AnswersTo RFIsIFB-36C25722B0039.docx
DOCX document 15 KB Posted
- Attached to
- Y1DA--549-22-191 Replace Isolation Valves & Correct Plumbing Phase 2 Federal contract opportunity
- Solicitation number
- 36C25722B0039
About this file
This document contains answers to requests for information (RFIs) related to solicitation number 36C25722B0039 for the replacement of isolation valves and correction of plumbing at Building 2J for the Department of Veterans Affairs. The RFIs and answers provide clarification on issues such as asbestos abatement requirements, valve counts and locations, backflow preventer schedules and specifications, and whether any valves are located in confined spaces. Specifically, it is confirmed that asbestos abatement is not required due to the building construction year, updated valve quantity schedules and backflow preventer drawings are provided, and there are no known confined spaces associated with the project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BUILDING 2J ADDENDUM 1 Part1.pdf | ||
| 36C25722B0039 0005.docx | DOCX document | |
| BUILDING 2J ADDENDUM 1 Part1A.pdf | ||
| BUILDING 2J ADDENDUM 1 Part2.pdf | ||
| Pre-Bid RFI 8 - 13 Consolidated.docx | DOCX document | |
| 36C25722B0039 0004.docx | DOCX document | |
| VALVES QUANTITIES.pdf | ||
| 36C25722B0039 0003.docx | DOCX document | |
| 549-22-191 - Site Visit Attendance.pdf | ||
| Dallas VA Campus Building 9 Instructions.pdf | ||
| 36C25722B0039 0002.docx | DOCX document | |
| Bldg 2J Insp_MgmtPlan FINAL.pdf | ||
| 36C25722B0039 0001.docx | DOCX document | |
| 2013-07-13_-_BUILDING_2J_IFC_DRAWINGS.pdf | ||
| 36C25722B0039_1.docx | DOCX document | |
| 2013-07-13_-_BLD._2J_-_IFC_NARRATIVE Rev1.pdf | ||
| 100 _CD_SPECIFICATIONS - PHASE 2.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFB # 36C25722B0039 – Amendment # A00004
RFI #Pre-Bid RFI #1 — Asbestos Requirement Current Status: Resolved Description: There is a specification for the abatement for this project however the spec given does not have quantities in it. After reviewing Asbestos survey report, it appears that comprehensive survey report would tend to indicate that it doesn’t need abatement for pipe fittings or insulation. Can you please confirm this. If abatement required for this project, then provide us allowance to carry in our bid.
Comments:
it is my understanding that this project does not require any asbestos abatement due to the construction year of the building. However, I cannot say that there is no asbestos in the areas of work. The contractor was supplied with an asbestos report for the building and should use that as their basis for providing any allowances. Any allowances for abatement shall be clearly identified in their bids.
RFI #Pre-Bid RFI #2 — Valve Count Current Status: Resolved Description: Yesterday it was mentioned in the walk through that a valve count would be provided by the Engineer. Haven’t seen the valve count? The engineer said that they would provide the individual valve count.
The PRV schedule only reflects the PRV valve count. Not the individual valve count that is reflected on each page of the plans.
Comments:
** Attached is the updated valve quantity schedule. - Mark McComas
RFI #Pre-Bid RFI #3 — Backflow Preventer Schedule Current Status: Resolved Description: It looks like we are missing some schedules from the drawings.
Example, Drawing P-500, references a BFP-1 and BFP-2, but we don’t see a schedule of these what we think is Backflow Preventers?
Comments:
BFP SCHEDULE PROVIDED 1. AS PART OF THE ADDENDUM DRAWINGS, P500 - Fred Crabtree
2. Refer to Addendum 01 (Revision 01) drawings uploaded to Centerline today. - Mark McComas
RFI #Pre-Bid RFI #4 — Backflow Preventer Specs Current Status: Resolved Description: Another question is we don’t see a specification on the highlighted yellow water meter in the backflow preventer detail on drawing P-500.
Comments:
1. see below meter spec.
Onicon F3205-1-1-2-4-102 https://www.onicon.com/wp-content/uploads/f-3200-inline-electromagnetic-flow-metercatalog-sheet-doc-0002595.pdf
- Fred Crabtree
2. Refer to Addendum 01 (Revision 01) drawings uploaded to Centerline today. - Mark McComas
RFI #Pre-Bid RFI #5 — Valve Schedule DWG Current Status: Resolved Description: On drawing P-500, there is a schedule of PRV’s that need replacing, we can’t find these PRV’s on the drawings. How do we find these based Tag number WPRV ?-?? and location from the plans?
Comments:
There 1. are specific callouts on the plans identifying the location for the PRVs, and the PRV numbers are in the backgrounds. - Fred Crabtree
2. Refer to Addendum 01 (Revision 01) drawings uploaded to Centerline today. - Mark McComas
RFI #Pre-Bid RFI #6 — As-Built Clarification Current Status: Resolved Description: Drawing L1-A1-Level One Plan Bldg 2J-A.1, we don’t know what this dashed/squared highlighted yellow lines are telling us. Is this demo piping/valves? We don’t have a drawing with a legend/symbol definition plan.
Comments:
1. line legend will be provided on the addendum drawings. these lines are as built observations that were added in to accommodate additional observed valve locations. – Fred Crabtree
2. Refer to Addendum 01 (Revision 01) drawings uploaded to Centerline today. - Mark McComas
RFI #Pre-Bid RFI #7 — Confined Space Current Status: Resolved Description: Are there going to be any valves replaced that are located within confined spaces?
Comments:
1. Per Campos Engineers, "No known spaces are known to be "confined space" for this project." - Mark McComas