36C25722B0008 0002.docx

DOCX document 28 KB Posted

Attached to
Y1DA--674A4-20-110 Improve Fire Suppression System - Waco Federal contract opportunity
Solicitation number
36C25722B0008
Issued by
Department of Veterans Affairs

About this file

This document provides details for a federal construction contract opportunity to improve the fire suppression system at the Doris Miller VA Medical Center in Waco, Texas. The Department of Veterans Affairs intends to award a firm-fixed-price construction contract valued between $5-10 million to provide all labor, materials, and equipment for improvements to fire suppression systems in multiple buildings. The work includes general construction, alterations to fire suppression systems, installation of new sprinkler heads and components. The contract is set aside for Service-Disabled Veteran Owned Small Businesses. The solicitation is expected to be issued on October 15th, 2021 with bids due on November 15th, 2021 and work to be completed within 365 calendar days of the notice to proceed.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--674A4-20-110 Improve Fire Suppression System - Waco, newest first.
File Type Posted
Prebid Sign in Sheet.pdf PDF
36C25722B0008 0001.docx DOCX document
VA_WAC Fire Suppression - Bid Set Narrative.pdf PDF
674A4-20-110 Specs.pdf PDF
VA_WAC Fire Suppression - Bid Set Drawings.pdf PDF
36C25722B0008_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 67A4-20-110 Department of Veterans Affairs Central Texas Veterans HCS 2002 Scott Blvd.

Temple TX 76504 Department of Veterans Affairs Central Texas Veterans HCS 2002 Scott Blvd.

Temple TX 76504 To all Offerors/Bidders

36C25722B0008 12-10-2021

X X X

X Amendment #0002 is hereby issued to address the following:

A. To issue answered RFIs and attach the pre-bid sign in sheet.

B. All other terms and conditions remain unchanged.

RFI’s Construction: Improve Fire Suppression System - Waco, TX

1. Are the building elevators able to be used to transport materials to facilitate the work required under this requisition?

COR Response: Please follow the contract documents. Ref. 01 00 00 – 15 Para. 1.19.

1. What are the requirements regarding Fire Watch notification?

COR Response: Please follow the contract documents. Ref. 01 35 26 We will use the standard VA ILSM.

1. Who will be responsible for putting the Alarm System on test throughout the project? LAD Response: Ref 01 35 26 Follow the standard VA ILSM.

1. Are there reflected ceiling plans available for the buildings to know how to address the sprinkler installation? LAD Response: No

1. Buildings 4,93, and 90 have very limited access to the attic. Would it be acceptable to remove vent louvers/ cut in access doors and fly the pipe up with a crane?

COR Response: Yes, we can discuss options.

1. In building 90 the SOW ask to demo all fire sprinkler piping in the subbasement and replace with new. Should we consider the crawl spaces a part of the subbasement? LAD Response: No, do not include crawl space piping.

1. In building 7 the SOW ask to demo and replace all bulk piping in the subbasement. Does this include the wet sprinkler systems as well? LAD Response: The SOW is to replace all bulk piping for the dry attic systems.

1. Where will the power for the new nitrogen generator systems come from? Available breakers? LAD Response: Review electrical power plans for nearest electrical panel and verify capacity.

Network Contracting Office, NCO17 anticipates awarding a Firm-Fixed-Price construction contract for, Improve Fire Suppression System, Project No. 67A4-20-110, Doris Miller VA Medical Center, 4800 Memorial Drive, Waco, TX 76711.

The method of procurement shall be an Invitation for Bid (IFB) in accordance with the procedures set forth in Parts 14 and 36 of the Federal Acquisition Regulation (FAR), with an estimated issue date of October 15, 2021, and a projected bid due date of November 15, 2021.

Contractor shall provide all necessary labor, materials, equipment, and supervision to make improvements to the Fire Suppression System in building specified in the contract documents located at the Doris Miller VAMC, 4800 Memorial Drive, Waco, Texas 76504. The work shall be in accordance with the provided specifications and drawings. Work includes general construction, alterations, necessary improvements to the fire suppression system, fire suppression system components and sprinkler heads as identified in the construction drawings, and any associated repair construction and certain other items.

Project duration shall be 365 calendar days from issuance of the Notice to Proceed (NTP).

This requirement is a competitive offer, Set Aside 100% for Service-Disabled Veteran Owned Small Business (SDVOSB).

The applicable NAISC code is 236220, $39.5 Mil.

The magnitude of the construction estimated cost range: $5,000,000 - $10,000,000.

See attached document: Prebid Sign in Sheet.