Pre-Bid RFI 8 - 13 Consolidated.docx

DOCX document 14 KB Posted

Attached to
Y1DA--549-22-191 Replace Isolation Valves & Correct Plumbing Phase 2 Federal contract opportunity
Solicitation number
36C25722B0039
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

This document contains responses to contractor questions regarding Solicitation Number 36C25722B0039 to replace isolation valves and correct plumbing at a Department of Veterans Affairs medical facility. The solicitation involves replacing valves and RPZs, which may require night and weekend work. Contractors will be responsible for obtaining keys to access areas and shutting off valves without VA assistance. Work can begin after 5 PM on weekdays and at 6 AM on weekends. The project does not allow pro press joining. Confined space work in an electrical room with a 2 foot crawl space will require contractors to specify how lines will be frozen and negative pressure maintained for soldering or bracing.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--549-22-191 Replace Isolation Valves & Correct Plumbing Phase 2, newest first.
File Type Posted
36C25722B0039 0005.docx DOCX document
BUILDING 2J ADDENDUM 1 Part2.pdf PDF
BUILDING 2J ADDENDUM 1 Part1.pdf PDF
BUILDING 2J ADDENDUM 1 Part1A.pdf PDF
VALVES QUANTITIES.pdf PDF
AnswersTo RFIsIFB-36C25722B0039.docx DOCX document
36C25722B0039 0004.docx DOCX document
549-22-191 - Site Visit Attendance.pdf PDF
36C25722B0039 0003.docx DOCX document
Dallas VA Campus Building 9 Instructions.pdf PDF
36C25722B0039 0002.docx DOCX document
Bldg 2J Insp_MgmtPlan FINAL.pdf PDF
36C25722B0039 0001.docx DOCX document
2013-07-13_-_BUILDING_2J_IFC_DRAWINGS.pdf PDF
2013-07-13_-_BLD._2J_-_IFC_NARRATIVE Rev1.pdf PDF
100 _CD_SPECIFICATIONS - PHASE 2.pdf PDF
36C25722B0039_1.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI’s – IFB 36C25722B0039 PROJECT # 549-22-191

1. We need to know if this will be nights and weekends to replace the valves and RPZs.

Nights and weekends will be allowed on this project. Valves and systems may need to be replaced at nights and weekends based on the contractor’s proposed method of replacement and impact to the facility.

1. Will the VA have a VA representative working with us to open doors and shut off existing valves for us to replace the valves?

VA will not provide a representative to escort the contractor at all times during this project. The contractor will need to request for keys in order to access the doors. The contractor will be responsible and liable for keys they are assigned. VA will not provide a representative to shut off existing valves. The contractor will be responsible to shut off valves based on their proposed method of isolating the line to replace the valves.

1. What time can we start if work is done after hours M thru F

After hours on regular work days start after 05:00 p.m..

1. What time can we start on weekend Saturday and Sunday

Contractor can start work on weekends at 06:00 a.m..

1. This project requires no pro press , correct?

1. On walk thru the COR and Architect said they will have a details for confined space for electrical room that has 2 ft crawl space how should we approach this area and where can we freeze lines at and how can we have negative pressure for soldering or bracing Answered