Pre-Bid RFI 8 - 13 Consolidated.docx
DOCX document 14 KB Posted
- Attached to
- Y1DA--549-22-191 Replace Isolation Valves & Correct Plumbing Phase 2 Federal contract opportunity
- Solicitation number
- 36C25722B0039
About this file
This document contains responses to contractor questions regarding Solicitation Number 36C25722B0039 to replace isolation valves and correct plumbing at a Department of Veterans Affairs medical facility. The solicitation involves replacing valves and RPZs, which may require night and weekend work. Contractors will be responsible for obtaining keys to access areas and shutting off valves without VA assistance. Work can begin after 5 PM on weekdays and at 6 AM on weekends. The project does not allow pro press joining. Confined space work in an electrical room with a 2 foot crawl space will require contractors to specify how lines will be frozen and negative pressure maintained for soldering or bracing.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25722B0039 0005.docx | DOCX document | |
| BUILDING 2J ADDENDUM 1 Part2.pdf | ||
| BUILDING 2J ADDENDUM 1 Part1.pdf | ||
| BUILDING 2J ADDENDUM 1 Part1A.pdf | ||
| VALVES QUANTITIES.pdf | ||
| AnswersTo RFIsIFB-36C25722B0039.docx | DOCX document | |
| 36C25722B0039 0004.docx | DOCX document | |
| 549-22-191 - Site Visit Attendance.pdf | ||
| 36C25722B0039 0003.docx | DOCX document | |
| Dallas VA Campus Building 9 Instructions.pdf | ||
| 36C25722B0039 0002.docx | DOCX document | |
| Bldg 2J Insp_MgmtPlan FINAL.pdf | ||
| 36C25722B0039 0001.docx | DOCX document | |
| 2013-07-13_-_BUILDING_2J_IFC_DRAWINGS.pdf | ||
| 2013-07-13_-_BLD._2J_-_IFC_NARRATIVE Rev1.pdf | ||
| 100 _CD_SPECIFICATIONS - PHASE 2.pdf | ||
| 36C25722B0039_1.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI’s – IFB 36C25722B0039 PROJECT # 549-22-191
1. We need to know if this will be nights and weekends to replace the valves and RPZs.
Nights and weekends will be allowed on this project. Valves and systems may need to be replaced at nights and weekends based on the contractor’s proposed method of replacement and impact to the facility.
1. Will the VA have a VA representative working with us to open doors and shut off existing valves for us to replace the valves?
VA will not provide a representative to escort the contractor at all times during this project. The contractor will need to request for keys in order to access the doors. The contractor will be responsible and liable for keys they are assigned. VA will not provide a representative to shut off existing valves. The contractor will be responsible to shut off valves based on their proposed method of isolating the line to replace the valves.
1. What time can we start if work is done after hours M thru F
After hours on regular work days start after 05:00 p.m..
1. What time can we start on weekend Saturday and Sunday
Contractor can start work on weekends at 06:00 a.m..
1. This project requires no pro press , correct?
1. On walk thru the COR and Architect said they will have a details for confined space for electrical room that has 2 ft crawl space how should we approach this area and where can we freeze lines at and how can we have negative pressure for soldering or bracing Answered