-414C
2D-414B
2D-414
2D-414A
2D-500
2D-501
2D-502
2D-503
2D-504
2D-505
2D-506 2D-309
2D-306A 2D-309A
2D-306
2D-304
2D-304A
2D-510
2D-511
2D-600
2D-603
2D-602
2D-601 2D-607
2D-606
2D-605
2D-608
2D-609
2D-700
2D-800
2D-800
2D-704
2D-705
2D-706
2D-707 2D-701
2D-708
2D-702
2D-708A
2D-806
2D-805
2D-803
2D-804
2D-807
2D-8012D-801
2D-900
2D-909
2D-908
2D-901
2D-902
2D-903
2D-904
2D-905
2D-906
2D-907 2D-700
2D-900 2D-104 2D-103
2D-101A
2D-106
2D-101B
2D-800
2D-800B
90 CFM (EA)
75 CFM (SA )
90 CFM (EA)
75 CFM (SA)
130 CFM (EA)
90 CFM (SA)
120 CFM (EA)
80 CFM (SA)
80 CFM (EA)
65 CFM (SA)
80 CFM (EA)
65 CFM (SA)
60 CFM (EA)
40 CFM (SA)
40 CFM (SA)
60 CFM (EA)
80 CFM (SA)
100 CFM (EA)
100 CFM (EA)
75 CFM (SA)
120 CFM (EA)
80 CFM (SA)
120 CFM (EA)
60 CFM (SA)
70 CFM (EA) 80 CFM (SA)100 CFM (EA)
80 CFM (SA)
80 CFM (SA)
100 CFM (EA)
100 CFM (EA)
100 CFM (EA)
80 CFM (SA)
80 CFM (SA)
100 CFM (EA)
80 CFM (SA)
CAV
2-20
2 VOLUME DAMPER
22222
2 2 2
2 2
80 CFM (EA)
65 CFM (EA)
RELIEF LOUVER
32X10
X1
X1
8X8
NEW
ALTERN ATE :
1. RELPACE EXISTING EF-6 WITH NEW
2. PROVIDE NEW DUCTWORK AND MOTORIZED
OSA DAMPER INTERLOCK WITH EF-6
3. LOCATE EF-6 IN WAITING 2D-102 , PROVIDE
4. ACCESS PANEL FOR FAN SERVICE
REMOVE
8X8 EA DUCT
AND CAP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID SET
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
VA DALLAS PATIENT BATHROOM
RENOVATION
4500 S. Lancaster Rd. Dallas, Texas 75216
549-22-227
Building 2 Project Director
Revisions: Date:
STAMP35% SCHEMATIC DESIGN
65% DESIGN DEVELOPMENT 10/5/2022
9/9/2022
95% CONSTRUCTION DOCUMENTS 11/4/2022
8/28/2023
100% CONSTRUCTION DOCUMENTS 12/2/2022
BID SET 8/28/2023
NORTH
MECHANICAL SECOND FLOOR PLAN
MH
SCALE: 1/8" = 1'-0"
2-MH-200
MECHANICAL SECOND FLOOR PLAN
RDSH
.0 .0
.9 \D at aF ile s\
Pr oj ec ts
\2
2\ S6
.0
- V A
D al la s P at ie nt B at hr oo m
R en ov at io n\
M \M
H -2
-M
EC
H
AN
IC
AL
S
EC
O
N D
F
LO
O R
P
LA
N .d w g, /1
/2
3:
:4
PM
, t yl er
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
EF
AutoCAD SHX Text
AutoCAD SHX Text
EXP. 06-30-25
AutoCAD SHX Text E
AutoCAD SHX Text No. 29448
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SPECIFIC NOTE
1. HOT TAP CAV BOX PIPING TO (E) HWS/R MAIN LOOP
GENERAL NOTE
1. CONTRACTOR TO BALANCE GPM FLOW(SEE SCHEDULE
2M-003) FOR EACH NEW VAVBOX
CAV
2-19
CAV
2-1
CAV
2-3
CAV
2-4
CAV
2-5
CAV
2-6
CAV
2-7
CAV
2-8
CAV
2-10
CAV
2-9
CAV
2-11
CAV
2-12
CAV
2-13
CAV
2-14
CAV
2-15
CAV
2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .