This solicitation requests bids to replace windows and reinsulate Building 146 at the Central Texas Veterans Health Care Facility in Temple, Texas. The scope of work includes removing existing flooring and windows, installing new flooring and windows, and applying spray foam insulation in various building areas. Bids are due by September 13, 2022 and shall be submitted electronically to the specified email address. The performance period is 90 days from the notice to proceed. A site visit will be held on August 23 for contractors to verify measurements and site conditions. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WIN_20220902_09_32_51_Pro.jpg | JPG image | |
| WIN_20220902_09_42_53_Pro.jpg | JPG image | |
| 36C25722B0031 0001.docx | DOCX document | |
| BLDG 146-1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25722B0031
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C25722B0031 X 674-22-263 Department of Veterans Affairs
NCO 17
2002 Scott Blvd.
Temple TX 76504 Department of Veterans Affairs Central Texas Veterans HCS 2002 Scott Blvd.
Temple TX 76504 Tammy Wilson 254-778-4811
Contractor shall provide all necessary labor, materials, equipment and supervision to complete work in accordance with the Statement Of Work (SOW).
Magnitude of Work: Between $250,000.00 and $500,000.00
Period Of Performance: 90 days after the Notice To Proceed(NTP).
Site Visit: August 23, at 9:00AM CST, 1901 Veterans Memorial Drive Bldg 46, Temple TX 76504.
RFIs due via email to tammy.wilson5@va.gov by August 31,2022 @ 1:00PM CST, title of the email will reflect 36C25722B0031 Bldg. 146 E Wing Repairs in the subject line of the email.
Bids due via email to tammy.wilson5@va.gov by September 13 ,2022 at 1:00PM CST, title of the email will reflect 36C257220031 Bldg. 146 E Wing Repairs in the subject line.
Funds are not currently available for this solicitation. Award of a contract as a result of this solicitation is contingent upon the availability of appropriated funds from which payment of this contract may be made. There shall shall be no legal liability on the part of the Government for contract purposes until funds are made available to the Contracting Officer. The Contracting Officer will confirm availability of funds prior to award of a contract.
This will be 100% SDVOSB set-aside.
X X 52.211-10 X 1:00pm
CDT
09-13-2022 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Department of Veterans Affairs
NCO 17
2002 Scott Blvd.
Temple TX 76504 This is accomplished through the Tungsten Network located at:
http://www.fsc.va.gov/einvoice.asp This is mandatory and the sole method for submitting invoices.
(877) 353-9791
(512) 460-5540
1. Bldg 146 E Wing Repairs, Temple TX VAMC
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| SCOPE OF WORK | 5 |
| SCOPE OF WORK | 11 |
| INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS | 18 |
| 1.1 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 18 |
| 1.2 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 19 |
| 1.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 20 |
| 1.4 52.228-1 BID GUARANTEE (SEP 1996) | 21 |
| 1.5 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021) | 21 |
| 1.6 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 22 |
| 1.7 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 22 |
| 1.8 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 23 |
| 1.9 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 23 |
| REPRESENTATIONS AND CERTIFICATIONS | 24 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022) (JUL 2020) (DEVIATION) | 24 |
| 3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 28 |
| GENERAL CONDITIONS | 31 |
| 4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) | 31 |
| 4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (NOV 2021) | 31 |
| 4.3 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) | 32 |
| 4.4 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2021) | 32 |
| 4.5 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020) | 36 |
| 4.6 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020) | 36 |
| 4.7 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) | 36 |
| 4.8 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (NOV 2021) | 38 |
| 4.9 SUPPLEMENTAL INSURANCE REQUIREMENTS | 42 |
| 4.10 52.248-3 VALUE ENGINEERING—CONSTRUCTION (OCT 2020) | 42 |
| 4.11 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION) | 48 |
| 4.12 VAAR 852.219-77 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (SEP 2021) (DEVIATION) | 50 |
| 4.13 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 51 |
| 4.14 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 53 |
| 4.15 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 54 |
| 4.16 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 54 |
| 4.17 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020) | 54 |
| 4.18 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 56 |
| 4.19 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 57 |
| 4.20 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 57 |
| 4.21 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020) | 57 |
| 4.22 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 58 |
| 4.23 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018) | 58 |
Bid Schedule
The contractor shall furnish all labor, equipment, materials, and supervision in accordance with the SOW and solicitation.
| CLIN |
| Bldg 146 E Wing Repairs |
Temple TX VAMC
| Qty |
| Unit of issue |
Firm Fixed Price Lump Sum amount
| 0001 |
| Base Pricing |
(SEE SOW FOR DETAILS)
| 1 |
| Job |
| $_________ |
Statement Of Work Page 1 of Page 1 of
Bldg 146 E Wing Repairs Temple VA Project
PROJECT # 674-22-263
Requirements
The contractor shall be responsible for providing labor and materials for the services required to remove and install flooring and windows in the E wing of building 146. Work performed will be done at the Central Texas Veterans Health Care Facility in Temple at 1901 Veterans Memorial Drive, Temple, Texas 76504. After all work is completed, the contractor will have a walkthrough with the Project Manager (PM) or VA COR to ensure all work is completed and ready to receive payment. Contractors are urged to attend the site visit to determine the full extent of the work. Failure to inspect the site will not constitute grounds for a claim after award.
The Contractor shall provide and install any required materials, equipment, labor, and trades for the completion of this project. The Government will not provide any materials, equipment, labor, or trades for this project. It is the sole responsibility of the Contractor to meet the requirements of this project without any assistance from the Government. The Government will provide access and information only for this project.
The Contractor shall contact the VA COR 10 days ahead of starting work.
The Contractor shall schedule all power outages through the VA COR 5 days prior to requirement.
The Contractor shall protect all government property from damage to include landscape, curbs, signs, building, walls and doors. Contractor shall replace any damaged item with new or better equipment.
The Contractor shall provide a work schedule to include a detailed list of work to be done for each requirement and the sequence in which it will be accomplished. The schedule shall be in the form of a progress chart of suitable scale to indicate the work scheduled for completion by any given date during the work. The work plan shall indicate time frames and programmed power shut-off, if applicable. Contractor shall highlight on the schedule any off-hours and overtime work requirements.
The contractor shall provide all skilled personnel, services, tools, facility supervision, administration supervision and any other item(s) necessary to perform and accomplish this service. The contractor shall be familiar with all the terms, conditions, and requirement herein contained. A pre site visit will be coordinated for Contractors bidding and all must be present to verify measurements and investigate site conditions prior to submitting proposal. All work must comply with federal, state, and local regulations.
The Contractor shall obtain all required permits.
Contractor and all associated subcontractor employees shall comply with applicable facility and local security policies and procedures. Contractor shall provide names of Contractor and Subcontractor employees to the COR or Government representative. VA will issue contractor badge/pass to contractor and subcontractor employees, as applicable. Employee list shall include name, title, qualifications and responsibilities like hazardous materials, PPE, fire safety penetrations, material disposal, lock-out/tag-out, etc.
The Contractor shall provide one (1) year performance agreement labor and material in addition to the manufacturer’s warranty. Contractor shall provide a warranty management plan copy. The plan shall include information relevant to the warranty of materials and equipment incorporated into the project, including the starting date of warranty. The plan shall be in narrative form and contain enough detail to render it suitable for use by future maintenance and repair personnel, whether tradesmen, or of engineering background, not necessarily familiar with this contract. The plan shall be assembled in a binder and shall be turned over to the Government at the final walkthrough. The warranty period shall begin on the date of project acceptance and shall continue for the full product warranty period.
All work shall be done according to the Infection Control Risk Assessment (ICRA) specified for the respective areas where work is performed. Exterior construction activities causing disturbance of soil or creates dust in some other manner must be controlled.
Note 1: The C&A requirements do not apply, and that a Security Accreditation Package is not required for this contract.
Note 2: The Contractor shall be responsible for all coordination or work that involves Water, Controls, electrical, mechanical, fire suppression, shutdowns and emergency power that may be required for the project.
Note 3: The shall Contractor use the following material, brand name or a product equal to or better:
Forbo Allura Flex Wood (4mm) Classic Beach 100cmX20cm Forbo Allura Flex Wood (4mm) Dark Mahogany 100cmX20cm (This is for Transitions) Plygem Vinyl White Window with Low-E glass with Argon gas, standard grid pattern colonial.
Performance Period: 90 days from Notice to Proceed (NTP)
Project Requirements:
1. The Contractor shall be responsible for field verifying all measurements.
2. The Contractor shall remove and replace approx. 2200 sq ft of flooring, 67 windows and 1 hollow metal service door on second floor.
3. The Contractor shall remove existing floor and prep for new flooring installation to include leveling and foreign objects removed.
4. The Contractor shall provide and install new 4” toffee cove base and flooring as selected by VA staff.
5. The Contractor shall provide and install new transitions as selected by VA staff.
6. The Contractor shall ensure that floor access panels are trimmed and flush to surface.
7. The Contractor shall ensure that expansion joints are level and resealed so that there isn’t a visible difference and there are no tripping hazards.
8. The Contractor shall remove and dispose of 67 windows as specified in drawings. Field verify rough opening dimensions prior to removal.
9. The Contractor shall, provide and install 67 new windows. The windows must match (Bldg. 147) and fit existing windows and openings.
10. The Contractor shall at the end of the project, clean up, dispose of demolished, used materials, debris, or waste at an approved off-limits location in accordance with applicable local, State and federal laws and regulations and pay any related fees.
11. Perform a final walkthrough with the VA COR or PM when completed.
A. Program Office Points of Contact:
a. Contracting Officer’s Representative (COR):
b. Project Manager:
12. Coordinate with VA COR before the start of this service. See information below:
A. Government Holidays:
(a) The Government hereby provides notice and Contractor hereby acknowledges receipt that Government personnel observe the listed days as holidays:
| New Year's Day | January 1st | |
| Martin Luther King's Birthday | Third Monday in January | |
| Washington’s Birthday | Third Monday in February | |
| Memorial Day | Last Monday in May | |
| Juneteenth | June 19th | |
| Independence Day | July 4th | |
| Labor Day | First Monday in September | |
| Columbus Day | Second Monday in October | |
| Veterans Day | November 11th | |
| Thanksgiving Day | Fourth Thursday in November | |
| Christmas | December 25th |
(b) In addition to the days designated as holidays, the Government observes the following days:
a. Any other day designated by Federal Statute
b. Any other day designated by Executive Order
c. Any other day designated by the President’s Proclamation
It is understood and agreed between the Government and the Contractor that observance of such days by Government personnel shall not otherwise be a reason for an additional period of performance, or entitlement of compensation. In the event the Contractor's personnel work during the holiday, they may be reimbursed by the Contractor, however, no form of holiday or other premium compensation will be reimbursed either as a direct or indirect cost, other than their normal compensation for the time worked.
13. Submit the proper documentation and reports to receive payment on this service. See information below:
A. Invoices and Payment
1. Payment to be made monthly, in arrears, following satisfactory performance by Contractor’s personnel and upon receipt of a properly prepared invoice.
1. Contractor shall be required to invoice through the Tungsten System at http://www.tungsten-network.com/us/en/veterans-affairs/. Additional information regarding Tungsten shall be provided upon award.
1. The contract shall have current registration in the System for Award Management (SAM) for this solicitation; URL: www.sam.gov.
1. The invoice MUST be itemized to include the following information. Any information listed below, and not provided on an invoice, will render that invoice incomplete and the invoice will be returned for immediate correction.
i. Time period being invoiced for.
ii. Description of services performed.
iii. Unit Cost billed.
iv. Extended amount due.
v. Invoice number, date, and;
vi. Contract and obligation numbers.
vii. Other Considerations
· The contractor will be required to submit a safety plan for VA review and approval prior to the performing work.
· It is the contractor’s responsibility to provide adequate documentation verifying that any equipment and/or materials proposed will meet or exceed all federal government requirements.
· Majority of the work shall be performed during normal working hours unless otherwise noted by the COR or PM. Normal working hours are 8:00 am – 5:00 pm, Monday – Friday.
· The contractor’s supervisor shall always be available to address any needs the VA COR may have during the period of performance. All employees or sub-contractors shall be accountable solely to the Contractor, not the Government.
· The contractor may be required to coordinate work activities and shutdowns with VA COR and Project Manager.
· The contractor shall thoroughly clean inside and outside of project site daily with contractor’s own equipment, including vacuums, mops, buckets, wash rags, dust mops, etc.
· The Government will not provide facilities or staging area for the Contractor’s use to support this contract. The contractor is responsible for all shipping, receiving, storage and security of any materials or equipment for the duration of this project.
· The Government will provide water and electrical utilities. All utilities in the facility will be available for the Contractor’s use in performance of tasks outlined in this SOW. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
· The Government will not provide materials for this project.
· Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure that personnel present a professional appearance. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor is responsible for ensuring that any Contractor employees providing services under this contract conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove from the job site any employee for reasons of misconduct or security. The Contractor shall ensure no contractor employees conduct political related activities or events on VA Facilities.
· The Contractor shall notify the COR or Government representative of any accidents requiring medical treatment. Emergency medical treatment and services for Contractor personnel is the responsibility of the Contractor.
Codes and Standards The project shall be in accordance with the latest Uniform Building Code (UBC), National Fire Protection Associate (NFPA) standard, Uniform Federal Accessibility Standard (UFAS), Inspectors Manual, VA Specifications and Standards, and local facility requirements. In the event there is a conflict between any of the standards/codes, the more stringent standard/code shall apply.
The contractor shall provide all applicable safety signage and barricades applicable to OSHA, VHA and DOD regulations. Contractor shall comply with VHA DIRECTIVE 2004-012 and all VA Center Policy Memorandums, including but not limited to the following:
(a) Protection of patients, visitors, and employees from traumatic injury, as well as occupational and facility–associated infections.
(b) Compliance with OSHA and State construction safety regulations. Construction contracts require that the general contractor’s on-site “competent person” have completed the OSHA 30-hour construction worker course and that all other general and sub-contractor’s workers have completed the OSHA 10-hour construction worker course or other relevant competency training. The determination for training is based on the project hazards and complexity, State and Federal regulations and VA requirements. Verification of completion of training will be required prior to performing work.
(c) Compliance with EPA and State environmental regulations.
SAFETY PLAN REQUIREMENTS
Prior to performing any work, the contractor will be required to submit a safety plan in accordance with OSHA and VA Regulations.
The safety plan shall include, but not limited to the following:
A. Safety and Health Policy (i.e. company policy) B. Safety and Health Objectives (i.e. company goals, procedures, etc.)
C. Job Site Inspections (i.e. safety inspection/potential hazards/prevention, etc.)
D. Contractor Safety Administrator (i.e. competent person/safety officer) E. Personal Protective Equipment (i.e. head, hearing, and eye protection, footwear, clothing, gloves, etc.)
F. Safety Rules (i.e. rules applicable to the work/task being performed, equipment, ladders, confined spaces, open flame, etc.)
G. Job Safety Training (i.e. OSHA, safety meetings, etc.)
· 30 Hour OSHA Construction Safety Course – competent person
· 10 Hour OSHA Construction Safety Course – all others H. Safety Discipline (i.e. correction of violations, etc.)
I. Hot Work Permit (i.e. responsibilities, procedures, etc.)
J. Emergency Procedures (i.e. responsibilities, procedures, etc.)
K. Written Hazard Communication Program (i.e. responsibilities, procedures, list of hazards, MSDS, etc.)
SAFETY INSPECTIONS
On a weekly basis, the VA will conduct a safety inspection of the work area. This inspection includes, but is not limited to the following:
A. Means of Egress
· Fire/Smoke Doors unlocked, free of obstructions
· Means of Egress (includes Exits) free of obstructions and clearly marked
B. Fire Alarm, Fire Detection, and Fire Suppression Systems.
· Fire Alarm Pull Stations are unobstructed
· Smoke Detector smoke caps in use, or removed at end of the day
· Hot Work Permits are current, in use
· Sprinkler Heads are unobstructed
C. Housekeeping and Traffic Control
· Trash and debris are removed promptly and transported outside the construction area
· Floor mats and dust tack mats are located at the entrance to construction area
· Tools and equipment are properly stored
· Signs installed to restrict patient access (doors locked as needed)
· Dust control measures are in place
· Barriers are in place and properly sealed
· Debris barriers are to be install at all drainage locations to prevent debris in the storm drain system.
D. Hazardous Chemicals/Conditions
· Appropriate storage of hazardous chemicals
· MSDS sheets are readily available on-site
· Lock out/tag out procedures are in place
· Hot work permit is current and posted
E. Clothing
· PPE is available and properly worn
· Clothing is relatively dust free with the construction area and patient areas Page 1 of
Spray Foam Insulation Building 146 Temple VA Project
PROJECT # 674-21-2-5065-1541
Requirements
The contractor shall be responsible for providing labor and materials for the services required to apply spray foam insulation in building 146. Work performed will be done at the Central Texas Veterans Health Care Facility in Temple at 1901 Veterans Memorial Drive, Temple, Texas 76504. After all work is completed, the contractor will have a walkthrough with the Project Manager (PM) or VA COR to ensure all work is completed and ready to receive payment.
The Government will only provide access to the location. It is the sole responsibility of the Contractor to meet the requirements of this project without any other assistance from the Government.
The Contractor shall contact the VA COR 10 days ahead of starting work to allow for coordination.
The Contractor shall protect all government property from damage.
The contractor shall provide all skilled personnel, services, vehicles, transportation, tools, equipment, materials, supplies, facility supervision, administration supervision and any other item(s) necessary to perform and accomplish this service. The contractor shall be familiar with all the terms, conditions, and requirement herein contained. A pre site visit will be coordinated for Contractors bidding and all must be present to verify measurements and investigate site conditions prior to submitting proposal. All work must comply with federal, state and local regulations.
The Contractor shall obtain all required permits.
Contractor and all associated subcontractor employees shall comply with applicable facility and local security policies and procedures. Contractor shall provide names of Contractor and Subcontractor employees to the COR or Government representative. VA will issue contractor badge/pass to contractor and subcontractor employees, as applicable. Employee list shall include name, title, qualifications and responsibilities like hazardous materials, PPE, fire safety penetrations, material disposal, lock-out/tag-out, etc.
The Contractor shall provide one (1) year performance agreement labor and material in addition to the manufacturer’s warranty. Contractor shall provide a warranty management plan copy. The plan shall include information relevant to the warranty of materials and equipment incorporated into the project, including the starting date of warranty. The plan shall be in narrative form and contain enough detail to render it suitable for use by future maintenance and repair personnel, whether tradesmen, or of engineering background, not necessarily familiar with this contract. The plan shall be assembled in a binder and shall be turned over to the Government at the final walkthrough. The warranty period shall begin on the date of project acceptance and shall continue for the full product warranty period.
All work shall be done according to the Infection Control Risk Assessment (ICRA) specified for the respective areas where work is performed.
Note 1: The C&A requirements do not apply, and that a Security Accreditation Package is not required for this contract.
Note 2: The Contractor shall field verify all existing conditions, measurements and working space to dig and install for this project.
Note 3: The Contractor shall provide a written Method of Procedure (MOP) for all work 5 days prior to starting work.
Note 4: The Contract shall be prepared to work every day including afterhours and weekends when this project is started until completed to minimize work interruptions.
Performance Period: 45 days from Notice to Proceed (NTP)
Project Requirements:
14. The Contractor shall provide all labor, supervision, material, tools and equipment to install 2” closed cell insulation in the crawlspace of building 146. Approximately 13,204 sq. ft.
15. The Contractor shall provide all labor, supervision, material, tools and equipment to install 10.5” open cell insulation in the roofline of building 146. Approximately 13,608 sq. ft.
16. The Contractor shall provide all labor, supervision, material, tools and equipment to install thermal barrier (fire retardant) in the roofline of building 146.
17. The Contractor shall provide all labor, supervision, material, tools and equipment to install 2” closed cell insulation in the Gable ends that are brick or concrete in building 146.
18. The Contractor shall provide all labor, supervision, material, tools and equipment to install 3.5” open cell insulation in the Gable ends that are not brick or concrete in building 146.
19. The Contractor shall provide all labor, supervision, material, tools and equipment to install 3.5” open cell insulation at the Demising Walls in building 146.
20. The Contractor shall ensure that all insulation has bug & rodent protection.
21. The Contractor shall remove and dispose of existing insulation in the drop ceiling.
22. Perform a final walkthrough with the VA COR or PM when completed.
23. Coordinate with VA COR before the start of this service. See information below:
B. Government Holidays:
(c) The Government hereby provides notice and Contractor hereby acknowledges receipt that Government personnel observe the listed days as holidays:
| New Year's Day | January 1st |
| Martin Luther King's Birthday | Third Monday in January |
| Washington’s Birthday | Third Monday in February |
| Memorial Day | Last Monday in May |
| Independence Day | July 4th |
| Labor Day | First Monday in September |
| Columbus Day | Second Monday in October |
| Veterans Day | November 11th |
| Thanksgiving Day | Fourth Thursday in November |
| Christmas | December 25th |
(d) In addition to the days designated as holidays, the Government observes the following days:
d. Any other day designated by Federal Statute
e. Any other day designated by Executive Order
f. Any other day designated by the President’s Proclamation
It is understood and agreed between the Government and the Contractor that observance of such days by Government personnel shall not otherwise be a reason for an additional period of performance, or entitlement of compensation. In the event the Contractor's personnel work during the holiday, they may be reimbursed by the Contractor, however, no form of holiday or other premium compensation will be reimbursed either as a direct or indirect cost, other than their normal compensation for the time worked.
24. Submit the proper documentation and reports to receive payment on this service. See information below:
B. Invoices and Payment
1. Payment to be made monthly, in arrears, following satisfactory performance by Contractor’s personnel and upon receipt of a properly prepared invoice.
1. Contractor shall be required to invoice through the Tungsten System at http://www.tungsten-network.com/us/en/veterans-affairs/. Additional information regarding Tungsten shall be provided upon award.
1. The contract shall have current registration in the System for Award Management (SAM) for this solicitation; URL: www.sam.gov.
1. The invoice MUST be itemized to include the following information. Any information listed below, and not provided on an invoice, will render that invoice incomplete and the invoice will be returned for immediate correction.
viii. Time period being invoiced for.
ix. Description of services performed.
x. Unit Cost billed.
xi. Extended amount due.
xii. Invoice number, date, and;
xiii. Contract and obligation numbers.
Other Considerations
· The contractor will be required to submit a safety plan for VA review and approval prior to the performing work.
· It is the contractor’s responsibility to provide adequate documentation verifying that any equipment and/or materials proposed will meet or exceed all federal government requirements.
· Work shall be performed during weekend working hours unless otherwise noted by the COR or PM. Working hours are 7:30 am – 1700, Monday-Friday. Weekend and Afterhours will be authorized if needed to complete the project.
· The contractor’s supervisor shall always be available to address any needs the VA COR may have during the period of performance. All employees or sub-contractors shall be accountable solely to the Contractor, not the Government.
· The contractor shall be required to coordinate work activities and shutdowns with VA COR and Project Manager.
· The contractor shall thoroughly clean inside and outside of project site daily with contractor’s own equipment, including vacuums, mops, buckets, wash rags, dust mops, etc.
· The Government will not provide facilities or staging area for the Contractor’s use to support this contract. The contractor is responsible for all shipping, receiving, storage and security of any materials or equipment for the duration of this project.
· The Government will provide water and electrical utilities. All utilities in the facility will be available for the Contractor’s use in performance of tasks outlined in this SOW. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
· Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure that personnel present a professional appearance. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor is responsible for ensuring that any Contractor employees providing services under this contract conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove from the job site any employee for reasons of misconduct or security. The Contractor shall ensure no contractor employees conduct political related activities or events on VA Facilities.
· The Contractor shall notify the COR or Government representative of any accidents requiring medical treatment. Emergency medical treatment and services for Contractor personnel is the responsibility of the Contractor.
Codes and Standards The project shall be in accordance with the latest Uniform Building Code (UBC), National Fire Protection Associate (NFPA) standard, Uniform Federal Accessibility Standard (UFAS), Inspectors Manual, VA Specifications and Standards, and local facility requirements. In the event there is a conflict between any of the standards/codes, the more stringent standard/code shall apply.
The contractor shall provide all applicable safety signage and barricades applicable to OSHA, VHA and DOD regulations. Contractor shall comply with VHA DIRECTIVE 2004-012 and all VA Center Policy Memorandums, including but not limited to the following:
(d) Protection of patients, visitors, and employees from traumatic injury, as well as occupational and facility–associated infections.
(e) Compliance with OSHA and State construction safety regulations. Construction contracts require that the general contractor’s on-site “competent person” have completed the OSHA 30-hour construction worker course and that all other general and sub-contractor’s workers have completed the OSHA 10-hour construction worker course or other relevant competency training. The determination for training is based on the project hazards and complexity, State and Federal regulations and VA requirements. Verification of completion of training will be required prior to performing work.
(f) Compliance with EPA and State environmental regulations.
SAFETY PLAN REQUIREMENTS
Prior to performing any work, the contractor will be required to submit a safety plan in accordance with OSHA and VA Regulations.
The safety plan shall include, but not limited to the following:
L. Safety and Health Policy (i.e. company policy) M. Safety and Health Objectives (i.e. company goals, procedures, etc) N. Job Site Inspections (i.e. safety inspection/potential hazards/prevention, etc) O. Contractor Safety Administrator (i.e. competent person/safety officer) P. Personal Protective Equipment (i.e. head, hearing, and eye protection, footwear, clothing, gloves, etc.)
Q. Safety Rules (i.e. rules applicable to the work/task being performed, equipment, ladders, confined spaces, open flame, etc.)
R. Job Safety Training (i.e. OSHA, safety meetings, etc)
· 30 Hour OSHA Construction Safety Course – competent person
· 10 Hour OSHA Construction Safety Course – all others S. Safety Discipline (i.e. correction of violations, etc) T. Hot Work Permit (i.e. responsibilities, procedures, etc) U. Emergency Procedures (i.e. responsibilities, procedures, etc) V. Written Hazard Communication Program (i.e. responsibilities, procedures, list of hazards, MSDS, etc)
SAFETY INSPECTIONS
On a weekly basis, the VA will conduct a safety inspection of the work area. This inspection includes, but is not limited to the following:
F. Means of Egress
· Fire/Smoke Doors unlocked, free of obstructions
· Means of Egress (includes Exits) free of obstructions and clearly marked
G. Fire Alarm, Fire Detection, and Fire Suppression Systems.
· Fire Alarm Pull Stations are unobstructed
· Smoke Detector smoke caps in use, or removed at end of the day
· Hot Work Permits are current, in use
· Sprinkler Heads are unobstructed
H. Housekeeping and Traffic Control
· Trash and debris are removed promptly and transported outside the construction area
· Floor mats and dust tack mats are located at the entrance to construction area
· Tools and equipment are properly stored
· Signs installed to restrict patient access (doors locked as needed)
· Dust control measures are in place
· Barriers are in place and properly sealed
I. Hazardous Chemicals/Conditions
· Appropriate storage of hazardous chemicals
· MSDS sheets are readily available on-site
· Lock out/tag out procedures are in place
· Hot work permit is current and posted
J. Clothing
· PPE is available and properly worn
· Clothing is relatively dust free with the construction area and patient areas
VHA Supplemental Contract Requirements for Combatting COVID-19
1. Contractor employees who work in or travel to VHA locations must comply with the following:
a. Documentation requirements:
1) If fully vaccinated, contractors shall show proof of vaccination.
i. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.
2) If unvaccinated, contractors shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test that includes an affiliated telehealth service.
3) Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.
4) Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.
2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates.
a. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.
3. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities.
1. For indefinite delivery contracts: Contractor agrees to comply with VHA Supplemental Contract Requirements for any task or delivery orders issued prior to this modification when performance has already commenced.
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
1.1 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
1.2 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
| Goals for minority participation for each trade |
| Goals for female participation for each trade |
| 16.4 % |
| 6.9 % |
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Bell County
(End of Provision)
1.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
1.4 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may…