Attachment B Consolidated RFI with answers.pdf

PDF 46 KB Posted

Attached to
Y1DA--674A4-22-004 NRM Repair Entry Bldg. 94
Solicitation number
36C25722Q0767
Issued by

View the file

Other files

File Type Posted
Attachment A 94 Utility map.pdf PDF
36C25722Q0767 0004.docx DOCX document
36C25722Q0767 0003.docx DOCX document
36C25722Q0767 0002.docx DOCX document
BLDG 94 SHEET 1 .pdf PDF
Specifications - - Repair Entry Bldg. 94 .docx DOCX document
36C25722Q0767 0001.docx DOCX document
BLDG 94 COVER SHEET .pdf PDF
BLDG 94 SHEET 2 .pdf PDF
BLDG 94 SHEET 3 .pdf PDF
BLDG 94 SHEET 2.pdf PDF
BLDG 94 COVER SHEET.pdf PDF
BLDG 94 SHEET 3.pdf PDF
Attachment A OSHA - EMR Requirement.docx DOCX document
BLDG 94 SHEET 1.pdf PDF
Specifications - - Repair Entry Bldg. 94.docx DOCX document
36C25722Q0767_1.docx DOCX document
Attachment B SELF-PERFORMED CALCULATIONS 9-5-2019.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Consolidated RFI(s)

36C25722Q0767

NRM Repair Entry Bldg. 94, Project #674A-18-004

Q1 Are there underground utilities at pier locations?

A1 See attached utility drawing. It is the General Contractors responsibility to locate utilities. It also the General Contractors responsibility to repair any utilities that damaged during this construction project.

Q2 Is the brick provided for this project? If so, what is the brick mixture requirements.

A2 The general Contractor is to provide all masonry and accessories. The brick is to be #100 Texas Red Common. The Cast Stone is to be Dark Bluff by Terracon or approved equal.