S06_504-19-106_Drawing Addendum 1.pdf

PDF 9 MB Posted

Attached to
Y1DB--504-19-106 Renovate Clinical Lab for Modernization (Construction) (VA-22-00043821)
Solicitation number
36C25722B0016
Issued by

About this file

This solicitation is for a construction project to renovate a clinical lab for modernization at the Amarillo VA Medical Center in Amarillo, Texas. Key details include renovating the existing lab space and constructing a temporary modular lab building. The solicitation requires demolition, mechanical, plumbing and electrical work. The estimated award value is $6 million. The performance period is 480 calendar days. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17. The response due date is July 25, 2022.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

750 W Hampden Ave, Suite #300

Englewood, CO 80110

Ph (720) 550-6307 www.ValhallaEngineering.com

ADDENDUM NO. 1

TO THE DRAWINGS AND SPECIFICATIONS FOR:

Renovate Clinical Lab for Modernization VAMC Project #504-19-106

AMARILLO VA MEDICAL CENTER

Amarillo, TX

July 14, 2022

I. GENERAL

A. This narrative addendum supplements and revises the drawings and specifications dated 02/03/2022, as noted within and shall become part of the contract documents.

B. Proposers shall acknowledge receipt of this addendum in the space provided on the proposal form. Failure to do so may subject proposer to disqualification.

C. Each holder of proposal documents registered with the construction manager will receive a copy of the addendum. Each prime proposer is responsible for distribution of information conveyed by this addendum to its sub-proposers and suppliers.

II. DESCRIPTION

A. Clarifications of lab equipment mechanical connections: Refer to revised sheet MQ601.

B. NFPA45 lab exhaust controls clarifications: Refer to revised sheet MI701 and MI702.

C. Clarifications of flexible shaft wrapping for exhaust ducts: Refer to revised sheet

MH112B.

D. Additional incubator and revised analyzer equipment in Temporary Lab, with associated revised plumbing, HVAC air quantities, and power provisions. Refer to revised drawings attached.

E. Additional lab air connections to analyzers. Refer to attached drawings.

F. Clarifications of lab equipment plumbing connections and water closet fixture tag: Refer to revised sheet PQ601.

G. Plumbing fixture mounting heights: revise specification 22 40 00 to mount fixtures at height per sheet GI003.

H. Additional blocking and power+data rough-ins for wall-mount televisions. Refer to attached revised drawings.

http://www.valhallaengineering.com/

I. Engineering Document Management Software (EDMS) requirements:

• Contractor shall provide the EDMS for the construction phase of the project.

• EDMS shall be web-based and accessible to project members as recommended and approved by the VHA COR.

• EDMS shall have separate portals for submitting construction RFIs, submittals, and other project documents as requested by the VHA COR.

• EDMS file portals shall have the capability to:

• Upload files up to 100MB

• Assign files to one or multiple project members for review and action by a stipulated due date, agreeable to all parties and per the contract documents.

• Reassign files as determined by assignees

• Update disposition of files by assignee such as reviewed, approved, rejected, etc

• Track dates and times of uploads, revisions, assignments, re-assignments, and reviews.

• Manage project submittals and RFIs through the EDMS. Strike references to email submissions thereof from the contract documents.

III. ATTACHMENTS

A. Revised Clouded Drawing Sheets:

• AE121A

• AE122B

• AE151A

• AE152B

• AE411B

• PQ601

• PG112B

• PP112A

• PW112A

• MQ601

• MI701

• MI702

• MH112A

• MH112B

• MP112A

• EP111A

• EP112B

• EP601

• ET112B

END ADDENDUM NARRATIVE

OS

OS

OS OS

3 3.2 4 5 6

B

C

D

E

F

8' - 0"

2263A

TEMP MULTI-LAB

8' - 0"

MECHANICAL

STORAGE

FOOD STORAGE

KITCHEN

2231A

HAC

ELECTRICAL

C1-5

CORRIDOR

TEMP LAB STORAGE

4' - 6" 6' - 11"

5'

6'

6'

6'

6'

6'

5'

2'

3'

1'

4' - 5" 6' - 6" 6' - 0" 6' - 0" 6' - 0"

1' - 0"

8' - 6"

8' - 6"

8' - 6"

STORAGE / FLEX

TEMP HISTOLOGY

TEMP HISTOLOGY

TEMP

MICROBIOLOGY

WORKSTATION

WORKSTATION

UNISEX RR

WORKSTATION

FIRE RISER

1. ALL CEILING HEIGHTS ARE AT 9'-0" AFF UNO.

CEILING HEIGHT

SUPPLY

RETURN / EXHAUST

TYPICAL LIGHT FIXTURE

SIZE VARIES

9'-0"

REFLECTED CEILING PLAN SYMBOLS LEGEND

OS

LINEAR PENDANT LIGHT

INDUSTRIAL STRIP LIGHT

CAN LIGHTACCESS PANEL

OCCUPANCY SENSOR

FIRE EXIT SIGN

SPRINKLER HEAD

S H E I L

A

F . HO

O T E N

S T A

T E

OF T

E

X A S

R E G

IS

TE

RED ARCH

IT

E C T

S H E I

LA

F . HO

O T E N

8 9 9

##KEYNOTES

KEY PLAN

GENERAL NOTES

P la n N or th

Tru e N or th

ORIG HOSP 1

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

MAIN

HOSP 28

MED

ARTS

CLC

CLC

WALKER BLVD

LAB

MODULAR LAB

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

JUL 14, 2022

C :\U se rs

\V . A rc hi te ct

7\

D oc um en ts \2

1.

_A R

C H

_R

_p sa nd er s@ va lh al la en gi ne er in g.

co m .r vt 7/

/2

2:

:2

P M

AE121A

REFLECTED CEILING PLANS -

(INTERIM)

RENOVATE CLINICAL LAB FOR

MODERNIZATION

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-19-106

02/03/2022 SH PS

100% FINAL BID

DOCUMENTS

VEG 21.15

32'16'8'4'2'0'

P la n N or th

Tru e N or th

1/8" = 1'-0"

SECOND FLOOR RCP (INTERIM)

32'16'8'4'2'0'

P la n N or th

T ru e N or th

1/8" = 1'-0"

MODULAR BUILDING RCP (INTERIM)

1. EXHAUST HOOD

0 100% CONSTRUCTION DOCUMENTS 02/03/2022

1 ADDENDUM 1 07/14/2022

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS

OS OS

OS

OS

OS

OS

OS

OS

OS OS OS

OS

OS OS OS OS

OS OS

OS

OS

OS

OS

OS

OS

3 3.2 4 5 6 7 8 9 10 10.3

B

C

D

E

F

2259 2257

2231A 2263

C1-4

22622260

2255E

2255F 2255

2255C

2255B 2255A

22402251B

C1-6

2239A 2221

2235 2234

2256A

2251A

2251C

2252B

2252A

C1-7

2238A

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

8' - 0"

STAIR 3

STAIR 5

P-2

ELEV

P-1

ELEV

S-1

ELEV

STAIR 2

AE611

AE521B

TYP

AE521B

TYP

AE521B

TYP

AE521B

TYP

7' - 6"

8' - 6"

8' - 6"

8' - 6"

6'

5'

5'

8' - 0" 8' - 0" 6' - 10"

6' - 0" 6' - 0" 6' - 10"

2' - 10"

1'

3'

6' - 4"

5' - 1"

TYP

6' - 0"

TYP

6' - 0"

TYP

6' - 11"

4'

2'

7'

7'

4'

2' - 7"

8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0" 8' - 0"

8'

8'

8'

4'

1"

8' - 0" 8' - 0"

5' - 11"

6'

6'

"2'

2'

0"

1'

6' - 0" 3' - 5"

7'

5' - 5" 6' - 0" 8' - 0"

1. ALL CEILING HEIGHTS ARE AT 9'-0" AFF UNO.

CEILING HEIGHT

SUPPLY

RETURN / EXHAUST

TYPICAL LIGHT FIXTURE

SIZE VARIES

9'-0"

REFLECTED CEILING PLAN SYMBOLS LEGEND

OS

LINEAR PENDANT LIGHT

INDUSTRIAL STRIP LIGHT

CAN LIGHTACCESS PANEL

OCCUPANCY SENSOR

FIRE EXIT SIGN

SPRINKLER HEAD

S H E I L

A

F . HO

O T E N

S T A

T E

OF T

E

X A S

R E G

IS

TE

RED ARCH

IT

E C T

S H E I

LA

F . HO

O T E N

8 9 9

##KEYNOTES

KEY PLAN

GENERAL NOTES

P la n N or th

Tru e N or th

ORIG HOSP 1

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

MAIN

HOSP 28

MED

ARTS

CLC

CLC

WALKER BLVD

LAB

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

JUL 14, 2022

C :\U se rs

\V . A rc hi te ct

7\

D oc um en ts \2

1.

_A R

C H

_R

_p sa nd er s@ va lh al la en gi ne er in g.

co m .r vt 7/

/2

2:

:2

P M

AE122B

REFLECTED CEILING PLAN -

SECOND FLOOR (FINAL)

RENOVATE CLINICAL LAB FOR

MODERNIZATION

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-19-106

02/03/2022 SH PS

100% FINAL BID

DOCUMENTS

VEG 21.15

32'16'8'4'2'0'

P la n N or th

Tru e N or th

1/8" = 1'-0"

SECOND FLOOR NEW RCP

1. EXHAUST HOOD (NEW)

ROOM NUMBER KEY

NUMBER ROOM NAME

2221 BARBER SHOP

2225 MEN'S RR

2227 VENDING

2231 KITCHEN

2231A HAC

2234 MECHANICAL

2235 FLAMMABLE STORAGE

2236 MICROBIOLOGY

2237 LOCKERS

2238 STAFF TOILET

2238A STAFF TOILET

2239 HISTOLOGY

2239A GROSS SPECIMEN

2240 PATHOLOGIST

2241 LAB TECH OFFICE

2242 SUPERVISOR

2243 HAC

2244 CUBICLE OFFICE

2245 PREFAB MORTUARY

2246 TELE

2247 STORAGE

2248 ELECTRICAL

2249 STORAGE

2250 ELECTRICAL

2251A RECEPTION

2251B MED RECORDS

2251C STORAGE

2252 BLOOD COLLECTION

2252A RESTROOM

2252B RESTROOM

2253 PHLEB OFFICE

2254 CHIEF

2255 LABORATORY

2255A LAB TECH

2255B ACCESSIONING

2255C REFRIG STORAGE

2255D BLOOD BANK

2255E MULTIPURPOSE CONF RM

2255F EMPL URINE

2256 STORAGE

2256A REFUSE STORAGE

2257 STORAGE

2258 HAC

2259 MECHANICAL

2260 TELE

2261 CANTEEN STORAGE

2262 ELECTRICAL

2263 CANTEEN OFFICE

2264 FOOD STORAGE

2267 STORAGE CLOSET

C1-4 CORRIDOR

C1-5 CORRIDOR

C1-6 CORRIDOR

C1-7 CORRIDOR

0 100% CONSTRUCTION DOCUMENTS 02/03/2022

1 ADDENDUM 1 07/14/2022

3 3.2 4 5 6

B

C

D

E

F

MECHANICAL

STORAGE

FOOD STORAGE

KITCHEN

2231A

HAC

ELECTRICAL

C1-5

CORRIDOR

C1-4

CORRIDOR

2263A

TEMP MULTI-LAB

TEMP LAB STORAGE

67 64

LOCKERS, REF SPECS

143136

STORAGE / FLEX

TEMP HISTOLOGY

TEMP HISTOLOGY

TEMP

MICROBIOLOGY

WORKSTATION

WORKSTATION 0009

UNISEX RR

WORKSTATION

AE211A 7AE211A6

AE211A3 2

11864119

109 109

66 66

150149

FIRE RISER

1. ALL EQUIPMENT IS GF/GI (GOV. FURNISHED, GOV. INSTALLED), UNLESS

OTHERWISE NOTED.

2. ANY FFE ITEMS NOT TAGGED AND SCHEDULED ARE COUNTERTOPS,

CASEWORK, OR FURNITURE.

3. ALL FURNITURE IS GF/GI.

S H E I L

A

F . HO

O T E N

S T A

T E

OF T

E

X A S

R E G

IS

TE

RED ARCH

IT

E C T

S H E I

LA

F . HO

O T E N

8 9 9

##KEYNOTES

KEY PLAN

GENERAL NOTES

P la n N or th

Tru e N or th

ORIG HOSP 1

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

MAIN

HOSP 28

MED

ARTS

CLC

CLC

WALKER BLVD

LAB

MODULAR LAB

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

JUL 14, 2022

C :\U se rs

\V . A rc hi te ct

7\

D oc um en ts \2

1.

_A R

C H

_R

_p sa nd er s@ va lh al la en gi ne er in g.

co m .r vt 7/

/2

2:

:2

P M

AE151A

EQUIPMENT PLANS - (INTERIM) RENOVATE CLINICAL LAB FOR

MODERNIZATION

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-19-106

02/03/2022 SH PS

100% FINAL BID

DOCUMENTS

VEG 21.15

32'16'8'4'2'0'

P la n N or th

Tru e N or th

1/8" = 1'-0"

SECOND FLOOR EQUIPMENT PLAN (INTERIM)

32'16'8'4'2'0'

P la n N or th

T ru e N or th

1/8" = 1'-0"

MODULAR BUILDING EQUIPMENT PLAN (INTERIM)

INTERIM EQUIPMENT SCHEDULE

ITEM # ITEM DESCRIPTION

53 Printer, Microbiology

54 Sink Station

55 Gene Analyzer

56 Gene Analyzer

57 Microscope

60 Biohazard Rectangle

62 Biohazard Safety Cabinet

63 Sofia

64 Refrigerator

65 Refrigerator

66 Refrigerator

67 Freezer

80 Bio Safety Cabinet (CFCI)

90 Laboratory Exhaust Hood (CFCI)

100 Specimen Drop Off

101 Biohazard Rectangle

102 Printer

103 MS Analyzer

104 Stainer

105 MD Viewer

106 Co2 Tank

107 Stryker Saw and Console

108 Grossing Station

109 Cryostat

110 Cover Slipper

INTERIM EQUIPMENT SCHEDULE

ITEM # ITEM DESCRIPTION

1 Pneumatic Centrifuge

4 Toso

5 Hematology Analyzer

6 Slide Stainer

7 Slide Drawers

8 Microscope

9 Sedrate

10 Auto Urine Analyzer

11 Blood Coagulation Analyzer

12 Avantus Urine Analyzer

13 Centrifuge, Electric Only

14 Centrifuge

15 Osometer

16 Blood Gas Analyzer

22 Refrigerator

23 UC Freezer

24 Water Filter

28 Platelet

29 Label Printer

30 Plasma Thawer

31 Agglutination Viewer

32 Washer

33 Scale

34 Heat Block

52 Veritor

INTERIM EQUIPMENT SCHEDULE

ITEM # ITEM DESCRIPTION

111 Slide Stainer

112 IHC

113 Special Stainer

114 New IHC

116 Embedding Station

117 Processor

118 Processor

119 Storo Cart

120 Wax Dispenser

121 BD Proc

122 Printer

123 Incubator Scale

124 Incubator Scale

125 Incubator Scale

126 Incubator

127 Incubator

136 DxC700 AU

140 Diasorin Liaison XL

143 DXL

148 Slide Stainer

149 Microtome

150 Cold Plate

151 Water Bath

152 Abbott M2000 & Accessory

153 Abbott M2000 & Accessory

154 Biofire

155 Incubator, Bacteriology

167 Lockers - 12x12x48 (CFCI)

168 Incubator

169 Incubator

0 100% CONSTRUCTION DOCUMENTS 02/03/2022

UP

3 3.2 4 5 6 7 8 9 10 10.3

B

C

D

E

F

MECHANICAL

STORAGE

2255F

EMPL URINE

2255E

MULTIPURPOSE

CONF RM

HAC

STORAGE

FOOD

STORAGE

KITCHEN

2231A

HAC

CANTEEN

OFFICE

ELECTRICAL

STORAGE

VENDING 2246

TELE 2243

HAC

MEN'S RR

2239A

GROSS

SPECIMEN

BARBER

SHOP

HISTOLOGY

2238A

STAFF

TOILET

MICROBIOLOGY

MECHANICAL

FLAMMABLE

STORAGE

TELE

ELECTRICAL

2252A

RESTROOM

2255C

REFRIG

STORAGE 2255B

ACCESSIONING

2255A

LAB TECH

CHIEF

SUPERVISOR

PATHOLOGIST

2251B

MED RECORDS

BLOOD

COLLECTION

PHLEB OFFICE

2252B

RESTROOM

C1-4

CORRIDOR

C1-7

CORRIDOR

C1-6

CORRIDOR

2251A

RECEPTION

LAB TECH OFFICE

LOCKERS

STAFF

TOILET

2256A

REFUSE STORAGE

CUBICLE OFFICE

C

S T

O R

A G

E

39 39

40 40 40

44 44

40 49

68 69

144 145 146

143142141143142

136 136 136

137 91

138 139 140

66 66 65

119 64 118 117

STAIR 3

STAIR 5

P-2

ELEV

P-1

ELEV

S-1

ELEV

STAIR 2

LABORATORY

51 51 51

50 50 50

133 132 61

166 166

166 166

166166

150151

134 (U/C)

1 1

0 0

1. ALL EQUIPMENT IS GF/GI (GOV. FURNISHED, GOV. INSTALLED), UNLESS

OTHERWISE NOTED.

2. ANY FFE ITEMS NOT TAGGED AND SCHEDULED ARE COUNTERTOPS,

CASEWORK, OR FURNITURE.

3. ALL FURNITURE IS GF/GI.

S H E I L

A

F . HO

O T E N

S T A

T E

OF T

E

X A S

R E G

IS

TE

RED ARCH

IT

E C T

S H E I

LA

F . HO

O T E N

8 9 9

##KEYNOTES

KEY PLAN

GENERAL NOTES

P la n N or th

Tru e N or th

ORIG HOSP 1

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

MAIN

HOSP 28

MED

ARTS

CLC

CLC

WALKER BLVD

LAB

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

JUL 14, 2022

C :\U se rs

\V . A rc hi te ct

7\

D oc um en ts \2

1.

_A R

C H

_R

_p sa nd er s@ va lh al la en gi ne er in g.

co m .r vt 7/

/2

2:

:3

P M

AE152B

EQUIPMENT PLAN - SECOND

FLOOR (FINAL)

RENOVATE CLINICAL LAB FOR

MODERNIZATION

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-19-106

02/03/2022 SH PS

100% FINAL BID

DOCUMENTS

VEG 21.15

32'16'8'4'2'0'

P la n N or th

Tru e N or th

1/8" = 1'-0"

EQUIPMENT PLAN - SECOND FLOOR (FINAL)

FINAL EQUIPMENT SCHEDULE

ITEM # ITEM DESCRIPTION

2 Centrifuge, Large

4 Toso

8 Microscope

14 Centrifuge

22 Refrigerator

29 Label Printer

31 Agglutination Viewer

33 Scale

39 Shelving (CFCI)

40 Shelving (CFCI)

41 Shelving (CFCI)

42 Lab Slides

43 Closet

44 Cart

45 Medical Palette

46 Biohazard

47 Closet

48 Cabinet

49 Dolly

FINAL EQUIPMENT SCHEDULE

ITEM # ITEM DESCRIPTION

50 Blood Draw

51 Blood Draw

55 Gene Analyzer

56 Gene Analyzer

60 Biohazard Rectangle

61 Scanner Printer

64 Refrigerator

65 Refrigerator

66 Refrigerator

67 Freezer

68 Barcode Printer

69 Printer

70 P Thawer

71 T.Bath

72 Analysis Viewer

73 Incubator, P

74 Cell Washer

75 Microscope

76 Blood Bank Ref

FINAL EQUIPMENT SCHEDULE

ITEM # ITEM DESCRIPTION

80 Bio Safety Cabinet (CFCI)

90 Laboratory Exhaust Hood (CFCI)

91 Iris Urinalysis

92 Iris UA Computer

100 Specimen Drop Off

101 Biohazard Rectangle

102 Printer

103 MS Analyzer

104 Stainer

105 MD Viewer

106 Co2 Tank

107 Stryker Saw and Console

108 Grossing Station

109 Cryostat

110 Cover Slipper

111 Slide Stainer

112 IHC

113 Special Stainer

114 New IHC

FINAL EQUIPMENT SCHEDULE

ITEM # ITEM DESCRIPTION

116 Embedding Station

117 Processor

118 Processor

119 Storo Cart

120 Wax Dispenser

121 BD Proc

122 Printer

123 Incubator Scale

124 Incubator Scale

125 Incubator Scale

126 Incubator

127 Incubator

128 Calculator

129 Money Scale

130 Money Machine

131 Safe

132 Copy Printer

133 Network Printer

134 Dishwasher (CFCI)

FINAL EQUIPMENT SCHEDULE

ITEM # ITEM DESCRIPTION

135 Refrigerator w/ Ice and Water Disp

136 DxC700 AU

137 DxH900

138 AUTOMATION POWER Output C25994

139 Storage 6.5k

140 Diasorin Liaison XL

141 DXL CONSOLE

142 DXL PRINTER

143 DXL

144 DUAL CENTRIFUGE

145 AUTOMATION POWER INPUT

146 DxA Server Console B62967

147 AUTOMATION LINE

148 Slide Stainer

149 Microtome

150 Cold Plate

151 Water Bath

152 Abbott M2000 & Accessory

153 Abbott M2000 & Accessory

166 Shelving (CFCI)

167 Lockers - 12x12x48 (CFCI)

0 100% CONSTRUCTION DOCUMENTS 02/03/2022

1. PROVIDE BLOCKING FOR TV MOUNT AS REQ'D. VERIFY FINAL LOCATION

WITH COR.

T

T

UP

D

A

B

2252A

RESTROOM

2252B

RESTROOM

1'

T Y

P

1'

1'

S1

A4

9'

/4

F3

F3

A3

A3

A3

7' - 0 3/4"

7' - 10"1' - 2"

F3

F3

1' - 6"

S1

AE211B

AE601

A4

2'

/4

AE211B7

3' - 8" CLR. 3' - 8" CLR.

2238A2238

2238A

STAFF TOILET

STAFF TOILET

A3

F3F3 F3F3

A3A3

A1

A3

2'

3' - 10" 3' - 11"

A3 A3

E3'

1'

1"

7' - 0"

5' - 0"

A4

A4 A4

A1

A1

A1

D

2' - 0"

1'

2' - 9 1/2"

5'

/8

3'

/8

2'

3' - 0" ø 5' - 6"

A1A1 A1

A1

A3

A3 A3 A3

F2

A1

F2

F2

E

AE211B

AE431B

AE431B

2'

2'

0"

8" 2' - 0" 3' - 9"

4" 8"

4" 8"

F1

F1

F1

EXIST CONC. ROOF SLAB

EXIST TAPERED INSULATION

EXIST ROOFING MEMBRANE;

CONTRACTOR TO VIF CONDITIONS

BUILT-UP TREATED 2X6 WOOD CURB TO

HEIGHT OF (E) TAPERED INSULATION

SELF-ADHERED ROOFING MEMBRANE; LAP UP

& OVER CURB ASSEMBLY

REPLACE RIGID INSULATION AS REQ.

SHEET MTL CAP FLASHING

SEALANT, EA SIDE

6" COLD-FORMED METAL FRAMED MECHANICAL

CURB; LAG-BOLT TO T.O. WOOD CURB

ANCHOR-BOLT TO (E) CONC. SLAB;

3/8" ANCHOR BOLT, MIN. 3" PENETRATION

5/8" GYP EXTERIOR SHEATHING;

EA. SIDE

SPLICE & LAP NEW SELF-ADHERED ROOFING

MEMBRANE OVER EXISTING ROOF MEMBRANE

NOTE: COORDINATE WITH

MECHANICAL ROOF PLAN FOR

LOCATIONS

1'

AE211B15 16

6'

1/ 2"

6'

1/ 2"

2' - 4"2' - 4"

36" RAMP

RE: MECH

2" MIN. AIR GAP

FLOOR SLAB

6 MIL POLYETHYLENE

FLOOR MEMBRANE

COLD STORAGE DOOR;

RE: MNFR

COLD STORAGE WALL;

RE: MNFR

COLD STORAGE FLOOR;

RE: MNFR

PREPARE EXIST CONC FLOOR

& WATERPROOF PER

COLD STORAGE MNFR

SCHEDULED WALL;

RE: PLAN

RE: PLAN

3'

SCHEDULED WALL;

RE: PLAN

COORDINATE WALL

OPENING FOR DOOR W/

COLD STORAGE MNFR

R E

: M E

C H

2" M

IN

. A

IR

G

A P

RE: MECH

2" MIN. AIR GAP

6" LAY-IN INSULATION

WALL (BEYOND);

RE: PLAN

1. ALL TOILET ACCESSORIES ARE VA-FURNISHED, VA-INSTALLED.

2. ALL WALLS SURROUNDING TOILET ROOMS TO RECEIVE SOUND BATT

INSULATION TO ACHEIVE MIN. 45 STC.

D

CLR

12' - 7"

C

LR

CLR

9' - 11"

C

LR

4'

RE: WALK-IN COOLER MNFR

AE411B

S H E I L

A

F . HO

O T E N

S T A

T E

OF T

E

X A S

R E G

IS

TE

RED ARCH

IT

E C T

S H E I

LA

F . HO

O T E N

8 9 9

##KEYNOTES

KEY PLAN

GENERAL NOTES

P la n N or th

Tru e N or th

ORIG HOSP 1

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

MAIN

HOSP 28

MED

ARTS

CLC

CLC

WALKER BLVD

LAB

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307 WWW.VALHALLAENGINEERING.COMDate:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

JUL 14, 2022

C :\U se rs

\V . A rc hi te ct

7\

D oc um en ts \2

1.

_A R

C H

_R

_p sa nd er s@ va lh al la en gi ne er in g.

co m .r vt 7/

/2

2:

:3

P M

AE411B

ENLARGED PLANS AND DETAILS -

(FINAL)

RENOVATE CLINICAL LAB FOR

MODERNIZATION

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-19-106

02/03/2022 SH PS

100% FINAL BID

DOCUMENTS

VEG 21.15

1. FILLER AT EACH END OF LOCKERS

2. ABAAS-COMPLIANT FIXED LOCKER ROOM BENCH - VA FURNISHED, VA

INSTALLED

3. LOCKERS - VA FURNISHED, VA INSTALLED

4. PAPER TOWEL DISPENSER / DISPOSAL

5. COAT HOOK

6. ACCESSIBLE MIRROR

7. SOAP DISPENSER

8. ABAAS GRAB BAR

9. SEAT COVER DISPENSER

10. TOILET PAPER DISPENSER

11. SANITARY DISPOSAL

3/8" = 1'-0"

ENLARGED PT RESTROOM

3/8" = 1'-0"

ENLARGED STAFF RESTROOM

3/8" = 1'-0"

ENLARGED PLAN - BLOOD COLLECTION ENTRY

3/8" = 1'-0"

ENLARGED VIEW - LOCKER ROOM

3/8" = 1'-0"

RECEPTION WEST

1 1/2" = 1'-0"

DETAIL - ROOF CURB

3/8" = 1'-0"

ENLARGED VIEW - CUBICLES

1 1/2" = 1'-0"

SECTION - WALK-IN COOLER ENCLOSURE

3/8" = 1'-0"

ENLARGED VIEW - WALK-IN COOLER ENCLOSURE

1 ADDENDUM 1 07/14/2022

0 100% CONSTRUCTION DOCUMENTS 02/03/20221 ADDENDUM 1 07/14/2022

0 100% CONSTRUCTION DOCUMENTS 02/03/2022

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

NOT FOR

CONSTRUCTION

Date:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\U se rs

\V . M

. E . 1

9\ D oc um en ts

\2 1.

_M

E C

H _P

LU

M

_R

_m bi bl e2

H X

D 7.

rv t

7/

/2

2:

:3

P

M

PQ601

EQUIPMENT AND FIXTURE

SCHEDULES

RENOVATE CLINICAL LAB FOR

MODERNIZATION

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-19-106

02/03/2022 MB RL

100% FINAL BID

DOCUMENTS

VEG 21.15

PLUMBING FIXTURE SCHEDULE

MARK DESCRIPTION

CW CONNECTION

(IN)

HW CONNECTION

(IN)

WASTE

CONNECTION (IN)

VENT CONNECTION

(IN)

REMARKS

FD-J LAB FLUSHING DRAIN 3/4 - 3 2 1

FD-T LAB FUNNEL DRAIN - - 3 2 1

FD-W OPEN SIGHT HUB DRAIN - - 2 2 1

FD-X LAB GENERAL DRAIN - - 3 2 1

P-107 WATER CLOSET 1 - 4 2 1

P-408 LAVATORY, WALL MOUNT 1/2 1/2 1 1/2 1 1/2 1

P-517 SINK, SS, TWO-COMPARTMENT, FREE STANDING 1/2 1/2 1 1/2 1 1/2 1

P-524 SINK, SS, TWO-COMPARTMENT, COUNTER MOUNT 1/2 1/2 1 1/2 1 1/2 1

P-526 SINK, COUNTER-MOUNTED,DI, DEEP 1/2 1/2 1 1/2 1 1/2 1,3

P-528 HAND SINK, COUNTER-MOUNTED 1/2 1/2 1 1/2 1 1/2 1

P-529 SINK, DI 1/2 1/2 1 1/2 1 1/2 1,3

P-605 BOTTLE FILLING STATION, REFRIGERATED 1/2 - 1 1/2 1 1/2 1

P-707 COMBINATION EMERGENCY SHOWER AND EYE WASH 1 1/4 1 1/4 1 1/2 1 1/2 1

P-708 EMERGENCY EYE WASH 3/4 3/4 1 1/2 1 1/2 1

P-807 REAGENT WATER GRADE FAUCET 1/2 - - - 1,2

P-812 WATER SUPPLY BOX UNIT 1/2 - - - 1

P-M1 SAME AS P-408

P-M2 SAME AS P-107

SCHEDULE REMARKS:

1. REFER ALSO TO SPECIFICATIONS

22 40 00 AND 22 13 00.

2. SCHEDULED CW CONNECTION IS

RW.

3. SCHEDULED CW CONNECTION IS

BOTH DCW AND RW.

SCHEDULE REMARKS:

1. ONLY EQUIPMENT REQUIRING

PLUMBING PROVISIONS ARE

SCHEDULED HERE. REFER TO

ARCHITECTURAL FOR DETAILED

EQUIPMENT REQUIREMENTS AND

FOR REMAINING EQUIPMENT

DESCRIPTIONS.

0 100% FINAL BID DOCUMENTS 02/03/2022

1 ADDENDUM 1 07/14/2022

LAB EQUIPMENT PLUMBING CONNECTION SCHEDULE

EQUIPMENT

MARK DESCRIPTION BASIS OF DESIGN

DCW RW

FD &

SS CRP

LAB GASES

REMARKS

CONNECTION

(IN)

CONNECTION

(IN) TYPES

CONNECTION

(IN)

1 PNEUMATIC CENTRIFUGE

(E) BECKMAN COULTER AIR

ULTRACENTRIFUGE

- - - LA,LV 1/2,3/4 1

10 AUTO URINE ANALYZER (E) ICHEM VELOCITY 700-7177-001 - - YES - - 1

19 COBAS (E) COBAS 8000 & GWT WATER FILTER - 1/2 YES - - 1

21 CHEMISTRY ANALYZER (E) BECKMAN COULTER DXI 600 REF EQ-88 1/2 YES - - 1

24 WATER FILTER (E) ELGA LA621 1/2 - - - - 1

62 MOBILE FUME HOOD (E) PURAIR PCR-24 1/2 1/2 YES - - 1

80 BIO SAFETY CABINET (HOOD) REF 11 53 53 1/2 1/2 YES LA,LV,N,O 1/2,3/4,1/2,1/2 1

90 FUME HOOD WITH CUP SINK REF 11 53 13 1/2 1/2

YES, 1-1/2" INDIRECT DRAIN

FROM CUP SINK THERETO

LA,LV,N,O 1/2,3/4,1/2,1/2 1

91 IRIS URINALYSIS (E) ICHEM VELOCITY 700-7177-001 - - YES - - 1

108 GROSSING STATION (E) MOPEC 1/2 - - - - 1

111 SLIDE STAINER (E) HOLOGIC THINPREP 2000 1/2 - YES - - 1

134 DISHWASHER TBD 1/2 - - - - 1

135 REFRIGERATOR TBD 1/2 - - - - 1

136 CHEMISTRY ANALYZER - AUTOMATED BECKMAN COULTER DXC700AU OR EQUAL 1/2 1/2 YES - - 1

137 AUTOMATION - DXH900 BECKMAN COULTER DXH900 OR EQUAL - - YES - - 1

139 AUTOMATION - STORAGE BECKMAN COULTER STORAGE OR EQUAL - - YES - - 1

140 AUTOMATION - LIASON UTILITIES

BECKMAN COULTER LIASON UTILITY OR

EQUAL

- - YES - - 1

143 AUTOMATION - DXL BECKMAN COULTER DXL OR EQUAL - - YES - - 1

3 3.2 4 5 6 7 8 9 10 10.3

B

C

D

E

F

C1-5

2255E

2255F

2255D

2256A

2231A

C1-4

2252A

2252B

2255C 2255B

C1-7

2225 2239A 2221

C1-6

2251B

2251C 2251A

2255A

2238 2238A

1/ 2" ø N

1/ 2" ø O

3/4"ø LA

3/4"ø LV

1/2"ø N

1/2"ø O

3/4"ø LA 3/4"ø LV

3/4"ø LA 3/4"ø LV

1/2"ø N 1/2"ø O

3/4"ø LA 3/4"ø LV

1/2"ø N 1/2"ø O

1/2"ø O

1/2"ø N

3/4"ø LV

3/4"ø LA

3/ 4" ø L

V

3/ 4" ø L

A

1/2"ø O

1/2"ø N

3/4"ø LV

3/4"ø LA3

1/ 2" ø O

1/ 2" ø N

3/ 4" ø L

V

3/ 4" ø L

A

3/4"ø LV

3/4"ø LA

STAIR 5

S-1

ELEV

P-1

ELEV

P-2

ELEV

STAIR 3

STAIR 2

3/ 4" ø L

A

3/ 4" ø L

V

A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL

NOTES.

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI SHEET SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED.

ABATEMENT WILL BE PERFORMED BY THE VHA OUTSIDE OF THIS CONTRACT.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. WATER AND MED GAS HORIZONTAL PIPING IS ABOVE THE CEILING UNO.

SANITARY SEWER AND STORM DRAINAGE HORIZONTAL PIPING IS UNDER

FLOOR UNO. VENT HORIZONTAL PIPING IS ABOVE CEILING UNO. REFER TO

GC111 FOR RATED CONSTRUCTION ON FIRST FLOOR.

##KEYNOTES

KEY PLAN

GENERAL NOTES

P la n N or th

Tru e

Nor th

ORIG HOSP 1

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

MAIN

HOSP 28

MED

ARTS

CLC

CLC

WALKER BLVD

LAB

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

NOT FOR

CONSTRUCTION

Date:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\U se rs

\V . M

. E . 1

9\ D oc um en ts

\2 1.

_M

E C

H _P

LU

M

_R

_m bi bl e2

H X

D 7.

rv t

7/

/2

2:

:4

P

M

PG112B

MED GAS PLAN - SECOND FLOOR

(FINAL)

RENOVATE CLINICAL LAB FOR

MODERNIZATION

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-19-106

02/03/2022 MB RL

100% FINAL BID

DOCUMENTS

VEG 21.15

32'16'8'4'2'0'

P la n N or th

Tru e

Nor th

1/8" = 1'-0"

MED GAS PLAN - SECOND FLOOR (FINAL)

1. PROVIDE LAB GAS VALVE ENCLOSURE IN WALL FACED TO CORRIDOR.

INCLUDE SHUTOFF VALVES FOR LAB AIR, LAB VACUUM, OXYGEN, AND

NITROGEN. PROVIDE NEW PRESSURE SENSORS, EXTENDED AND

RE-CONNECTED TO EXISTING TUBING AND WIRING. RE-ENABLE EXISTING

ALARMS. REF DEMO PLAN.

2. STANDALONE CO2 CANISTERS FOR INCUBATOR. SHOWN FOR REFERENCE

ONLY. CANISTERS AND CONNECTIONS TO EQUIPMENT BY VHA.

3. PROVIDE DROPS AND WALL OUTLET BOX FOR GENERAL USE.

4. VALVED AND CAPPED FOR FUTURE EXTENSION.

5. PROVIDE QTY 2 VALVED 1/2" LA RUNOUTS TO "POWERLINK" EQUIPMENT

UNITS, FINAL LOCATION TBD. ASSUME UP TO 25' DISTANCE FROM TAKEOFF.

ROOM NUMBER KEY

NUMBER ROOM NAME

2221 BARBER SHOP

2225 MEN'S RR

2227 VENDING

2231 KITCHEN

2231A HAC

2234 MECHANICAL

2235 FLAMMABLE STORAGE

2236 MICROBIOLOGY

2237 LOCKERS

2238 STAFF TOILET

2238A STAFF TOILET

2239 HISTOLOGY

2239A GROSS SPECIMEN

2240 PATHOLOGIST

2241 LAB TECH OFFICE

2242 SUPERVISOR

2243 HAC

2244 CUBICLE OFFICE

2245 PREFAB MORTUARY

2246 TELE

2247 STORAGE

2248 ELECTRICAL

2249 STORAGE

2250 ELECTRICAL

2251A RECEPTION

2251B MED RECORDS

2251C STORAGE

2252 BLOOD COLLECTION

2252A RESTROOM

2252B RESTROOM

2253 PHLEB OFFICE

2254 CHIEF

2255 LABORATORY

2255A LAB TECH

2255B ACCESSIONING

2255C REFRIG STORAGE

2255D BLOOD BANK

2255E MULTIPURPOSE CONF RM

2255F EMPL URINE

2256 STORAGE

2256A REFUSE STORAGE

2257 STORAGE

2258 HAC

2259 MECHANICAL

2260 TELE

2261 CANTEEN STORAGE

2262 ELECTRICAL

2263 CANTEEN OFFICE

2264 FOOD STORAGE

2267 STORAGE CLOSET

C1-4 CORRIDOR

C1-5 CORRIDOR

C1-6 CORRIDOR

C1-7 CORRIDOR

0 100% FINAL BID DOCUMENTS 02/03/2022

3 3.2 4 5 6

C

D

E

2263A

TEMP MULTI-LAB

FOOD STORAGE

KITCHEN

TEMP LAB STORAGE

P-524

1"ø DHWR

2"ø DHW

3"ø DCW

2256J

BREAKROOM

1/

2" ø

R W

U F

BFP, TYP 2

1/2"ø DCW UF

1/ 2" ø D

C W

U F

1/

2" ø

D H

W U

F

1/

2" ø

D C

W U

F

FD-T

1/

4" ø

D C

W U

F 1 1/4"ø DCW UF

FD-T FD-T

FD-T

FD-X

3/4"ø RW UF

3/4"ø RWR UF

1 1/2"ø RW UF

3/ 4" ø R

W U

F

3/4"ø RW UF

1/

4" ø

D H

W U

F

3/ 4" ø D

C W

U F

1/

4" ø

D H

W R

U F

P-707

3/ 4" ø R

W U

F

1/

4" ø

D H

W U

F

P-807

2256I

SPECIMEN

ACCESSIONING

3/ 4" ø R

W R

10 10 12

15 16

FD-T

A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL

NOTES.

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI SHEET SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED.

ABATEMENT WILL BE PERFORMED BY THE VHA OUTSIDE OF THIS CONTRACT.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. WATER AND MED GAS HORIZONTAL PIPING IS ABOVE THE CEILING UNO.

SANITARY SEWER AND STORM DRAINAGE HORIZONTAL PIPING IS UNDER

FLOOR UNO. VENT HORIZONTAL PIPING IS ABOVE CEILING UNO. REFER TO

GC111 FOR RATED CONSTRUCTION ON FIRST FLOOR.

TEMP

MICROBIOLOGY

STORAGE / FLEX

TEMP HISTOLOGY

TEMP HISTOLOGY

P-107

P-M1

P-707

P-524 P-524

P-524

P-807

P-807

P-807

FD-X

66 66

109 109

116117118

123 125

##KEYNOTES

KEY PLAN

GENERAL NOTES

P la n N or th

Tru e

Nor th

ORIG HOSP 1

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

MAIN

HOSP 28

MED

ARTS

CLC

CLC

WALKER BLVD

LAB

MODULAR LAB

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

NOT FOR

CONSTRUCTION

Date:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\U se rs

\V . M

. E . 1

9\ D oc um en ts

\2 1.

_M

E C

H _P

LU

M

_R

_m bi bl e2

H X

D 7.

rv t

7/

/2

2:

:4

P

M

PP112A

DOMESTIC WATER PLANS

(INTERIM)

RENOVATE CLINICAL LAB FOR

MODERNIZATION

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-19-106

02/03/2022 MB RL

100% FINAL BID

DOCUMENTS

VEG 21.15

32'16'8'4'2'0'

P la n N or th

Tru e

Nor th

1/8" = 1'-0"

DOMESTIC WATER PLAN - SECOND FLOOR (INTERIM)

1. PROVIDE DCW AND RW TO RELOCATED EXISTING HOOD. PROVIDE BFP'S

PER SPECIFICATION SECTION 22 05 23 GENERAL DUTY VALVES FOR

PLUMBING PIPING.

2. REFER TO PQ-SERIES SHEET SCHEDULES AND MODULAR LAB

PERFORMANCE SPECIFICATION 13 34 41. PROVIDE PREFABRICATED

INTERNAL PLUMBING IN ACCORDANCE THEREWITH. REFER TO PS-SERIES

SHEETS FOR SITE UTILITY CONNECTIONS.

3. ALL WORK SHOWN AS NEW IN THE INTERIM PHASE SHALL, AFTER

COMPLETION OF THE FINAL LAB AND OWNER MOVE-OUT OF THE

TEMPORARY SPACE, BE DEMO'D COMPLETELY BACK TO INTERIM TAKEOFF

VALVES AND CAPPED.

4. PROVIDE TP-1 TRAP PRIMER. ROUTE 1/2" DCW PIPING TO TRAP PRIMER

CONNECTIONS ON ALL FLOOR DRAINS IN ACCORDANCE WITH

SPECIFICATIONS 22 13 00 AND MANUFACTURER INSTRUCTIONS. ENGAGE

ELECTRICAL FOR 120V/1Φ POWER SERVICE.

32'16'8'4'2'0'

P la n N or th

T ru e N or th

1/8" = 1'-0"

DOMESTIC WATER PLAN - MODULAR LAB (INTERIM)

0 100% FINAL BID DOCUMENTS 02/03/2022

A. REFER TO P-001 FOR PLUMBING SYMBOLS, ABBREVIATIONS, AND GENERAL

NOTES.

B. FIELD VERIFY EXISTING CONDITIONS AND REPORT DISCREPANCIES TO THE

VHA COR BEFORE PROCEEDING WITH WORK.

C. REFER TO GI SHEET SERIES LIFE SAFETY PLANS FOR LEGEND AND DETAILED

LOCATIONS OF RATED CONSTRUCTION REQUIRING ADDITIONAL MEP

PENETRATION SEALING MEASURES IN ACCORDANCE WITH THE

SPECIFICATIONS. IN THE EVENT OF A CONFLICTING OR AMBIGUOUS WALL

PATTERN SHOWN ON MEP PLANS, RATINGS FROM THE LIFE SAFETY PLAN

SHALL GOVERN.

D. REFER TO HAZARDOUS MATERIAL SURVEY IN THE SPECIFICATIONS. DO NOT

PROCEED WITH DEMOLITION OR DISTURBANCE OF ITEMS CONTAINING

HAZARDOUS MATERIALS UNTIL ABATEMENT HAS BEEN PERFORMED.

ABATEMENT WILL BE PERFORMED BY THE VHA OUTSIDE OF THIS CONTRACT.

E. REFER TO GC SHEET SERIES FOR PROJECT PHASING PLAN AND NARRATIVE.

F. WATER AND MED GAS HORIZONTAL PIPING IS ABOVE THE CEILING UNO.

SANITARY SEWER AND STORM DRAINAGE HORIZONTAL PIPING IS UNDER

FLOOR UNO. VENT HORIZONTAL PIPING IS ABOVE CEILING UNO. REFER TO

GC111 FOR RATED CONSTRUCTION ON FIRST FLOOR.

3 3.2 4 5 6

C

D

E

2263A

TEMP MULTI-LAB

FOOD STORAGE

KITCHEN

TEMP LAB STORAGE

P-524

FD-T

10 105

FD-T

FD-T FD-T

P-707

FD-X

3"ø SS CRP

3"ø SS CRP

3" ø

S S

C R

P

3"ø SS CRP3"ø SS CRP

2" ø

V C

R P

2" ø

V C

R P

2"ø V CRP 2"ø V CRP

2" ø

V C

R P

2" ø

V C

R P

3" ø

S S

C R

P

2231A

HAC

ELECTRICAL

ELECTRICAL

2"ø V CRP

3"ø SS CRP

CO

8 67

11 57

65 22

FD-T

3"ø SS CRP

TEMP

MICROBIOLOGY

STORAGE / FLEX

TEMP HISTOLOGY

TEMP HISTOLOGY

6666 65

109 109

118 117

120 112

P-M1

P-107

P-707

P-524 P-524

P-524

FD-X

##KEYNOTES

KEY PLAN

GENERAL NOTES

P la n N or th

Tru e

Nor th

ORIG HOSP 1

W A

LK

E

R B

LV

D

W A

LK

E

R B

LV

D

WALKER BLVD

MAIN

HOSP 28

MED

ARTS

CLC

CLC

WALKER BLVD

LAB

MODULAR LAB

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

NOT FOR

CONSTRUCTION

Date:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\U se rs

\V . M

. E . 1

9\ D oc um en ts

\2 1.

_M

E C

H _P

LU

M

_R

_m bi bl e2

H X

D 7.

rv t

7/

/2

2:

:4

P

M

PW112A

DRAIN-WASTE-VENT PLANS

(INTERIM)

RENOVATE CLINICAL LAB FOR

MODERNIZATION

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-19-106

02/03/2022 MB RL

100% FINAL BID

DOCUMENTS

VEG 21.15

32'16'8'4'2'0'

P la n N or th

Tru e

Nor th

1/8" = 1'-0"

DRAIN-WASTE-VENT - SECOND FLOOR (INTERIM)

1. REFER TO PQ SHEET SERIES SCHEDULES AND MODULAR LAB

PERFORMANCE SPECIFICATIONS. PROVIDE PREFABRICATED INTERNAL

PLUMBING IN ACCORDANCE THEREWITH. REFER TO PS SHEET SERIES FOR

SITE UTILITY CONNECTIONS.

2. KEEP DOWNSTREAM EXISTING SS CRP IN SERVICE UNTIL NEW 3" SS CRP IN

APPROXIMATE SAME LOCATION IS COMPLETE AND CONNECTED TO MAIN

STACK (REF FINAL PW SHEET SERIES). MOVE CONNECTION TO NEW SS CRP

THEREAFTER AND COMPLETE DEMO PER PD SHEET SERIES.

3. ALL WORK SHOWN AS NEW IN THE INTERIM PHASE SHALL, AFTER

COMPLETION OF THE FINAL LAB AND OWNER MOVE-OUT OF THE

TEMPORARY SPACE, BE DEMO'D COMPLETELY BACK TO INTERIM TAKEOFF

VALVES AND CAPPED.

32'16'8'4'2'0'

P la n N or th

T ru e N or th

1/8" = 1'-0"

DRAIN-WASTE-VENT PLAN - MODULAR LAB (INTERIM)

GENERAL NOTES

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

NOT FOR

CONSTRUCTION

Date:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\U se rs

\V . M

. E . 1

9\ D oc um en ts

\2 1.

_M

E C

H _P

LU

M

_R

_m bi bl e2

H X

D 7.

rv t

7/

/2

2:

:4

P

M

MQ601

EQUIPMENT SCHEDULES RENOVATE CLINICAL LAB FOR

MODERNIZATION

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-19-106

02/03/2022 MB RL

100% FINAL BID

DOCUMENTS

VEG 21.15

TERMINAL UNIT (TU) SCHEDULE

MARK TYPE

UNIT

SIZE

MAX

CFM

MIN

CFM

MAX

TOTAL

APD

(IN WG)

REHEAT COIL

SINGLE POINT

ELECTRICAL

BOD MFGR

AND MODEL REMARKS

HEATING

CFM

EAT

(°F)

LAT

(°F) MBH GPM

EWT

(°F)

WPD

(FT WG) VAC/PH

MAX

LOAD

28-TU-4-2 SINGLE DUCT HW REHEAT 8 640 640 1 640 55 85 21.1 1.4 180 0.19 24 / 1 15 VA TITUS DESV 1

28-TU-4-3 SINGLE DUCT HW REHEAT 6 300 300 1 300 55 85 9.9 0.7 180 0.08 24 / 1 15 VA TITUS DESV 1, 2

28-TU-5-1 SINGLE DUCT HW REHEAT 8 550 550 1 550 55 85 18.2 1.2 180 0.15 24 / 1 15 VA TITUS DESV 1

28-TU-5-4 SINGLE DUCT HW REHEAT 10 1170 1170 1 1170 55 85 38.6 2.6 180 0.10 24 / 1 15 VA TITUS DESV 1

28-TU-5-5 SINGLE DUCT HW REHEAT 6 340 340 1 340 55 85 11.2 0.7 180 0.08 24 / 1 15 VA TITUS DESV 1

28-TU-5-6 SINGLE DUCT HW REHEAT 10 1130 1130 1 1130 55 85 37.3 2.5 180 0.26 24 / 1 15 VA TITUS DESV 1

28-TU-5-7 SINGLE DUCT HW REHEAT 6 270 270 1 270 55 85 8.9 0.6 180 0.95 24 / 1 15 VA TITUS DESV 1, 2

28-TU-5-8 SINGLE DUCT HW REHEAT 8 880 440 1 440 55 85 14.5 1.0 180 0.19 24 / 1 15 VA TITUS DESV 1, 2

28-TU-5-9 SINGLE DUCT HW REHEAT 6 300 150 1 150 55 85 5.0 0.5 180 0.20 24 / 1 15 VA TITUS DESV 1, 2

28-TU-5-10 SINGLE DUCT HW REHEAT 4 170 120 1 120 55 85 4.0 0.5 180 0.08 24 / 1 15 VA TITUS DESV 1, 2

28-TU-5-11 SINGLE DUCT HW REHEAT 6 370 185 1 185 55 85 6.1 0.5 180 0.08 24 / 1 15 VA TITUS DESV 1

28-TU-5-12 SINGLE DUCT HW REHEAT 8 840 840 1 840 55 85 27.7 1.8 180 0.30 24 / 1 15 VA TITUS DESV 1, 2

28-TU-5-13A SINGLE DUCT HW REHEAT 12 1300 1300 1 1300 55 85 42.9 2.9 180 0.14 24 / 1 15 VA TITUS DESV 1

28-TU-5-13B SINGLE DUCT HW REHEAT 12 1300 1300 1 1300 55 85 42.9 2.9 180 0.14 24 / 1 15 VA TITUS DESV 1

28-TU-5-13C SINGLE DUCT HW REHEAT 12 1390 1390 1 1390 55 85 45.9 3.1 180 0.12 24 / 1 15 VA TITUS DESV 1

28-TU-5-14 SINGLE DUCT HW REHEAT 6 275 130 1 130 55 85 4.3 0.5 180 0.08 24 / 1 15 VA TITUS DESV 1, 2

28-TU-5-15 SINGLE DUCT HW REHEAT 4 100 100 1 100 55 85 3.3 0.5 180 0.07 24 / 1 15 VA TITUS DESV 1, 2

28-TU-5-16 SINGLE DUCT HW REHEAT 6 250 125 1 125 55 85 4.1 0.5 180 0.08 24 / 1 15 VA TITUS DESV 1, 2

28-TU-5-17 SINGLE DUCT HW REHEAT 4 100 70 1 70 55 85 2.3 0.5 180 0.08 24 / 1 15 VA TITUS DESV 1, 2

28-TU-5-18 SINGLE DUCT HW REHEAT 6 400 400 1 400 55 85 13.2 0.9 180 0.1 24 / 1 15 VA TITUS DESV 1, 2

28-TU-5-19 SINGLE DUCT HW REHEAT 4 200 200 1 200 55 85 6.6 0.5 180 0.08 24 / 1 15 VA TITUS DESV 1, 2

28-TU-5-20 SINGLE DUCT HW REHEAT 6 400 400 1 400 55 85 13.2 0.9 180 0.09 24 / 1 15 VA TITUS DESV 1, 2

28-TU-5-21 SINGLE DUCT HW REHEAT 6 500 500 1 500 55 85 16.5 1.1 180 0.12 24 / 1 15 VA TITUS DESV 1

28-TU-5-22 SINGLE DUCT HW REHEAT 8 820 410 1 410 55 85 13.5 0.9 180 0.22 24 / 1 15 VA TITUS DESV 1, 2

28-TU-5-23 SINGLE DUCT HW REHEAT 6 210 210 1 210 55 85 6.9 0.5 180 0.20 24 / 1 15 VA TITUS DESV 1, 2

28-TU-5-INT-1 SINGLE DUCT HW REHEAT 12 1680 1680 1 1680 55 85 52.1 3.5 180 0.19 24 / 1 15 VA TITUS DESV 1

28-TU-5-INT-2 SINGLE DUCT HW REHEAT 12 1680 1680 1 1680 55 85 52.1 3.5 180 0.19 24 / 1 15 VA TITUS DESV 1

28-TU-5-INT-3 SINGLE DUCT HW REHEAT 8 600 270 1 270 55 85 8.9 0.6 180 0.26 24 / 1 15 VA TITUS DESV 1

EXHAUST FAN (EF) SCHEDULE

MARK LOCATION AREA SERVED

AIRFLOW

(CFM)

ESP

(IN WG)

FAN MOTOR

BAS

CONTROLS

BOD MFGR AND

MODEL REMARKSTYPE DRIVE

DUTY RPM

% OF MAX

ELECTRICAL SPEED

CONTROLHP VAC Φ MCA MOCP

28-EF25

MECH RM

LABORATORY 4680 1 CENTRIFUGAL - INLINE DIRECT 90 1.5 480 3 3.75 15

VFD -

REMOTE

VARIABLE

SPEED

GREENHECK SQ 1,5

28-EF-5

BLDG 28

ROOF

MICROBIOLOGY 1350 2

CENTRIFUGAL - HIGH

PLUME

DIRECT 90 1 480 3 2.7 15

VFD -

REMOTE

VARIABLE

SPEED

GREENHECK

VK-H-13-8

1,2,5

28-EF-6

BLDG 28

ROOF

HISTOLOGY

FUME HOOD

775 1

CENTRIFUGAL - HIGH

PLUME

DIRECT 90 0.75 480 3 2 15

VFD -

REMOTE

VARIABLE

SPEED

GREENHECK

VK-H-10-6

1,2,4,5,6

28-EF-7

BLDG 28

ROOF

MICROBIOLOGY

FUME HOOD

775 1

CENTRIFUGAL - HIGH

PLUME

DIRECT 90 0.75 480 3 2 15

VFD -

REMOTE

VARIABLE

SPEED

GREENHECK

VK-H-10-6

1,2,3,5,6

28-EF-14

BLDG 28

ROOF

BREAKROOM 460 1 CENTRIFUGAL - UTILITY DIRECT 90 1 480 3 3 15

VFD -

REMOTE

VARIABLE

SPEED

GREENHECK

USF-12

1,5

28-EF-17

BLDG 28

ROOF

HISTOLOGY 1610 2

CENTRIFUGAL - HIGH

PLUME

DIRECT 90 1.5 480 3 3.8 15

VFD -

REMOTE

VARIABLE

SPEED

GREENHECK

VK-H-14-9

1,2,4,5

28-EF-2235

MECH RM

FLAMMABLE

STORAGE

500 0.3 CENTRIFUGAL - INLINE DIRECT 90 0.25 208 3 3 15

VFD -

REMOTE

VARIABLE

SPEED

GREENHECK SQ 1,4,5

28-EF-INT1

BLDG 28

ROOF

INTERIM LAB

SPACE

3640 1

POWER WALL

VENTILATOR

DIRECT 90 3 208 3 10.6 15

VFD -

REMOTE

VARIABLE

SPEED

GREENHECK

CUE-240HP-B

1,5,7

28-EF-INT2

BLDG 28

ROOF

INTERIM FUME

HOOD

500 2

CENTRIFUGAL - HIGH

PLUME

DIRECT 90 1.5 480 3 3.8 15

VFD -

REMOTE

VARIABLE

SPEED

GREENHECK VK 1,2,4,5

AIR DEVICE SCHEDULE

MARK TYPE DESCRIPTION MOUNTING

PANEL / FRAME

SIZE

NECK SIZE MAX CFM

MAX NC

MAX APD

(IN WG)

BOD MFGR &

MODEL REMARKS

6"Ø 6"X6"

8"Ø 8"X8"

10"Ø 10"X10"

12"Ø 12"X12"

14"Ø 14"X14"

E3-A

EXHAUST - PERFORATED

FACE

CEILING 24"X24" 125 220 345 500 600 20 0.10 TITUS PAR ALL

R3-A

RETURN - PERFORATED

FACE

CEILING 24"X24" 125 220 345 500 600 20 0.10 TITUS PAR ALL

S1-A

SUPPLY - SQUARE,

LOUVER, FULLY

ADJUSTABLE PATTERN

CEILING 24"X24" 120 230 350 525 700 20 0.05 TITUS TMS ALL

S4-D

SUPPLY - SLOT

DIFFUSER/PLENUM

CEILING

48"L, SINGLE 1"

SLOT

100 275 315 -1 -1 25 0.15 TITUS FL ALL

S6-A SUPPLY - REGISTER WALL 18"WX6"H 130 240 360 540 725 20 0.05 TITUS 300FL ALL

SCHEDULE REMARKS:

1. UNIT IS EXISTING TO REMAIN.

DATA SHOWN IS FROM

EQUIPMENT SUBMITTAL

PROVIDED BY THE VHA AND IS

PRESENTED FOR REFERENCE

AND TAB/CONTROLS

COORDINATION PURPOSES

ONLY.

A. FOR ALL SCHEDULED EQUIPMENT, PROVIDE BASIS OF DESIGN OR APPROVED

EQUAL. REFER TO SPECIFICATIONS 01 33 23 AND 23 05 11 FOR FURTHER

REQUIREMENTS.

B. SELECT EQUIPMENT FOR SCHEDULED PERFORMANCE AT 3700 FT ELEVATION.

SCHEDULE REMARKS:

1. REFER ALSO TO SPECIFICATION

23 36 00.

2. REPROGRAM AND REUSE

EXISTING TERMINAL UNIT OF

MATCHING SIZE. REFER TO MD

SHEET SERIES. VERIFY SIZE IN

FIELD.

SCHEDULE REMARKS:

1. REFER ALSO TO SPECIFICATION

23 34 00.

2. PROVIDE INTAKE PLENUM FOR

HORIZONTAL DUCT

CONNECTION.

3. PROVIDE HEPA FILTER AT

DISCHARGE.

4. SPARK RESISTANT

CONSTRUCTION.

5. PROVIDE VFD WITH BYPASS.

6. DO NOT ORDER UNTIL

ACCOMPANYING HOOD IS

SUBMITTED AND APPROVED.

7. PROVIDE WITH FLANGED CURB

AND HARDWARE FOR THRU-

WALL INSTALLATION.

SCHEDULE REMARKS:

1. REFER ALSO TO SPECIFICATION

23 37 00.

2. MATCH RUN-OUT TO NECK SIZE

UNLESS OTHERWISE TAGGED.

3. BLACK SHADED CELLS INDICATE

NECK SIZES NOT APPLICABLE TO

GIVEN AIR DEVICE.

EXISTING AIR HANDLING UNIT (AHU) SCHEDULE

MARK LOCATION

AREA AND/OR

BLDG SERVED

SUPPLY

AIRFLOW

(CFM)

OUTSIDE

AIRFLOW

(CFM)

PRE-

FILTER

AFTER-

FILTER

HEAT

RECOVERY

PREHEAT

COIL

COOLING

COIL

REHEAT

COIL HUMIDIFIER REMARKS

(E)

28-AHU5

MECH RM

LAB 14,750 14,750 YES NO NO

HW 1,077 MBH; 73 GPM

140°F-110°F WATERSIDE;

14,750 CFM 7°F-67°F AIRSIDE

CHW 871 MBH; 124 GPM 45°F-59°F

WATERSIDE; 14,750 CFM

97°F/71°F-51°F/51°F AIRSIDE

NO

MPS 257

LB/HR

REFRIGERATION UNIT (RU) SCHEDULE

MARK TYPE LOCATION

AREA AND/OR

BLDG SERVED

SUCTION

TEMP

(°F)

AMBIENT

AIR/ROOM

DESIGN TEMP

(°F)

CAPACITY

(MBH)

MAX

CONDENSING

TEMP (°F)

SUPPLY

AIRFLOW

(CFM)

SINGLE POINT POWER

BOD MFGR &

MODEL REMARKSVAC/PH MCA MOCP

28-RU-I-1

INDOOR UNIT - WALL

MOUNT UNIT COOLER

2255C

2255C REFRIG

STORAGE

15 36 12 - 1,300 120/1 2 15

CHANDLER

RLC

28-RU-O-1

OUTDOOR UNIT - AIR

COOLED CONDENSER

BLDG 28

ROOF

28-RIU-2255C 15 105 12 110 - 480 7.1 15

EMERSON

FFAP

1,2,3

SCHEDULE REMARKS:

1. REFER ALSO TO SPECIFICATION

13 21 29.

2. PROVIDE DUPLEXED

REDUNDANT COMPRESSORS.

3. PROVIDE NEMA 3R 30A/3P 600V

DISCONNECT FACTORY

MOUNTED ON UNIT.

0 100% FINAL BID DOCUMENTS 02/03/2022

1 ADDENDUM 1 07/14/2022

SCHEDULE REMARKS:

1. ONLY EQUIPMENT REQUIRING

MECHANICAL PROVISIONS ARE

SCHEDULED HERE. REFER TO

ARCHITECTURAL FOR DETAILED

EQUIPMENT REQUIREMENTS AND

FOR REMAINING EQUIPMENT

DESCRIPTIONS. BALANCE

EXHAUST DUCT DROPS TO

EQUIPMENT TO TOTAL SCHEDULED

CFM. CONFIRM WITH FINAL

INSTALLED EQUIPMENT. PROVIDE

MANUFACTURER APPROVED

ADAPTER FOR CONNECTION TO

MACHINE PORT.

LAB EQUIPMENT MECHANICAL CONNECTION SCHEDULE

EQUIPMENT

MARK DESCRIPTION BASIS OF DESIGN

EXHAUST

CFM REMARKS

80 BIO SAFETY CABINET (HOOD) REF 11 53 53 775 1

90 FUME HOOD WITH CUP SINK REF 11 53 13 775 1

108 GROSSING STATION (E) MOPEC 500 1

110 COVER SLIPPER (E) TISSUE-TEK FILM-A1 30 1

SOUND ATTENUATING DEVICE (SAD) SCHEDULE

MARK LOCATION

SYSTEM

AND/OR

SERVICE TYPE

AIRFLOW

(CFM)

MAX APD

(IN WG)

INLET

SIZE

(IN)

LENGTH

(IN)

OCTAVE BAND DYNAMIC INSERTION LOSS (DB)

REMARKS63 125 250 500 1000 2000 4000 8000

28-SAD-5-4 2236 28-TU-5-4 PACKLESS - ROUND 1200 0.10 12 36 11 8 15 72 14 11 9 7 1

SCHEDULE REMARKS:

1. REFER ALSO TO SPECIFICATION

23 31 00.

M NO

TTTT MT

M

NO

V F

D

PR

SF

C H

W

M

NC

M

NO

H W

LP

S

H U

M

AFMD

MT TT

MT TT

PDT

AF

TE

R-

FI

LT

ER

V F

D

PR

EF AFMD

PDT

PR

E-

FI

LT

ER

PSH PT

OA SA

EA RA

TT TT

M NO TT

M

NO

T

H

WSA SA

AFMD

P&ID CONTROL POINT LEGEND

XXXX

XXXX

POINT ID (REFERENCE POINT LIST). '#'

INDICATES TYPICAL OF SEVERAL AS

SHOWN 'SIM' IN P&ID.

DEVICE MARK (REF CONTROL

DEVICE SCHEDULE). '---' DENOTES

DEVICE OR EQUIPMENT BY OTHERS

IN SCOPE OF GENERAL CONTRACT.

CONTROL DEVICE (SHADED

INDICATES BY BASC)

CONTROL

POINT/CONNECTION

(HARDWIRED OR NETWORK,

REF POINT LIST)

GENERAL/GLOBAL

CONTROL POINTS

FA.ST

BASD-01D

ZN.T.CLR

PTS.ST

BASD-05

DPR.OA

BASD-10B

PHT.ET

BASD-54

CV.CC

SF.ST

SF.SPD

BASD-A

SF.SS

BASD-09A

SA.RH

BASD-10A

SA.T

BASD-54

CV.HUM

BASD-13B

SA.FL

BASD-54

CV.PHT

BASD-09A

RA.RH

BASD-10A

RA.ET

BASD-09A

OA.RH

BASD-10A

OA.T

BASD-12B

SA.P.LMT

BASD-12A

SA.SP

BASD-11

FPD.SA

EF.ST

EF.SPD

BASD-A

EF.SS

BASD-13B

RA.FL

1. UPDATE EXISTING SEQUENCE OF OPERATION AS

FOLLOWS:

2. UNIT SHALL BE IN "OCCUPIED" MODE BASED ON AN

OPERATOR DEFINED SCHEDULE OR LOCAL ZONE

OVERRIDE SIGNAL. OTHERWISE THE UNIT SHALL BE IN

"UNOCCUPIED" MODE.

3. BUILDING FIRE ALARM OR OTHER SAFETY SIGNAL SHALL

SHUT DOWN THE UNIT IN OVERRIDE OF THE BAS.

4. WHEN IN OCCUPIED MODE:

A. INITIALIZATION:

a. OUTSIDE AIR (OA) DAMPER SHALL OPEN.

b. SUPPLY AIR (SA) FAN SHALL ENERGIZE.

c. RA FAN SHALL ENERGIZE.

B. SETPOINT CONTROL:

a. ACTIVE DUCT REMOTE STATIC PRESSURE

SETPOINT SHALL BE MODULATED BETWEEN 2.0

AND 3.0 IN WG* TO MAINTAIN THE MOST OPEN

TERMINAL UNIT (TU) DAMPER AT 95% OPEN.

b. ACTIVE SUPPLY AIR TEMPERATURE (SAT)

SETPOINT: SAT SETPOINT SHALL BE MODULATED

FROM 52°F* TO THE ACTIVE UPPER SAT LIMIT TO

MAINTAIN HIGHEST TU CFM AT 50%* OF DESIGN

FLOW (OR 110% OF MINIMUM FLOW, WHICHEVER

IS HIGHER). ACTIVE UPPER SAT LIMIT SHALL BE

RESET FROM 55°F* TO 70°F* AS OA DEWPOINT

VARIES FROM 57°F* TO 55°F*.

c. THE RA CFM SETPOINT SHALL BE EQUAL TO 110%*

OF THE ACTIVE MEASURED SA CFM, LESS THE

ACTIVE EF25 CFM.

C. CONTROL OUTPUTS:

a. SA FAN CONTROL: MODULATE FAN SPEED TO

MAINTAIN THE ACTIVE DUCT REMOTE STATIC

PRESSURE SETPOINT.

b. RA FAN CONTROL: MODULATE FAN SPEED TO

MAINTAIN THE ACTIVE RA CFM SETPOINT.

c. CHILLED WATER (CHW) CONTROL VALVE:

MODULATE TO MAINTAIN SAT AT THE ACTIVE SAT

SETPOINT.

d. HEATING HW VALVE: MODULATE TO MAINTAIN SAT

AT THE ACTIVE SAT SETPOINT, MINUS 5°F*.

e. HUMIDIFIER STEAM VALVE: MODULATE TO

MAINTAIN RA RELATIVE HUMIDITY AT 40%*.

5. WHEN IN UNOCCUPIED MODE:

A. FANS SHALL DE-ENERGIZE.

B. COOLING COIL, HEATING COIL, OA DAMPER, AND EA

DAMPER SHALL FULL CLOSE.

C. IF ANY ZONE TEMPERATURE FALLS BELOW

UNOCCUPIED SETBACK TEMPERATURE OF 55°F* OR

ABOVE UNOCCUPIED SETUP TEMPERATURE OF 85°F*,

ENABLE AHU AND CONTROL AS IN OCCUPIED MODE

EXCEPT THAT:

a. ZONE SETPOINTS SHALL BE SETBACK AND SETUP

TEMPERATURES ABOVE.

6. ALARMS AND SAFETIES:

A. RETAIN EXISTING ALARMS AND SAFETIES WITH

ADDITION OF THE FOLLOWING.

B. SEND ALARM UPON DUCT HIGH PRESSURE LIMIT TRIP.

*-INDICATES SETPOINT TO BE ADJUSTABLE.

SEQUENCE OF OPERATIONS PROCESS & INSTRUMENTATION

DIAGRAM (P&ID)

BASD-11

FPD.OA

BASD-10B

CC.ET

BASD-10B

CC.LT

HALFTONE INDICATES

EXISTING TO REMAIN, TYP

BLACK INDICATES NEW

ADDED DEVICES, TYP

PER NFPA45, ENSURE FIRE DETECTION

AND ALARM SYSTEMS ARE NOT

INTERLOCKED TO AUTOMATICALLY

SHUT DOWN LABORATORY EXHAUST

FANS.

ENSURE OA DAMPER OVERRIDES TO OPEN IF FA

IS TRIPPED IN ORDER TO PROVIDE INTAKE PATH

FOR CONTINUED LAB EXHAUST AS REQUIRED

BY NFPA45

BASD-05

DPR.TU

BASD-54

CV.TU.RH

BASD-01A

ZN.T

ZN.ADJ

ZN.OVRD

BASD-10A

TU.T

TU.FL

1. UNIT SHALL BE IN "OCCUPIED" MODE BASED ON AN OPERATOR

DEFINED SCHEDULE OR LOCAL ZONE OVERRIDE SIGNAL.

OTHERWISE THE UNIT SHALL BE IN "UNOCCUPIED" MODE.

2. WHEN IN OCCUPIED MODE:

A. INITIALIZATION: TERMINAL UNIT (TU) DAMPER SHALL OPEN

TO MINIMUM POSITION AS PRESET IN THE CONTROLLER

PER THE EQUIPMENT SCHEDULE.

B. SETPOINT CONTROL:

a. ACTIVE ZONE COOLING TEMPERATURE SETPOINT:

COMPUTE FROM A BASE SETPOINT OF 75°F* ± UP TO 5°

F* BASED ON LOCAL THERMOSTAT ADJUSTMENT IN

APPLICABLE SPACES.

b. ACTIVE ZONE HEATING TEMPERATURE SETPOINT:

COMPUTE FROM ACTIVE COOLING SETPOINT MINUS 5°F*

DEADBAND.

c. COOLING DEMAND %: COMPUTE BASED ON PID

RESPONSE TO THE ACTIVE ZONE COOLING SETPOINT

AND THE ZONE TEMPERATURE.

d. HEATING DEMAND %: COMPUTE BASED ON PID

RESPONSE TO THE ACTIVE ZONE HEATING SETPOINT

AND THE ZONE TEMPERATURE.

e. ACTIVE CFM SETPOINT: RESET BETWEEN SCHEDULED

MINIMUM AND DESIGN CFM AS COOLING DEMAND

VARIES FROM 0%-100%.

C. CONTROL OUTPUTS:

a. PRIMARY AIR DAMPER: MODULATE TO MAINTAIN THE

PRIMARY AIR CFM AT THE ACTIVE CFM SETPOINT.

b. HEATING WATER (HW) VALVE: MODULATE EQUAL TO THE

HEATING DEMAND %.

3. WHEN IN UNOCCUPIED MODE:

A. DAMPER SHALL CLOSE TO 10%* OPEN POSITION TO AVOID

AHU DEAD-HEAD AT START-UP.

B. HW SHALL FULL CLOSE.

C. IF ZONE TEMPERATURE FALLS BELOW UNOCCUPIED

SETBACK TEMPERATURE OF 60°F* OR ABOVE UNOCCUPIED

SETUP TEMPERATURE OF 80°F*, ENABLE TU AND CONTROL

AS IN OCCUPIED MODE EXCEPT THAT ZONE SETPOINTS

SHALL BE SETBACK AND SETUP TEMPERATURES ABOVE.

*-INDICATES SETPOINT TO BE ADJUSTABLE.

SEQUENCE OF OPERATIONS PROCESS & INSTRUMENTATION

DIAGRAM (P&ID)

BASD-01A

ZN.T

Drawing Title

VA FORM 08 - 6231

F

CONSULTANTS:

750 W HAMPDEN AVE

SUITE 300

ENGLEWOOD, CO 80110

(720) 550-6307

WWW.VALHALLAENGINEERING.COM

NOT FOR

CONSTRUCTION

Date:Revisions:

10987654321

10987654321

E

D

C

B

A

F

E

D

C

B

A

ARCHITECT/ENGINEERS: STAMP:

Approved: Project Director

Phase Project Title

Location

Issue Date Checked Drawn

Project Number

Drawing Number

Building Number

Number:

C :\U se rs

\V . M

. E . 1

9\ D oc um en ts

\2 1.

_M

E C

H _P

LU

M

_R

_m bi bl e2

H X

D 7.

rv t

7/

/2

2:

:4

P

M

MI701

CONTROLS & INSTRUMENTATION

DETAILS

RENOVATE CLINICAL LAB FOR

MODERNIZATION

6010 W AMARILLO BLVD, AMARILLO, TX 79106

504-19-106

02/03/2022 MB RL

100% FINAL BID

DOCUMENTS

VEG 21.15

CONTROL DEVICE SCHEDULE

GENERAL NOTES:

A. REFER TO PROCESS &

INSTRUMENTATION

DIAGRAMS (P&IDs) AND

POINT LISTS FOR DEVICE

QUANTITIES AND

SCHEMATIC LOCATIONS.

B. REFER TO SPECIFICATION

23 09 23 FOR DETAILED

DEVICE REQUIREMENTS.

A. UNLESS OTHERWISE NOTED, REFER TO MECHANICAL EQUIPMENT

SCHEDULES FOR QUANTITIES OF EACH SYSTEM TYPE TO

RECEIVE CONTROLS.

B. "HARDWIRED" POINTS REQUIRE INDIVIDUAL PHYSICAL

CONNECTION FROM BAS CONTROLLER INPUT/OUTPUT

TERMINALS TO SENSORS, DEVICES, OR EQUIPMENT AS NOTED.

C. "NETWORK" POINTS ARE POINTS SENT TO OR RECEIVED FROM

EQUIPMENT FACTORY CONTROLS VIA BACNET, OR THE LIKE,

INTERFACE. COORDINATE WITH EQUIPMENT SUPPLIER

REQUIREMENTS FOR COMM GATEWAY TO INTERFACE WITH BAS

AS NECESSARY PRIOR TO BID. UNLESS OTHERWISE NOTED,

REQUISITE GATEWAYS SHALL BE FURNISHED WITH RESPECTIVE

EQUIPMENT BY EQUIPMENT MFGR.

D. NETWORK POINTS INDICATED AS BOTH READ AND WRITE IN

POINT LISTS SHALL BE NORMALLY CONTROLLED BY EQUIPMENT

FACTORY CONTROLS, BUT OVERRIDABLE FROM THE BAS.

E. BAS CONTRACTOR SHALL PROVIDE CONTROL DEVICES IN POINT

LISTS AND RESPECTIVE P&IDs, AND AS SCHEDULED ON CONTROL

DEVICE SCHEDULE AND SPECIFIED IN SPECIFICATION 23 09 23.

F. ALL I/O POINTS IN THE POINTS LIST(S), AS WELL AS ALL

SOFTWARE POINTS SUCH AS SETPOINTS AND ALARMS, SHALL BE

DISPLAYED AND OVERRIDABLE VIA THE BAS FRONT-END

GRAPHIC FOR THE EQUIPMENT.

G. "START/STOP" AS NOTED IN POINT LISTS HEREIN IS SYNONYMOUS

WITH "ENABLE/DISABLE". START/STOP COMMANDS FROM THE

BAS SHALL BE SUBJECT TO EQUIPMENT INTERNAL CHECKS AND

SAFETIES PRIOR TO PHYSICAL START OR STOP OF THE

RESPECTIVE EQUIPMENT.

BAS POINT LIST GENERAL NOTES

POINT LIST GENERAL NOTES:

REFER TO BAS POINT LIST

GENERAL NOTES ON SHEET

MI701.

POINT LIST FOOTNOTES:

REFER TO BAS POINT LIST

FOOTNOTES ON SHEET MI701.

BAS POINT LIST FOOTNOTES

GENERAL BAS SCHEDULES, NOTES, AND CONTROL POINTS1

1. REFER TO MECHANICAL PLANS FOR TSTAT LOCATIONS. MOUNT

48" AFF UNLESS OTHERWISE NOTED.

2. INSTALL SENSOR IN SPACE NEXT TO TSTAT.

3. INSTALL SENSOR ON EXTERIOR WALL. REFER TO MECHANICAL

PLANS FOR LOCATION.

4. INSTALL AT 2/3 OF MAIN DUCT RUN. LABEL CEILING GRID BELOW

PER SPECIFICATION 23 05 11.

5. DUAL REDUNDANT VFDs BY DIV 23 WITH REMOTE

PRIME/STANDBY SWITCHOVER SIGNAL CAPABILITY.

6. HARDWIRE TO FAN SAFETY CIRCUIT(S).

7. WIRE HUMIDIFIER VALVE POWER THROUGH NO SUPPLY AIR

MOISTURE HIGH-LIMIT SWITCH.

8. VFD SPEED % COMMAND SHALL BE PERCENT OF FULL DESIGN

HZ, AS DETERMINED DURING TAB AND SET AT THE DRIVE BY THE

BASC, AND MAY BE GREATER THAN OR LESS THAN 60 HZ.

9. NOTE NOT USED.

10. ENGAGE AND COORDINATE WITH FIRE ALARM CONTRACTOR TO

PROVIDE ALARM OUTPUT FROM BLDG FA SYSTEM FOR

MONITORING IN BAS. FIRE ALARM SIGNAL SHALL DISABLE ALL

AIR MOVING EQUIPMENT CONTROLLED BY THE BAS. DISPLAY

FIRE ALARM STATUS ON ALL EQUIPMENT GRAPHICS.

11. PROVIDE LCD READOUT OF AFMD AT THE HOOD AND LABEL

WITH ENGRAVED PHENOLIC NAMEPLATE PER SPECIFICATION 23

05 11.

GENERAL/GLOBAL AND MISCELLANEOUS BAS I/O POINT LIST

POINT DESCRIPTION

P&ID POINT

ID

HARDWIRED

CONTROLLER I/O's

NETWORK

POINTS

T R

E N

D

FOOT

NOTESDI DO AI AO R

E A

D

W R

IT

E

GLOBAL FIRE ALARM SIGNAL FA.ST ● 10

WALK-IN COOLER TEMPERATURE ZN.T.CLR ● ● 10

PNEUMATIC TUBE SYSTEM

STATUS

PTS.ST ● 10

(REF: P&IDs AND I/O POINT LISTS. BY BASC UNO.)

CONTROL DEVICE SCHEDULE

DEVICE

MARK DEVICE DESCRIPTION

BASD-01A

ZONE/SPACE TEMPERATURE SENSOR WITH LOCAL SETPOINT ADJUSTMENT

AND OCCUPANCY OVERRIDE

BASD-01D

LOW TEMP ZONE/SPACE TEMPERATURE SENSOR, MONITORING ONLY,

ACCURATE TO 0°F

BASD-05 CONTROL DAMPER & ACTUATOR

BASD-09A DUCT HUMIDITY SENSOR

BASD-10A DUCT AIR TEMPERATURE SENSOR

BASD-10B DUCT/COIL AIR AVERAGING TEMPERATURE SENSOR

BASD-11 AIR FILTER BANK DIFFERENTIAL PRESSURE TRANSMITTER

BASD-12A DUCT STATIC PRESSURE TRANSMITTER

BASD-12B DUCT PRESSURE HIGH LIMIT CUT-OUT SWITCH

BASD-13B AIRFLOW MEASURING DEVICE, ELECTRONIC THERMAL TYPE

BASD-14

ZONE/SPACE BI-DIRECTIONAL, THROUGH-THE-WALL DIFFERENTIAL

PRESSURE SENSOR

BASD-15 MAGNETIC CONTACT DOOR SWITCH

BASD-54 CONTROL VALVE & ACTUATOR

BASD-A PILOT RELAY/FRACTIONAL HP (1/3 OR SMALLER) MOTOR CONTACTOR

EXISTING AHU-52

POINT LIST GENERAL

NOTES:

REFER TO BAS POINT LIST

GENERAL NOTES ON SHEET

MI701.

POINT LIST FOOTNOTES:

REFER TO BAS POINT LIST

FOOTNOTES ON SHEET

MI701.

100% OA SDVAV CHW/STEAM AHU BAS I/O POINT LIST

POINT DESCRIPTION

P&ID POINT

ID

HARDWIRED

CONTROLLER I/O's

NETWORK

POINTS

T R

E N

D

FOOT

NOTESDI DO AI AO R

E A

D

W R

COOLING COIL ENTERING AIR TEMPERATURE CC.ET ● ●

COOLING COIL LEAVING AIR TEMPERATURE CC.LT ● ●

COOLING COIL CHW VALVE COMMAND (%) CV.CC ● ●

HUMIDIFIER STEAM VALVE COMMAND (%) CV.HUM ● ●

PRE-HEAT COIL HW VALVE COMMAND (%) CV.PHT ● ●

OUTSIDE AIR DAMPER COMMAND (%) DPR.OA ● ●

EXHAUST FAN VFD SPEED COMMAND (%) EF.SPD ● ●

EXHAUST FAN VFD START/STOP EF.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .