36C25723Q0209- Waco Security Lighting and Install RFI / Questions
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 674-23-1-5065-0414 Department of Veterans Affairs Network Contracting Office (NCO-17) 1901 Veterans Memorial Dr. Building 171 Temple TX 76504 Department of Veterans Affairs Network Contracting Office (NCO-17) 1901 Veterans Memorial Dr. Building 171 Temple TX 76504 To all Offerors/Bidders
36C25723Q0209 01-23-2023
X x x
See CONTINUATION Page The purpose of this amendment is to post questions and answers and provide picture reference of existing light pole type.
Please submit all quotes/proposals via email to cassandra.king@va.gov NO LATER THAN Wednesday, January 25, 2023, 10:00, CST.
Makarim Abdul-Jabbar Contracting Officer
CONTINUATION PAGE
1. For Bldg 10, for the additional wire to be pulled, where are the previous pole and succeeding pole from the one that needs to be reset?
Ans: In the parking directly across to the other island.
2. During the site visit, it was mentioned that the fuse blocks will not be needed. Can you confirm that they will or will not be needed for this project?
Ans: No, fuse blocks are needed for this project.
3. It would be beneficial to have in-line fuses installed on each pole. Does the VA want inline fuses for each pole?
Ans: No, in-line fuses are needed.
4. Where are photo-eyes to be installed (at the beginning of each circuit, on each light pole, or on each fixture)?
Ans: I will only one photo-eye for each new pole installed at the beginning of each new the circuit.
5. Please confirm the number of light poles to be removed and reset at Bldg 94.
Ans: 1 with 480 V.
6. Please confirm the number of light poles to be removed and reset at Bldg 10.
Ans: 1 with 277 V
7. Are the existing light poles at Bldgs 10 and 94 to be reused or is a new light pole altogether to be installed?
Ans: Light Poles for Buildings 10/94 will be reused.
8. For the light poles at Bldgs 94 and 10, please confirm what existing wire is to be removed and what new wire is to be installed.
Ans: 94 – 2 wires from 2 different due to being daisy chained. 10-1 wire directly across from the island.
9. What is the voltage for each light to be installed.
Existing Light Poles:
94 – 480V 10 – 277V New Light Poles 90/91 – 208V (power coming from Generator Room) 91/92 – 208V (power coming from inside of Building 92) 92/93 – 208V (power coming from Generator Room)
10. Please provide concrete dimensions for all new concrete pedestals.
Existing Light poles Building 10 and 94. 8ft below grade and 1 ft above grade. New poles refer to manufactures specification base for these poles.
11. Are photo-eyes or timers to be installed on all light poles for this project?
Ans: Photo eyes
12. Can the VA provide utility plans in this RFI where fiber optic may be encountered?
Ans: Currently this is unknown due to changes over the years.
13. Could this project be sole sourced?
Ans: No
14. Could another Site Visit be considered due to the turn-around time being short, even if scheduled one on one?
Ans: No, due to time constraints
15. Are all lights being replaced even if they are in working order?
No, lights are being replaced.
16. When is the anticipated start date?
Ans: ASAP when the contractor receives the NTP
17. Is there a current incumbent?
Ans: No
18. How many fixtures are not in working order?
Ans: All fixtures are currently working.
19. How many new fixtures will need to be installed?
Ans: Refer to SOW which is stated how many fixtures need per new light pole, ( all lights need to be 400 Watts each)
20. Are there any major electrical issues that need to be addressed currently?
Ans: None
21. Do you have any photos or specific details for the lights that are currently on-site? Do you have an photos of the light poles or parking lots? How many additional light poles are being requested?
Ans: Photo will be submitted. You can add up 4 lights to each side of the pole.
22. Requesting information regarding the drawing that shows exactly where the new poles will be located, in order to compose an accurate quote to the satisfaction of the government.
Ans: Location was site seen at site visit. Government is not responsible for any misconceptions if the site was not visited.
23. Can you provide any prints or aerial photos showing locations? Do you have any specs for the poles?
Ans: We don’t know any drawings for aerial views for the locations. No specs, match existing light that was provided for the new poles.
New Light poles must match this existing light pole which is 30 ft. You can add lights to it as well. Lead times are low.